N <strong>ATO</strong> <strong>UNC</strong> L A <strong>SSIF</strong> <strong>IE</strong> D<br />

Releasable to ISAF<br />

NA T O Cons ult a tion , Comm and and C o nt rol A gency<br />

A ge nce d e co nsu lt at ion , d e comm a ndeme nt et d e cont ra le de I' OTA N<br />

NC3A1ACQ/ASG/2012/431<br />

15May2012<br />

To:<br />

<strong>From</strong>:<br />

<strong>Subject</strong>:<br />

See Distribution List<br />

The General Manager, N<strong>ATO</strong> C3 Agency<br />

Invitation For Bid (IFB) CO 13355-0PL, Provide Enhanced Camp<br />

Surveillance System for HQ ISAF<br />

<strong>References</strong><br />

<strong>Dear</strong> <strong>Bidders</strong>,<br />

a)<br />

b)<br />

c)<br />

d)<br />

e)<br />

f)<br />

AC/4-DS(2011 )0031 dated 22 November 2011<br />

Serial2011 /5VA30641<br />

Decision Document AC/4(PP) D/26954<br />

AC/4-D(2011 )0009 -FINAL-AS1 dated 25 July 2011 , Non-Article<br />

5 N<strong>ATO</strong> Led Operations-NSIP Procurement Regulations<br />

Framework Document<br />

AC/4-D(2007)0003 Alliance Operations and Missions Procedure<br />

Invitation for Bid (IFB-CO-13355-0PL), dated 4 May 2012<br />

1. The purpose of this amendment is to provide Purchaser responses to <strong>Bidders</strong><br />

clarification requests and to amend the Statment of Work (Book II Part IV). The<br />

clarification responses are for information only and do not change the<br />

requirements of the Invitation for Bid (IFB). The N<strong>ATO</strong> C3 Agency responses are<br />

included in Attachment 1 under (T1 toT2). Annex I of the SOW is hereby<br />

amended to remove the paragraph at 1.1.4.1.8. The visualisation of monitors is<br />

now corrected referenced at Annex I.<br />

2. With respect to the Invitation for Bid (IFB) referenced above, please be informed<br />

that the Bid Closing Date as indicated in the Bidding Instructions, Paragraph<br />

2.3.1 , Bid Delivery and Bid Closing, is unchanged and remains 14:00 HOURS<br />

Central European Time on, Friday 8 June 2012, at which time and date bidding<br />

shall be closed .<br />

3. Please note that in accordance with Paragraph 2.9 of the Bidding Instructions -<br />

Modification and Withdrawal of Bids - <strong>Bidders</strong> who have submitted their Bid<br />

before receiving the notification of extension to the Bid Closing Date, have the<br />

right to modify or withdraw the Bid , as indicated therein. Except as provided<br />

herein, all other terms and conditions of the Bid documents remain unchanged.<br />

Cude Waalsdorperweg 61 , 2597 AK The Hague, (P.O. 8 0x 174 2501 CD). The Netherlands. Tel. + 31 (0)70 3743000, Fax. + 31 (0)70 3743239<br />

Boulevard Leopold III, 1110 Bruxelles. Belgique. Tel. + 32 (0)2 707 4111 or xxxx (4 digit ext.), Fax. + 32 (0)2 707 8770. NCN 255 )()()(X (4 digit ext.)<br />

NAT O<br />

<strong>UNC</strong><strong>LA</strong> S SIF <strong>IE</strong> D<br />

Releasable to ISAF<br />

I


N<strong>ATO</strong> UN C<strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to rSAF<br />

4. The Purchaser point of contact for all information concerning this Invitation For<br />

Bid is:<br />

Mr. Joseph L. Vitale (ACQ/ASG<br />

T: +32 (0)2 707 8321/8308<br />

F : +32 (0)2 707 8770<br />

E: joseph.vitale@nc3a.nato.int.<br />

FOR THE GENERAL MANAGER:<br />

oseph L Vitale<br />

ior Contracting Officer<br />

Attachement 1: Purchaser Clarifications<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

II


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

Distribution List for AMD 1 IFB-CO-13355-0PL<br />

Prospective <strong>Bidders</strong> (sent separately in electronic version)<br />

1<br />

N<strong>ATO</strong> Delegations (Attn: Infrastructure Adviser):<br />

Albania<br />

Belgium<br />

Bulgaria<br />

Canada<br />

Croatia<br />

Czech Republic<br />

Denmark<br />

Estonia<br />

France<br />

Germany<br />

Greece<br />

Hungary<br />

Iceland<br />

Italy<br />

Latvia<br />

Lithuania<br />

Luxembourg<br />

The Netherlands<br />

Norway<br />

Poland<br />

Portugal<br />

Romania<br />

Slovakia<br />

Slovenia<br />

Spain<br />

Turkey<br />

United Kingdom<br />

United States<br />

Belgian Ministry of Economic Affairs<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

III


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

Embassies in Brussels (Attn: Commercial Attache):<br />

Albania<br />

Bulgaria<br />

Canada<br />

Croatia<br />

Czech Republic<br />

Denmark<br />

Estonia<br />

France<br />

Germany<br />

Greece<br />

Hungary<br />

Italy<br />

Latvia<br />

Lithuania<br />

Luxembourg 1<br />

The Netherlands 1<br />

Norway 1<br />

~Iand 1<br />

Portugal 1<br />

Romania 1<br />

Slovakia 1<br />

Slovenia 1<br />

Spain 1<br />

Turkey 1<br />

United Kingdom 1<br />

United States electronic copy to brussels.office.box@mail.doc.gov 1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

N<strong>ATO</strong> HQ<br />

N<strong>ATO</strong> Office of Resources<br />

Management and Implementation Branch - NOR 1<br />

Director, N<strong>ATO</strong> HQ C3 Staff<br />

Attn: Executive Co-ordinator 1<br />

SACTREPEUR<br />

Attn: Infrastructure Assistant 1<br />

Strategic Commands<br />

ACT Attn: ACOS C41 1<br />

ACO Attn: ACOS J-6 1<br />

N<strong>ATO</strong> Agencies<br />

NCSA Attn: Documentation Ctr. 1<br />

NAMSA Attn: Communications and Calibration Programme 1<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

IV


NC3A -Internal Distribution<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

ACQ<br />

NLO (Mr C. Ulsh)<br />

ACQ/ASG PCO (Mr. P Chulick)<br />

ACQ/ASG CO (Mr. J Vitale)<br />

DOP<br />

CAT9 PM (U Cdr J. Williams)<br />

CAT9 PMO (Mr M. Brown)<br />

DOPIILS (Mr. R. Spijkerman)<br />

DSA<br />

CRO Programme Manager (Mr Tim Murphy)<br />

DSA/ACO (Mr. Erick Lesbaupin)<br />

Legal Office<br />

Legal Adviser (Mrs. S. Rocchi)<br />

Deputy General Manager<br />

Principle Administrative Assistant (Mrs. M.L Le Bourlot)<br />

Registry<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

NATEX<br />

Czech Republic<br />

Denmark<br />

France<br />

Hungary<br />

Germany<br />

Greece<br />

Italy<br />

The Netherlands<br />

Norway<br />

Poland<br />

Spain<br />

Turkey<br />

United Kingdom<br />

United States<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

V


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

VI


N A T O UN C L A S S I F I E D<br />

Releasable to ISAF I<br />

IFB-CO-13355-OPL Book I- Annex D<br />

INVITATION FOR BID<br />

IFB-CO-13355-OPL<br />

AMD 1<br />

Provide Enhanced Camp Surveillance System for HQ ISAF<br />

Purchaser Clarifications<br />

N A T O U N C L A S S I F I E D<br />

Releasable to ISAF<br />

Page D-1


N A T O UN C L A S S I F I E D<br />

Releasable to ISAF I<br />

IFB-CO-13355-OPL Book I- Annex D<br />

ADMINISTRATION or CONTRACTING<br />

Serial<br />

NR<br />

A.1<br />

IFB<br />

REF<br />

QUESTION ANSWER Status<br />

A.2<br />

A.3<br />

N A T O U N C L A S S I F I E D<br />

Releasable to ISAF<br />

Page D-2


N A T O UN C L A S S I F I E D<br />

Releasable to ISAF I<br />

IFB-CO-13355-OPL Book I- Annex D<br />

PRICE<br />

Serial<br />

NR<br />

P.1<br />

IFB<br />

REF<br />

QUESTION ANSWER Status<br />

P.2<br />

P.3<br />

N A T O U N C L A S S I F I E D<br />

Releasable to ISAF<br />

Page D-3


N A T O UN C L A S S I F I E D<br />

Releasable to ISAF I<br />

IFB-CO-13355-OPL Book I- Annex D<br />

TECHNICAL<br />

Serial<br />

NR<br />

IFB<br />

REF<br />

T.1 In Book II<br />

Part 4,<br />

Section 4.<br />

Technical<br />

requirements<br />

it states<br />

NetApps,<br />

Cisco<br />

specifically,<br />

T.2 In Book II<br />

Part 4,<br />

Section 5.<br />

Training:<br />

Listed here is<br />

NetApps,<br />

VMware,<br />

Symantecs,<br />

OnTap,<br />

RedHat and<br />

other<br />

software<br />

training.<br />

QUESTION ANSWER Status<br />

Unfortunately, this is written as a brand<br />

name NetApp requirement. This is clearly<br />

outlined in the SOW as they even list the<br />

exact parts numbers and quantities, is this<br />

NetApps Brand Name procurement Can a<br />

vendor bid another Hardware solution<br />

Are there any pre-requisites, i.e. equipment,<br />

manuals, security Clearances, number of<br />

participants, etc for this training<br />

N A T O U N C L A S S I F I E D<br />

Releasable to ISAF<br />

Page D-4<br />

4.5.2.5 And I.1.5.2.4 (technical annex) specifies<br />

CISCO or 3COM routers and switches if used within<br />

the proposed solution. These are the only brands<br />

currently authorized for use in ISAF as stated in the<br />

technical annex.<br />

The purchaser does not understand the bidder’s<br />

referral to the NetApp requirement. The only brand<br />

name requirements are for routers and switches.<br />

The system itself is N<strong>ATO</strong> Unclassified and therefore<br />

the training material is also N<strong>ATO</strong> unclassified. The<br />

contractor shall provide training on the operation and<br />

maintenance of the equipment and for only those<br />

software applications which are proposed for use.<br />

This shall be a windows based system that is<br />

complaint through MS Windows 7.<br />

There is no requirement for VMWARE, RedHat<br />

Linux, Symantec, or On Tap software mentioned<br />

within Book II Part 4. However, if these tools are to<br />

be used in the proposed design, then training must<br />

be provided.


N A T O UN C L A S S I F I E D<br />

Releasable to ISAF I<br />

IFB-CO-13355-OPL Book I- Annex D<br />

TECHNICAL<br />

Serial<br />

NR<br />

T.3<br />

IFB<br />

REF<br />

QUESTION ANSWER Status<br />

N A T O U N C L A S S I F I E D<br />

Releasable to ISAF<br />

Page D-5


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

PART IV<br />

PROVIDE ENHANCED CAMP SECURITY SURVEIL<strong>LA</strong>NCE<br />

SYSTEM - HEADQUARTERS INTERNATIONAL SECURITY<br />

ASSISTANCE FORCE (HQ ISAF)<br />

STATEMENT OF WORK (SOW)<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

DOCUMENT HISTORY<br />

Version Author Date Reason for Change Superseded<br />

Document<br />

0.1 Williams 1 st Draft -<br />

0.2 Williams 24/02/12 Spec Review Board<br />

0.1<br />

integration<br />

0.3 Janovszki 24/02/12 SOW ANNEX E & I<br />

0.2<br />

Modification<br />

0.4 Williams 12/03/12 ISAF Project Officers<br />

0.3<br />

comment incorporation<br />

0.5 Williams 11/05/12 Removal of overspecification<br />

artifacts<br />

0.4<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

TABLE OF CONTENTS<br />

SECTION 1: Introduction .................................................................................................. 4<br />

SECTION 2: Applicable documents ................................................................................ 10<br />

SECTION 3: Project Management .................................................................................. 13<br />

SECTION 4: System Design, Engineering and Implementation .................................. 26<br />

SECTION 5: Integrated Logistics Support (ILS)........................................................... 34<br />

SECTION 6: Quality Assurance and Control ................................................................ 52<br />

SECTION 7: Documentation ............................................................................................ 55<br />

SECTION 8: Testing and Acceptance ............................................................................. 59<br />

SECTION 9: List Of Sites ................................................................................................. 67<br />

Annex A: Acronyms ............................................................................................................... 69<br />

Annex B: Proposed camera location map HQ ISAF .......................................................... 72<br />

Annex C: Notional Equipment configuration diagram ...................................................... 74<br />

Annex D: Example ResiliEnt IP network plan for IP CCTV ............................................ 75<br />

ANNEX E General Equipment Description ........................................................................ 76<br />

Annex F: Approximate Dimensions of the HQ ISAF Compound ..................................... 77<br />

Annex G: Poles lighting standards ....................................................................................... 78<br />

Annex H: Poles painting standards ...................................................................................... 80<br />

Annex I: System Requirements Specification (SRS)........................................................... 81<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 1:<br />

INTRODUCTION<br />

1.1.Purpose<br />

1.1.1. The purpose of this Contract is to implement and support the Headquarters (HQ)<br />

International Security Assistance Force (ISAF) Kabul, Closed Circuit TV-based<br />

Ground Security Surveillance System, henceforth referred to as (CCTV HQ<br />

ISAF). This is a Requirements Contract for services and supplies to design,<br />

integrate, test, implement, and provide life-cycle support for the CCTV HQ ISAF<br />

system to meet an operational availability of 99.9% with regard to full camera<br />

coverage.<br />

1.2.Background<br />

1.2.1. The existing CCTV system at the HQ ISAF compound is rapidly approaching its<br />

end of life. An updated system that provides day and night vision for the<br />

perimeter and all points of entry is required.<br />

1.2.2. The contractor shall deliver the updated CCTV HQ ISAF system that meets the<br />

requirements specified within this IFB package to augment current force<br />

protection efforts.<br />

1.3.Contract Scope<br />

1.3.1. The Contract shall cover the design and implementation of CCTV HQ ISAF<br />

System. The CCTV HQ ISAF System shall provide adequate coverage of the<br />

exterior and all points of access to the HQ ISAF compound. Remote monitoring<br />

and control of the system shall be performed from the Base Defence Operations<br />

Centre (BDOC), hosted in the Base Support Group (BSG) HQ building. The<br />

Entry Control Point (ECP) shall be able to view and control cameras from the<br />

corresponding gate (e.g. Front Entry Control Point) from the guard house. When<br />

there is a conflict, the BDOC shall retain control.<br />

1.3.2. The implementation of CCTV HQ ISAF shall be followed by warranty and<br />

Contractor Support, for a 12 month period, effective from Final System<br />

Acceptance (FSA), with options to extend that support by further periods of 12,<br />

24, or 36 months.<br />

1.4.Roles<br />

1.4.1. The Contractor shall be aware of the roles played by the relevant stakeholders, as<br />

described below, and shall deliver the CCTV HQ ISAF System according to the<br />

Contract, through direct liaison with:<br />

1.4.1.1. The Purchaser (the N<strong>ATO</strong> Consultation, Command and Control Agency (NC3A));<br />

the NC3A is assigned as the Host Nation (HN) for the Project and is responsible<br />

for Project Management and technical matters (Project Manager, Technical<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

4/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

5/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

Manager), including delivery, information assurance (e.g. security accreditation<br />

process), acceptance from the Contractor (through FAST, PSA and FSA) handover<br />

to the end-users during PSA, and handover to the service provisioning authority<br />

during FSA.<br />

1.4.1.2. Following the formal handover from NC3A:<br />

1.4.1.2.1. The CCTV HQ ISAF System users will act as the 1 st level maintenance echelon<br />

for the System, in theatre, supported by HQ ISAF BSG staff at HQ ISAF (2 nd<br />

level), and the Contractor (3 rd level, at the factory, or in theatre)<br />

1.4.1.2.2. Any support activities, beyond the first year following FSA, are to be covered<br />

under NAMSA’s O&M framework. NAMSA will act as Service Provisioning<br />

Authority (SPA) for the CCTV HQ ISAF System, in theatre.<br />

1.5.General requirement<br />

1.5.1. The Contractor shall complete the work in accordance with Book II Part I:<br />

Schedule of Supply and Services (SSS).<br />

1.5.2. The CCTV HQ System will be installed within the confines of the HQ ISAF<br />

compound. Proposed locations for the installations and the approximate<br />

dimensions of the HQ ISAF compound are provided, for information purposes,<br />

and can be found at the following Annexes:<br />

1.5.2.1. Annex A: Acronym List<br />

1.5.2.2. Annex B: Proposed camera location map HQ ISAF<br />

1.5.2.3. Annex C: Notional Equipment Configuration Diagram<br />

1.5.2.4. Annex D: Resilient IP network plan for CCTV<br />

1.5.2.5. Annex E: General Equipment Description<br />

1.5.2.6. Annex F: Approximate Dimensions of the HQ ISAF Compound<br />

1.5.2.7. Annex G: Poles Lighting Standards<br />

1.5.2.8. Annex H: Poles Painting Standards<br />

1.5.2.9. Annex I: System Requirements Specification<br />

1.5.3. The Contractor shall be responsible for:<br />

1.5.3.1. Procurement<br />

1.5.3.2. Shipment to HQ ISAF with the exception of the leg between CLD Brunssum and<br />

Depot 26, Afghanistan.


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

1.5.3.3. Delivery<br />

1.5.3.4. Installation<br />

1.5.3.5. Testing of the CCTV System<br />

1.5.3.6. Training of HQ ISAF personnel<br />

1.5.3.7. Provision of One (1) year Contractor Logistic Support (CLS) and One (1) year<br />

warranty service.<br />

1.5.4. The Contractor shall perform a site survey within 4 weeks following Effective<br />

Date of Contract (EDC) with the Purchaser Project Manager (PM) or his in-theatre<br />

representative, to finalise implementation details. During the site survey the<br />

contractor shall validate and optimize the design to provide a cost effective<br />

resilient design that meets the Force Protection requirements.<br />

1.5.5. The Project Implementation Plan (PIP) shall include a listing of all requirements<br />

with their associated timelines and any dependencies or risks that must be<br />

mitigated by the Contractor or Purchaser PM.<br />

1.5.6. Civil Works.<br />

1.5.6.1. The contractor shall develop a civil works plan to include required ducting and/or<br />

trenching. The use of existing ducting and trenching shall be employed where<br />

possible. <strong>From</strong> the proposed camera locations, it is estimated an average run to<br />

interface with base utilities is approximately 10 meters for power and 50 meters<br />

for communications cabling.<br />

1.5.6.2. Civil works shall include any required trenching, ducting, cabling, earthing,<br />

interconnecting with base facilities and services, mounting, and laying of<br />

foundations. Civil works also involves providing the updates to schematics and<br />

diagrams for all work performed with “As Built documentation.”<br />

1.5.6.3. The BDOC is located in BSG HQ and is the primary control point for all security<br />

cameras for the CCTV HQ ISAF.<br />

1.5.6.4. Use of local Afghan labor is authorized. However, it is the sole responsibility of<br />

the contractor to provide cleared escorts at the ratio of 1 cleared escort for every 3<br />

uncleared contractors. “Cleared escort” refers to an individual in possession of a<br />

valid N<strong>ATO</strong> security clearance.<br />

1.5.7. The contractor shall ensure safe and resilient connections to the HQ ISAF power<br />

grid for all equipment requiring power. Base power shall be available from HQ<br />

ISAF. The contractor shall ensure that each camera is supported by an UPS and<br />

surge protection to maintain continuity of operations in the event of power<br />

disruption, spikes, or temporary loss.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

6/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

7/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

1.5.8. The contractor shall escort uncleared personnel engaged in work for this project.<br />

1.5.9. An Earth and grounding system shall be provisioned and provide effective<br />

protection for personnel and equipment. The cameras, masts, UPS, etc. shall be at<br />

the same equipotential plane by means of bonding.<br />

1.5.10. The masts, CCTV equipment, UPS and ancillary equipment shall be equipped with<br />

a lightning protection system. The equipment shall not be damaged and continue<br />

to operate without degradation when subjected to the standard lightening<br />

waveforms typical for the Kabul environmental conditions.<br />

1.5.11. Appropriate surge protection devices (SPD) shall be used to provide sufficient<br />

protection for the equipment and interfaces.<br />

1.5.12. It is the contractor’s responsibility to provide all necessary equipment and<br />

hardware to connect to the CCTV system<br />

1.5.13. The Contractor shall propose an engineering change based on the Site Survey<br />

Report (SSR) via the Purchaser PM. The PM shall bring all major deviations<br />

before the project board for approval.<br />

1.5.14. The Contractor shall be required to complete the installation work in accordance<br />

with the updated SSS as agreed upon by the Contractor and Purchaser PM.<br />

1.5.15. The Contractor shall identify to the Purchaser PM at least 2 weeks before a<br />

Contractor visit to HQ ISAF all on-site heavy machinery, logistics or other support<br />

required.<br />

1.5.16. The Contractor shall perform on-site commissioning and provide training to HQ<br />

ISAF Force Protection (FP) personnel.<br />

1.6.Other Requirements<br />

1.6.1. As an option the contractor shall provide additional Type I, Type II or Type III<br />

cameras, masts, and installation to support increased physical security<br />

requirements and base improvements.<br />

1.6.2. As an option the contractor shall provide an additional monitoring and control<br />

station to support additional HQ ISAF entry control points i.e. a possible rear entry<br />

control point.<br />

1.6.3. As an option the contractor shall integrate the existing CCTV system with the new<br />

system. Currently, no reuse of existing hardware (cameras, wiring, masts, et<br />

cetera) is anticipated.<br />

1.6.4. As an option the contractor shall provide an additional year(s) of Contractor<br />

Logistics Support (CLS). CLS shall include, but is not limited to: level three (3)<br />

maintenance where the level of support provided is defined as a maximum of two


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

(2) visits to HQ ISAF during the year, problem and modification analysis, complex<br />

repairs and/or replacements, detailed calibrations, supply support, overhaul and<br />

rebuild, implementation of major and/or critical changes, restoration (e.g.<br />

emergency maintenance) that requires specialised maintenance personnel and<br />

equipment, monitor and coordinate the transportation of faulty equipment out of<br />

theatre and replacement equipment back into theatre.<br />

1.7.Statement of Work<br />

1.7.1. The Statement of Work (SOW) is organised to follow the outline of activities to be<br />

conducted during the life of the CCTV HQ ISAF System project as follows:<br />

1.7.1.1. Applicable Documents, SECTION 2<br />

1.7.1.2. Project Management, SECTION 3:<br />

1.7.1.3. System Engineering, Integration, and Implementation, SECTION 4:<br />

1.7.1.4. Integrated Logistic Support (ILS), SECTION 5:<br />

1.7.1.5. Quality Assurance and Control, Documentation and Testing and Acceptance,<br />

SECTION 6: 7 and 8 respectively.<br />

1.7.1.6. Project Documentation, SECTION 7.<br />

1.7.1.7. A list of acronyms used in this SOW is provided for reference at Annex A:<br />

Acronyms.<br />

1.8.Standards for interpretation of the Statement of Work<br />

1.8.1. The Contractor shall note that, when the term in-theatre is quoted in this SOW,<br />

this refers to the HQ ISAF compound in Kabul, Afghanistan and KAIA,<br />

Afghanistan. Work by the Contractor in theatre is not envisaged at any other<br />

locations.<br />

1.8.2. The list of applicable and reference documents detailed in SECTION 2: includes<br />

a variety of Allied Publications and Military Standards (MIL-STDs). However, the<br />

following should be noted:<br />

1.8.2.1. While these are N<strong>ATO</strong> reference documents, there are national and international<br />

standards that are considered to be equivalent and are cited as such within these<br />

documents.<br />

1.8.2.2. Where there is a national or international standard which is not specifically<br />

referenced in the STANAGs, Allied Publications, or MIL-STDs as being<br />

equivalent, the Contractor may propose to utilise such a standard.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

