From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...
From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...
From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />
Releasable to ISAF<br />
CO-13355-OPL<br />
Part IV Statement of Work<br />
3.3.2.1. Section 1 of the PIP shall contain a Project overview, which shall provide an<br />
executive summary overview of the CCTV HQ ISAF, summarise the main<br />
features of each of the PIP sections, and indicate how the Project will be executed<br />
during the full lifetime of the Project.<br />
3.3.3. Applicable Documents<br />
3.3.3.1. Refer to section 1.8.2<br />
3.3.4. Project Management<br />
3.3.4.1. Section 3 of the PIP shall define the Contractor’s personnel structure and shall<br />
include:<br />
3.3.4.1.1. The management structure of the Contractor’s team;<br />
3.3.4.1.2. A list of Key Personnel assigned to the Contractor’s team and their respective<br />
roles, responsibilities and authority, as well as their qualifications, experiences and<br />
security clearances. The Contractor shall demonstrate that they have successfully<br />
implemented a project of similar scope in an operational environment supporting<br />
either N<strong>ATO</strong> or National Forces. The Contractor shall identify the similarities of<br />
the system design and support delivered under previous Contract(s) to the system<br />
required under this procurement.<br />
3.3.4.2. This Section shall also include the following:<br />
3.3.4.2.1. Details of how the Contractor intends to address his responsibilities as defined<br />
in paragraph 3.2.1;<br />
3.3.4.3. Details of the Contractor’s methodology for Project Control as defined in<br />
paragraph 3.5 below. This shall include all aspects of Project Control and shall<br />
demonstrate how all the critical dates will be met;<br />
3.3.4.4. Details of how the Project Reporting as identified in paragraph 3.5.1 below will be<br />
organised;<br />
3.3.4.5. Details of the Contractor’s Risk Management methodology as defined in<br />
paragraph 3.6 below;<br />
3.3.4.6. Details of the Contractor’s Issue Management approach as defined in paragraph<br />
3.7 below.<br />
3.3.4.7. The PIP shall identify all major Contractor operating units and any Sub-<br />
Contractors and Suppliers involved in the development of the CCTV HQ ISAF,<br />
and a description of the portion of the overall effort or deliverable item for which<br />
they are responsible.<br />
N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />
Releasable to ISAF<br />
17/104