NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

NATO COMMUNICATIONS AND INFORMATION<br />

AGENCY<br />

INVITATION FOR BID<br />

IFB-CO-13300-ANWI<br />

NEW NATO HEADQUARTERS<br />

ACTIVE NETWORK INFRASTRUCTURE<br />

(NNHQ ANWI)<br />

BOOK I<br />

INSTRUCTIONS TO BIDDERS<br />

VERSION 03<br />

(issued under IFB Amendment No.2)<br />

Book I, Page I-1<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

TABLE OF CONTENTS<br />

SECTION 1 INTRODUCTION 4<br />

1.1. Purpose 4<br />

1.2. Scope 4<br />

1.3. Overview of the Prospective Contract. 6<br />

1.4. Governing Rules, Eligibility, and Exclusion Provisions 9<br />

1.5. Security 10<br />

1.6. Bidders Conference 10<br />

1.7. Documentation 12<br />

SECTION 2 GENERAL BIDDING INFORMATION 13<br />

2.1. Definitions 13<br />

2.2. Eligibility and Origin of Equipment and Services 14<br />

2.3. Bid Delivery and Bid Closing 14<br />

2.4. Requests for Extension of Bid Closing Date 15<br />

2.5. Purchaser’s Point of Contact 16<br />

2.6. Request for IFB Clarifications 16<br />

2.7. Requests for Waivers and Deviations 17<br />

2.8. Amendment of the Invitation for Bid 18<br />

2.9. Modification and Withdrawal of Bids 18<br />

2.10. Bid Validity 19<br />

2.11. Bid Guarantee 19<br />

2.12. Cancellation of Invitation for Bid 21<br />

2.13. Electronic Transmission of Information and Data 21<br />

2.14. Supplemental Agreements 22<br />

2.15. Notice of Limitations on Use of Intellectual Property Delivered to the<br />

Purchaser 22<br />

2.16. Mandatory Quality Assurance and Quality Control Standards 23<br />

SECTION 3 BID PREPARATION INSTRUCTIONS 24<br />

3.1. General 24<br />

3.2. Bid Package Content 25<br />

3.3. Package Marking 25<br />

3.4. Bid Administration Package 26<br />

3.5. Price Quotation 27<br />

3.6. Technical Proposal Package 29<br />

SECTION 4 BID EVALUATION AND CONTRACT AWARD 40<br />

4.1. General 40<br />

4.2. Best Value Award Approach and Bid Evaluation Factors 41<br />

4.3. Evaluation Procedure 42<br />

4.4. Evaluation Step 1 - Administrative and Contractual Compliance 43<br />

4.5. Evaluation Step 2 - Technical Evaluation 45<br />

4.6. Evaluation Step 3 - Price Evaluation 55<br />

4.7. Evaluation Step 4 – Calculation of Best Value Scores 58<br />

Annex A Bidding Sheets 1<br />

Annex B Prescribed Administrative Forms and Certificates 1<br />

Book I, Page I-2<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex C Bid Guarantee - Standby Letter of Credit 1<br />

Annex D Clarification Request Form 1<br />

Book I, Page I-3<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 1<br />

INTRODUCTION<br />

1.1. Purpose<br />

1.1.1. The purpose of this solicitation is to invite Bids for the provision of<br />

equipment and services to implement and support the New NATO<br />

Headquarters Active Network Infrastructure (ANWI) and to provide ANWI<br />

Integration Test Services (ITS) as per Part IV - Statement of Work and in<br />

accordance with Part I - Schedule of Supplies and Services.<br />

1.2. Scope<br />

1.2.1. The NATO Communications and Information Agency (NCI Agency,<br />

NCIA), as designated Host Nation responsible for the implementation of<br />

the New NATO Headquarters (NNHQ) Active Network Infrastructure<br />

(ANWI) is authorized to award a Contract to a ANWI Implementation<br />

Contractor (hereinafter referred to as “ANWI Contractor”).<br />

1.2.2. The delivery of the NNHQ requires a number of different elements<br />

supporting the various aspects to deliver a working facility.<br />

1.2.3. The Headquarters Programme Office (HQPO) has overall responsibility<br />

for the delivery of the NNHQ Programme including the migration of<br />

systems and services from the current to the NNHQ in support of NATO<br />

HQ’s planned business functions for 2015 and beyond. In order to<br />

achieve this, three Host Nations (HNs) have the responsibility of<br />

executing the necessary projects to deliver a fully functional New NATO<br />

Headquarters ICT capability.<br />

1.2.4. HN Belgium will deliver the building and the following building related ICT<br />

systems and facilities:<br />

1.2.4.1. its Building Management System (BMS);<br />

1.2.4.2. its Electronic Security Systems (ESS);<br />

1.2.4.3. the integrated audio-visual equipment (AVI);<br />

1.2.4.4. the passive network cabling (PNWI).<br />

1.2.5. Host Nation Executive Management - Information Communications<br />

Technology Management (HN EM-ICTM) will migrate their business<br />

applications, services and data to the ANWI.<br />

1.2.6. HN NCIA is responsible for delivering the new NATO Headquarters’<br />

ANWI which will provide:<br />

Book I, Page I-4<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.2.6.1. Infrastructure capabilities (processing, storage) for four security<br />

