64 OMNIA ANNUAL REPORT <strong>2010</strong> SUSTAINABILITY REPORT continued<br />

Audits<br />

The number of external and internal SHE audits steadily<br />

increased over the <strong>report</strong>ing period – an indication of greater<br />

participation in the IMS implemented and our commitment to<br />

continual improvement. Divisions schedule their own internal<br />

or external audits, with assistance from internal SHE resources<br />

as well as Group SHE for second-party audits.<br />

Other SHE initiatives during F<strong>2010</strong> include:<br />

� Routine medical surveillance tests continued according to<br />

schedule on all sites.<br />

� A water spraying system has been installed on the bulk<br />

ammonia storage facility at our liquid fertilizer production<br />

plant at Wesselsbron.<br />

� The construction of a new enclosed chlorine storage facility<br />

for the bulk storage of chlorine gas cylinders at Protea<br />

Chemicals Cape Killarney Gardens site has been completed.<br />

The commissioning of this facility will significantly reduce<br />

the risks associated with the storage of chlorine cylinders<br />

at the site.<br />

� Upgrade of acid repacking areas has been initiated.<br />

A number of containment measures have been installed,<br />

for example, additional bunds/channels in solvents areas<br />

and warehouses.<br />

� In terms of energy conservation, a co-generation project<br />

which involves the installation of a 1 920 kW Turbo-<br />

Generator was successfully commissioned at the Omnia<br />

Fertilizer factory in Sasolburg. The implementation of this<br />

project will result in a direct electricity saving of about<br />

10% at the Sasolburg site.<br />

Legal compliance<br />

Several initiatives to improve compliance with safety, health<br />

and environmental legislation at all divisions of the Omnia Group<br />

have been introduced during the period under review. Important<br />

initiatives implemented to improve the legal compliance of all<br />

facilities within the Group can be summarised as follows:<br />

� Omnia, through CAIA and Business Unity South Africa<br />

(BUSA), participated in various initiatives to assist with<br />

the formulation of:<br />

– The National Waste Act<br />

– Minimum emissions standards for point sources<br />

– Contaminated land in terms of the National Waste Act<br />

– A new national waste minimisation strategy<br />

– The new National Transport Act<br />

– NEMAQA-listed activities<br />

– EIA processes in terms of the National Waste Act<br />

– Air priority working groups<br />

– SANS standards relating to MHI, electrical issues, tanks<br />

standards and pressure vessels.<br />

� A project to evaluate legal compliance with the conditions<br />

of all applicable legal requirements, including authorisations<br />

and permits, was launched by the Group Engineering<br />

Projects and Services Department. Two audits in the<br />

Fertilizer division, four at the Protea Division, one at<br />

BME and three EIA environmental authorisations have<br />

been conducted.<br />

� Legal compliance assessments at our international sites are<br />

in process. A project plan, which sees all our international<br />

sites being evaluated over a three-year period, has been<br />

approved. As part of these assessments, contract<br />

management will also be included and compliance to local<br />

depots and warehouses will be extended beyond the current<br />

assessments. As part of our international compliance<br />

assessment, the current legal register will be extended to<br />

key international sites and smaller local sites.<br />

Public participation<br />

Attendance of the following environmental forums<br />

is ongoing:<br />

� Industry Forums<br />

– CAIA and Responsible Care ® workshops<br />

– Sasolburg Inter-company Response Meeting<br />

– NapCof<br />

– Institute of Safety Management<br />

� Environmental participation<br />

– Vaal Triangle Priority Area Air Meeting<br />

– Vaal Triangle Priority Area Air Technical Task Team<br />

– Leeu-Taaibosch Forum (and Technical Task Team),<br />

with one of our employees voted as chairperson for<br />

the LTF Forum<br />

– Sasolburg Rejuvenation Committee<br />

– Highveld Priority Area Air Quality Officer Forum<br />

and Multi-stakeholder Reference Group<br />

� Community Forums<br />

– Sasolburg Community Working Group<br />

– Local Security Forum