8/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

1.8.2.3. The Purchaser, however, reserves the right to deny such a request and demand<br />

performance in accordance with the standard cited in the SOW.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

9/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 2:<br />

APPLICABLE DOCUMENTS<br />

2.1.Compliance Documents<br />

2.1.1. N<strong>ATO</strong><br />

2.1.1.1. Allied Quality Assurance Publications<br />

2.1.1.1.1. AQAP 110, N<strong>ATO</strong> Quality Assurance Requirements for Design, Development,<br />

and Production.<br />

2.1.1.1.2. AQAP 119, N<strong>ATO</strong> Guide to AQAPs -110, -120 and -130<br />

2.1.1.1.3. AQAP 130, N<strong>ATO</strong> Quality Assurance Requirements for Inspection and Test<br />

2.1.1.1.4. AQAP 150, N<strong>ATO</strong> Quality Assurance Requirements for Software Development.<br />

2.1.1.1.5. AQAP 159, Guidance for the Use of AQAP 150.<br />

2.1.1.2. Allied Configuration Management Publications<br />

2.1.1.2.1. ACMP 1, N<strong>ATO</strong> Requirements for the Preparation of Configuration Management<br />

Plans.<br />

2.1.1.2.2. ACMP 2, N<strong>ATO</strong> Requirements for Configuration Identification.<br />

2.1.1.2.3. ACMP 3, N<strong>ATO</strong> Requirements for Configuration Control--Engineering Changes,<br />

Deviations, and Waivers.<br />

2.1.1.2.4. ACMP 4, N<strong>ATO</strong> Requirements for Configuration Status Accounting.<br />

2.1.1.2.5. ACMP 5, N<strong>ATO</strong> Requirements for Configuration Audits.<br />

2.1.1.2.6. ACMP 6, N<strong>ATO</strong> Configuration Management Terms and Definitions.<br />

2.1.1.2.7. ACMP 7, N<strong>ATO</strong> Configuration Management Guidance on the Application of<br />

ACMPs 1 to 6.<br />

2.1.1.3. N<strong>ATO</strong> Standard<br />

2.1.1.3.1. STANAG 4107, Mutual Acceptance of Government Quality Assurance and Usage<br />

of the Allied Quality Assurance Publications.<br />

2.1.1.3.2. STANAG 4159, N<strong>ATO</strong> Materiel Configuration Management Policy and<br />

Procedures for Multinational Joint Projects.<br />

2.1.1.3.3. STANAG 6001, Language Proficiency Levels.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

10/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

2.1.1.3.4. N<strong>ATO</strong> Security Documents<br />

2.1.1.3.5. C-M(2002)49, Security within the North Atlantic Treaty Organisation.<br />

2.1.1.3.6. N<strong>ATO</strong> Security Committee and N<strong>ATO</strong> C3 Board – Primary Directive on<br />

INFOSEC.<br />

2.1.1.3.7. Review of the Nature and Extent of the Threats to, and Vulnerabilities of, CIS<br />

2.1.1.3.8. Guidelines for the Security Approval or Security Accreditation of CIS<br />

2.1.1.3.9. Guidelines for Security Risk Assessment and Risk Management of CIS<br />

2.1.1.3.10. Guidelines for the Development of Security Requirement Statements (SRSs)<br />

2.1.1.3.11. Guidelines for the Structure and Content of Security Operating Procedures<br />

(SecOPs) for CIS<br />

2.1.1.4. Other N<strong>ATO</strong> documents<br />

2.1.1.4.1. ACT Directive 75-10 Bi-SC Education and Individual Training Directive<br />

2.1.1.4.2. N<strong>ATO</strong> Interoperability Management Plan, Volume 2.<br />

2.1.1.4.3. AC/322 N<strong>ATO</strong> Architecture Framework V3.<br />

2.1.1.4.4. N<strong>ATO</strong> Bi-SC Directive 75-7 Education and Individual Training.<br />

2.1.2. Non-N<strong>ATO</strong><br />

2.1.2.1.1. RFC 1883, Internet Protocol, Version 6 (IPv6) Specification.<br />

2.1.2.1.2. RFC 791, Internet Protocol, Version 4 (IPv4) Specification.<br />

2.1.2.2. International Standards Organisation<br />

2.1.2.2.1. ISO/<strong>IE</strong>C 7810:1995 Identification cards -- Physical characteristics.<br />

2.1.2.2.2. ISO/<strong>IE</strong>C 7816-1:1998, Identification cards -- Integrated circuit(s) cards with<br />

contacts -- Part 1: Physical characteristics.<br />

2.1.2.2.3. ISO/<strong>IE</strong>C 7816-2:1999, Information technology -- Identification cards -- Integrated<br />

circuit(s) cards with contacts -- Part 2: Dimensions and location of the contacts.<br />

2.1.2.2.4. ISO/<strong>IE</strong>C 7816-3:1997, Information technology -- Identification cards -- Integrated<br />

circuit(s) cards with contacts -- Part 3: Electronic signals and transmission<br />

protocols.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

11/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

2.1.2.2.5. ISO/<strong>IE</strong>C 9126: Information Technology – Software Product Evaluation – Quality<br />

characteristics and guidelines for their use.<br />

2.1.2.2.6. ISO 9001:2008, Quality Management Systems: Requirements.<br />

2.1.2.2.7. MIL-STD-810 Department of Defense Test Method Standard for Environmental<br />

Engineering Considerations and Laboratory Tests.<br />

2.2.Reference Documents<br />

2.2.1. N<strong>ATO</strong><br />

2.2.1.1. AC/322(SC/5) N (2005)0005, dated 14 June 2005.<br />

2.2.1.2. AC/322 D/0030T.<br />

2.2.1.3. Terminology Clarification for Security Accreditation/Approval/Certification.<br />

2.2.1.4. AC/4-D/2261, dated 24 March 1998.<br />

2.2.1.5. N<strong>ATO</strong> International Competitive Bidding (ICB) procedures.<br />

2.2.1.6. AC/4-D (95)002-ADD3-REV1, dated 17 April 2003.<br />

2.2.1.7. N<strong>ATO</strong> Infrastructure Committee Urgent Requirements Procedures.<br />

2.2.1.8. Procedures Governing the Use of Basic Ordering Agreements (BOA(s)) by NC3A.<br />

2.2.1.9. AC/322-D(2009)0020-AS1.<br />

2.2.1.10. STANAG 2895 MMS – Climatic conditions<br />

2.2.1.11. Allied Environmental Conditions and Test Publication (AECTP) 200:<br />

Environmental conditions.<br />

2.2.1.12. AECTP-200 Allied Environmental Conditions and Test Publication<br />

2.2.2. Non-N<strong>ATO</strong><br />

2.2.2.1. ICAO Annex 14 Volume 1 Aerodrome design and operations Chapter 6.<br />

2.2.2.2. ICAO Doc 9157 Aerodrome Design Manual Part 4 Chapter 14.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

12/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 3:<br />

PROJECT MANAGEMENT<br />

3.1.Introduction<br />

3.1.1. This section outlines the Project Management Area for the CCTV HQ ISAF<br />

Contract.<br />

3.1.2. The success of the CCTV HQ ISAF System depends upon a sound project<br />

management approach. Full and open communication between the Contractor and<br />

the Purchaser is an essential element of this approach.<br />

3.1.3. A project cannot be risk-free. Problems will occur. The goal of the Contractor’s<br />

project management shall not be to eliminate problems, but to ensure that those<br />

that do occur are identified early, assessed accurately, and resolved quickly in<br />

partnership with the Purchaser.<br />

3.2.Organisation<br />

3.2.1. Purchaser Project Organisation and Responsibilities<br />

3.2.1.1. The Purchaser Project Manager (PM) will act as the Purchaser’s representative and<br />

will be the primary interface between the Contractor and Purchaser from the<br />

Effective Date of Contract (EDC).<br />

3.2.1.2. The Purchaser PM will be supported by specialists in certain areas who may, from<br />

time to time, be delegated to act on the PM’s behalf in their area of expertise.<br />

3.2.1.3. Neither the PM, the specialists, other team members, nor any other N<strong>ATO</strong><br />

personnel may make changes to the terms and conditions of the Contract but may<br />

only provide the Purchaser’s interpretation of technical matters.<br />

3.2.1.4. All changes to the Contract will be made through the Purchaser's contracting office<br />

only.<br />

3.2.1.5. The Purchaser PM, the specialists, and the key Stakeholders representatives<br />

collectively form the CCTV HQ ISAF Integrated Project Management Team<br />

(IPMT). The Project Executive chairs the CCTV HQ ISAF IPMT Project Board.<br />

3.2.1.6. The CCTV HQ ISAF IPMT serves as the primary mechanism for monitoring<br />

project status, resolving issues or conflicts within the project, and advising the<br />

Purchaser’s CCTV HQ ISAF PM.<br />

3.2.1.7. Provided that the Contractor has successfully discharged his duties under this<br />

contract and made available to the Purchaser the required capability, the Purchaser<br />

will accept from the Contractor the delivered capability and any associated<br />

equipment, services, and documentation.<br />

3.2.2. Contractor Project Management Office<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

13/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.2.2.1. The Contractor shall establish and maintain a Project Management Office (PMO)<br />

to perform and manage all efforts necessary to discharge all his responsibilities<br />

under this Contract. The Contractor shall describe their Project Management<br />

Office (PMO) by providing a comprehensive organisational chart detailing the<br />

specific roles, responsibilities and authority of each member of the Contractor’s<br />

Project Team.<br />

3.2.2.2. The Contractor shall provide a list of “Key Personnel” that are considered to be<br />

key to the performance of the Contract as defined in Section 26 of Book II, Part II<br />

(Contract Special Provisions). Key Personnel cannot be replaced without prior<br />

approval of the Purchaser and shall include at a minimum the Project Manager,<br />

Deputy Project Manager, Integrated Logistic Support Manager, and the Fielding<br />

and Support Manager (if different from the Project Manager) with functions as<br />

defined below. The Contractor shall quantify the qualifications and experience of<br />

the Key Personnel assigned to the Contract. The Contractor shall demonstrate that<br />

all Key Personnel have sufficient experience to complete the project. Curriculum<br />

Vitae shall be submitted for the Project Manager (PM). The PM must have a<br />

minimum of 2 years experience. A brief summary of the experience for all other<br />

key personnel shall be submitted.<br />

3.2.2.3. The Contractor shall also provide all necessary manpower and resources to<br />

conduct and support the management and administration of operations in order to<br />

meet the objectives of the program, including taking all reasonable steps to ensure<br />

continuity of personnel assigned to work on this project. The Contractor shall<br />

provide a narrative or organizational chart detailing all major Contractor operating<br />

units and any Sub-Contractors and Suppliers involved in the development of the<br />

CCTV HQ ISAF system and a description of the portion of the overall effort or<br />

deliverable items for which they are responsible to be included with the PIP at<br />

EDC + 2 weeks. This narrative must clearly demonstrate that the Contractor<br />

possesses the management capability to successfully control and coordinate the<br />

work of their subcontractors.<br />

3.2.2.4. Project Manager. The Contractor shall designate a suitably qualified Project<br />

Manager (PM), who will direct and co-ordinate the activities of the Contractor's<br />

project team. The Project Manager shall be the Contractor's primary contact for the<br />

Purchaser’s CCTV HQ ISAF PM and shall conduct all major project design, test,<br />

and review meetings.<br />

3.2.2.5. Technical Lead. The Contractor shall designate a suitably qualified Technical Lead<br />

for the Project. The Technical Lead shall lead the analysis, design, development,<br />

integration, and follow-on enhancement efforts of the Contractor.<br />

3.2.2.6. Test Director. The Contractor shall designate a suitably qualified individual to<br />

serve as the Test Director for all test activities conducted under this Contract. The<br />

Test Director shall report to a separate manager within the Contractor's<br />

organisation, at a level equivalent to or higher than the Project Manager.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

14/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.2.2.7. Quality Assurance Manager. The Contractor shall designate a suitably qualified<br />

individual to serve as the Quality Assurance Manager for activities under this<br />

Contract. The Quality Assurance Manager shall report to a separate manager<br />

within the Contractor's organisation, at a level equivalent to or higher than the<br />

Project Manager.<br />

3.2.2.8. Integrated Logistics Support Manager. The contractor shall designate a suitably<br />

qualified individual to serve as the lead for integrated logistics support. The ILS<br />

manager shall coordinate all transportation activities of materials to and from<br />

ISAF. The ILS manager shall report to the project manager.<br />

3.2.2.9. Fielding and Support Manager. The Contractor shall designate a suitably qualified<br />

individual to serve as the lead for implementation and operational support at the<br />

various facilities involved, including those in theatre.<br />

3.2.2.10. Training Manager. The Contractor shall designate a suitably qualified individual to<br />

serve as the training manager throughout the performance of the Contract, and<br />

across the designated training sites. The designated training sites are the Purchaser<br />

premises ISAF HQ in Kabul.<br />

3.2.2.11. Two or more of the roles above can be played by the same individual, in which<br />

case the Contractor shall provide proof that the required qualifications and<br />

availability requirements can be met to the Purchaser’s satisfaction, throughout the<br />

period of performance of the Contract.<br />

3.3.Project Planning<br />

3.3.1. Project Implementation Plan<br />

3.3.1.1. The Contractor shall provide a complete Project Implementation Plan (PIP), which<br />

shall describe how the Contractor will implement the totality of the Project,<br />

including details of the Project Controls that will be applied.<br />

3.3.1.2. The PIP shall cover all aspects of the project implementation including its<br />

management structure and project control processes, personnel assignments,<br />

external relationships and project control necessary to provide the capability<br />

required by this Contract.<br />

3.3.1.3. The PIP shall identify all major Contractor operating units and any Sub-<br />

Contractors involved in the development of the CCTV HQ ISAF and a description<br />

of the portion of the overall effort or deliverable item for which they are<br />

responsible.<br />

3.3.1.4. The PIP shall contain an organisational chart showing the members of the<br />

Contractor’s Project Team (including the members of the PMO listed in section<br />

3.2.2) and showing their respective responsibilities and authority.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

15/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.3.1.5. The PIP shall be sufficiently detailed to ensure that the Purchaser is able to assess<br />

the Contractor plans with insight into the Contractor’s plans, capabilities, and<br />

ability to satisfactorily implement the entire project in conformance with the<br />

requirements as specified in this SOW.<br />

3.3.1.6. The PIP shall follow the outline of this SOW, unless otherwise agreed by the<br />

Purchaser.<br />

3.3.1.7. The initial version of the PIP shall be provided to the Purchaser for review and<br />

acceptance within two (2) calendar weeks after Effective Date of Contract (EDC).<br />

The PIP shall be reviewed by the Purchaser no later than five (5) working days<br />

after receipt.<br />

3.3.1.8. Upon Purchaser Acceptance, the PIP shall be placed under the Purchaser’s CCTV<br />

HQ ISAF CCB.<br />

3.3.1.9. The acceptance of the PIP by the Purchaser signifies only that the Purchaser agrees<br />

to the Contractor’s approach in meeting the requirements. This acceptance in no<br />

way relieves the Contractor from its responsibilities to meet the requirements<br />

stated in this Contract.<br />

3.3.1.10. The Contractor shall ensure that the PIP remains current throughout the duration of<br />

the Project to reflect the actual state of the Contractor's organisation and efforts.<br />

3.3.1.11. The PIP shall follow the structure of this SOW, and include the sections listed and<br />

described here below:<br />

3.3.1.11.1. Section 1: Project Overview<br />

3.3.1.11.2. Section 2: Applicable Documents<br />

3.3.1.11.3. Section 3: Project Management<br />

3.3.1.11.4. Section 4: System Design, Engineering and Implementation<br />

3.3.1.11.5. Section 5: Integrated Logistics Support<br />

3.3.1.11.6. Section 6: Quality Assurance and Control<br />

3.3.1.11.7. Section 7: Documentation<br />

3.3.1.11.8. Section 8: Testing and Acceptance<br />

3.3.1.12. The PIP shall be updated throughout the Project, and be subject to review at each<br />

Project Review Meeting (PRM).<br />

3.3.2. Project Overview<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

16/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.3.2.1. Section 1 of the PIP shall contain a Project overview, which shall provide an<br />

executive summary overview of the CCTV HQ ISAF, summarise the main<br />

features of each of the PIP sections, and indicate how the Project will be executed<br />

during the full lifetime of the Project.<br />

3.3.3. Applicable Documents<br />

3.3.3.1. Refer to section 1.8.2<br />

3.3.4. Project Management<br />

3.3.4.1. Section 3 of the PIP shall define the Contractor’s personnel structure and shall<br />

include:<br />

3.3.4.1.1. The management structure of the Contractor’s team;<br />

3.3.4.1.2. A list of Key Personnel assigned to the Contractor’s team and their respective<br />

roles, responsibilities and authority, as well as their qualifications, experiences and<br />

security clearances. The Contractor shall demonstrate that they have successfully<br />

implemented a project of similar scope in an operational environment supporting<br />

either N<strong>ATO</strong> or National Forces. The Contractor shall identify the similarities of<br />

the system design and support delivered under previous Contract(s) to the system<br />

required under this procurement.<br />

3.3.4.2. This Section shall also include the following:<br />

3.3.4.2.1. Details of how the Contractor intends to address his responsibilities as defined<br />

in paragraph 3.2.1;<br />

3.3.4.3. Details of the Contractor’s methodology for Project Control as defined in<br />

paragraph 3.5 below. This shall include all aspects of Project Control and shall<br />

demonstrate how all the critical dates will be met;<br />

3.3.4.4. Details of how the Project Reporting as identified in paragraph 3.5.1 below will be<br />

organised;<br />

3.3.4.5. Details of the Contractor’s Risk Management methodology as defined in<br />

paragraph 3.6 below;<br />

3.3.4.6. Details of the Contractor’s Issue Management approach as defined in paragraph<br />

3.7 below.<br />

3.3.4.7. The PIP shall identify all major Contractor operating units and any Sub-<br />

Contractors and Suppliers involved in the development of the CCTV HQ ISAF,<br />

and a description of the portion of the overall effort or deliverable item for which<br />

they are responsible.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

17/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.3.5. System Design, Engineering and Implementation<br />

3.3.5.1. Section Four of the PIP shall cover the System Design, Engineering and<br />

Implementation aspects of the Project.<br />

3.3.5.2. The System Design, Engineering and Implementation section shall include all the<br />

areas as detailed in SECTION 4: of this SOW.<br />

3.3.5.3. Section Four (4) shall address all functional, performance and technical<br />

specifications in the SRS at Annex I of this SOW.<br />

3.3.6. Integrated Logistics Support<br />

3.3.6.1. Section Five of the PIP shall cover the Integrated Logistics Support (ILS) aspects<br />

of the Project.<br />

3.3.6.2. This Section shall detail the Contractor’s approach to meeting the ILS<br />

requirements presented at SECTION 5 of this SOW.<br />

3.3.7. Quality Assurance and Control<br />

3.3.7.1. Section Six (6) of the PIP shall cover the Quality Assurance and Control aspects of<br />

the Project detailed at SECTION 6 of this SOW.<br />

3.3.7.2. This Section shall include details of how the Contractor shall establish, execute,<br />

document, and maintain an effective Quality Assurance (QA) program, throughout<br />

the Contract lifetime.<br />

3.3.8. Documentation<br />

3.3.8.1. Section Seven (7) of the PIP shall describe the Contractor’s Documentation Plan<br />

for all of the deliverable documents, including details of when these shall be<br />

provided. The Documentation Plan shall include the details as described at Section<br />

7 of this SOW.<br />

3.3.9. Testing and Acceptance<br />

3.3.9.1. Section 8 of the PIP shall define the Contractor’s Test and Acceptance Plan, which<br />

shall include a description of the allocation of personnel and the time schedule to<br />

accomplish all the test and acceptance activities up to and including Final System<br />

Acceptance (FSA) as detailed at SECTION 8 of this SOW.<br />

3.4.Project Master Schedule<br />

3.4.1.1. The Contractor shall establish and maintain a Project Master Schedule (PMS) that<br />

contains all contract events and milestones. The Contractor shall describe their<br />

strategy for implementing the project schedule and the CCTV HQ ISAF capability<br />

as outlined in the Schedule of Supplies and Services by providing a Project<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

18/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

Management Schedule (PMS) in Microsoft Project format. For each task, the PMS<br />

shall be thorough and specifically identify the start and finish dates, duration,<br />

predecessors, constraints, and resources needed to complete the project in<br />

accordance with schedule. The PMS shall also provide network, milestone, and<br />

Gantt views and identify the critical path for the overall project.<br />

3.4.1.2. The PMS shall show all contractual deliverables, the work associated with them,<br />

and their delivery dates.<br />

3.4.1.3. The PMS shall not be cluttered with events or tasks internal to the Contractor,<br />

unless they are of major importance to the Project.<br />

3.4.1.4. The PMS shall also be traceable to performance and delivery requirements of this<br />

SOW. The PMS shall be linked to Contractor resources to enable assessment of<br />

changes to staff, facilities, event dates, and system requirements.<br />

3.4.1.5. The PMS shall clearly identify the critical path.<br />

3.4.1.6. The PMS shall be provided in Microsoft Project format. For each task, the PMS<br />

shall identify the start and finish dates, duration, predecessors, constraints, and<br />

resources. The PMS shall provide network, milestone, and Gantt views and<br />

identify the critical path for the overall project.<br />

3.4.1.7. The initial version of the PMS shall be provided to the Purchaser for acceptance.<br />

Upon Purchaser Acceptance, the PMS shall be placed under the Purchaser’s<br />

CCTV HQ ISAF CCB. The Purchaser PM, without consulting the other HQ ISAF<br />

CCB members, can approve changes to the PMS, provided they do not affect other<br />

baseline documents, or incur additional costs. Changes to the PMS do not change<br />

contractual delivery dates in the SSS.<br />

3.5.Project Controls<br />

3.5.1. Project Status Reports (PSR)<br />

3.5.1.1. The Contractor shall provide, no later than the third business day of each month, a<br />

Project Status Report (PSR)<br />

3.5.1.2. The PSR shall summarise activities, including:<br />

3.5.1.2.1. A summary of contract activities during the preceding month; including the status<br />

of current and pending activities;<br />

3.5.1.2.2. Progress of work and schedule status, highlighting any changes since the<br />

preceding report;<br />

3.5.1.2.3. Configuration Status Accounting (CSA) report, addressing all products in the<br />

Project Breakdown Structure;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