domains (NATO SECRET, NATO Business (up to NATO<br />

RESTRICTED), Euro-Atlantic Partnership Council (EAPC) SECRET,<br />

and Public/NATO UNCLASSIFIED);<br />

1.2.6.2. Wired and Wireless LAN switching capabilities for four security<br />

domains, installed and integrated with building and cabling<br />

infrastructure;<br />

1.2.6.3. Communications capabilities consisting of the HQs’ telephone services,<br />

Video Teleconferencing, site security communications, IPTV services,<br />

GSM services;<br />

1.2.6.4. End-user equipment;<br />

1.2.6.5. Core information services;<br />

1.2.6.6. Cross domain capabilities to support external networks interconnection<br />

and information services interoperability services;<br />

1.2.6.7. Coordination and integration of the ANWI capability with systems/<br />

services external to the ANWI scope;<br />

1.2.6.8. Migration of ANWI identified services from the current building to the<br />

NNHQ building and support to migration of business applications;<br />

1.2.6.9. ANWI Integration Test Services (ITS) offers a base-lined reference suite<br />

of functions that all new building Host Nations will use to test their<br />

capabilities prior to deployment in the new building.<br />

1.2.7. HN NCIA will achieve the ANWI scope by means of three different types<br />

of activities:<br />

1.2.7.1. Procurement of ANWI functions and services through a primary<br />

Contract resulting from International Competitive Bid (ICB);<br />

1.2.7.2. Procurement of ANWI functions, on a sole source basis, from existing<br />

NATO wide services/systems that will be provided to the ANWI<br />

Contractor as PFE;<br />

1.2.7.3. Act as the implementation and design authority for integration of ANWI<br />

systems and services into NATO wide communication and information<br />

services.<br />

Book I, Page I-5<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.3. Overview of the Prospective Contract.<br />

1.3.1. ANWI services will be provided to 4,500 users (Staff and Delegations) of<br />

the New NATO Headquarters (NNHQ) and a subset of services will also<br />

be available to up to 1,500 conference visitors.<br />

1.3.2. The ANWI capability will support four different security domains, as<br />

detailed in 1.2.6.1.<br />

1.3.3. ANWI Services consist of the following:<br />

1.3.3.1. Infrastructure Services<br />

1.3.3.1.1. Processing Services: Spread across two server rooms and four<br />

classifications, providing high available processing power over a<br />

scalable and flexible environment for NNHQ ICT functions, taking<br />

advantage of virtualization technologies;<br />

1.3.3.1.2. Storage Services: Spread across two server rooms and four<br />

classifications, providing a high available central storage capability<br />

and a storage network for NNHQ ICT functions as well as supporting<br />

the storage requirements for ESS, BMS and AVI;<br />

1.3.3.1.3. Network Infrastructure Services: A set of services to support the<br />

NNHQ ICT systems, such as DHCP, DNS, Authentication, Time<br />

Services, etc.;<br />

1.3.3.1.4. LAN Services: Wired and Wireless connectivity spread across the<br />

NNHQ campus for four classifications (Wireless only available for<br />

NATO RESTRICTED or below classifications), including server room<br />

active network components and the access layer network<br />

components;<br />

1.3.3.1.5. Infrastructure Information Assurance (IA) Services (including Cross<br />

Domain Services): The subset of overall IA Services for NNHQ,<br />

related to the Infrastructure Services spread across four<br />

classifications, such as firewalls, IDS/IDP devices, security agents<br />

running on servers. Additional Gateway (GW) services will be<br />

provided to achieve secure controlled cross domain connectivity<br />

using technologies such as proxies, specific guards and diodes.<br />

1.3.3.2. Unified Communications and Collaboration (UCC) Services<br />

1.3.3.2.1. Email: Email services;<br />

1.3.3.2.2. IM: Instant Messaging Services;<br />

Book I, Page I-6<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.3.3.2.3. Voice: Voice Communication Services through dedicated devices<br />

and/or software clients;<br />

1.3.3.2.4. Video: Video Communication Services through dedicated devices<br />

and/or software clients;<br />

1.3.3.2.5. Presence: Presence Services;<br />

1.3.3.2.6. Collaboration: Collaboration Services such as screen / window<br />

sharing, white boarding, collaborative editing;<br />

1.3.3.2.7. UCC Integrated Session Management: Integrating session<br />

management services for the above mentioned individual services<br />

under a single UCC management capability;<br />

1.3.3.2.8. UCC IA Services: UCC Specific IA Services, such as anti-spam,<br />

email AV, IM AV, content scanning.<br />

1.3.3.3. Client Provisioning Services<br />

1.3.3.3.1. Client Devices: Various client hardware form factors to be provided<br />

for different classifications / different user groups (such as desktop<br />

and portable computers, tablet devices, PDAs, VoIP and VoSIP<br />

phones, dedicated VTC devices, printers, scanners). Current scope<br />

does not include the provisioning of GSM phones to users, but these<br />

devices may be able to reach a subset of ANWI services based on<br />

the security and functional requirements;<br />

1.3.3.3.2. Software Provisioning: Provisioning of client software and integration<br />

with Purchaser furnished software. This includes establishing the<br />

software provisioning infrastructure in a centrally managed but<br />

flexible way to enable provisioning of OS and applications which will<br />

include Purchaser Furnished software (such as NATO Desktop<br />

Baseline), existing functional applications and any other applications<br />

in support of the overall client functionality;<br />

1.3.3.3.3. User workspace provisioning and management to provide support to<br />

multiple form factor devices;<br />

1.3.3.3.4. Integration of client workspace services with application services<br />

provisioning;<br />

1.3.3.3.5. Client Provisioning IA Services: Client specific IA services such as<br />

client side AV, client firewall software<br />

1.3.3.4. ANWI Supplementary Services<br />

Book I, Page I-7<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.3.3.4.1. GSM: The GSM service will allow the commercial GSM Network<br />