19/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.5.1.2.4. Description of any identified issues and high risk areas with proposed solutions<br />

and corrective actions;<br />

3.5.1.2.5. Test(s) conducted and results;<br />

3.5.1.2.6. Provisional financial status and predicted expenditures;<br />

3.5.1.2.7. Changes in key Contractor personnel;<br />

3.5.1.2.8. Summary of Change Requests requested or approve;<br />

3.5.1.2.9. Plans for activities during the following reporting period;<br />

3.5.1.2.10. Risk Log.<br />

3.5.1.3. The PSR, being a monthly document, shall be subject to the following specific<br />

review process:<br />

3.5.1.3.1. The Purchaser shall issue comments no later than one (1) week after receipt of the<br />

document;<br />

3.5.1.3.2. The Contractor shall issue answers to those comments within one (1) week after<br />

their receipt. No comment received within that timeframe means that the<br />

Contractor agrees to the comments issued by the Purchaser.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

20/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.5.2. Project Meetings<br />

3.5.2.1. General<br />

3.5.2.1.1. Except as otherwise stated in the Contract, the following provisions shall apply to<br />

all meetings to be held under the Contract.<br />

3.5.2.1.2. The Contractor shall take meeting minutes, submit them in draft version to the<br />

Purchaser for approval within three (3) working days of the meeting, post the final<br />

version of them on the Project portal within three (3) working days of receipt of<br />

Purchaser approval, and notify the Purchaser by email.<br />

3.5.2.1.3. The participants shall not regard these minutes as a mechanism to change the<br />

terms, conditions or specifications of the Contract, or as a vehicle to alter the<br />

design or configuration of equipment or systems. Any such changes shall only be<br />

made by agreement, amendment or by authorised mechanisms, as set forth in the<br />

Contract.<br />

3.5.2.1.4. Any documentation, even in draft format, that may be useful to the Purchaser in<br />

preparing for meetings and ensuring efficient discussions during the meetings shall<br />

be provided to the Purchaser no later than ten (10) working days before the<br />

meeting.<br />

3.5.2.2. Design Review Meetings<br />

3.5.2.2.1. The Contractor shall host the Design Reviews.<br />

3.5.2.2.2. In addition to the scope and requirements for Design Reviews as described in<br />

SECTION 4: related to contract line number (CLIN) 1.4 of the schedule of<br />

supplies and services the Contractor shall provide the following, if applicable, at<br />

all Design Reviews:<br />

3.5.2.2.2.1 Changes to the PMS;<br />

3.5.2.2.2.2 Risk assessment of proposed changes, and an update of the Risk Log and Issue<br />

Logs.<br />

3.5.2.3. Project Review Meetings<br />

3.5.2.3.1. The Contractor shall coordinate and hold Project Review Meetings (PRM) with<br />

the Purchaser.<br />

3.5.2.3.2. The PRM shall be held at least once a month, throughout the Contract period of<br />

performance.<br />

3.5.2.3.3. One (1) week before each PRM, the Contractor shall provide a Project Status<br />

Report (PSR), in accordance with paragraph 3.5.1.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

21/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

3.5.2.3.4. Problems shall be identified by the Contractor PM and discussed with the<br />

Purchaser PM promptly; not held until the next PRM.<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.5.2.3.5. The PRM shall be held, at the Purchaser’s discretion, either in Purchaser’s<br />

premises or via teleconference and, when possible, be scheduled with other project<br />

meetings.<br />

3.5.2.4. Other Meetings<br />

3.5.2.4.1. The Purchaser shall host all other meetings unless there is a specifically agreed<br />

need to review material, witness technical demonstrations, or perform any other<br />

activity outside of the Purchaser’s premises, as part of the meeting.<br />

3.5.2.4.2. The Contractor shall identify to the Purchaser’s PM any other meetings with<br />

N<strong>ATO</strong> personnel required to support this Contract.<br />

3.5.2.4.3. Upon approval by the Purchaser’s PM, the Contractor shall schedule, organise, and<br />

conduct such meetings.<br />

3.6.Risk Management<br />

3.6.1. The Contractor shall establish and maintain an overall Risk Management process<br />

for the project following a formal project management methodology. The<br />

preferred methodology is Projects in Controlled Environments 2 nd Revision<br />

(PRINCE2).<br />

3.6.2. This Risk Management process shall identify all risks (management, technical,<br />

schedule, and cost risks), evaluate each risk, and select a proposed response for<br />

each risk.<br />

3.6.3. Evaluating each risk shall result in the risk being rated as High, Medium, or Low,<br />

based on its probability and impact.<br />

3.6.4. For each risk, the proposed response shall be selected from the following list:<br />

3.6.4.1. Prevention: Terminate the risk - by doing things differently and thus removing the<br />

risk, where it is feasible to do so. Countermeasures are put in place that either stop<br />

the threat or problem from occurring or prevent it from having any impact on the<br />

project or business;<br />

3.6.4.2. Reduction: Treat the risk - take action to control it in some way where the action<br />

either reduce the likelihood of the risk developing or limit the impact on the<br />

project to acceptable levels;<br />

3.6.4.3. Acceptance: Tolerate the risk – e.g. if nothing can be done at a reasonable cost to<br />

mitigate it or the likelihood and impact of the risk occurring are at an acceptable<br />

level;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

22/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.6.4.4. Contingency: plan and organise actions to come into force as and when the risk<br />

occurs;<br />

3.6.4.5. Transference: Pass the management of the risk to a third party (e.g. insurance<br />

policy or penalty clause), such that the impact of the risk is no longer an issue for<br />

the health of the project;<br />

3.6.4.6. The Risk Management data shall be presented in a Risk Log.<br />

3.6.4.7. The Risk Log shall be a table listing the risks, and indicating for each one the<br />

following information:<br />

3.6.4.7.1. Risk identifier: unique code to allow grouping of all information on this risk;<br />

3.6.4.7.2. Description: brief description of the Risk;<br />

3.6.4.7.3. Risk category (e.g. commercial, legal, technical);<br />

3.6.4.7.4. Impact: effect on the Project if this risk were to occur;<br />

3.6.4.7.5. Probability: estimate of the likelihood of the risk occurring;<br />

3.6.4.7.6. Proximity: how close in time is the risk likely to occur;<br />

3.6.4.7.7. Countermeasure(s): what actions have been taken/will be taken to counter this risk;<br />

3.6.4.7.8. Owner: the individual responsible for monitoring, controlling and reporting on the<br />

risk;<br />

3.6.4.7.9. Author: the individual that submitted the risk;<br />

3.6.4.7.10. Date identified: when was the risk first identified;<br />

3.6.4.7.11. Date of last update: when was the status of this risk last checked;<br />

3.6.4.7.12. Status: e.g. dead, reducing, increasing, no change.<br />

3.7.Issue Management<br />

3.7.1. An issue is anything that could have an effect on the Project, either detrimental or<br />

beneficial (change request, problem, error, anomaly, risk occurring, query, and/or<br />

change in the Project environment).<br />

3.7.2. The purpose of the Issue Log is to record and track all issues and their status. The<br />

Issue Log shall be a table and shall comprise the following information:<br />

3.7.2.1. Project Issue Number;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

23/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.7.2.2. Project Issue Type (Request for change, Off-specification, general issue such as a<br />

question or a statement of concern);<br />

3.7.2.3. Author;<br />

3.7.2.4. Date identified;<br />

3.7.2.5. Date of last update;<br />

3.7.2.6. Description;<br />

3.7.2.7. Action item;<br />

3.7.2.8. Responsible (individual responsible for the resolution of the action item);<br />

3.7.2.9. Suspense date (Suspense date for the action item);<br />

3.7.2.10. Priority;<br />

3.7.2.11. Status.<br />

3.8.Project Portal<br />

3.8.1. The Purchaser will establish a N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D project portal for the<br />

Project.<br />

3.8.2. The Purchaser will implement an access control mechanism to restrict viewing of<br />

all contents of the portal to a list of users approved and administered by the<br />

Purchaser’s PM.<br />

3.8.3. The Contractor shall upload and maintain on this portal all unclassified CCTV HQ<br />

ISAF project documentation.<br />

3.8.4. The Contractor shall maintain on this portal the lists (databases) containing the<br />

Action Items Log, the Risk Log, and the Issue Log, associated to the Project. The<br />

databases shall follow the templates presented in paragraph 3.6 (Risk Log), and<br />

paragraph 3.7.2 (Issue Log).<br />

3.8.5. The portal shall allow any user to set various alerts in order to be notified (by e-<br />

mail) each time a specific document, a specific folder, or a specific record in a<br />

database, is modified.<br />

3.8.6. The portal shall include the Contract SOW and System Requirements<br />

Specification (SRS), all presentation material from all Design Reviews and other<br />

meetings, the draft and final (Purchaser-approved) minutes of any meetings, and<br />

all background, applicable, reference, and guidance documents referred to in the<br />

SOW and SRS.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

24/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.8.7. The portal shall include all vendor-provided technical documentation pertaining to<br />

any COTS components integrated in the CCTV HQ ISAF.<br />

3.8.8. The portal shall include other documents, as directed by the Contractor’s PM or<br />

the Purchaser’s PM.<br />

3.8.9. The portal shall identify all relevant classified documents by title, unless a title is<br />

itself classified.<br />

3.8.10. The portal shall clearly indicate for each document whether it is part of a baseline<br />

or not.<br />

3.8.11. After the FSA, the Contractor shall sanitise and replicate this portal to a public<br />

web server (outside the Purchaser’s facilities). The Contractor shall then keep the<br />

portal up to date, enable access by the users, or the Purchaser, through the 1-year<br />

of warranty, and during any subsequent (optional) Support extensions.<br />

3.8.12. N<strong>ATO</strong> RESTRICTED (NR) documentation shall not be permitted on the portal.<br />

Instead, transfers of such documentation will rely on optical storage support,<br />

postal mail, or on the use of dedicated NR laptops that can be leased from the<br />

purchaser.<br />

3.8.13. No N<strong>ATO</strong> SECRET or ISAF SECRET documentation relevant to the design,<br />

configuration, system documentation and training, is anticipated to be required<br />

during the execution of this Contract.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

25/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

SECTION 4: SYSTEM DESIGN, ENGINEERING AND<br />

IMPLEMENTATION<br />

4.1.General<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.1.1. This section outlines the System Design, Engineering and Implementation Area of<br />

the CCTV HQ ISAF Contract.<br />

4.1.2. The CCTV HQ ISAF shall largely comprise off-the-shelf products, whether<br />

commercially available or developed for other customers. However, there may be<br />

some modifications required to adapt these products to meet the CCTV HQ ISAF<br />

requirements.<br />

4.1.3. The CCTV HQ ISAF shall be a standalone system and is not expected to integrate<br />

with any existing N<strong>ATO</strong> systems. Future modifications or changes in the products<br />

and technologies employed in the CCTV HQ ISAF shall be anticipated and<br />

provided for through sound systems engineering practices. For these reasons, the<br />

Contractor shall be responsible for the overall design, development, integration,<br />

and system engineering of the CCTV HQ ISAF throughout the contract period of<br />

performance.<br />

4.1.4. The contractor shall fully complete the technical proposal cross reference matrix<br />

table per Book I of the Bidding Instruction.<br />

4.2.Environmental and Climatic Conditions<br />

4.2.1. In STANAG 2895 ‘Environmental conditions’, Kabul environmental conditions<br />

are described as: A3 (intermediate hot) in summer period and C0 (mild cold) in<br />

winter period. The system shall be fully operational under these conditions.<br />

4.2.2. All systems shall have a demonstrated capacity to operate under the following<br />

conditions without any signs of degradation as well as achieve the conditions for<br />

storage, transit and handling<br />

4.2.2.1. High Temperature: + 39° C for operation; + 58° C for transport, storage and<br />

handling.<br />

4.2.2.2. Low Temperature: - 19° C for operation; - 21° C for transport, storage and<br />

handling<br />

4.2.2.3. Temperature shock: 0.12 ° C/min for natural conditions during operation,<br />

transport, storage and handling. When moved from open environment into an<br />

acclimatised area, the equipment in the applicable storage/ transport packaging<br />

shall withstand the maximum expected temperature variation of 63 ° C.<br />

4.2.2.4. Solar radiation: 1120 W/m² for operation, transport, storage, handling and depot.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

26/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

27/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.2.2.5. Sun protection devices for the cameras shall be provided in support of the<br />

fulfilment of the STANAG 2895 related requirements (mainly A3 compliance).<br />

4.2.2.6. Humidity: 5 to 100% (saturation) for operation, transport and handling with the<br />

applicable change of temperature.<br />

4.2.2.7. Rain and water tightness (only applicable for outside components): The<br />

equipment shall have a high degree of water tightness when exposed to extended<br />

periods of rain and shall pass the following criteria:<br />

4.2.2.7.1. The wind velocity shall be applied during the 2 hour steady-state rain fall<br />

testing.<br />

4.2.2.7.2. Droplet sizes should not be smaller than approximately 0.5 mm.<br />

4.2.2.7.3. Extreme: Duration of 5 min at rate 14 mm/min.<br />

4.2.2.7.4. High: duration of 25 min at rate 8 mm/min<br />

4.2.2.7.5. Steady state: duration of 120 min at rate 1.7 mm/ min and wind velocity of<br />

18m/sec.<br />

4.2.2.8. Snow load:<br />

4.2.2.8.1. Large size equipment: 100 kg/m2 during operation, transport, storage and<br />

handling and depot.<br />

4.2.2.8.2. Smaller transportable equipment: 50 kg/m2 during operation, transport, storage<br />

and handling and depot.<br />

4.2.2.9. Ice with a specific gravity of 0.85:<br />

4.2.2.9.1. 13 mm for operation, transportation, storage and handling.<br />

4.2.2.10. Hail<br />

4.2.2.10.1. Hailstones of up to 25 mm diameter, 0.9 g/m3 density and 58 m/s terminal<br />

velocity during operation, transport, storage and handling and depot.<br />

4.2.2.11. Wind<br />

4.2.2.11.1. Norm: 22 m/s average and 39.6 m/s gustiness during operation, transport,<br />

storage and handling.<br />

4.2.2.12. Dust/sand particle size and concentration for external environment:<br />

4.2.2.12.1. Up to 2.0 g/m3 of 150µm particles for operation, transport, storage and<br />

handling. Sedimentation rate as high as 2.0 g/m2/day


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.2.2.12.2. Up to 1.0 g/m3 of 150µm particles for depot. Sedimentation rate as high as 2.0<br />

g/m2/day.<br />

4.2.2.12.3. Note: Average particle hardness of 7 in the Mohs scale, occasionally reaching<br />

9 on that scale.<br />

4.2.2.13. Max/min atmospheric pressure<br />

4.2.2.13.1. Norm: 1,087 to 503 mbar, for all conditions (operation, transport, storagehandling<br />

and depot.<br />

4.2.2.14. Acid atmosphere (Method 518) [MIL STD 810].<br />

4.2.2.14.1. The CCTV system outside units shall withstand, in the pertaining operating<br />

configuration (i.e. when properly mounted in the intended assembly),<br />

occasional exposure to the acid rainfall conditions existing in heavily<br />

industrialized areas or in the proximity of fuel burning machinery or vehicles<br />

exhaust systems.<br />

4.2.2.15. Contamination by fluids<br />

4.2.2.15.1. The equipment shall withstand occasional contamination by exposure to the<br />

contaminant fluids listed in table I, method 504 in [MILSTD 810, 2000].<br />

4.2.2.16. IP Rating<br />

4.2.2.16.1. IP65 (Protection against all dust penetration and against water jets from any<br />

direction) for outdoor enclosures, cables and connectors for operation.<br />

4.2.2.16.2. IP55 (Protection against internal dust accumulation and against splashing<br />

water from any direction) when in operation.<br />

4.2.2.17. Chemical/Fungus/ Salt fog (Corrosion) (Method 504/508/509) [MIL STD 810].<br />

4.2.2.18. UV Resistance (Method 505) [MIL STD 810].<br />

4.3.System Design Documentation Package<br />

4.3.1. The Contractor shall establish and maintain the CCTV HQ ISAF Design<br />

Documentation Package, comprising:<br />

4.3.1.1. System Design Specification (SDS), as per 4.3.3<br />

4.3.1.2. Requirements Traceability Matrix (RTM), as per 8.4<br />

4.3.2. and, if and where applicable:<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

28/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.3.2.1. Change Requests Document (CRD)<br />

4.3.2.2. Off-specifications Document (OSD)<br />

4.3.3. The SDS shall adhere to the requirements listed in the System Requirements<br />

Specification SRS of Annex I, and include the following information:<br />

4.3.3.1. Functional breakdown of the CCTV HQ ISAF, based on the Functional<br />

Requirements listed in the SRS;<br />

4.3.3.2. Physical breakdown of the CCTV HQ ISAF into hardware, software and firmware<br />

Configuration Items (CI), following the Technical Requirements listed in the SRS.<br />

The breakdown shall include the number of licenses for each software CI, with<br />

traceability to the functional breakdown above;<br />

4.3.3.3. Identification of COTS versus any developmental items;<br />

4.3.3.4. Configuration Status Accounting (CSA) Reports, addressing all system CIs;<br />

4.3.3.5. Description of the interworking of all components to meet the system level<br />

requirements (physical interfaces between components, existing network<br />

infrastructure);<br />

4.3.3.6. Deployment and Operation principles of the CCTV HQ ISAF: overview of the<br />

new system and how the operators will make use of the provided functionality, and<br />

how administrators will be able to monitor and control the system.<br />

4.3.3.7. The Contractor shall provide a list of major components and civil works activities<br />

required to implement the technical solution, in order for the Purchaser to<br />

determine that the equipment and civil work activities are fit for purpose.<br />

4.4.Site Survey<br />

4.5. A site survey shall be performed within 4 weeks of the effective date of contract<br />

(EDC) to confirm assumptions and mitigate risk.<br />

4.5.1. The Contractor shall provide the Purchaser PM with an electronic copy of the Site<br />

Survey Report (SSR) within One (1) week of the completion of the survey.<br />

4.5.2. The SSR shall contain:<br />

4.5.2.1. Confirmation of the physical locations of the masts and any cable runs.<br />

4.5.2.2. Copies of signed agreements with local Site Authorities<br />

<br />

<br />

Approval from BSG Commander<br />

Approval from ISAF J6<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

29/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

30/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.5.2.3. An assessment of the in-building requirements with proposed solutions, including<br />

relevant diagrams and analysis<br />

4.5.2.4. Optimized mast placement and camera type configuration. The Contractor shall<br />

determine the appropriate number of retractable masts, type of retractable mast<br />

systems, and camera types to achieve the required capability.<br />

4.5.2.5. The Contractor shall develop a stand alone CCTV architecture that can be easily<br />

expanded to support a minimum of twice (2x) the coverage capability without the<br />

exchange of server, router and switches, storage, and/or command and control<br />

software. Take note that there are 2 types of switches authorized for use in ISAF<br />

– CISCO and 3COM.<br />

4.5.2.6. The Contractor shall confirm the appropriate amount of civil works required and<br />

utilize the nearest cabling manhole or hand hole (smaller than a man hole) to<br />

patch into the existing infrastructure.<br />

4.5.2.7. The Contractor shall include a map of the grounds within the site survey report<br />

detailing the locations of required civil works, distance to both electrical power<br />

and communications man hole and hand hole locations, patch panel availability<br />

for specific ports, and recommended camera capability and placement.<br />

4.5.2.8. The Contractor shall specify the capabilities of the camera types that meet the<br />

requirements. Types I, II, and III are specified in this document. However, other<br />

camera types defined and if approved by NC3A, may be used to develop an<br />

inherently secure solution to meet requirement.<br />

4.5.2.9. The contractor shall validate and optimize the CCTV design to include network<br />

architecture that ensures a cost effective, efficient, resilient design that meets the<br />

requirements. The contractor shall submit the validated design as part of the<br />

preliminary design documentation.<br />

4.5.2.10. The Contractor shall identify all enablers and critical path to facilitate the project.<br />

4.6.System Design Reviews<br />

4.6.1. The Contractor shall deliver the Preliminary Design Documentation to the<br />

Purchaser within six (6) weeks of the Effective Date of Contract (EDC). The<br />

Contractor shall host and conduct a Preliminary Design Review (PDR) with the<br />

purchaser within eight (8) weeks of the EDC.<br />

4.6.1.1. The Contractor shall specify how redundancy is built into their proposed solution<br />

that shall notify the BDOC and affected ECP of camera outage while maintaining<br />

limited surveillance capability. Limited is defined as degraded capability that will<br />

continue to provide camera coverage until camera is repaired or replaced.<br />

4.6.1.2. The Contractor shall specify how the system can be connected to a network<br />

without major upgrade to proposed hardware and software. NOTE: Although the


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

system is designed as a stand alone network, it shall possess the capability within<br />

the technical control centre to interface with a standard IPv6 network to further<br />

centralize surveillance capability for future evolution of the CCTV network such<br />

as interconnection to archive data to an alternate location.<br />

4.6.2. During the Design Review, the Contractor shall cover the following topics:<br />

4.6.2.1. System Design, as presented in the System Design Documentation (SDD)<br />

package, including any change request or off-specification;<br />

4.6.2.2. Breakdown of the design into lowest-level CI;<br />

4.6.2.3. Recommended spare parts list (RSPL) and justification, provided as an availability<br />

analysis and assess the design in relation to RMA design as stated in section 5.3.2;<br />

4.6.2.4. List of off-the-shelf products to be used in the system: the Contractor shall identify<br />

the intended product and version, and note if any modifications, adaptations, or<br />

additional elements are required to meet the requirements set forth by the SRS. For<br />

any elements that require development, the Contractor shall describe the design,<br />

development, unit testing, and integration approach;<br />

4.6.2.5. Steps to mitigate any risks identified in the Risk Log;<br />

4.6.2.6. Draft Test Plan for FAT, PSA and Operational Test & Evaluation (OT&E).<br />

4.6.3. The duration of the review period of the CCTV HQ ISAF Design Documentation<br />

Package by the Purchaser shall be one (1) week, i.e. shall be finished within five<br />

(5) weeks of the EDC.<br />

4.6.4. A Critical Design Review (CDR) shall be conducted, if the changes requested after<br />

the first meeting require the Contractor to re-engineer the solution in any way at<br />

EDC +8 weeks.<br />

4.6.5. Purchaser review and acceptance of the SDD package shall not imply Purchaser<br />

acceptance of the CCTV HQ ISAF design. In particular:<br />

4.6.6. It remains the sole responsibility of the Contractor to prove the design through the<br />

regime of testing set forth in the Contract.<br />

4.6.7. It will be the sole responsibility of the Contractor in the event that the system<br />

proves deficient in meeting the Contractual requirements.<br />

4.6.8. As part of the Configuration Management (CM) activities, and like any other<br />

management product or specialist product, the Contractor shall update the SDD, in<br />

order to reflect changes, if any, at least at each of the following major milestones:<br />

4.6.8.1. Second Design Review, if required;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

31/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.6.8.2. Functional Testing in theatre;<br />

4.6.8.3. Provisional System Acceptance (PSA);<br />

4.6.8.4. Final System Acceptance (FSA) of the CCTV HQ ISAF in theatre.<br />

4.7.System Implementation<br />

4.7.1. General<br />

4.7.1.1. The implementation shall span over the following three stages:<br />

4.7.1.2. Stage 1<br />

4.7.1.2.1. Site Survey;<br />

4.7.1.2.2. Factory-based integration and testing (FAT), including testing of the upgrade<br />

components for the CCTV HQ ISAF;<br />

4.7.1.2.3. Preparation (packing, including the System Documentation), in preparation for the<br />

shipment to theatre;<br />

4.7.1.2.4. Shipment to B-CLD.<br />

4.7.1.3. Stage 2<br />

4.7.1.3.1. External/Internal installation of the CCTV HQ ISAF;<br />

4.7.1.3.2. Site and System Activation Testing (SSAT);<br />

4.7.1.3.3. OT&E of the CCTV HQ ISAF, after installation;<br />

4.7.1.3.4. Train-the-user training, in HQ ISAF, attended by ISAF J6, NAMSA, HQ ISAF FP<br />

Staff and HQ ISAF BSG staff<br />

4.7.1.3.5. PSA in HQ ISAF;<br />

4.7.1.3.6. Rectification of deficiencies encountered SSAT and OT&E;<br />

4.7.1.3.7. Final System Acceptance, FSA (in Brussels);<br />

4.7.1.4. Stage 3<br />

.<br />

4.7.1.4.1. 1-year warranty period (covered by the main Contract);<br />

4.7.1.4.2. 1-year Contractor Support (under warranty conditions);<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

32/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

4.7.1.4.3. Additional (yearly) Support, as an option to the main Contract.<br />

4.7.2. System Implementation Plan (SIP)<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.7.2.1. The implementation of the above three stages shall be outlined in the System<br />

Implementation Plan (SIP), which shall be part of the PIP.<br />

4.7.2.2. The SIP shall detail the following information:<br />

4.7.2.2.1. the Contractor's approach to all system implementation tasks, following the above<br />

three stages, and describing the activities at the various facilities involved (factory,<br />

and HQ ISAF);<br />

4.7.2.2.2. the overall schedule for the implementation activities (subset of the Project Master<br />

Schedule, PMS);<br />

4.7.2.2.3. the Contractor organisation and key personnel involved in the system<br />

implementation in theatre.<br />

4.7.2.3. System Implementation Facilities:<br />

4.7.2.4. The Purchaser will provide the Contractor with access to the facilities necessary to<br />

test and demonstrate the CCTV HQ ISAF at HQ ISAF:<br />

4.7.2.5. The Contractor shall bear the responsibility for the system's ownership (excluding<br />

PFE), operation, support, and performance verification, until the Technical<br />

Transfer to HQ ISAF BSG.<br />

4.7.2.6. The Purchaser reserves the right to suspend the Contractor's installation or testing<br />

work for up to five working days to avoid interfering with or disrupting a critical<br />

operational event. Only if this suspension exceeds five working days, an<br />

adjustment of the price can be submitted for consideration by the Purchaser, in<br />

connection with rescheduling efforts required on the Contractor’s side.<br />

4.7.2.7. During the implementation activities in theatre, should the Contractor receive any<br />

indication of a possible requirement for a suspension, this shall be made known<br />

immediately to the Purchaser.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

33/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 5:<br />

INTEGRATED LOGISTICS SUPPORT (ILS)<br />

5.1.General<br />

5.1.1. This section outlines the supportability requirements of the project. It addresses<br />

various Integrated Logistic Support (ILS) elements such as: maintenance, support<br />

services, spare parts provisioning, transportation, warranty and training.<br />

5.1.2. The NC3A/ILS PoC for all requests related to ILS is:<br />

N<strong>ATO</strong> C3 Agency<br />

Attn.: Mr. Ron Spijkerman<br />

ILS Officer at NC3A/DOP/ILS<br />

Ave. du Bourget 141<br />

B-1110 Brussels<br />

Belgium<br />

Tel: +32 (0)2 707 8578<br />

Fax: +32 (0)2 707 8770<br />

E-mail: ron.spijkerman@nc3a.nato.int<br />

5.1.3. The NC3A/ILS PoC for all requests related specifically to supply support,<br />

management and control of logistics movements, and warranty:<br />

N<strong>ATO</strong> C3 Agency<br />

Attn.: Mr. Jackie Robinson<br />

ILS Assistant at NC3A/DOP/ILS<br />

Ave. du Bourget 141<br />

B-1110 Brussels<br />

Belgium<br />

Tel: +32 (0)2 707 8498<br />

Fax: +32 (0)2 707 8770<br />

E-mail: jackie.robinson@nc3a.nato.int<br />

5.2.Support planning<br />

5.2.1. The Contractor shall develop and maintain the Integrated Logistics Support Plan<br />

(ILSP) that encapsulates all ILS Elements as defined below, covering the period<br />

starting from deployment to End of Life.<br />

5.2.2. The ILSP shall be structured as follows, but is not limited to:<br />

5.2.2.1. Introduction – The introduction shall cover scope and purpose of the ILSP, include<br />

appropriate references and definitions and include a detailed description of the<br />

products furnished under this Contract.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

34/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

35/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.2.2.2. Maintenance Concept - The Contractor shall describe the Maintenance Concept<br />

that defines the maintenance environment, constraints, locations, procedures,<br />

artefacts, organisation and personnel skills to maintain the products furnished<br />

under this Contract. The Maintenance Concept shall define the 3rd and 4th level<br />

maintenance tasks in accordance with the Maintenance and Support Concept<br />

section below.<br />

5.2.2.3. Support Concept - The Contractor shall describe the Support Concept showing<br />

how 1st, 2nd and 3rd level support services will be implemented and performed in<br />

accordance with the Maintenance and Support Concept section below.<br />

5.2.2.4. Supply Concept – The Contractor shall describe the Supply Concept that defines<br />

the procedures for the provisioning, procurement, and acquiring of spare/repair<br />

parts, inventories, and consumable material for the support of the products<br />

furnished under this Contract.<br />

5.2.2.5. Training - The Contractor shall describe how training is developed and performed<br />

during the Contract period.<br />

5.2.2.6. Configuration Management – The Contractor shall describe how configuration<br />

management is performed during the Contract period, and especially how the<br />

Contractor will maintain a Configuration Management Data Base (CMDB).<br />

5.3.Maintenance and Support<br />

5.3.1. Maintenance and Support Concept<br />

5.3.1.1. Level 1 maintenance tasks shall be defined and designed for on-site CCTV HQ<br />

ISAF users and operators and shall include, but are not limited to: day-to-day<br />

“housekeeping” tasks, visual inspections, verification of function and performance<br />

of the provided capabilities, change of configuration settings for adaptation to the<br />

operational environment or use, routine system operation, routine system<br />

administration, local user support, system monitoring, and system recovery.<br />

5.3.1.2. Level 1 support services entail, but are not limited to implementing the incident<br />

management process in accordance with the ISO/<strong>IE</strong>C 20000 and ITILv3<br />

framework or equivalent. As part of the incident management process, a service<br />

desk function shall be implemented.<br />

5.3.1.3. First level maintenance and support of the CCTV HQ ISAF will be provided by<br />

the user after training from the Contractor.<br />

5.3.1.4. Level 2 maintenance tasks shall be defined and designed for non-specialized<br />

military maintenance personnel, on-site or remote, and shall include, but are not<br />

limited to: detailed inspections, limited calibrations, replacement of items without<br />

specialized equipment or skillset, and minor equipment repairs and modifications,<br />

centralised system operation, centralised system administration, fault isolation,


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

system-wide performance monitoring and reporting, and in-depth technical<br />

assistance to level 1 support staff..<br />

5.3.1.5. Level 2 support services entail, but are not limited to implementing the problem<br />

management process in accordance with the ISO/<strong>IE</strong>C 20000 and ITILv3<br />

framework or equivalent. As part of problem management the Contractor shall<br />

perform the following tasks: (re-) evaluation of incident category, criticality and<br />

priority; identification of the root cause of the issue (e.g. by issue replication<br />

testing); identification of workarounds; identification and initial planning of<br />

possible short, medium and long-term solutions (e.g. workarounds, patches, or<br />

new releases); create change requests incl. schedule of implementation, and<br />

synchronization with the maintenance and warranty process; and monitor and<br />

control the approved change request during implementation, delivery of problem<br />

analysis reports and overall support reports when required.<br />

5.3.1.6. Second level maintenance and support of the CCTV HQ ISAF will be provided by<br />

the Base Support Group (BSG) technical staff user after training from the<br />

Contractor.<br />

5.3.1.7. Level 3 maintenance tasks shall be defined and designed for specialized military<br />

maintenance personnel, on-site or remote, and shall include, but are not limited to:<br />

problem and modification analysis, complex repairs and/or replacements, detailed<br />

calibrations, supply support, overhaul and rebuild, implementation of major and/or<br />

critical changes, restoration (e.g. emergency maintenance) that requires specialized<br />

maintenance personnel and equipment, monitoring and coordination of<br />

transportation of faulty equipment out of theatre and replacement equipment back<br />

into theatre.<br />

5.3.1.8. Level 3 support services implement the deployment and release management<br />

process in accordance with the ISO/<strong>IE</strong>C 20000 and ITILv3 framework or<br />

equivalent. In this process, the Contractor shall develop the solution (e.g. fix,<br />

repair, replace, patch, or release), test the solution and deliver and deploy the<br />

solution. Third level of support services shall be established to maintain the core<br />

expertise for all the CCTV HQ ISAF elements, including configuration<br />

management of the CCTV HQ ISAF components, administration of the CCTV HQ<br />

ISAF, performance assessment, off-specification reporting, and maintenance<br />

engineering. It includes the maintenance and administration of the CCTV HQ<br />

ISAF Reference System and its use in analysing operational problems and<br />

validating changes to the baseline as well as the link between the operational and<br />

factory support staff.<br />

5.3.1.9. The Purchaser’s existing trouble-ticketing system and existing incident<br />

management and problem management processes shall be used for opening,<br />

modifying, tracking, and closing Trouble Tickets, and logging of all requests<br />

concerning the products furnished under this Contract.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

36/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

37/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.3.1.10. As part of the support services provision, the Contractor shall create and<br />

maintain descriptions of all solutions (Quick solution, Work around, Patch,<br />

Baseline Release) to known issues in a COTS software database (“Known<br />

Error Database”). The Known Error Database shall link issues to solutions and<br />

corresponding documentation and expert POC.<br />

5.3.1.11. Third level maintenance and support of the CCTV HQ ISAF will be provided by<br />

the Contractor under a one (1) year CLS package as described below.<br />

5.3.1.12. Level 4 maintenance tasks shall include, but are not limited to: repair of faulty<br />

LRU(s) of the CCTV HQ ISAF beyond the capability of level 3 (usually under<br />

warranty), provisioning of replacement parts (usually under warranty),<br />

complicated factory adjustments, and provision of maintenance releases at the<br />

Contractor’s, Vendor’s or Manufacturer’s factory.<br />

5.3.1.13. Fourth level maintenance and support of the CCTV HQ ISAF will be provided by<br />

the Contractor, supported by the pertinent OEM-vendors, under a one (1) year<br />

CLS package as described below.<br />

5.3.1.14. The maintenance and support concept applies to both hardware and software.<br />

5.3.1.15. The maintenance and support concept shall be designed, and subsequently<br />

described in the ILSP, in such a way that the reliability, maintainability and<br />

availability (RMA) requirements specified below are achievable.<br />

5.3.2. Reliability, Maintainability and Availability (RMA) requirements<br />

5.3.2.1. Systems and equipment to be supplied under this Contract shall meet specified<br />

criteria for availability, reliability, and maintainability.<br />

5.3.2.2. Reliability, when expressed as Mean Time Between Critical Failures (MTBCF),<br />

shall be greater than four thousand (4,400) hours. In order to guarantee this<br />

reliability, the Contractor shall include sufficient redundancy in the design of the<br />

CCTV system. A critical failure is defined as any event that impairs the total<br />

camera coverage of the ISAF HQ CCTV system as a whole.<br />

5.3.2.3. Maintainability, when expressed as Mean Time To Replace/Repair (MTTR), shall<br />

be less than one (1) hour, with 95% of repairs not exceeding thirty (30) minutes.<br />

5.3.2.4. The Mean Time Between Corrective Maintenance Actions (MTBCMA) shall be<br />

greater than five hundred (500) hours.<br />

5.3.2.5. Operators shall have easy access to any system component in order to facilitate<br />

visual inspection, and so that any LRU replacement can be achieved within the<br />

specified time.<br />

5.3.2.6. Operational Availability (A 0 ), with respect to full camera coverage, shall be<br />

greater than 99.9%. Operational Availability (A 0 ) is defined as MTBF / (MTBF +


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

MTTR + MLDT) with MLDT and the conditions affecting A 0 contributable to the<br />

Contractor to be agreed upon.<br />

5.3.2.7. The Contractor shall organise a Provisioning Conference concurrent with the<br />

System Design Review meeting. The purpose of the conference is for the<br />

Purchaser to ascertain whether the Contractor’s designed maintenance and support<br />

concept (as part of the ILSP) and the Contractor’s recommended spare parts list<br />

(RSPL) is sufficient to meet the reliability, maintainability and availability<br />

requirements in this section of the SOW. The Contractor shall make available to<br />

the Purchaser attendees of the conference all data and documentation relevant to<br />

ascertain the validity of this purpose statement.<br />

5.3.3. Contractor Logistics Support (CLS)<br />

5.3.3.1. <strong>From</strong> Provisional Site Acceptance (PSA) of each Site to the Final System<br />

Acceptance (FSA) and during the warranty period from FSA to FSA + one (1)<br />

year, the Contractor shall provide CLS-services under the Contract, which shall<br />

cover:<br />

5.3.3.1.1. 3rd and 4th level maintenance tasks in accordance with the maintenance and<br />

support concept above. By default, the Contractor furnished 3rd level<br />

maintenance shall be provided at CLD Brunssum, The Netherlands. The<br />

Contractor furnished 4th level maintenance shall be provided off-site at<br />

Contractors’ or product vendors’ premises;<br />

5.3.3.1.2. 3rd level support services in accordance with the maintenance and support<br />

concept above. The Contractor furnished 3rd level support services shall be<br />

provided offsite at the Contractor’s premises;<br />

5.3.3.1.3. hardware support as defined below;<br />

5.3.3.1.4. software support and upgrades as defined below;<br />

5.3.3.1.5. technical assistance as defined below;<br />

5.3.3.1.6. maintenance of all of the Configuration Management documentation, including<br />

a Configuration Management Data Base (CMDB) and a Known Error<br />

Database (KEDB);<br />

5.3.3.1.7. revision of documentation covering any changes to the site and system level<br />

operation and maintenance (O&M) documentation and to the As-Built<br />

documentation.<br />

5.3.3.2. The CLS services shall be dimensioned to take full advantage of:<br />

5.3.3.2.1. the on-site N<strong>ATO</strong> technicians, who will carry out 1st and 2nd levels<br />

maintenance and support services;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

38/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.3.3.2.2. a limited on-site spares holding, based on the outcome of the provisioning<br />

conference;<br />

5.3.3.3. As an Option to this Contract, the contractor may be obligated to enter into a<br />

Contractor Logistics Support agreement with the Purchaser or his representative<br />

after the 1-year warranty period. The following considerations apply:<br />

5.3.3.3.1. The CLS contract may be renewed inline with the options detailed in the<br />

Schedule of Supplies and Services (SSS).<br />

5.3.3.3.2. This support agreement is a full Contractor Logistics Support (CLS) Contract<br />

provided under a Firm Fixed Price.<br />

5.3.3.3.3. Prices shall remain valid during the period of validity.<br />

5.3.3.3.4. The price revisions are to be limited to the amounts reflected for each period in<br />

a governmentally approved inflationary index of the producing country.<br />

5.3.3.3.5. If the Option of CLS is exercised, the Contractor shall be responsible for the<br />

CLS for all deliverables furnished under this Contract and shall guarantee the<br />

provisions of such equipment replacement/repair services including Technical<br />

Assistance.<br />

5.3.3.4. CLS hardware support<br />

5.3.3.4.1. During the CLS-period (and any subsequent period of CLS, if exercised), the<br />

Contractor shall establish a Logistics Support Programme and be responsible<br />

for ensuring adequate provision of direct exchange Line Replacement Units<br />

(LRUs), in terms of both range and quantity, to maintain the reliability and<br />

availability requirements specified in this SOW.<br />

5.3.3.4.2. To this end the Contractor shall provide sufficient spares at the site and shall<br />

ensure a comprehensive range is available to replace any defective LRUs<br />

returned from the site.<br />

5.3.3.4.3. The Contractor shall be responsible for the provision of any alternative or<br />

superseding items should the original part be no longer available ensuring<br />

form, fit, and functional requirements.<br />

5.3.3.4.4. The Contractor shall be responsible to provide upon request the necessary<br />

failure and price data to permit Purchaser selection and separate procurement<br />

of spare parts to cover any requirements arising during tension, crisis, or other<br />

emergency.<br />

5.3.3.4.5. The Contractor shall repair or replace any item returned as unserviceable in<br />

accordance with current approved specifications and QA requirements.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

39/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

40/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.3.3.4.6. The Contractor is to maintain complete records of spares consumption<br />

including those spares used in the repair of returned LRUs. Such records shall<br />

be made available to the Purchaser on request.<br />

5.3.3.4.7. It is at the Contractor’s discretion to introduce any system updates, or parts<br />

thereof, but always subject to prior approval by the Purchaser<br />

5.3.3.5. CLS software support and upgrades<br />

5.3.3.5.1. During the CLS-period, the Contractor shall be responsible for all software<br />

support including software and firmware upgrades as part of the overall system<br />

support to ensure that the specified reliability and availability requirements are<br />

met.<br />

5.3.3.5.2. The Contractor shall be responsible for correcting in a timely manner all<br />

software defects identified by the Purchaser which have either a direct or<br />

potential impact on the operation of the system and of the availability<br />

requirements.<br />

5.3.3.5.3. It should be noted that the Purchaser, prior to operational use, normally tests<br />

the introduction of new software versions.<br />

5.3.3.5.4. The availability of software modifications and upgrades shall be made known<br />

to the Purchaser and, if proposed for introduction by the Contractor for<br />

whatever reason, including any corrective action for an identified fault, shall<br />

always be subject to Purchaser approval.<br />

5.3.3.5.5. The Contractor shall supply the associated release notes when supplying new<br />

hardware, software, and upgrades.<br />

5.3.3.6. CLS technical assistance<br />

5.3.3.6.1. During the CLS-period, the contractor shall return to HQ ISAF at a minimum<br />

of two (2) times per year to support the system to ensure optimal performance<br />

and operation. During the visits the purchaser may request as an option for the<br />

contractor to provide additional training to level 1 and 2 technicians and to the<br />

watch keepers for the proper maintenance (technicians) and operations (watch<br />

keepers) of the system.<br />

5.3.3.6.2. During the CLS-period, the Contractor shall be responsible for maintaining a<br />

technical support capability during normal working hours for support<br />

accessible via telephone to the N<strong>ATO</strong> Network Control Centre (NNCC) and e-<br />

mail or Web services. Additionally, higher level support capabilities with<br />

direct access to the Contractor’s engineering resources shall be available<br />

during normal working hours for timely resolution of system problems be they<br />

hardware or software related. In the context of Technical Assistance, the<br />

“normal working day” is defined as any time from Monday to Friday between<br />

08:00 hours and 18:00 hours Belgium time, excluding N<strong>ATO</strong> holidays.