Operators (MNO) operating in Belgium to provide services to the<br />

users throughout the NNHQ Campus;<br />

1.3.3.4.2. GSM Blocking: Capability to block GSM signals in specific parts of<br />

the campus for a required period of time using active blocking<br />

equipment;<br />

1.3.3.4.3. Wireless Blocking: Capability to block wireless signals in specific<br />

parts of the campus for a required period of time using active<br />

blocking equipment;<br />

1.3.3.4.4. Site Security Communications (Radio Communications): Provision of<br />

dedicated radio communication infrastructure for NNHQ Security<br />

Staff;<br />

1.3.3.4.5. IPTV: Provision of TV broadcast services including multiple<br />

channels, for the NNHQ Campus.<br />

1.3.3.5. Specific Communities of Interest Services<br />

1.3.3.5.1. Service Management Capability (SMC): Capabilities of service and<br />

system management and control for all of the above mentioned<br />

services;<br />

1.3.3.5.2. Information Assurance Management: Overall IA management<br />

covering all specific IA services mentioned above.<br />

1.3.4. The ANWI capability includes the following network interoperability<br />

capabilities:<br />

1.3.4.1. Cross Domain Gateways and network services allowing communication<br />

between domains, covering interoperability requirements for the NATO<br />

HQ at both local and global level, subject to security regulations;<br />

1.3.4.2. Interoperability and integration with NATO-wide secure Automated<br />

Information System (AIS) capabilities;<br />

1.3.4.3. Interoperability and integration with NATO-wide Information Assurance<br />

capabilities.<br />

1.3.4.4. The ANWI Contractor will provide and support Integration Test Services<br />

(ITS). The other Host Nations will be required to test and successfully<br />

pass their installable CIS capabilities through the ITS before the<br />

capability can be installed on-site. Nations wishing to provide their own<br />

ICT capability with an interface to ANWI will be able to use the ITS for<br />

testing the interface (this assumes that the Nation will provide any<br />

Book I, Page I-8<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

needed connectivity between the two environments and fund the<br />

testing).<br />

1.3.5. The ANWI Contractor will integrate the ANWI capability with<br />

systems/services external to the ANWI scope; as such, it will have the<br />

responsibility to coordinate, synchronise solutions and schedules with the<br />

other Host Nation Contractors to deliver a fully integrated and useable<br />

ANWI.<br />

1.3.6. The ANWI Contractor will migrate the identified ANWI ICT core services<br />

from the current HQ ICT infrastructure to the ANWI infrastructure inside<br />

the NNHQ and will provide ANWI migration support to other Host<br />

Nations.<br />

1.4. Governing Rules, Eligibility, and Exclusion Provisions<br />

1.4.1. This solicitation is an International Invitation for Bid and is issued in<br />

accordance with the procedures for International Competitive Bidding set<br />

forth in the NATO document AC/4-D/2261 (1996 Edition).<br />

1.4.2. Pursuant to these procedures, Bidding is restricted to companies from<br />

participating NATO member nations for which a Declaration of Eligibility<br />

has been issued by their respective government authorities.<br />

1.4.3. Best Value Evaluation Method<br />

The evaluation method to be used in the selection of the successful<br />

Bidder under this solicitation will follow the Best Value Procedures set<br />

forth in AC/4-D(2008)0002-REV1 dated 27 April 2009.<br />

1.4.4. The Bid evaluation criteria and the detailed evaluation procedures are<br />

described in SECTION 4<br />

1.4.5. The Bidder shall refer to the Purchaser all queries for resolution of any<br />

conflicts found in information contained in this document in accordance<br />

with the procedures set forth in paragraph 2.6 "Request for IFB<br />

Clarifications”.<br />

1.4.6. Prospective Bidders shall note that the Purchaser reserves the right to<br />

exclude the successful Bidder and its prospective Subcontractors from<br />

the award of this Contract if the successful Bidder or its prospective<br />

Subcontractors may be in a position to unfairly influence this Contract as<br />

a result of being selected for the work performed or to be performed<br />

under other New NATO Headquarters (NNHQ) related Contracts. This<br />

applies also to the Contractor's/Subcontractor's parent companies or<br />

subsidiaries unless the parent company or its subsidiaries provide<br />

evidence in accordance with the prescriptions of paragraph 3.4.4. The<br />

Book I, Page I-9<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.5. Security<br />

1.6.2. The purpose of the Bidders Conference will be to present the Project,<br />

and present the key members of the NATO project management team,<br />

as well as to allow the Prospective Bidders to clarify aspects of the<br />

Invitation for Bid for which they may have questions at that time.<br />

NATO UNCLASSIFIED<br />

Book I, Page I-10<br />

process described in paragraph 4.4.1.5 will be used to evaluate any such<br />

evidence provided.<br />

1.5.1. This Invitation for Bid has been classified as NATO UNCLASSIFIED.<br />

1.5.2. The Contractor will be required to handle and store classified material to<br />

the level of “NATO SECRET”, and the Contractor shall have the<br />

appropriate facility and personnel clearances at the date of Contract<br />

signature. Should the Contractor be unable to perform the Contract due<br />

to the fact that the facility clearance has not been provided by their<br />

respective national security agency, this lack of clearance cannot be the<br />

basis for a claim of adjustment or an extension of schedule, nor the lack<br />

of clearance be considered a mitigating circumstance in the case of an<br />

assessment of Liquidated Damages or a determination of Termination<br />

For Default by the Purchaser.<br />

1.5.3. Contractor personnel working at NATO or National sites are required to<br />

possess a security clearance of “NATO SECRET”. Contractor personnel<br />

without such a clearance, confirmed by the appropriate national security<br />

authority and transmitted to the cognisant NATO or National security<br />

officer at least fourteen (14) days prior to the site visit, will be denied<br />

access to the site. Denial of such access by the Purchaser may not be<br />

used by the Contractor as the basis for a claim of adjustment or an<br />

extension of schedule nor can the denial of access be considered a<br />

mitigating circumstance in the case of an assessment of Liquidated<br />

Damages or a determination of Termination for Default by the Purchaser.<br />

1.5.4. Bidders are advised that Contract signature will not be delayed in order<br />

to allow the processing of security clearances for personnel or facilities<br />

and, should the otherwise successful Bidder not be in a position to<br />

accept the offered Contract within a reasonable period of time, due to the<br />

fact that its personnel or facilities do not possess the appropriate security<br />

clearance(s), the Purchaser may determine the Bidder’s Offer to be noncompliant<br />

and offer the Contract to the next ranking Bidder. In such a<br />

case, the Bidder who would not sign the Contract shall be liable for<br />

forfeiture of the Bid Guarantee.<br />

1.6. Bidders Conference<br />

1.6.1. Prospective Bidders are invited to a Bidders Conference that will be held<br />

at NATO Headquarters, Brussels, on 18 July 2012.