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

41/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.3.3.6.3. All problems reported including their agreed corrective action shall be<br />

maintained in a log which shall be made available on request to the Purchaser.<br />

5.4.Supply support<br />

5.4.1. System Inventory/ Material Data Sheet (MDS)<br />

5.4.1.1. The Contractor shall provide the NC3A/ILS PoC with a Material Data Sheet<br />

(MDS), in electronic format, ten (10) working days before the first delivery. The<br />

MDS, as a minimum, shall include the data elements cited with an “M” mandatory<br />

below, if applicable. The MDS, amended as necessary, shall be used by the<br />

Purchaser for acceptance purposes and to create data element entries in the N<strong>ATO</strong><br />

Accounting system, ahead of delivery of the Final System Inventory.<br />

5.4.1.2. The Contractor shall provide the NC3A/ILS PoC with a Final System Inventory,<br />

which shall be based on and be consistent with the MDS, ten (10) working days<br />

before PSA. The Final System Inventory shall include all data elements listed<br />

below. The Final System Inventory shall be provided as a hard copy as well as on<br />

electronic media in Microsoft Excel or Access database format. . Details on the<br />

exact format of the various data elements to be adopted will be communicated<br />

following contract award. An inventory template together with a full content<br />

description for each column (electronic format) shall be provided to the Contractor<br />

at the request of the Contractor after contract award. For information purposes, the<br />

minimum inventory/equipment data elements required are as follows:<br />

a. Contract Customer Line Item Number (CLIN);<br />

b. N<strong>ATO</strong> Stock Number (NSN - if available);<br />

c. Nomenclature – M;<br />

d. Expendable/Repair code XB/ND – M;<br />

e. True Manufacturer Part Number – M;<br />

f. True Manufacturer Cage Code – M (or complete name and address);<br />

g. Vendor/Contractor Cage Number (or complete name and address) – M;<br />

h. Vendor/Contractor Part Number – M;<br />

i. Quantity ordered-M;<br />

j. Order Unit – M;<br />

k. Serialized Item Tag – M;<br />

l. Serial number – M;<br />

m. Serial number software revision level;<br />

n. Serial number hardware revision level;<br />

o. Other serial number attributes;<br />

p. Currency – M;


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

q. Unit Price – M;<br />

r. Warranty expiration date – M;<br />

s. Receiving N<strong>ATO</strong> Depot;<br />

t. Extended Line Item Description;<br />

u. Part Number of next higher assembly;<br />

v. Quantity in the next higher assembly.<br />

5.4.2. Codification<br />

5.4.2.1. On the basis that an adequate manufacturer’s identification numbering system is in<br />

place, the N<strong>ATO</strong> codification (as described in Clause 33 of the NC3O General<br />

Provisions) is not required.<br />

5.4.3. Initial Spare Parts<br />

5.4.3.1. The Contractor shall provide a detailed, location-specific, and priced<br />

Recommended Spare Parts List (RSPL) that shall reflect all individual spare part<br />

components for the installed equipment.<br />

5.4.3.2. The RSPL shall as a minimum include the following main subjects:<br />

a. Item sequence number;<br />

b. Detailed item description;<br />

c. True manufacturer's part number;<br />

d. True manufacturer's identification code (Cage Code) or name;<br />

e. Mean Time Between Failures (when validated data is available);<br />

f. Next higher assembly;<br />

g. Unit price.<br />

5.4.3.3. Spare Parts shall be provided in adequate packaging, protecting the parts during<br />

transportation and storage.<br />

5.5.Management and control of logistics movements<br />

5.5.1. Transportation<br />

5.5.1.1. The Contractor shall provide a Transportation Plan twenty (20) working days<br />

before the first delivery in electronic format. The Transportation Plan shall<br />

describe all planned (partial-) shipments, locations, point of contact(s),<br />

transportation stages, schedules, and alternative schedules.<br />

5.5.1.2. The Contractor shall use the transportation routes identified in the below figure.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

42/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

Figure 1 – Overview of Transportation route<br />

5.5.1.3. All equipment covered under this Contract shall be transported from a N<strong>ATO</strong><br />

country to the N<strong>ATO</strong> CIS Logistics Depot (CLD) at Brunssum, The Netherlands<br />

by the Contractor (Shipment #1) at the expense of the Contractor.<br />

5.5.1.4. All equipment covered under this Contract shall be transported from the N<strong>ATO</strong><br />

CIS Logistics Depot (CLD) at Brunssum, The Netherlands to Depot 26, Kabul by<br />

the Purchaser (Shipments #2,) at the expense of the Purchaser;<br />

5.5.1.5. All equipment covered under this Contract shall be transported from Depot 26,<br />

Kabul to the final destination at ISAF HQ, by the Contractor (Shipments #3) at the<br />

expense of the Contractor; The Contractor is responsible for providing all required<br />

equipment to support operations to include cranes, forklifts, etc.<br />

5.5.1.6. Warranty return of unserviceable equipment from HQ ISAF to CIS Logistics<br />

Depot (CLD) at Brunssum, The Netherlands, as well as transportation of repaired<br />

or replacement items under warranty from the CIS Logistics Depot (CLD) at<br />

Brunssum, The Netherlands to HQ ISAF are the responsibility of the Purchaser at<br />

the expense of the Purchaser.<br />

5.5.1.7. Warranty return of unserviceable equipment from CIS Logistics Depot (CLD) at<br />

Brunssum, The Netherlands to the Contractor’s facilities, as well as transportation<br />

of repaired or replacement items under warranty from the Contractor’s facilities to<br />

CIS Logistics Depot (CLD) at Brunssum, The Netherlands are the responsibility of<br />

the Contractor at the expense of the Contractor.<br />

5.5.2. Preservation and Packaging<br />

5.5.2.1. The Contractor shall ensure that the various supplies will be transported,<br />

packaged, crated, or otherwise prepared in accordance with the best commercial<br />

practices for the types of supplies involved, giving due consideration to shipping<br />

and other hazards associated with the transportation of consignments to overseas.<br />

5.5.2.2. A detailed description of packaging to be used shall be provided by the Purchaser<br />

at the request of the Contractor.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

43/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.5.2.3. Any special packaging materials required for the shipment of items shall be<br />

provided by the Contractor.<br />

5.5.3. Package Marking<br />

5.5.3.1. The packages, palettes and/ or containers in which supplies are transported shall,<br />

in addition to normal mercantile marking, show on a separate nameplate the<br />

project name, contract number and shipping address.<br />

5.5.3.2. All hardware packaging supplied shall be marked as applicable with the true<br />

manufacturer's part number, serial number and revision level as identified in the<br />

relevant technical documentation.<br />

5.5.4. Packing Lists<br />

5.5.4.1. The Contractor shall provide the NC3A/ILS PoC with a packing list in electronic<br />

format fifteen (15) working days before each shipment.<br />

5.5.4.2. Copies of the packing lists shall also accompany each shipment. Each individual<br />

box from a consignment shall have one packing list in weather proof envelope<br />

affixed to the outside of each box that indicates exactly what is contained inside.<br />

One copy shall also be put inside each box.<br />

5.5.4.3. The Contractor shall ensure that packing lists are provided in such a way as to<br />

permit easy identification of the items to be delivered to destinations.<br />

5.5.4.4. Packing lists shall as a minimum include the following:<br />

a. The NC3A contract number;<br />

b. The NC3A Project Title;<br />

c. Item description;<br />

d. Item part number and serial number;<br />

e. CLIN number as per the SSS;<br />

f. Name and address of the Contractor/ Sender, the Purchaser and Consignor;<br />

g. Detailed weight and dimensions per box/pallet/container;<br />

h. Box number and number of boxes in the consignment.<br />

5.5.5. Customs Form 302<br />

5.5.5.1. The Contractor shall ensure the timely request of Customs Form 302 through the<br />

NC3A/ILS PoC fifteen (15) working days before a shipment. A Customs Form<br />

302 is required for duty free import/export of supplies. Following receipt of the<br />

request by the NC3A/ILS PoC, normally a maximum of three working days is<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

44/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

required for the issue of the form. This form is not required for movements within<br />

the European Union.<br />

5.5.5.2. These forms have to be originals and cannot therefore be faxed but have to be<br />

mailed or sent by mail/express courier. In case that an express courier has to be<br />

used to ensure that the form is available in time before shipment, all associated<br />

costs shall be the responsibility of the Contractor.<br />

5.5.5.3. The written request for a 302 form shall contain the following information:<br />

a. Purchaser Contract Number.<br />

b. CLIN, Designation and Quantities.<br />

c. Destination.<br />

d. Number and Gross Weight.<br />

e. Consignors and Consignee’s Name and Address.<br />

f. Method of Shipment, i.e. road, rail, sea, air, etc.<br />

5.5.5.4. If a country refuses to accept the Form 302 and requires the payment of customs<br />

duties, the Contractor shall immediately inform the Purchaser by the fastest means<br />

available and obtain from the Customs Officer a written statement establishing that<br />

his country refuses to accept the Form 302. Only after having received Purchaser’s<br />

approval the Contractor shall pay these customs duties and the Purchaser shall<br />

reimburse the Contractor at actual cost against presentation of pertaining<br />

documents.<br />

5.5.5.5. The Contractor shall inform forwarding agents of the availability of Form 302 and<br />

how this form is utilised to avoid the payment of customs duties. This Form 302<br />

shall be added to the shipping documents to be provided to the carrier.<br />

5.5.6. Notice of Shipment<br />

5.5.6.1. Ten (10) working days before each shipment of supplies, the Contractor shall<br />

provide the NC3A/ILS PoC with a Notice of Shipment (NoS) comprising the<br />

following details:<br />

a. Shipment Date.<br />

b. Contract Line Item.<br />

c. Consignor and Consignee.<br />

d. Number of Packages/Containers.<br />

e. Final/Partial Shipment.<br />

f. Mode of Shipment.<br />

g. Number of 302 Forms used.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

45/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.6.Warranty<br />

5.6.1. The Contractor shall provide Warranty for all Hardware and Software<br />

Configuration Items procured under this Contract;<br />

5.6.2. The period of Warranty for the Hardware and Software Configuration Items shall<br />

be one (1) year, starting at the time of FSA;<br />

5.6.3. The Contractor shall repair/ replace/ fix all CI’s received through the Support<br />

and/or Maintenance process as per their internal procedures with the highest<br />

priority allocated and shall be responsible to return the repaired/ replacement/<br />

fixed CI to the N<strong>ATO</strong> CIS Logistics Depot (CLD) in Brunssum, the Netherlands<br />

through express delivery or electronic submission within five (5) days of receipt;<br />

5.6.4. The Contractor shall warrant that any developed Hardware or Software CI(s) shall<br />

perform according to the requirements. If the Contractor becomes aware at any<br />

time before acceptance by the Purchaser that a defect exists in any Hardware or<br />

Software CI, the Contractor shall coordinate with the Purchaser and promptly<br />

correct the defect;<br />

5.6.5. During the warranty period, the Contractor shall be responsible for the provision<br />

of any alternative or superseding items, should the original part be no longer<br />

available, ensuring compliance with the fielded baseline;<br />

5.6.6. During the warranty period, the Contractor shall be responsible for implementing<br />

all COTS hardware and/or software upgrades. The availability of COTS hardware<br />

and/or software upgrades shall be made known to the Purchaser and, if proposed<br />

for introduction by the Contractor for whatever reason, including any corrective<br />

action for an identified fault, shall always be subject to Purchaser approval.<br />

5.6.7. Within ten (10) working days after End of Warranty (EoW) date, the Contractor<br />

shall submit a Warranty Report that documents all warranty cases, affected CI’s,<br />

taken activities, cost and schedule.<br />

5.7.Configuration Management<br />

5.7.1. The Contractor shall implement a Configuration Management (CM) program in<br />

accordance with the Allied Configuration Management Publication (ACMP-1<br />

through ACMP-7).<br />

5.7.2. The Contractor shall ensure that an effective CM organisation is established and<br />

maintained to implement the CM program throughout the duration of the contract.<br />

5.7.3. Under the CM program the Contractor shall maintain and update all project CIs as<br />

requested by changes within the project or external to the project throughout the<br />

duration of the contract.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

46/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

47/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.7.4. Configuration Item Identification - The Contractor shall identify Configuration<br />

Items (CIs) in accordance with ACMP-2. The CIs shall be chosen in a way to<br />

assure visibility and ease of management throughout the development effort and<br />

the support after acceptance.<br />

5.7.5. All COTS, adapted and developed hardware and software shall be designated as<br />

CIs. Every CI shall have a unique identifier. The level of granularity for the CI<br />

selection shall reach at minimum Line Replaceable Units (LRUs) for hardware CIs<br />

and software/firmware unit as defined in ACMP-1 for software CIs.<br />

5.7.6. Hardware CI attributes shall include, but are not limited to, the Material Data<br />

Sheet (MDS) information described above. Software CI attributes shall include,<br />

but are not limited to the ACMP-1 definitions.<br />

5.7.7. The Purchaser reserves the right to modify the CI structure and attributes prior to<br />

its baselining.<br />

5.7.8. The Contractor shall ensure that all CIs are persistently stored in a COTS<br />

Configuration Management Database (CMDB) and that it shall be kept consistent<br />

and updated.<br />

5.7.9. Configuration Control - The Contractor shall be fully responsible for the<br />

Configuration Control of all CIs. Configuration Control shall be exercised in<br />

accordance with ACMP-3.<br />

5.7.10. Configuration Status Accounting - The Contractor shall be fully responsible for<br />

the Configuration Status Accounting (CSA) for all CIs. The Contractor shall<br />

deliver CSA reports to the Purchaser both as part of management and specialist<br />

products in this contract and also as standalone documents at the Purchaser’s<br />

request. At the end of the Contract, the Contractor shall deliver a set of final CSA<br />

reports for each CI in both hard copy and in electronic media. Configuration Status<br />

Accounting shall be exercised in accordance with ACMP-4.<br />

5.7.11. Configuration Verification – During PSA, the Contractor shall support on-site<br />

auditing of the installed configuration to demonstrate that the as-built actual status<br />

of all CIs matches the authorised state of CIs as registered in the CMDB and<br />

pertinent CSA reports. The Contractor shall support auditing effort by providing<br />

the required Baseline Documentation and answering questions from the<br />

Purchaser’s Auditor. Configuration Verification shall be exercised in accordance<br />

with ACMP-5.<br />

5.7.12. Configuration Management Data Base - The Contractor shall create and maintain a<br />

COTS based Configuration Management Database (CMDB) that persists the<br />

Configuration Items, pertinent CI-item attributes, and CI (inter-) relationships. The<br />

Contractor shall provide the CMDB prior to PSA. The CMDB shall be in a nonproprietary<br />

standard format such as a CSV or a Microsoft Excel file format to<br />

ensure compatibility from a variety of applications.


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.8.Initial Training Requirements<br />

5.8.1. General<br />

5.8.2. The Contractor shall provide training in theatre. Two types of training shall be<br />

provided:<br />

5.8.2.1. CCTV HQ ISAF Operator Training Course, for setting up and operating the<br />

CCTV HQ ISAF (also including Level 1 maintenance training);<br />

5.8.2.2. CCTV HQ ISAF Maintenance Training Course, for HQ ISAF BSG personnel who<br />

will conduct level 2 maintenance (consisting of level 1 and 2 maintenance<br />

training);<br />

5.8.3. Training material<br />

5.8.3.1. The Contractor shall provide Course material packages for both types of training<br />

courses, to include:<br />

5.8.3.1.1. Student handbooks for each course type, providing the student with necessary<br />

information on all lesson objectives and contents, guidance for all learning<br />

activities and cross-references to assist the students in achieving the course<br />

objectives;<br />

5.8.3.1.2. Self-training material for each course type, providing the student with all<br />

necessary information to assist the students in learning the operation of the<br />

CCTV HQ ISAF without access to a trainer or instructor-led course;<br />

5.8.3.1.3. Course certificates for each course type to certify students successfully<br />

completed the course;<br />

5.8.3.1.4. Trainer guides for each course type, containing all necessary information for<br />

future trainers to prepare and conduct lessons, and to evaluate students,<br />

including exercises, quizzes, and examinations (with their corresponding<br />

answer sheets);<br />

5.8.3.2. For each training course, the training course package shall provide training<br />

material in the following quantities:<br />

Material No. of Copies Media<br />

Student handbook 10 Printed + CD<br />

Self-training material 10 Printed + CD<br />

Course certificates 10 Printed + CD<br />

Trainer’s guide 2 Printed + CD<br />

Table 1 Training documentation deliverables<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

48/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.8.3.3. The Maintenance Training Course package shall be based on the Operator<br />

Training Course package, modified or augmented as follows:<br />

5.8.3.3.1. Background and context information shall be covered with a higher level of<br />

detail, to give the trainer a closer view of the CCTV HQ ISAF network<br />

architecture, through detailed system diagrams;<br />

5.8.3.3.2. Removal and replacement of major system components;<br />

5.8.3.3.3. Review of any additional capabilities that the system can provide;<br />

5.8.3.3.4. Training material specifically build for maintenance personnel to maintain the<br />

CCTV HQ ISAF in theatre;<br />

5.8.3.4. The Contractor shall provide the Self-training material, as follows:<br />

5.8.3.4.1. Electronic media shall be delivered to take the customer step by step through<br />

the operation and maintenance of CCTV system without an instructor.<br />

5.8.3.4.2. Electronic media instruction discussing operation of the system shall be<br />

accompanied with screen shots that clearly show the operator what is expected<br />

on screen.<br />

5.8.3.4.3. Electronic media instruction discussing maintenance shall clearly display the<br />

component, adjacent components, and all interconnections. Images should be<br />

viewable from various angles while maintaining the aspect ratio. The training<br />

shall be designed to be understood by the beginner to intermediate level<br />

technician.<br />

5.8.3.4.4. Training materials shall describe how to resolve error problems to include<br />

complete discussions on the indications, probable causes, and course of actions<br />

to resolve the problems.<br />

5.8.3.4.5. Electronic media shall contain an index that is linked to the corresponding<br />

area. The electronic media shall be searchable in order to facilitate keyword<br />

searches. E.g. if the operator types in the word “cleaning”, all locations that<br />

involve cleaning shall be listed and the operator selects the appropriate<br />

reference.<br />

5.8.3.4.6. Training materials shall detail the method of submission of trouble tickets to<br />

the contractor during the active CLS period to expedite technical support.<br />

5.8.3.5. The initial training documentation requirements are, but not limited to:<br />

5.8.3.5.1. Overview of the CCTV HQ ISAF capabilities,<br />

5.8.3.5.2. Overview of the CCTV HQ ISAF and its components,<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

49/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.8.3.5.3. Setup of the CCTV HQ ISAF:<br />

5.8.3.5.4. Basic troubleshooting of the CCTV HQ ISAF:<br />

5.8.3.5.5. Fault resolution and workarounds, including:<br />

5.8.3.5.6. Cable replacement,<br />

5.8.3.5.7. Fuse replacement,<br />

5.8.3.5.8. Lighting replacement,<br />

5.8.3.5.9. Retractable Mast Operation,<br />

5.8.3.5.10. Lens Cleaning Periodicity and requirements,<br />

5.8.3.5.11. Support processes (including a description of where to ask for support (hotlines,<br />

if provided by the Contractor) and how to report issues).<br />

5.8.3.6. All training material shall be written in the English language.<br />

5.8.3.7. Training material in electronic format must be executable utilizing Microsoft<br />

Windows 2000, Microsoft Windows XP, Microsoft Windows Vista, and Microsoft<br />

Windows 7 operating system. Associated viewers must be installed on electronic<br />

media e.g. Adobe Reader, PPT Viewer, Freewrl, XJ3D, X3D-Edit, et cetera.<br />

5.8.3.8. All training material delivered under this Contract shall be subject to review and<br />

approval by the Purchaser. The Contractor shall deliver, at least four (4) weeks<br />

prior to the delivery of the training, a complete draft of all training material for<br />

review by the Purchaser. Upon acceptance of the draft version, the Contractor shall<br />

deliver the final version of the training material in accordance with the Schedule of<br />

Supplies and Services (SSS).<br />

5.8.4. Initial training course requirements<br />

5.8.4.1. The Contractor shall provide instructor led courses at the locations as follows:<br />

Course Location Frequency<br />

CCTV HQ ISAF<br />

HQ ISAF<br />

Operator Training Course<br />

1<br />

CCTV HQ ISAF<br />

HQ ISAF<br />

Maintenance Training Course<br />

1<br />

Table 2 Training locations<br />

5.8.4.2. For the instructor led courses it can be assumed that the maximum number of<br />

students will be eight (8).<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

50/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.8.4.3. The Purchaser can make available the training facilities for the instructor-led<br />

courses.<br />

5.8.4.4. The Contractor is responsible for specifying and requesting the training facilities.<br />

5.8.4.5. The estimated training durations are given below:<br />

Training<br />

Duration [Days]<br />

CCTV HQ ISAF<br />

2<br />

Operator Training Course<br />

CCTV HQ ISAF<br />

3<br />

Maintenance Training Course<br />

Table 3 Training duration<br />

5.8.4.6. The estimated durations exclude any Contractor training preparation at the two<br />

locations.<br />

5.8.4.7. The Contractor shall not assume any knowledge or experience prerequisite for the<br />

users and future trainers, other than a working-level proficiency in the English<br />

language, basic user-knowledge of the Microsoft Windows Operating System, of<br />

the Microsoft ‘Office’ suite, and of the Microsoft Internet Explorer browser.<br />

5.8.4.8. Instructors shall meet a minimum English language proficiency equivalent to SLP<br />

4444 (in accordance with N<strong>ATO</strong> STANAG 6001).<br />

5.8.4.9. The Contractor shall deliver, as part of the ILSP, a Training Plan detailing the<br />

development of the training deliverables and performing of the training courses.<br />

5.8.4.10. The Contractor shall evaluate each training course through the use of evaluation<br />

forms to be filled in by every student. The completed evaluation forms will be<br />

incorporated in a Training Evaluation Report. This report will be made available to<br />

the Purchaser within two (2) weeks after conclusion of each training course.<br />

5.8.4.11. The Contractor shall update the training material when necessary based on the<br />

outcome of the evaluations.<br />

5.8.4.12. The Contractor shall update the training material whenever a modification,<br />

upgrade or version change is implemented to the CCTV HQ ISAF as supplied to<br />

the Purchaser.<br />

5.8.4.13. The contractor shall provide instructors for additional CCTV HQ ISAF courses<br />

following the training in theatre, as options to the contract.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

51/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 6:<br />

QUALITY ASSURANCE AND CONTROL<br />

6.1.Quality Assurance Program<br />

6.1.1. The Contractor shall establish, execute, document and maintain an effective<br />

Quality Assurance (QA) program throughout the Contract lifetime. This program<br />

shall be in accordance with the compliance documents.<br />

6.1.2. The QA program shall apply to all services and all products (both management<br />

products and specialist products) to be provided by the Contractor under this<br />

contract (this includes all hardware and software COTS as well as developed for<br />

this project – documentation and supplies that are designed, developed, acquired,<br />

maintained or used, including deliverable and non-deliverable items).<br />

6.1.3. The QA program shall ensure that procedures are developed, implemented and<br />

maintained to adequately control the design, development, production, purchasing,<br />

installation, inspection, testing, configuration management and customer support<br />

of all services and all products (both management products and specialist<br />

products), in accordance with the requirements of this Contract.<br />

6.1.4. The QA Program shall meet the requirements of AQAP-2110. The Contractor<br />

shall have an ISO 9001 certificate and operate in accordance with AQAP 2110 and<br />

AQAP 2130.<br />

6.1.5. The QA program shall be described in detail in the Quality Assurance Plan (QAP).<br />

6.1.6. The QAP shall clearly indicate the QA activities, responsibilities, and controls for<br />

the Contractor and any sub-Contractors. The Contractor shall include in the QAP<br />

the certificates of the same nature for all major sub-Contractors who are expected<br />

to manufacture and deliver critical elements of the system and show how the<br />

provisions of the Prospective Contract regarding QA/QC will be inserted in all<br />

subcontracts and enforced by the Prime Contractor.<br />

6.1.7. The initial version of the QAP shall be provided to the Purchaser for acceptance.<br />

Upon Purchaser Acceptance, the QAP shall be placed under the Purchaser’s<br />

Configuration Control Board.<br />

6.1.8. The acceptance of the QAP by the Purchaser signifies only that the Purchaser<br />

agrees to the Contractor’s approach in meeting the requirements. This acceptance<br />

in no way relieves the Contractor from its responsibilities to meet the requirements<br />

stated in this Contract.<br />

6.1.9. The Contractor shall review his QA program periodically and audit it for<br />

adequacy, compliance and effectiveness.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

52/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

53/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

6.1.10. If the Purchaser detects that the Contractor does not respect the QA program as<br />

described in the QAP, the Purchaser has the right to suspend the Contractor’s<br />

activities without any compensation for the Contractor.<br />

6.2.Purchaser Quality Assurance Representative<br />

6.2.1. As provided under STANAG 4107, the Purchaser has the right to delegate some<br />

of the QAR responsibilities to a National Quality Assurance Representative<br />

(NQAR).<br />

6.2.2. The Contractor shall agree to provide all necessary assistance to the QAR or his<br />

delegated National Quality Assurance Representative (NQAR). The Contractor<br />

shall make his quality records, and those of his sub-Contractors, available for<br />

evaluation by the QAR/NQAR throughout the duration of the Contract. Quality<br />

audits at the Contractor or sub-Contractors premises will in principle only be<br />

executed by the QAR/NQAR if the documents provided by the Contractor do not<br />

sufficiently guarantee that a valid QA system is available.<br />

6.2.3. AQAP-2009 will be used by the Purchaser as a guide for the evaluation of the<br />

Contractor’s QA program. Such evaluations shall not be used by the Contractor to<br />

avoid his own responsibility for ensuring that the QA requirements are met. The<br />

QAR will also use AQAP-159 and ISO/<strong>IE</strong>C 9126 as guides for QA review of<br />

software that has to be developed under this Contract.<br />

6.3.Quality Log<br />

6.3.1. The Quality Log summarises all the quality checks that are planned and that have<br />

taken place on each product earmarked for quality checking.<br />

6.3.2. The Quality Log shall be a table and shall comprise the following information:<br />

6.3.2.1. Reference Number;<br />

6.3.2.2. Product;<br />

6.3.2.3. Method of quality checking;<br />

6.3.2.4. Staff responsible, name, role;<br />

6.3.2.5. Planned date;<br />

6.3.2.6. Actual date;<br />

6.3.2.7. Result;<br />

6.3.2.8. Number of action items;<br />

6.3.2.9. Target sign-off date;


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

6.3.2.10. Actual sign-off date.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

54/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 7:<br />

DOCUMENTATION<br />

7.1.Documentation Requirements<br />

7.1.1. General<br />

7.1.1.1. The documentation to be provided by the Contractor under this contract falls in<br />

three groups: System Documentation, ILS Documentation and Project<br />

Documentation.<br />

7.1.1.2. The System Documentation shall consist of:<br />

SDS Document<br />

System Design Specification<br />

Test Procedures<br />

Maintenance Manuals<br />

OEM Manuals<br />

Operating Manuals<br />

Custom Manuals<br />

System Configuration Files<br />

As Built Drawings<br />

Test Reports<br />

Off-Specification Documents<br />

Due<br />

EDC + 8 weeks<br />

EDC + 8 weeks<br />

EDC + 18 weeks<br />

EDC + 18 weeks<br />

EDC + 18 weeks<br />

EDC + 18 weeks<br />

EDC + 19 weeks<br />

EDC + 19 weeks<br />

EDC + 19 weeks<br />

EDC + 19 weeks<br />

7.1.1.2.1. The System Documentation shall be part of the packaging of the CCTV HQ ISAF<br />

components, when the system is shipped to theatre.<br />

7.1.1.3. The ILS Documentation shall consist of:<br />

ILS Document<br />

Integrated Logistics Support Plan<br />

Transportation Plan<br />

Master Test Plan<br />

Draft RSPL<br />

Final RSPL<br />

Material Data Sheet (MDS)<br />

Draft Training Material<br />

Final Training Material<br />

Final System Inventory<br />

Configuration Management Database (CMDB)<br />

Known Error Database (KEDB)<br />

Notice of shipment<br />

Packing Lists<br />

Warranty Report<br />

Due<br />

EDC + 2 weeks<br />

EDC + 2 weeks<br />

EDC + 2 weeks<br />

EDC + 5 weeks<br />

EDC + 8 weeks<br />

EDC + 8 weeks<br />

EDC + 12 weeks<br />

EDC + 16 weeks<br />

EDC + 19 weeks<br />

EDC + 19 weeks<br />

EDC + 19 weeks<br />

2 weeks before each shipment<br />

3 weeks before each shipment<br />

FSA + 12 months<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

55/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

Training Evaluation Report<br />

End of Training + 2 weeks<br />

7.1.1.4. The Project Documentation shall consist of:<br />

Project Documentation<br />

Project Implementation Plan (PIP)<br />

System Implementation Plan (SIP)<br />

Requirements Traceability Matrix (RTM)<br />

Project Status Reports<br />

Due<br />

EDC + 2 weeks<br />

EDC + 2 weeks<br />

EDC + 2 weeks<br />

Monthly - starting at EDC + 4 weeks<br />

7.1.2. Documentation Format<br />

7.1.2.1. All the documentation to be provided under this Contract shall be written in<br />

English.<br />

7.1.2.2. The convention to be used for numbers appearing in non-COTS textual documents<br />

is for a comma to be the thousands separator and a period to be the decimal<br />

separator (e.g. 1,365,276.24).<br />

7.1.2.3. The convention to be used for dates appearing in free text (e.g. quoting dates of<br />

meetings) is day-month-year and not month-day-year.<br />

7.1.2.4. The security classification of any non-COTS documentation shall follow the N<strong>ATO</strong><br />

security guidelines. No Contractor-provided documentation shall bear any non-<br />

N<strong>ATO</strong> protective markings.<br />

7.1.2.5. Any contractual documentation shall have a clear title indicating the Contractual<br />

deliverable it pertains to, a reference and version number, and appropriate signature<br />

blocks demonstrating that the documentation has been subject to the Contractor’s<br />

quality process.<br />

7.1.2.6. Any contractual documentation shall include a ‘version history’ block identifying at<br />

least for the last version the complete list of changes brought to the document since<br />

the previous version, and clearly indicating any superseded documents (including<br />

the previous version of the document).<br />

7.1.2.7. Each change from the previous version shall be identified at least by Section#,<br />

Page#, Nature of change. (A summary list is sufficient provided that the changes<br />

are tracked within the document, e.g. using the ‘change tracking’ mechanism in MS<br />

WORD, or some equivalent for other applications).<br />

7.1.3. System Configuration Files<br />

7.1.3.1. The default configuration of any of the CCTV HQ ISAF component shall be<br />

documented in the System Configuration Files.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

56/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

7.1.3.2. The System Configuration Files shall also contain guidance on how to show, edit<br />

and save those configurations on the respective devices, together with user or<br />

administrator passwords.<br />

7.1.3.3. The System Configuration Files shall be classified and labelled N<strong>ATO</strong><br />

<strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D.<br />

7.1.4. Operator Manual and Maintenance Manual<br />

7.1.4.1. The Contractor shall provide installation and configuration documentation as part<br />

of the maintenance manual.<br />

7.1.4.2. The Contractor shall create, update, maintain and deliver the Operator Manual and<br />

the Maintenance Manual which shall describe the complete system by the<br />

explanation of functional blocks and Configuration Items.<br />

7.1.4.3. The Operator Manual and the Maintenance Manual shall contain descriptions, with<br />

appropriate drawings, of the mechanical, electrical, and electronic assemblies and<br />

sub-assemblies that comprise the applicable major product components.<br />

7.1.4.4. The Operator Manual shall define the in-depth, step by step procedure how to<br />

operate the system and how to perform operator level maintenance tasks, i.e. the<br />

pertinent level 1 maintenance tasks as identified in the Maintenance Concept.<br />

7.1.4.5. The Maintenance Manual shall define the in-depth, step by step procedure how to<br />

perform the 1st, 2nd and 3rd level maintenance tasks as identified in the<br />

Maintenance Concept.<br />

7.1.4.6. For all COTS Configuration Items, the maintenance manual shall take maximum<br />

advantage of the existing COTS-vendor Original Equipment Manufacturer (OEM)<br />

manuals and documentation, supplemented with adaptations, and additions relevant<br />

to the products furnished under this Contract.<br />

7.1.4.7. The maintenance manual shall define the required maintenance tools and test<br />

equipment.<br />

7.1.4.8. At least one hard copy and one soft copy shall be provided for the CCTV HQ ISAF<br />

of the following:<br />

7.1.4.8.1. As Build Drawings - As Built drawings shall be self-sufficient and independent of<br />

any other documents and shall cover Plans of the physical details of all installed<br />

equipment, apparatus and devices, and details of all interfaces.<br />

7.1.4.8.2. OE M Manuals - The Contractor shall provide original equipment manufacturer<br />

manuals for all CCTV HQ ISAF commercial off the shelf (COTS) hardware and<br />

software installed.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

57/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

7.1.4.8.3. Custom Manuals - The Contractor shall provide manuals or operating instructions<br />

for all custom CIs developed or adapted specifically for the CCTV HQ ISAF<br />

project.<br />

7.2.Documentation Delivery and Review<br />

7.2.1. The documentation shall be available on electronic media using standard software<br />

packages at least readable on Microsoft based systems (windows 2K, XP, Vista,<br />

and Windows 7) and allowing ‘cut and paste’ so that the Purchaser can easily<br />

transfer some of their contents to other documents.<br />

7.2.2. The Contractor shall submit all documentation in electronic and paper format to<br />

the Purchaser for review and comments as applicable.<br />

7.2.3. At each review cycle, the Purchaser will state if the document is or is not likely to<br />

be accepted in its Final version.<br />

7.2.4. Except otherwise stated for specific documents, the following provisions shall<br />

apply for any documentation to be provided by the Contractor under this contract:<br />

7.2.4.1. The Contractor shall provide a first draft (version 0.1) of each deliverable for<br />

Purchaser review. The first draft shall be substantially complete and correct.<br />

7.2.4.2. The Purchaser shall provide comments, corrections, and suggested changes to the<br />

Contractor within one (1) week of receipt. The Purchaser reserves the right to<br />

return without review a document that has significant deficiencies (e.g. a document<br />

only including a table of contents). The Contractor shall not rely on the Purchaser<br />

review to fill in deficiencies or obtain missing Purchaser information.<br />

7.2.4.3. The Contractor shall resubmit the document as a revised draft (version 0.2)<br />

incorporating the Purchaser's comments within one (1) week after receipt.<br />

7.2.4.4. The Purchaser shall provide comments, corrections, and suggested changes to the<br />

Contractor within one (1) week of receipt.<br />

7.2.4.5. The Contractor shall provide the Final (version 1.0) document within one week of<br />

receipt of the Purchaser's comments on the revised draft.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

58/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 8:<br />

TESTING AND ACCEPTANCE<br />

8.1.General<br />

8.1.1.1. This section outlines the testing process to be applied to all test activities to be<br />

performed under this Contract.<br />

8.2.Testing Approach<br />

8.2.1. The CCTV HQ ISAF requires a set of testing activities to verify its compliance<br />

with the contractual requirements, to demonstrate its operational suitability, and to<br />

evaluate its performance to establish benchmarks for future enhancements.<br />

8.2.2. All equipment and facilities identified as a configuration item and supplied by the<br />

Contractor shall be tested under the control of the QA organisation defined in<br />

SECTION 6: and the special requirements of this specification.<br />

8.2.3. The Contractor shall have the overall responsibility for meeting the CCTV HQ<br />

ISAF testing requirements and conducting all related activities. This responsibility<br />

includes the development of all test documentation required under this contract,<br />

the provision of all personnel, documentation, equipment and facilities required to<br />

complete all testing and the evaluation and documentation of the tests results. The<br />

Contractor shall maintain complete records of all testing.<br />

8.2.4. The Testing Approach shall comprise three test sessions as follows:<br />

Test Location Due<br />

Factory Acceptance Test (FAT) including<br />

the validation of system expandability Contractor's premises EDC + 8 weeks<br />

Site and System Activation Testing<br />

(SSAT) HQ ISAF EDC + 18 weeks<br />

Operational Test and Evaluation (OT&E) HQ ISAF EDC + 19 weeks<br />

8.2.5. Before each test session the Contractor shall ensure that its hardware, software,<br />

test equipment, instrumentation, supplies, facilities, and personnel are available<br />

and in place to conduct the test session.<br />

8.2.6. The Purchaser will monitor and inspect the Contractor’s test activities to ensure<br />

compliance.<br />

8.2.7. As the supporting documentation for each test session the Contractor shall develop<br />

the System Test Documentation Package.<br />

8.3.System Test Documentation Package<br />

8.3.1. As part of the PIP the contractor shall provide a System Test Documentation<br />

Package comprising the following documents:<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

59/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.3.1.1. the Project Test Plan (PTP);<br />

8.3.1.2. the System Version Definition Document;<br />

8.3.1.3. the test procedures;<br />

8.3.1.4. any submitted test waivers together with supporting material;<br />

8.3.1.5. the requirements traceability matrix updated with test-related information;<br />

8.3.1.6. the updated system Off-specifications Document:<br />

8.3.1.7. the results of the dry-runs performed by the Contractor as a preparation for the<br />

upcoming test session.<br />

8.3.2. The Purchaser will review the Contractor’s System Test Documentation Package<br />

for correctness, completeness, and acceptance.<br />

8.3.2.1. Specifically, the Purchaser shall have the right to reject any test waiver.<br />

8.3.2.2. The Contractor shall record and log all test waiver requests along with their<br />

resolution.<br />

8.3.2.3. Upon completion of the test session, the Contractor shall provide the updated<br />

version of the System Test Documentation Package.<br />

8.3.3. Project Test Plan<br />

8.3.3.1. As part of the System Test Documentation Package the Contractor shall provide<br />

and maintain a Project Test Plan (PTP) covering all tests activities in this Contract,<br />

describing all tests and supporting tasks to meet the requirements of this SOW<br />

including the SRS, the CSRS/SSRS, SISRS. The Contractor shall extend the<br />

Requirements Traceability Matrix to the Product Baseline to maintain full<br />

traceability between the functional, the developmental, and the product baseline,<br />

so as to ensure the Purchaser can verify compliance throughout the project.<br />

8.3.3.2. The PTP shall describe how the Contractor plans to meet the following objectives:<br />

8.3.3.2.1. Compliance with the requirements of the Contract;<br />

8.3.3.2.2. Verification that the design produces the capability required;<br />

8.3.3.2.3. Compatibility among internal system components;<br />

8.3.3.2.4. Compliance with the requirements of the SRS and with external system interfaces<br />

as defined in the ICDs;<br />

8.3.3.2.5. Confidence that system defects are detected early and tracked through to<br />

correction;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

60/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.3.3.2.6. Operational readiness and suitability;<br />

8.3.3.2.7. System characterisation to establish the system’s performance benchmarks.<br />

8.3.3.3. The PTP shall describe the Contractor’s test organisation and its relationship with<br />

the Contractor’s Project Management Office and QA functions.<br />

8.3.3.4. The PTP shall provide a flow diagram that shows the overall sequence of tests, the<br />

location, and Contractor and Purchaser equipment and personnel involved in each<br />

test, and the relationship of test events to project milestones.<br />

8.3.3.5. The PTP shall identify the entry and exit criteria proposed by the Contractor for<br />

each test session.<br />

8.3.3.6. The PTP shall identify any specialised or long-lead items required for testing.<br />

8.3.3.7. The PTP shall identify all the CCTV HQ ISAF Configuration Items (CIs) that are<br />

subject to the test program and shall indicate by which method the items will be<br />

tested.<br />

8.3.3.8. The PTP shall include a detailed description of the design and configuration of the<br />

Factory Acceptance Testbed and of the Certification Testbed.<br />

8.3.4. Security Implementation Verification Procedures (SIVP)<br />

8.3.4.1. The Contractor shall provide and maintain SIVP. The SIVP shall consist of a set of<br />

software scripts that shall allow a Site System Security Officer to verify that the<br />

installed system at a site comply with the CSRS, SSRS, SISRS and CPS if the<br />

system includes a PKI and Security Operating Procedures.<br />

8.3.5. Test waivers<br />

8.3.5.1. For some specific requirements, rather than perform actual tests the Contractor may<br />

choose to provide documentary evidence to show that these requirements are<br />

fulfilled.<br />

8.3.5.2. This documentary evidence may either be a rationale based on existing design or<br />

specification documentation, or rely on previously successfully completed<br />

qualification testing to national or international standards for assemblies,<br />

subassemblies, components or parts.<br />

8.3.5.3. If the Contractor intends to rely on previously successfully completed qualification<br />

testing to national or international standards for assemblies, subassemblies,<br />

components or parts, the Contractor shall produce the following documentation:<br />

8.3.5.3.1. The equipment specifications and true manufacturing number to demonstrate that<br />

the CCTV HQ ISAF CI for which a test waiver is requested is identical to the<br />

equipment previously tested,<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

61/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

8.3.5.3.2. The SRS, CSRS/SSRS, SISRS requirement(s) covered by the test waiver,<br />

8.3.5.3.3. The test standards, procedures and methods employed on the testing; and<br />

8.3.5.3.4. The nationally or internationally certified test results.<br />

8.5.1. Classification of Test Failures<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

62/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.3.5.3.5. A Statement in which the Contractor shall certify that the equipment to be<br />

implemented is identical to that which was originally tested and certified, or advise<br />

the Purchaser of design/construction changes which affect form, fit or function. In<br />

the latter case, the Purchaser, after review of such changes and their impact, shall<br />

have the right to require test and certification of the modified equipment, at no cost<br />

to the Purchaser.<br />

8.4.Requirements Traceability Matrix<br />

8.4.1. The Contractor shall develop and maintain a Requirements Traceability Matrix<br />

(RTM) that establishes a complete cross-reference between:<br />

8.4.1.1. the requirements stated in the SRS;<br />

8.4.1.2. the detailed contents of the SDS in terms of SDS statements and lowest-level CIs;<br />

8.4.1.3. The test cases (or test waivers), intended to demonstrate compliance to the<br />

requirements.<br />

8.4.1.4. The Requirements Traceability Matrix shall include the following data:<br />

8.4.1.4.1. List of all numbered requirements in the SRS, list of any additional requirements<br />

identified in the SSRS;<br />

8.4.1.4.2. For each requirement, two-way traceability between the requirement and the design<br />

feature that implements the requirement;<br />

8.4.1.4.3. For each requirement, identification of any Off-specifications associated with the<br />

requirement;<br />

8.4.1.4.4. For each requirement already successfully tested: identification of the test(s) or test<br />

waiver(s) on the basis of which the requirement was demonstrated;<br />

8.4.1.4.5. For each requirement not yet successfully tested: identification of the test(s) or test<br />

waiver(s) that are intended to demonstrate the requirement.<br />

8.4.2. The Contractor shall extend the requirements traceability matrix to reflect the<br />

results of all previous test sessions, and show how the tests and any test waivers<br />

relevant to the test session demonstrate the associated requirements.<br />

8.5.Test Failures


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.5.1.1. Should a failure occur during testing, a failure report shall be raised by the<br />

Contractor and a preliminary investigation shall be immediately carried out in order<br />

to classify the failure as one of the following:<br />

8.5.1.1.1. Class “A”: there is evidence that the cause was an external or transient condition;<br />

8.5.1.1.2. Class “B”: there is mutual agreement that the cause was an inherent design or<br />

manufacturing deficiency in the unit under test; or<br />

8.5.1.1.3. Class “C”: When the specific nature of the cause cannot be immediately determined<br />

and a more detailed investigation is required before a conclusion can be drawn.<br />

8.5.1.2. Class "A" Failures<br />

8.5.1.2.1. In the event that a preliminary investigation results in the classification of a failure<br />

as is described above, the test shall be repeated at least three successive times.<br />

8.5.1.2.2. If the re-test is successful, the Purchaser will close the observation and testing shall<br />

be resumed from the point immediately after that where the failure occurred.<br />

8.5.1.2.3. If a failure is encountered prior to the successful completion of the re-test, the<br />

failure category shall be changed to class "B" or "C", as described below.<br />

8.5.1.3. Class "B" Failures<br />

8.5.1.3.1. In the event that a failure is classified as a Class "B" from above, the equipment<br />

shall be rejected and all testing related to that particular series of tests shall be<br />

suspended until such a time as the Contractor determines the specific cause of the<br />

failure and proposes appropriate remedial action acceptable to the Purchaser.<br />

8.5.1.3.2. Should the cause of the failure or the effect of the proposed remedial action be<br />

deemed by the Contractor to have no influence whatsoever on other areas of<br />

scheduled testing, the Contractor may propose to the Purchaser to continue testing<br />

in the other areas prior to the rectification of the cause of the failure.<br />

8.5.1.3.3. If such proposals are accepted by the Purchaser, the Purchaser shall have the right<br />

to require repetition of any or all tests performed in these circumstances after the<br />

rectification of the cause of the failure and the subsequent re-tests, to prove they<br />

have been successfully completed.<br />

8.5.1.3.4. The Contractor shall be responsible for all costs related to the rectification of<br />

deficiencies or failures and subsequent re-testing caused by the design or<br />

production of the deliverables identified during the verification and/or testing<br />

cycles. The Contractor shall be responsible for any travel, subsistence and other<br />

incidental expenses incurred by the Purchaser as a result of the requirement for the<br />

re-performance of tests necessitated by test failures.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

63/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.5.1.3.5. After remedial action has been taken by the Contractor, the test may be resumed at<br />

the step during which the deficiency or failure was identified, however, the<br />

Purchaser shall have the right to require that re-testing includes all of the tests<br />

related to the verification of that particular specification requirement.<br />

8.5.1.3.6. The Contractor shall seek the Purchaser's agreement of a mutually suitable time<br />

when testing shall be resumed, subsequent to the Purchaser having accepted the<br />

contents of a formal submission by the Contractor providing full details describing<br />

the cause of the failure and the recommended remedial actions to be taken.<br />

8.5.1.4. Class "C" Failures<br />

8.5.1.4.1. In the event that a failure is classified as a Class "C" from above, all testing shall be<br />

immediately suspended until such a time as the Contractor completes a detailed<br />

investigation and subsequently recommends to the Purchaser, that the failure should<br />

be re-classified as either a Class "A” or "B", as appropriate. The actions previously<br />

described relating to these classifications shall then be commenced.<br />

8.5.1.4.2. In this context, should it be determined that the test failure was due to a component<br />

failure and not attributable to a deficiency in equipment design, or a defective<br />

process during manufacture of the equipment, then the defective component may be<br />

replaced and the failure re-classified as a Class "A" failure.<br />

8.5.2. Test Reports<br />

8.5.2.1. The results of each test called for in the test plan shall be recorded in test results<br />

sheets incorporated in the relevant test procedure.<br />

8.5.2.2. The test procedure with attached test results sheets is called the Test Report.<br />

8.5.2.3. Each test will only be declared ‘passed’ if the entirety of the expected results were<br />

obtained when running the test.<br />

8.5.2.4. The test report cover sheet shall clearly show whether the test passed, failed, or was<br />

not run and for what reasons.<br />

8.5.2.5. Where the Purchaser or his representative has witnessed the testing, appropriate<br />

annotations shall be made on each page of the test results to ensure that the test<br />

report is a true record of test activities and results as witnessed by the Purchaser,<br />

and the whole test report shall be signed by the Contractor representative and by the<br />