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.6.3. The Bidder’s Conference is planned to include a briefing on the bidding<br />

process; the Bidding Sheets; the prospective contract; and the technical<br />

and project management aspects of the project.<br />

1.6.4. The participation to the Conference is limited to a maximum of three (3)<br />

attendees per Bidder. No exception to this number of attendees will be<br />

made. A detailed agenda for the Bidder’s Conference will be sent to the<br />

participating companies in due course.<br />

1.6.5. Bidders that wish to participate in the Bidders Conference shall indicate<br />

their intention to attend not later than 7 days prior to the date of the<br />

Conference to the Point of Contact stated hereafter. NATO Secret<br />

security clearances are not required for the Bidders Conference. The<br />

interested Bidders shall provide the following relevant data for each of<br />

their (maximum of three) staff wishing to attend:<br />

Name of company,<br />

Name of attendee,<br />

Passport/ ID card number,<br />

Place and date of birth,<br />

E-mail address.<br />

1.6.6. All attendee nominations shall be addressed to the IFB POC specified in<br />

2.5.1 below.<br />

1.6.7. Any questions which the potential Bidders would like to have answered<br />

at the Bidders Conference must be submitted in writing not later than 7<br />

days prior to the date of the Conference to the POC, at the address<br />

mentioned under paragraph ‎2.5.1 “Purchaser Point of Contact”.<br />

1.6.8. The Purchaser will respond to these previously submitted questions at<br />

the Bidders Conference. If any additional questions are asked by the<br />

potential Bidders at the Conference, the Purchaser may attempt to<br />

answer pertinent questions at that time, but any answer that may appear<br />

to amend terms, conditions and/or specifications of the Contract shall be<br />

considered to be formally included in the Invitation for Bid only when a<br />

written amendment to the IFB is issued in writing by the Purchaser.<br />

1.6.9. In any case, a written summary of the Bidders Conference will be issued<br />

by the Purchaser to all potential Bidders after the Bidders Conference.<br />

1.6.10. Notwithstanding the written answers provided by the Purchaser after the<br />

Bidders’ Conference, the terms, conditions and language of the IFB<br />

Book I, Page I-11<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

remains unaltered unless a formal IFB amendment is issued by the<br />

Purchaser and is identified as such.<br />

1.7. Documentation<br />

1.7.1. All documentation, including the IFB itself, all applicable documents and<br />

any reference documents provided by the Purchaser are solely to be<br />

used for the purpose of preparing a response to this IFB. They are to be<br />

safeguarded at the appropriate level according to their classification and<br />

reference documents are provided “as is“, without any warranty as to<br />

quality or accuracy.<br />

Book I, Page I-12<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 2<br />

GENERAL BIDDING INFORMATION<br />

2.1. Definitions<br />

2.1.1. In addition to the definitions and acronyms set in the Contract Special<br />

Provisions (Part II) of the prospective Contract, and the definitions and<br />

acronyms set in the Clause entitled “Definitions of Terms and Acronyms”<br />

of the Contract General Provisions (Part III) of the prospective Contract,<br />

the following terms and acronyms, as used in this Invitation for Bid shall<br />

have the meanings specified below:<br />

2.1.1.1. "Bidder": a firm, consortium, or joint venture which submits an offer in<br />

response to this solicitation. Bidders are at liberty to constitute<br />

themselves into any form of contractual arrangements or legal entity<br />

they desire, bearing in mind that in consortium-type arrangements a<br />

single judicial personality shall be established to represent that legal<br />

entity. A legal entity, such as an individual, Partnership or Corporation,<br />

herein referred to as the “Principal Contractor”, shall represent all<br />

members of the consortium with the NCI Agency and/or NATO. The<br />

“Principal Contractor” shall be vested with full power and authority to act<br />

on behalf of all members of the consortium, within the prescribed<br />

powers stated in an irrevocable Power of Attorney issued to the<br />

“Principal Contractor” by all members associated with the consortium.<br />

Evidence of authority to act on behalf of the consortium by the “Principal<br />

Contractor” shall be enclosed and sent with the Bid. Failure to furnish<br />

proof of authority may be a reason for the Bid being declared noncompliant.<br />

2.1.1.2. "Compliance": strict conformity to the requirements and standards<br />

specified in this IFB and its attachments.<br />

2.1.1.3. "Contractor": the awardee of this solicitation of offers, who shall be<br />

responsible for the fulfilment of the requirements established in the<br />

prospective Contract.<br />

2.1.1.4. “Firm of a Participating Country”: a firm legally constituted or chartered<br />

under the laws of, and geographically located in, or falling under the<br />

jurisdiction of a Participating Country.<br />

2.1.1.5. “IFB”: Invitation for Bid.<br />

2.1.1.6. “Participating Country”: any of the NATO nations contributing to the<br />

project, namely, (in alphabetical order): ALBANIA, BELGIUM,<br />

BULGARIA, CANADA, CROATIA, CZECH REPUBLIC, DENMARK,<br />

ESTONIA, FRANCE, GERMANY, GREECE, HUNGARY, ICELAND,<br />

ITALY, LATVIA, LITHUANIA, LUXEMBOURG, THE NETHERLANDS,<br />

NORWAY, POLAND, PORTUGAL, ROMANIA, SLOVAKIA, SLOVENIA,<br />

SPAIN, TURKEY, THE UNITED KINGDOM and THE UNITED STATES.<br />

Book I, Page I-13<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2.1.1.7. “Purchaser”: NATO Communications and Information Agency (NCI<br />

Agency, NCIA).<br />

2.1.1.8. “Quotation” or “Bid”: a binding offer to perform the work specified in the<br />

attached prospective Contract (Book II).<br />

2.2. Eligibility and Origin of Equipment and Services<br />

2.2.1. As stated in paragraph 1.4.1 above only firms from a Participating<br />

Country are eligible to engage in this competitive Bidding process. In<br />

addition, all Contractors, Subcontractors and manufacturers, at any tier,<br />

must be from Participating Countries.<br />

2.2.2. None of the work, including project design, labour and services shall be<br />

performed other than by firms from and within Participating Countries.<br />

2.2.3. No materials or items of equipment down to and including identifiable<br />

Sub-assemblies shall be manufactured or assembled by a firm other than<br />

from and within a Participating Country.<br />

2.2.4. Unless otherwise authorised by the terms of the prospective Contract,<br />

the Intellectual Property Rights to all design documentation and related<br />

system operating software shall reside in NATO member countries, and<br />

no license fees or royalty charges shall be paid by the Contractor to<br />

firms, individuals or governments other than within the NATO member<br />

community.<br />

2.3. Bid Delivery and Bid Closing<br />

2.3.1. All Bids shall be in the possession of the Purchaser at the address given<br />

below in paragraph 2.3.2 on/or before 13.00 hours (Brussels Time) on<br />

22 October 2012, at which time and date Bidding shall be closed.<br />

2.3.2. Bids shall be delivered to the following address:<br />

2.3.2.1. By Post:<br />

NCI Agency<br />

Acquisition and Procurement<br />

(Attn: Mr. Sven Schumacher)<br />

Boulevard Leopold III<br />

1110 Brussels<br />

Belgium<br />

2.3.2.2. Hand Carried Service or courier:<br />

NCI Agency<br />

Acquisition and Procurement<br />

(Attn: Mr. Sven Schumacher)<br />

Bâtiment Z<br />

Avenue du Bourget 140<br />

1110 Brussels,Belgium<br />

Book I, Page I-14<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-15<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2.3.3. Bids submitted by electronic means are not permitted and will not be<br />