Purchaser representative on completion of that testing.<br />

8.5.2.6. Each original test report plus one copy shall be distributed to the Purchaser for<br />

acceptance within Fifteen (15) working days after the completion of the test.<br />

8.5.2.7. System Off-specifications<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

64/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

65/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.5.2.8. Throughout any test session Off-specifications will be identified, either as a result<br />

of test failures, or noted while running tests regardless of whether the tests<br />

eventually pass or fail.<br />

8.5.2.9. Throughout any test session the Contractor shall maintain Off-specifications<br />

Reports and the Off-specifications Document describing all noted Offspecifications.<br />

8.5.2.10. The contents of the required Off-specification Reports and Off-specification<br />

Document are outlined in sections 8.5.<br />

8.5.2.11. Tests status meetings<br />

8.5.2.12. Throughout any test session the Contractor shall organise and conduct Tests Status<br />

Meetings with the Purchaser on a weekly basis to discuss:<br />

8.5.2.12.1. the results of the tests run to date,<br />

8.5.2.12.2. any new Off-specifications raised,<br />

8.5.2.12.3. any adjustments to the schedule of test activities within the test session,<br />

8.5.2.12.4. any other issues.<br />

8.6.Provisional System Acceptance<br />

8.6.1. A Provisional System Acceptance (PSA) shall begin after installation of the CCTV<br />

HQ ISAF network. PSA is the process by which the Purchaser evaluates the<br />

delivered and installed CCTV system and associated ILS to ensure that it fulfils all<br />

requirements and standards as stated in the Contract.<br />

8.6.2. Prior to system acceptance, the Contractor shall:<br />

8.6.2.1. prove that the CCTV HQ ISAF can adequately process, display, and show thermal<br />

imagery for Type I, Type II, and Type III cameras;<br />

8.6.2.2. demonstrate the archival, data retrieval, and analysis capability of the system under<br />

test;<br />

8.6.2.3. deliver all training to the operator and level 1 & 2 maintenance personnel;<br />

8.6.2.4. deliver all training material and electronic self training aids to the customer;<br />

8.6.2.5. deliver all as built documentation to include technical manuals to the customer;<br />

8.6.2.6. deliver all software licenses for associated with the CCTV system to the customer.<br />

8.6.3. PSA requirements;


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

8.6.4. Successful completion of agreed testing.<br />

8.6.5. Delivery of all required spares, special tools and test equipment and consumable<br />

items and accomplishment of complete inventory taking.<br />

8.6.6. Delivery of all required site-level/as-built documentation.<br />

8.6.7. PSA marks the start of operational testing. Operational testing will proceed for a<br />

minimum of 30 days during time issues shall be identified, and documented.<br />

8.7.Final System Acceptance<br />

8.7.1. A FSA meeting will be convened and chaired by the Purchaser when the Purchaser<br />

considers that all the required deliverables of the contract have been supplied by the<br />

Contractor and that all deficiencies identified at PSA have been rectified.<br />

8.7.2. The contractor shall verify and validate that all deficiencies identified during PSA<br />

operational testing have been corrected.<br />

8.7.3. FSA will be achieved following satisfactory completion of all of the requirements<br />

of the Contract consisting of at least the following:<br />

8.7.4. Inventory list: A deliverables inventory has been provided and verified by the<br />

Purchaser, which details all of the deliverables to be supplied under the terms of the<br />

Contract.<br />

8.7.5. As-Built Documentation: The Contractor shall provide As-Built Installation<br />

Drawings which reflect the entire installation. The documentation shall include a<br />

layout drawing that identifies the physical details of the installed equipment as per<br />

the SSS.<br />

8.7.6. The Contractor has provided Certificates of Conformity (CoC) that the equipment<br />

conforms to the regulatory standards defined in the Contract or otherwise legally<br />

required.<br />

8.7.7. The Purchaser has received all Contract deliverables including training.<br />

8.7.8. The Contractor has shown all equipment to be operational to SOW specifications<br />

upon delivery, and installation at HQ ISAF.<br />

8.7.9. The Contractor shall provide the Purchaser a FSA report stating that all items under<br />

this SOW have been completed.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

66/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

SECTION 9:<br />

LIST OF SITES<br />

9.1.The CCTV HQ ISAF will be installed within the confines of the HQ ISAF compound.<br />

9.2.The following nominal locations for the proposed installations and the approximate<br />

dimensions of the HQ ISAF compound can be found at the following Annexes:<br />

9.2.1. Annex A: Acronyms<br />

9.2.2. Annex B: Proposed Camera Location Map HQ ISAF<br />

9.2.3. Annex C: Resilient IP network plan for CCTV<br />

9.2.4. Annex D: Notional Equipment Configuration Diagram<br />

9.2.5. Annex E: General Equipment Description<br />

9.2.6. Annex F: Approximate Dimensions of HQ ISAF Compound<br />

9.2.7. Annex G: Pole Lighting Standards<br />

9.2.8. Annex H: Poles Painting Standards<br />

9.2.9. Annex I: System Requirements Specification<br />

9.3.The final system configuration, including system locations and component numbers, will<br />

be agreed during the project site survey of HQ ISAF.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

67/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

68/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX A: ACRONYMS<br />

ACO<br />

ACP<br />

ACT<br />

AEDC<br />

AIS<br />

AMSG<br />

AQAP<br />

AOC<br />

BDOC<br />

BSG<br />

CC<br />

CCB<br />

CDR<br />

CIS<br />

CI<br />

CLI<br />

CLIN<br />

CLS<br />

CM<br />

CMB<br />

CoC<br />

CONOPS<br />

COTS<br />

CPS<br />

CSA<br />

CSRS<br />

CSV<br />

DFAC<br />

EDC<br />

EMS<br />

ECP<br />

ESTO<br />

ESTP<br />

ESTR<br />

FAT<br />

FP<br />

FPR<br />

FSA<br />

Gym<br />

HQ<br />

HTML<br />

I<strong>ATO</strong><br />

ICAO<br />

ICD<br />

IFB<br />

ILS<br />

ILSP<br />

IOC<br />

IPMT<br />

Allied Command Operations<br />

Allied Communication Publication<br />

Allied Command Transformation<br />

After Effective Date of Contract<br />

Automated Information System<br />

Allied Military Security Guideline<br />

Allied Quality Assurance Publications<br />

Air Operations Centre<br />

Base Defence Operations Centre<br />

Base Support Group<br />

Common Criteria<br />

Configuration Control Board<br />

Critical Design Review<br />

Communication and Information Systems<br />

Configuration Items<br />

Command Line Interface<br />

Contract Line Item<br />

Contractor Logistic Support<br />

Configuration Management<br />

Configuration Management Board<br />

Certificate of Conformity<br />

Concept of Operations<br />

Commercial Off The Shelf<br />

Certification Practice Statement (only if the Project deals with PKI)<br />

Configuration Status Accounting<br />

Community Security Requirements Statement<br />

Comma Separated Value<br />

Dining Facility<br />

Effective Date of Contract<br />

Enterprise Management System<br />

Entry Control Point<br />

Equipment and System Test Objectives<br />

Equipment and System Test Procedures<br />

Equipment and System Test Report<br />

Factory Acceptance Tests<br />

Force Protection<br />

Formal Progress Report<br />

Final System Acceptance<br />

Gymnasium<br />

Headquarters<br />

Hypertext Mark-up Language<br />

Interim approval To Operate<br />

International Civilian Aviation Organisation<br />

Interface Control Document<br />

Invitation for Bid<br />

Integrated Logistics Support<br />

Integrated Logistics Support Plan<br />

Initial Operational Capability<br />

Integrated Project Management Team<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

69/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ISAF<br />

LRU<br />

MIB<br />

MIL-STD<br />

MWA<br />

N<strong>ATO</strong><br />

NC3A<br />

NCSA<br />

NS WAN<br />

NPKI<br />

ORs<br />

O&M<br />

OT&E<br />

PA<br />

PBS<br />

PDF<br />

PDR<br />

PFD<br />

PFE<br />

PFP<br />

PIP<br />

PM<br />

PMP<br />

PMO<br />

PMS<br />

PRM<br />

PSA<br />

PTP<br />

QA<br />

QAP<br />

RAR<br />

ROM<br />

RSPL<br />

SAT<br />

SDS<br />

SHAPE<br />

SIP<br />

SISRS<br />

SIVP<br />

SOW<br />

SRS<br />

SSAT<br />

SSS<br />

SSR<br />

SSRS<br />

STANAG<br />

STP<br />

TBA<br />

TBD<br />

TT<br />

T & E<br />

WBS<br />

International Security and Assistance Force<br />

Line Replaceable Unit<br />

Management Information Base<br />

Military Standard<br />

Main Welfare Area<br />

North Atlantic Treaty Organisation<br />

N<strong>ATO</strong> Consultation Command and Control Agency<br />

N<strong>ATO</strong> Communications Services Agency<br />

N<strong>ATO</strong> SECRET WAN<br />

N<strong>ATO</strong> PKI (only if the project deals with PKI)<br />

Off-specification Reports<br />

Operation and Maintenance<br />

Operational Test & Evaluation<br />

Public Address<br />

Product Breakdown Structure<br />

Portable Document Format<br />

Preliminary Design Review<br />

Product Flow Diagram<br />

Purchaser-furnished equipment<br />

Purchaser-furnished property<br />

Project Implementation Plan<br />

Project Manager<br />

Project Management Plan<br />

Project Management Office<br />

Project Master Schedule<br />

Project Review Meeting<br />

Provisional Site Acceptance<br />

Project Test Plan<br />

Quality Assurance<br />

Quality Assurance Plan<br />

Risk Assessment Report<br />

Rough Order of Magnitude<br />

Recommended Spare Parts List<br />

Site Acceptance Tests<br />

System Design Specification<br />

Supreme Headquarters Allied Powers Europe<br />

System Implementation Plan<br />

System Interconnection Security Requirements Statement<br />

Security Implementation Verification Procedures<br />

Statement of Work<br />

System Requirements Specification<br />

Site and System Activation Testing<br />

Schedule of Supply and Services<br />

Site Survey Report<br />

System Security Requirements Statement<br />

Standards N<strong>ATO</strong> Agreement<br />

Security Test Plan<br />

To Be Advised<br />

To Be Determined<br />

Technical Transfer<br />

Test and Evaluation<br />

Work Breakdown Structure<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

70/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

71/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX B: PROPOSED CAMERA LOCATION MAP HQ ISAF<br />

Cameras monitor all activity along the perimeter and entry points of HQ ISAF<br />

Satellite Imagery for this location available on Google Earth: 34º31’48.32”N 69º11’25.69”E<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

72/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

Type I Camera System<br />

5, 8, 10<br />

Type II Camera System<br />

3, 11, 12<br />

Type III Camera System<br />

1, 2, 4, 6, 7, 9, 13, 14, 15, 16<br />

NOTE: The term system denotes that additional assets may be required to meet the<br />

requirements as specified in the technical annex.<br />

NOTE: The above information specifies the area of coverage. Contractors shall<br />

develop low cost innovative designs that meet the requirement.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

73/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX C: NOTIONAL EQUIPMENT CONFIGURATION DIAGRAM<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

74/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX D: EXAMPLE RESIL<strong>IE</strong>NT IP NETWORK P<strong>LA</strong>N FOR IP CCTV<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

75/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX E GENERAL EQUIPMENT DESCRIPTION<br />

THIS SECTION INTENTIONALLY LEFT B<strong>LA</strong>NK SEE APPENDIX I FOR TECHNICAL DESCRIPTION<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

76/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX F: APPROXIMATE DIMENSIONS OF THE HQ ISAF COMPOUND<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

77/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX G: POLES LIGHTING STANDARDS<br />

All poles lighting shall be installed according to Medium Intensity Type C lighting (steady red) as described in the table below.<br />

One or more low-, medium- or high-intensity obstacle lights shall be located as close as practicable to the top of the object. The top lights shall<br />

be so arranged as to at least indicate the points or edges of the object highest in relation to the obstacle limitation surface.<br />

All lights must be able to switch off using only one master switch located in the BDOC for compound security reasons.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

78/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

Examples of marking and lighting of tall<br />

structures<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

79/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX H: POLES PAINTING STANDARDS<br />

Painting shall be completed in accordance with the principles:<br />

Painting: Red – White – stripes paintings on them. The stripes shall be 1/7 of longest dimension (20/7=2.8m wide). The lower and the higher<br />

stripes should be red.<br />

Medium Intensity lighting<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

80/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

ANNEX I: SYSTEM REQUIREMENTS SPECIFICATION (SRS)<br />

I.1 General<br />

I.1.1<br />

I.1.1.1<br />

I.1.1.2<br />

I.1.1.3<br />

I.1.1.3.1<br />

I.1.1.3.2<br />

I.1.1.3.3<br />

I.1.1.3.4<br />

I.1.1.3.5<br />

I.1.1.3.6<br />

I.1.1.3.7<br />

I.1.2<br />

Scope of this Annex<br />

This Annex to the CCTV HQ ISAF SOW provides the minimum functional and technical requirements for the CCTV HQ ISAF.<br />

The requirements in the Annex are organised in six categories, as follows:<br />

System requirements;<br />

Functional Requirement;<br />

Operational Requirement;<br />

Technical Requirement;<br />

Security Requirement;<br />

Environmental Requirement;<br />

Physical Requirement;<br />

Remote administration, management requirement.<br />

System Requirements<br />

I.1.2.1 The Contractor shall design and implement a surveillance system including Cameras distribution systems, cabling Network and control<br />

elements.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

81/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.3<br />

I.1.3.1<br />

I.1.3.1.1<br />

I.1.3.1.2<br />

Functional Requirements<br />

The enhanced IP CCTV HQ ISAF System shall meet the following functional requirements detailed below:<br />

Central control and operation of the IP CCTV HQ ISAF from the BDOC and ECP;<br />

Remotely controlled Pan Tilt Zoom (PTZ) controllers.<br />

I.1.3.1.3 Complete ground surveillance coverage of the perimeter and points of entry of HQ ISAF compound as shown at ANNEX A;<br />

I.1.3.1.4<br />

I.1.3.1.5<br />

I.1.3.1.6<br />

I.1.4<br />

I.1.4.1<br />

I.1.4.1.1<br />

Support for wide range of IP cameras and/or 3 rd party IP cameras<br />

Picture in Picture and Multiple monitor display of IP cameras<br />

Installation of retractable masts that are designed to last for a minimum of 10 years;<br />

Operational Requirements<br />

The enhanced IP CCTV HQ ISAF System shall meet the following operational requirements:<br />

Provide a Microsoft Windows based Operational & Maintenance GUI, application compatible with MS XP Pro, MS Vista, and MS<br />

Windows 7 operating 64 bit systems.<br />

I.1.4.1.1.1 User and device registration, administration<br />

I.1.4.1.1.2 Operational status display of CCTV components: network links’ status; network alarms, notifications; cameras’ status; CCTV system<br />

performance data; storage status<br />

I.1.4.1.2<br />

The server room equipment cabinets shall have sufficient cooling to support all equipment installed therein.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

82/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.4.1.3<br />

I.1.4.1.4<br />

I.1.4.1.5<br />

I.1.4.1.6<br />

I.1.4.1.7<br />

I.1.4.1.8<br />

I.1.4.1.9<br />

The system shall be remotely configurable and controllable from the BDOC.<br />

The system shall be remotely controllable (PTZ) from ECP and BDOC installed digital keyboard, workstations;<br />

The system shall provide coverage in low light conditions.<br />

Have dual field of view thermal and daylight/lowlight capability.<br />

The system shall provide clear, high contrast imagery in total darkness, through smoke, and fog.<br />

The system shall provide camera coverage as specified in Annex B and allow for future expansion of up to twice the proposed<br />

cameras without system degradation; A camera subsystem contains all photo optical equipment required to achieve the capability.<br />

Audio and video recording synchronization where applicable (if there is voice input);<br />

I.1.4.1.10 The system shall provide 30 days of video storage capacity for the highest configured resolution of the cameras for the proposed<br />

solution;<br />

I.1.4.1.11 The system shall allow future expansion of cameras capable of both day, low light, and night vision;<br />

I.1.4.1.12 The system towers and masts shall conform to the International Civilian Aviation Organisation (ICAO) aerodrome marking<br />

requirements;<br />

I.1.4.1.13 The IP transport network shall be robust, resilient and has fast convergence between redundant links<br />

I.1.4.1.14 The system shall handle unclassified information only and is not expected to interface with any other N<strong>ATO</strong> or non-N<strong>ATO</strong> systems.<br />

I.1.4.1.15 The systems and its components shall meet the environmental requirements detailed in this document;<br />

I.1.4.1.16 The system components shall be maintained under a three (3) tier Operation & Maintenance (O&M) contract.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

83/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5<br />

I.1.5.1<br />

I.1.5.1.1<br />

I.1.5.1.2<br />

I.1.5.1.3<br />

I.1.5.1.4<br />

I.1.5.1.5<br />

I.1.5.2<br />

I.1.5.2.1<br />

I.1.5.2.2<br />

Technical Requirements<br />

Global requirement<br />

All network components, devices shall support AAA RADIUS settings<br />

All components shall have NTP server feature for system clock adjustment, setting<br />

All components shall be UPS protected. I.1.5.5.6<br />

All server and network equipments shall have dual power supply ( 1 connected directly to power and second one directly to UPS, this<br />

way UPS can be maintained without service disruption)<br />

Live viewing shall be supported on a variety of client platforms, including standard Internet browsers.<br />

External Equipment Requirements<br />

Be resistant to local environment as stipulated in section 4.2 and able to operate without any degradation<br />

Rugged ethernet cables for outdoor use which withstand:<br />

I.1.5.2.2.1 Cable pull to ensure proper strain relief (50 pounds) not loosing electrical connectivity;<br />

I.1.5.2.2.2 All cables shall be labelled and given adequate protection in accordance with N<strong>ATO</strong> SPID-29<br />

I.1.5.2.3<br />

External cabinets<br />

I.1.5.2.3.1 Shall be capable housing 19” rackable devices<br />

I.1.5.2.3.2 Shall include a battery back-up power system (UPS) for equipments inside.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

84/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.3.3 Shall have patch panel for fibre, copper cable support<br />

I.1.5.2.3.4 Shall have protection against EMI, and electrical surges<br />

I.1.5.2.3.5 External cabinets shall be robust and lockable to block unauthorised access<br />

I.1.5.2.3.6 Shall have EN1303 class. code 16-0-13 or equivalent lock<br />

I.1.5.2.3.7 Shall have earth bond strap on metal door<br />

I.1.5.2.3.8 Operating temperature for the external box install shall be inline with section 4.2.<br />

I.1.5.2.4<br />

Ethernet switch requirements<br />

I.1.5.2.4.1 Shall be remotely manageable, controllable and be either CISCO or 3COM. CISCO and 3COM are the 2 types of routers and<br />

switches authorized for use in ISAF.<br />

I.1.5.2.4.2 Shall have RADIUS centralized password management<br />

I.1.5.2.4.3 Shall have Web based management, Command Line Interface (CLI) capability<br />

I.1.5.2.4.4 Shall be remotely manageable, controllable<br />

I.1.5.2.4.5 Shall have RADIUS centralized password management<br />

I.1.5.2.4.6 Support user authentication<br />

I.1.5.2.4.7 Shall have Web based management, Command Line Interface (CLI) capability<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

85/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.4.8 Shall support IP v4, v6 (unicast, multicast); shall comply with the N<strong>ATO</strong> Policy on the Internet Protocol Version 6 (IPv6) AC/322-<br />

D(2007)0039<br />

I.1.5.2.4.9 Shall support SSHv2, SNMPv1,v2,v3, IGMPv1/v2, NTP,FTP,TFTP<br />

I.1.5.2.4.10 Shall have port enable/disable capability, MAC address restriction<br />

I.1.5.2.4.11 Shall have port rate, broadcast storm limiting<br />

I.1.5.2.4.12 Shall have logging, alarm, status and watchdog capability<br />

I.1.5.2.4.13 Shall support 802.1x,802.1Q,802.1p,STP,RSTP<br />

I.1.5.2.4.14 Shall support dynamic V<strong>LA</strong>N configuration protocol(VTP/GVRP/MVRP)<br />

I.1.5.2.4.15 Shall have dual power supply.<br />

I.1.5.2.4.16 Shall support IP v4, v6; shall comply with the N<strong>ATO</strong> Policy on the Internet Protocol Version 6 (IPv6) AC/322-D(2007)0039<br />

I.1.5.2.4.17 Shall support SSHv2, SNMPv1,v2,v3, IGMPv1/v2, NTP, FTP, TFTP<br />

I.1.5.2.4.18 Shall comply with the NCIRC-TC guidance for hardening CISCO Switches used on N<strong>ATO</strong> networks version 1.3 of 25 Nov 2010<br />

I.1.5.2.4.19 Shall comply with the NCIRC-TC guidance for hardening CISCO routers used on N<strong>ATO</strong> networks version 1.3 of 05 Mar 2009<br />

I.1.5.2.4.20 Shall support dynamic V<strong>LA</strong>N configuration protocol(VTP/GVRP/MVRP)<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

86/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

I.1.5.2.4.21 Shall have a minimum IP65 certification (temporary immersion of dust and water) or the external housing shall have IP65<br />

certification for outdoor operational usage and a minimum IP55 certification for indoor use.<br />

I.1.5.2.4.22 Shall have an operational availability of 99.9%.<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.5<br />

Masts<br />

I.1.5.2.5.1 The Contractor shall be responsible for purchasing, delivering and installing the all required masts and ancillary equipment.<br />

I.1.5.2.5.2 Masts shall be adjustable to a height of 15m.<br />

I.1.5.2.5.3 Masts shall be able to withstand the continuous wind load conditions applicable to the environmental conditions in Kabul,<br />

Afghanistan.<br />

I.1.5.2.5.4 Masts shall have a self-powered obstruction light fitted that meets the requirements of the ICAO. (See Annex G: Poles lighting<br />

standards)The mast shall be of the retractable type (foldable, telescopic, etc) to avoid climbing. It shall be able to be lowered by<br />

mechanical means (pulley system, etc) to facilitate routine maintenance without the need of cherry pickers, ladders, etc. Due to the<br />

environmental and climatic conditions of Afghanistan, hydraulic systems shall not be implemented for the CCTV project. The<br />

system shall be considered fixed<br />

I.1.5.2.5.5 Shall include mountings for the external equipment control cabinets.<br />

I.1.5.2.5.6 There shall be two types of mast provided for this project:<br />

I.1.5.2.5.6.1 Type 1 mast: Overhangs the perimeter wall by 5 meters and retracts within ISAF HQ for maintenance without the need for a<br />

Cherry Picker or ladder<br />

I.1.5.2.5.6.2 Type 2 mast: Vertical mast that retracts for maintenance with the need of cherry pickers or ladders.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