considered. Bidders are advised that security or other personnel<br />

remaining on the premises outside of normal business hours may decline<br />

to sign or issue receipts for delivered items.<br />

2.3.4. Late Bids<br />

2.3.4.1. Bids which are delivered to the Purchaser after the specified time and<br />

date set forth above for Bid Closing are "Late Bids" and shall not be<br />

considered for award. Such Bids will be returned unopened to the<br />

Bidder at the Bidder's expense unless the Purchaser can determine that<br />

the Bid in question meets the criteria for consideration as specified<br />

below.<br />

2.3.4.2. Consideration of Late Bid – The Purchaser considers that it is the<br />

responsibility of the Bidder to ensure that the Bid submission arrives by<br />

the specified Bid Closing time. Considering the number and quality of<br />

express delivery services, courier services and special services<br />

provided by the national postal systems, a late Bid shall only be<br />

considered for award under the following circumstances:<br />

2.3.4.2.1. A Contract has not already been awarded pursuant to the Invitation<br />

for Bid, and<br />

2.3.4.2.2. The Bid was sent to the address specified in the IFB by ordinary,<br />

registered or certified mail not later than ten (10) calendar days<br />

before the Bid closing date and the delay was due solely to the<br />

national or international postal system for which the Bidder bears no<br />

responsibility (the official postmark for ordinary and Registered Mail<br />

or the date of the receipt for Certified Mail will be used to determine<br />

the date of mailing), or<br />

2.3.4.2.3. The Bid was hand carried, or delivered by a private courier service<br />

and the Bidder can produce a receipt which demonstrates that the<br />

delivery was made to the correct address and received by a member<br />

of the NCI Agency and the failure to be received by the Contracting<br />

Authority was due to mishandling within the Purchaser’s<br />

organisation.<br />

2.3.4.3. A Late Bid which was hand-carried, or delivered by a private courier, for<br />

which a proper receipt cannot be produced, cannot be considered for<br />

award under any circumstances nor can late Bids which bear no post<br />

marks or for which documentary evidence of mailing date cannot be<br />

produced.<br />

2.4. Requests for Extension of Bid Closing Date<br />

2.4.1. Bidders are informed that requests for extension to the closing date for<br />

the IFB shall be submitted by the Bidder only through his respective<br />

country’s NATO Delegation or Embassy to the Purchaser point of contact


NATO UNCLASSIFIED<br />

Book I, Page I-16<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

indicated in paragraph 2.5.1 below. In accordance with AC/4-D/2261<br />

Final (July 1996 Edition) any request for extension shall be submitted by<br />

the respective NATO Delegation or Embassy no later than fourteen (14)<br />

days prior to the established Bid closing date. Bidders are advised to<br />

submit their request in sufficient time as to allow their respective NATO<br />

Delegation or Embassy to deliver the formal request to the Purchaser<br />

within the above time limit.<br />

2.5. Purchaser’s Point of Contact<br />

2.5.1. The Purchaser point of contact for all information concerning this<br />

Invitation for Bid is:<br />

Mr. Sven Schumacher<br />

Contracting Officer<br />

Acquisition and Procurement<br />

Tel: +32 (0)2 707 8576<br />

Fax: +32 (0)2 707 8770<br />

E-mail: sven.schumacher@ncia.nato.int<br />

Alternate:<br />

Ms. Dimitra Kokkali<br />

Senior Contracting Assistant<br />

Acquisition and Procurement<br />

Tel: +32 (0)2 707 8175<br />

Fax: +32 (0)2 707 8770<br />

E-mail: dimitra.kokkali@ncia.nato.int<br />

2.5.2. All correspondence related to the IFB shall be forwarded to:<br />

NCI Agency<br />

Acquisition and Procurement<br />

Boulevard Leopold III<br />

1110 Brussels, Belgium<br />

Attn: Mr Sven Schumacher (contact details stated above)<br />

2.6. Request for IFB Clarifications<br />

2.6.1. Bidders, during the solicitation period, are encouraged to query and seek<br />

clarification of any matters of a contractual, administrative and technical<br />

nature pertaining to this IFB.<br />

2.6.2. All requests for clarification shall be forwarded to the Purchaser using the<br />

Clarification Request Forms provided at Annex D of this Book I. Such<br />

requests shall be forwarded via email to the point of contact specified in<br />

paragraph 2.5.1 above and shall arrive not later than twenty eight (28)<br />

calendar days prior to the stated "Bid Closing Date". The Purchaser is<br />

under no obligation to answer requests for clarification submitted after


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

this time. Requests for clarification must address the totality of the<br />

concerns of the Bidder, as the Bidder will not be permitted to revisit areas<br />

of the IFB for additional clarification except as noted in 2.6.3 below.<br />

2.6.3. Additional requests for clarification are limited only to the information<br />

provided as answers by the Purchaser to Bidder requests for clarification.<br />

Such additional requests shall arrive not later than fourteen (14) calendar<br />

days before the established Bid Closing Date.<br />

2.6.4. The Purchaser may provide for a re-wording of questions and requests<br />

for clarification where it considers the original language ambiguous,<br />

unclear, subject to different interpretation or revelatory of the Bidder’s<br />

identity.<br />

2.6.5. Bidders are advised that subsequent questions and/or requests for<br />

clarification included in a Bid shall neither be answered nor considered<br />

for evaluation.<br />

2.6.6. Except as provided above, all questions will be answered by the<br />

Purchaser and the questions and answers (but not the identity of the<br />

questioner) will be issued in writing to all prospective Bidders.<br />

2.6.7. Where the extent of the changes implied by the response to a<br />

clarification request is of such a magnitude that the Purchaser deems<br />

necessary to issue revised documentation, the Purchaser will do so by<br />

the means of the issuance of a formal IFB amendment pursuant to AC/4-<br />

DS-2261 and in accordance with paragraph 2.8 below.<br />

2.6.8. The Purchaser reserves the right to reject questions and clarification<br />

requests clearly devised or submitted for the purpose of artificially obtain<br />

an extension of the bidding time (i.e. clarifications re-submitted using<br />

different wording where such wording does not change the essence of<br />

the clarification being requested).<br />

2.6.9. The published responses issued by the Purchaser shall be regarded as<br />

the authoritative interpretation of the Invitation for Bid. Any amendment<br />

to the language of the IFB included in the answers will be issued as an<br />

IFB Amendment and shall be incorporated by the Bidder in his offer.<br />

2.7. Requests for Waivers and Deviations<br />

2.7.1. Bidders are informed that requests for alteration to, waivers or deviations<br />

from the terms and conditions of this IFB and attached prospective<br />

Contract (Book II) will not be considered after the request for clarification<br />

process. Requests for alterations to the other requirements, terms or<br />

conditions of the Invitation for Bid or the prospective Contract may only<br />

be considered as part of the clarification process set forth in paragraph<br />

2.6 above. Requests for alterations to the specifications, terms and<br />

conditions of the Contract which are included in a Bid as submitted may<br />

Book I, Page I-17<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-18<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