87/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.5.7 Type 1 and Type 2 masts shall be able to support a minimum of 3 cameras to include the capability to provide sufficient emergency<br />

power to all cameras and supporting equipment in accordance with reference I.1.4.5.6 Uninterruptible Power Supply to ensure an<br />

inherent operational availability of 99.9%..<br />

I.1.5.2.5.8 Painting shall then be according to ICAO Doc 9157 Part 4 Chapter 14 as described at Annex H.<br />

I.1.5.2.5.9 Camera Stanchion Requirement:<br />

I.1.5.2.5.9.1 Obstacle Light<br />

I.1.5.2.5.9.1.1 Medium-Intensity Type C<br />

I.1.5.2.5.9.1.2 Red Fixed Signal Light ANNEX G<br />

I.1.5.2.5.9.1.3 Vertical Beam Spread 3º min<br />

I.1.5.2.5.9.1.4 Minimum Intensity 2000 candelas + 25%<br />

I.1.5.2.5.10 Pole Painting Standard<br />

I.1.5.2.5.10.1 Red & White stripe marking band ANNEX H<br />

I.1.5.2.5.11 Retractable<br />

I.1.5.2.5.11.1 Supports maintenance without the need of a cherry picker or extension ladder<br />

I.1.5.2.5.11.2 Can be ground or wall mountable<br />

I.1.5.2.5.12 Outdoor box/cabinet for<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

88/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.5.12.1 Fiber, copper patch panel, cable support<br />

I.1.5.2.5.12.2 Robust Ethernet switch<br />

I.1.5.2.5.12.3 UPS which supports both Camera, switch and Stanchion lighting<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

89/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

.<br />

I.1.5.2.6<br />

Cameras<br />

I.1.5.2.6.1 Following cameras performance requirements shall be met:<br />

I.1.5.2.6.1.1 20 X optical zoom<br />

I.1.5.2.6.1.2 Pan speed 90 degree / sec<br />

I.1.5.2.6.1.3 Minimum 15 fps<br />

I.1.5.2.6.1.4 Minimum 1.3 Megapixel (1280X1024) for the fix view 60 degree view angle<br />

I.1.5.2.6.1.5 Minimum 2.0 or 3.2 Megapixel (4X 800x600) for the 180 degree view angle PTZ<br />

I.1.5.2.6.1.6 Thermal resolution 320x240, 640x480 with PTZ<br />

I.1.5.2.6.1.7 shall have ruggedized, robust enclosur<br />

I.1.5.2.6.1.8 Cameras shall have sunshield<br />

I.1.5.2.6.1.9 Have M-JPEG,H.264,MPEG-4 stream format and jpeg snapshot capability<br />

I.1.5.2.6.1.10 Have IPv4 and IPv6 protocol support<br />

Figure 2 Notional depiction of a possible camera stantion<br />

I.1.5.2.6.1.11 Have user authentication support<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

90/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.6.2 All CCTV camera systems shall:<br />

I.1.5.2.6.2.1 Be resistant to local environment (see paragraphs 2.2.1.10, 4.2).<br />

I.1.5.2.6.2.2 Be delivered in rugged Pan/Tilt/Zoom (PTZ) enclosure.<br />

I.1.5.2.6.2.3 Be provided with pole mounting adapter.<br />

I.1.5.2.6.2.4 Be remotely controlled.<br />

I.1.5.2.6.2.5 Have a ‘snapshot’ capability<br />

I.1.5.2.6.2.6 Allow situation awareness through a wide angle capability.<br />

I.1.5.2.6.2.7 Have dual field of view and daylight/lowlight capability using existing technology such as Infrared Night Vision.<br />

I.1.5.2.6.2.8 Provide clear, high contrast imagery in total darkness, through smoke, and fog using existing technology such as Thermal vision<br />

capability.<br />

I.1.5.2.6.2.9 Be packaged in a rugged, precision PTZ enclosure that can slew at up to a minimum 90 degrees per second for type I and type II<br />

camera systems.<br />

I.1.5.2.6.2.10 Support network operations under IP v4 and v6<br />

I.1.5.2.6.2.11 Be remotely configurable<br />

I.1.5.2.6.2.12 Shall be Open Network Video Interface Forum (ONVIF) compliant and STANAG 4586<br />

I.1.5.2.6.2.13 Support for centralised user authentication<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

91/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.2.6.3 Type 1 CCTV cameras shall:<br />

I.1.5.2.6.3.1 Have a long range capability that can detect a man sized target at 500 m, and read a license plate at 200 m.<br />

I.1.5.2.6.3.2 Have auto-pivot and auto-scaling capability.<br />

I.1.5.2.6.3.3 Have a 360º degrees vision capability.<br />

I.1.5.2.6.3.4 Have motion tracking capability.<br />

I.1.5.2.6.4 Type 2 CCTV cameras shall:<br />

I.1.5.2.6.4.1 Have a range capability that can detect facial features at 100 m.<br />

I.1.5.2.6.4.2 Have a 180 deg. pan capacity.<br />

I.1.5.2.6.4.3 Have motion tracking capability.<br />

I.1.5.2.6.5 Type 3 CCTV cameras shall:<br />

I.1.5.2.6.5.1 Be of the fixed type – no pan required<br />

I.1.5.2.6.5.2 Have a range capability that can detect facial features at 10 m (horizontal distance from mast).<br />

I.1.5.2.6.5.3 Be able to continually monitor an area of 100 m2.<br />

I.1.5.3<br />

I.1.5.3.1<br />

Entry Control Points.<br />

IP matrix video switch component<br />

I.1.5.3.1.1 Shall drive the COP display wall of LCD screens at ECP<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

92/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.3.1.2 Shall support minimum two (2) Type II LCD screens<br />

I.1.5.3.2<br />

Common Operational Picture (COP) display wall shall have:<br />

I.1.5.3.2.1 The video wall shall contain two (2) Type 2 monitors and one video controller to allow the watchkeepers to clearly view imagery<br />

from multiple cameras simultaneously and zoom in on areas of interest to the highest resolution. Refer to I.1.5.4.5.6 Visualization<br />

monitors<br />

I.1.5.3.2.2 Live view of all ECP area camera feeds on the LCD screens<br />

I.1.5.3.2.3 The video wall setup shall have an easily customizable layout configuration manager (drag & drop, move or relocate, click to select<br />

zoom setup)<br />

I.1.5.3.2.4 COP display shall incorporate a overall status of the system I.1.4.1.1.2<br />

I.1.5.3.2.5 The Entry Control Point location(s) shall have a remote capability to control cameras (PTZ) within the vicinity of the gate (via Video<br />

Management Client and/or PTZ keyboard)<br />

I.1.5.3.2.6 The master control station shall remain the BDOC which shall have override authority<br />

I.1.5.3.2.7 The ECP shall have an visual indication when the BDOC overrides<br />

I.1.5.3.3<br />

Video Management Client ( workstation application UI ) shall have:<br />

I.1.5.3.3.1 manual bookmarking feature where the operator can create searchable tags with descriptions and send references via email to<br />

recipients<br />

I.1.5.3.3.2 timeline, scrub bar, thumbnail search features<br />

I.1.5.3.3.3 multiple channel (archive) search and simultaneous (synchron) playback of selected video files, cam feeds<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

93/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.3.3.4 manual function to run, execute analytics on selected feed<br />

I.1.5.3.3.5 Support user authentication I.1.5.5.5<br />

I.1.5.4<br />

I.1.5.4.1<br />

I.1.5.4.2<br />

Base Defence Operating Centre<br />

The operating centre equipment shall provide the control elements of the system in accordance with the following requirements:<br />

IP matrix video switch component<br />

I.1.5.4.2.1 Shall drive the COP display wall of LCD screens at BDOC<br />

I.1.5.4.2.2 Shall support minimum three (3) Type I LCD screens<br />

I.1.5.4.3<br />

Common Operational Picture (COP) display wall shall have:<br />

I.1.5.4.3.1 The video wall shall contain three (3) Type I LCD screens to allow the watch keepers to clearly view imagery from multiple cameras<br />

simultaneously and zoom in on areas of interest to the highest resolution<br />

I.1.5.4.3.2 Live view of all camera feeds on the LCD screens<br />

I.1.5.4.3.3 The video wall setup shall have an easily customizable layout configuration manager (drag & drop, move or relocate, click to select<br />

zoom setup)<br />

I.1.5.4.3.4 COP display shall incorporate a overall status of the system I.1.4.1.1.2<br />

I.1.5.4.4<br />

I.1.5.4.5<br />

The BDOC shall have a remote capability to control all cameras in the network via 2 watchstander consoles (utilizing Video<br />

Management Client and/or PTZ keyboard) .<br />

Video Management Client ( workstation application UI ) shall have:<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

94/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.4.5.1 Manual bookmarking feature where the operator can create searchable tags with descriptions and send references via email to<br />

recipients<br />

I.1.5.4.5.2 Timeline, scrub bar, thumbnail search features<br />

I.1.5.4.5.3 Multiple channel (archive) search and simultaneous (synchronize) playback of selected video files, cam feeds<br />

I.1.5.4.5.4 Manual function to run, execute analytics on selected feed<br />

I.1.5.4.5.5 Support user authentication I.1.5.5.5<br />

I.1.5.4.5.6 The Visualization Monitors<br />

I.1.5.4.5.6.1<br />

Type 1 monitors<br />

I.1.5.4.5.6.1.1 46-inch monitor minimum<br />

I.1.5.4.5.6.1.2 Shall be able to view at least six (6) cameras on each monitor<br />

I.1.5.4.5.6.2 Type 2 monitors<br />

I.1.5.4.5.6.2.1 24 inch monitors<br />

I.1.5.4.5.6.2.2 Shall be able to simultaneously view four (4) imagery / video from a minimum of cameras simultaneously on each monitor.<br />

I.1.5.4.5.6.3 Shall possess Dual camera control<br />

I.1.5.4.5.6.3.1 Shall be able to manipulate PTZ for all cameras<br />

I.1.5.4.5.6.3.2 The keyboard controls shall be fully redundant and provide the ability to take control of each monitor display.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

95/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.4.5.6.4 Monitors to display<br />

I.1.5.4.5.6.4.1 Video wall shall display permanent display of all camera feeds<br />

I.1.5.4.5.6.4.2 Selective display for feed from specific camera(s) of interest<br />

I.1.5.4.5.6.5 Digital Keyboard Control (Pan Tilt Zoom Controller):<br />

I.1.5.4.5.6.5.1 The keyboard controls shall be fully redundant and provide the ability to take control of each monitor display<br />

I.1.5.4.5.6.5.2 Each keyboard shall be delivered with a variable speed joystick<br />

I.1.5.4.5.6.6 Cabling<br />

I.1.5.4.5.6.6.1 High quality shielded cabling shall be used that is suitable for the environment for which it shall be used. Refer to Section 4.2 for<br />

environmental and climatic conditions for cabling that shall be exposed to the elements.<br />

I.1.5.4.5.6.6.2 Shall be properly labelled at each end (origin and termination points) in accordance with AC_35-D_1016-REV1<br />

I.1.5.4.5.6.6.3 Shall be properly crimped<br />

I.1.5.4.5.6.6.4 Shall adhere to standard cabling guidelines<br />

I.1.5.4.5.6.6.5 Shall be managed responsibly with with a cable management system e.g. cabling must be secured and positioned neatly to<br />

facilitate proper maintenance.<br />

I.1.5.4.5.6.6.6<br />

I.1.5.5<br />

Technical Centre.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

96/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.5.1<br />

The Technical Centre server room shall house the IP CCTV HQ ISAF system control hardware in accordance with the<br />

following requirements<br />

I.1.5.5.1.1 Equipments shall provide remote control, management capability<br />

I.1.5.5.1.2 Equipments shall be manageable from local console ( KVM, LCD in rack)<br />

I.1.5.5.1.3 42U high equipment cabinet rack(s) to mount system control equipment (19 inch standard)<br />

I.1.5.5.1.4 Rack(s) shall have fibre and copper cable patch panels and cable supporters;<br />

I.1.5.5.1.5 All rack elements shall be corrosion-resistant;<br />

I.1.5.5.1.6 Racks shall have sufficient cooling or fan installation to support installed components;<br />

I.1.5.5.1.7 Power outlet installation is European standard and power rate is 230 V;<br />

I.1.5.5.1.8 Rack(s) shall have a rack mountable UPS device(s) for the CCTV System components.<br />

I.1.5.5.2<br />

NTP time server<br />

I.1.5.5.2.1 System shall have a NTP server with GPS (stratum 0) time source<br />

I.1.5.5.2.2 NTP server shall support NTPv3 and NTPv4<br />

I.1.5.5.3<br />

DNS service<br />

I.1.5.5.3.1 The system shall have a DNS service<br />

I.1.5.5.3.2 All devices shall be registered in DNS zone(s) of system domain<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

97/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.5.4<br />

RADIUS service<br />

I.1.5.5.4.1 The system shall have a centralized RADIUS authentication service for the network devices<br />

I.1.5.5.5<br />

User authentication service<br />

I.1.5.5.5.1 The system shall have a centralized user authentication service for the IP CCTV system and its components<br />

I.1.5.5.6<br />

Uninterruptible Power Supply (UPS).<br />

I.1.5.5.6.1 All components shall be protected by real-time UPS.<br />

I.1.5.5.6.2 UPS power backup for 30 minutes and shall be expandable to 60 minutes timeframe with additional battery pack module;<br />

I.1.5.5.6.3 The UPS shall be On-Line double conversion technology (AC/DC/AC) with zero time transfer<br />

I.1.5.5.6.4 The UPS shall have Harmonic distortion of less than 5% Total Harmonic Distortion (THD)<br />

I.1.5.5.6.5 The batteries shall be of sealed maintenance free type, replacement of the batteries shall be possible without powering down the UPS.<br />

I.1.5.5.6.6 UPS shall provide remote power monitoring capability from BDOC;<br />

I.1.5.5.7<br />

Network Video Recorder (NVR) System<br />

I.1.5.5.7.1 IP CCTV System shall have a dual, redundant NVR recorder setup;<br />

I.1.5.5.7.2 Shall have a minimum of one (1) month recording capability for the entire CCTV network.<br />

I.1.5.5.7.3 NVR Servers shall have dual power supply<br />

I.1.5.5.7.4 Shall have minimum 3 Gigabit Ethernet interfaces (1 management, 2 network connectivity)<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

98/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.5.7.5 Shall have internal or external RAID 5 storage or storage cluster (with gigabit interfaces). External storage server shall have dual<br />

power supply.<br />

I.1.5.5.7.6 Recording capability ( video channels ) shall meet the number of cameras of the Contractor’s system design ( containing extension )<br />

I.1.5.5.7.7 Shall support M-JPEG,H.264,MPEG-4 stream format and jpeg snapshot recording capability<br />

I.1.5.5.7.8 Shall support IP v4 and v6, (unicast, multicast)<br />

I.1.5.5.7.9 Shall support multiple client platform for streaming<br />

I.1.5.5.7.10 Shall support transfer of recorded archived data via optical media (CD and DVD), HDD, Secure USB thumb drive, and network<br />

drive.<br />

I.1.5.5.7.11 Support user authentication I.1.5.5.5<br />

I.1.5.5.8<br />

NVR management application shall support the following requirements:<br />

I.1.5.5.8.1 Record continuously all camera feeds<br />

I.1.5.5.8.2 Search recorded camera files<br />

I.1.5.5.8.3 View, replay camera files<br />

I.1.5.5.8.4 Digital zoom 20X<br />

I.1.5.5.8.5 Remote search and replay on workstation for authenticated user<br />

I.1.5.5.8.6 video analytics facial, license plate recognition integration<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

99/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.5.8.7 backup camera files to USB,DVD, Network media<br />

I.1.5.5.8.8 free space requirement calculation for camera setup<br />

I.1.5.5.8.9 time stamps for video feeds<br />

I.1.5.5.9<br />

Video Management Software (VMS) shall have:<br />

I.1.5.5.9.1 Virtual desktop environment, predefined work area with saved positions of application windows<br />

I.1.5.5.9.2 Integration with NVR, analytics, authentication<br />

I.1.5.5.9.3 Support 64 cameras, camera setup, configuration<br />

I.1.5.5.9.4 Support 3 rd party cameras and Network Video Recorder servers<br />

I.1.5.5.9.5 Support analytics software (facial, licence plate)<br />

I.1.5.5.9.6 ONVIF compliance<br />

I.1.5.5.9.7 Timeline, scrub bar, thumbnail search features<br />

I.1.5.5.9.8 Archive video export utility (to USB stick and HDD, CD,DVD)<br />

I.1.5.5.9.9 Support user authentication I.1.5.5.5<br />

I.1.5.5.9.10 Capability to control, monitor and assign rights to CCTV HQ operators, clients (Video Management Clients). The master control<br />

station shall remain the BDOC which shall have override authority for operations.<br />

I.1.5.5.10 Distribution and access switches<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

100/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.5.10.1 Shall meet the requirements set forth in I.1.2.5.4<br />

I.1.5.6<br />

Connectivity<br />

I.1.5.6.1 The Contractor shall be responsible for the cabling between each camera/mast system and the ECP, BDOC, and technical centre.<br />

Where possible, the contractor shall utilise the installed site-wide cable infrastructure accessed through existing distribution nodes.<br />

I.1.5.6.2 It is estimated that the distance between camera placement and the nearest existing ducting is < 50m.<br />

I.1.5.6.3 The contractor shall utilize existing ducting, cabling and patch panels to the greatest extent possible to connect the CCTV system.<br />

Existing installed cabling is predominantly multimode fibre (50um) with SC connector patch panels, however a limited number of<br />

distribution nodes have only single-mode fibre connectivity.<br />

I.1.5.6.4 The contractor shall ensure that all cables are properly secured and labelled at both termination points to facilitate ease of<br />

maintenance. Cable labelling shall follow best commercial practice, and inline with the cable labelling standards already in use at<br />

HQ ISAF.<br />

I.1.5.6.5 The contractor shall ensure that all cabling is properly shielded and crimped. No copper or fiber shall be exposed to the<br />

environment.<br />

I.1.5.6.6 The contractor shall take appropriate precautions to minimize the build up of dust and other debris within or between devices and<br />

associated equipment. All cabling to/through external devices shall be hermetically sealed to prevent dust or debris build up in<br />

cabinets and boxes.<br />

I.1.5.6.7 The contractor shall ensure that run off drains are properly installed to prevent/minimize water collection on the equipment or at the<br />

based of support structures such as mast.<br />

I.1.5.6.8 The delivered as-built documentation shall include full details of all cabling installed.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

101/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.5.6.9<br />

Any needed connectivity between the supporting technical equipment and main connectivity patch panels shall be the Contractor’s<br />

responsibility e.g. where possible existing infrastructure can be used.<br />

I.1.5.6.10 The Contractor shall connect each camera system to the facility power.<br />

I.1.5.7<br />

I.1.5.7.1<br />

I.1.5.7.2<br />

I.1.5.8<br />

I.1.5.8.1<br />

I.1.5.8.2<br />

I.1.5.9<br />

I.1.5.9.1<br />

I.1.6<br />

I.1.6.1<br />

Performance<br />

IP transport network shall support all quality video feeds without interruption and frame loss, gigabit speed<br />

NVR system and storage shall be capable handling, recording all parallel IP camera streams, searching and replaying and analyze<br />

(facial, licence plate recognition) video files within set, specified recorded timeframes.<br />

Scalability and Sizing<br />

The system shall be scalable and it shall allow future expansions. The Contractor shall specify the maximum number IP cameras<br />

subsystems (such as additional Type I, Type II, and Type III cameras within the boundaries or the perimeter of HQ ISAF) the<br />

delivered system can handle without further investment and expansion of the core components;<br />

Contractor shall describe, document the delivered system scalability and feature set;<br />

Mobility.<br />

All cameras shall be installed on retractable masts. A retractable mast is a mast that can be lowered by mechanical means (e.g.<br />

hydraulics, pulley system, etc) to facilitate routine maintenance without the need of cherry pickers, ladders, etc. The system is<br />

considered fixed.<br />

Security Requirements<br />

Classification<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

102/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.6.1.1<br />

I.1.6.1.2<br />

I.1.7<br />

The CCTV HQ ISAF shall process unclassified video data only and shall be controlled, managed by the BDOC. Archived data of<br />

interest may be transferred from the NVR download terminal onto optical media for further analysis and reclassification.<br />

Capability from this SOW shall meet N<strong>ATO</strong> Security and Information Security (INFOSEC) directives and policies per section<br />

2.1.1.3.6 and AC/322-D/0030 – Rev 5, and AC/35-D/2005 Rev 2.<br />

Environmental and Climatic requirements<br />

I.1.7.1 Refer to section 4.2<br />

I.1.8<br />

I.1.8.1<br />

I.1.8.2<br />

I.1.8.3<br />

I.1.8.4<br />

I.1.8.5<br />

I.1.8.6<br />

I.1.8.7<br />

I.1.8.7.1<br />

Remote administration, management requirement<br />

The system shall have a management application to configure, administrate the IP CCTV System (server – client model)<br />

The management application shall provide remote access for the clients<br />

The system shall support management clients on additional remote locations over the IP network (with strict access rules as limited IP<br />

address access, limited user access, ...)<br />

Remote management client shall have to work through WAN environments (typically available bandwidth in theatre is 1Mbit/s to E3<br />

line but as shared bandwidth)<br />

Remote management client shall work over typical one satellite hop connection (300ms one way delay)<br />

Management application shall support the following protocols, data types, management objects:<br />

HTTPS, TLS<br />

SSHv1,SSHv2<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

103/104


N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

I.1.8.7.2<br />

I.1.8.7.3<br />

I.1.8.7.4<br />

I.1.8.7.5<br />

I.1.8.8<br />

I.1.8.8.1<br />

I.1.8.8.2<br />

I.1.8.8.3<br />

I.1.8.8.4<br />

I.1.8.8.5<br />

I.1.8.8.6<br />

I.1.8.8.7<br />

I.1.8.8.8<br />

I.1.8.8.9<br />

SNMPv1, SNMPv2,SNMPv3<br />

related data types ASN.1, SMI (Structure of Management Information)<br />

MIB, MIB II (Management Information Base)<br />

vendor provided MIB files<br />

Management application(s) shall be able:<br />

Load and use vendor provided MIB files<br />

Poll, collect performance data from the IP CCTV network devices, elements (switches, routers, IP cams, servers, storage)<br />

Display IP CCTV System visual network map with the components and their status (with colour codes e.g.: green, yellow, red as<br />

service status OK, DEGRADED, FAILED)<br />

Handle, process SNMP Trap messages, alarms, notifications<br />

Log and display events<br />

Forward, send SNMP traps, events to other management system<br />

Integrate external management application into its GUI interface (e.g: a management application or web interface of a specific<br />

network component shall be executed, called from the GUI menu)<br />

Provide configuration management functionality for network elements ( labelled, tagged, branched versions of configuration files)<br />

Support user authentication I.1.5.5.5<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

104/104