be regarded by the Purchaser as a qualification or condition of the Bid<br />

and may be grounds for a determination of non-compliance.<br />

2.8. Amendment of the Invitation for Bid<br />

2.8.1. The Purchaser may revise, amend or correct IFB at any time prior to the<br />

Bid Closing Date as detailed in paragraph 2.3. Any and all modifications<br />

will be transmitted to all Bidders by an official amendment designated as<br />

such and signed by the Purchaser. This process may be part of the<br />

clarification procedures set forth in paragraph 2.6 above or may be an<br />

independent action on the part of the Purchaser.<br />

2.8.2. All such IFB amendments issued by the Purchaser shall be<br />

acknowledged by the Bidder in its Bid by completing the<br />

“Acknowledgement of Receipt of IFB Amendments” certificate at Annex<br />

B-2. Failure to acknowledge receipt of all amendments may be grounds<br />

to determine the Bid to be administratively non-compliant.<br />

2.8.3. The Purchaser will consider the potential impact of amendments on the<br />

ability of prospective Bidders to prepare a Bid within the allotted time.<br />

The Purchaser may extend the "Bid Closing Date" at its discretion and<br />

such extension will be set forth in the amendment.<br />

2.9. Modification and Withdrawal of Bids<br />

2.9.1. Bids, once submitted, may be modified by Bidders, but only to the extent<br />

that the modifications are in writing, conform to the requirements of the<br />

IFB, and are received by the Purchaser prior to the Bid Closing Date as<br />

detailed in paragraph 2.3. Such modifications will be considered as an<br />

integral part of the submitted Bid.<br />

2.9.2. Modifications to Bids which arrive after the Bid Closing Date will be<br />

considered as "Late Modifications" and will be processed in accordance<br />

with the procedure detailed in paragraph 2.3.4, except that unlike a "Late<br />

Bid", the Purchaser will retain the modification until a selection is made.<br />

A modification to a Bid which is determined to be late will not be<br />

considered in the evaluation and selection process. If the Bidder<br />

submitting the modification is determined to be the successful Bidder on<br />

the basis of the unmodified Bid, the modification may then be opened. If<br />

the modification makes the terms of the Bid more favourable to the<br />

Purchaser, the modified Bid may be used as the basis of Contract award.<br />

The Purchaser, however, reserves the right to award a Contract to the<br />

apparent successful Bidder on the basis of the Bid submitted and<br />

disregard the late modification.<br />

2.9.3. A Bidder may withdraw its Bid at any time prior to Bid Opening without<br />

penalty. In order to do so, an authorised agent or employee of the<br />

Bidder must provide an original statement of the firm's decision to<br />

withdraw the Bid and subsequently remove the Bid from the Purchaser’s<br />

premises.


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2.9.4. Except as provided in paragraph 2.10.4.2 below, a Bidder may withdraw<br />

its Bid after Bid Opening only by forfeiture of the Bid Guarantee.<br />

2.10. Bid Validity<br />

2.10.1. Bidders shall be bound by the term of their Bid for a period of twelve (12)<br />

months starting from the Bid Closing Date specified in paragraph 2.3.1<br />

above.<br />

2.10.2. In order to comply with this requirement, the Bidder shall complete the<br />

Certificate of Bid Validity set forth in Annex B-4. Bids offering less than<br />

the period of time referred to above for acceptance by the Purchaser<br />

may be determined to be non-compliant.<br />

2.10.3. The Purchaser will endeavour to complete the evaluation and make an<br />

award within the period referred to above. However, should that period<br />

of time prove insufficient to render an award, the Purchaser reserves the<br />

right to request an extension of the period of validity of all Bids which<br />

remain under consideration for award.<br />

2.10.4. Upon notification by the Purchaser of such a request for a time<br />

extension, the Bidders shall have the right to:<br />

2.10.4.1. accept this extension of time in which case Bidders shall be bound by<br />

the terms of their offer for the extended period of time and the Bid<br />

Guarantee and Certificate of Bid Validity extended accordingly; or<br />

2.10.4.2. refuse this extension of time and withdraw the Bid, in which case the<br />

Purchaser will return to the Bidder its Bid Guarantee in the full amount<br />

without penalty.<br />

2.10.5. Bidders shall not have the right to modify their Bids due to a Purchaser<br />

request for extension of the Bid validity unless expressly stated in such<br />

request.<br />

2.11. Bid Guarantee<br />

2.11.1. The Bidder shall furnish with his Bid a guarantee in an amount equal to<br />

Five Hundred Thousand Euro (€500,000). The Bid Guarantee shall be<br />

substantially similar to Annex C as an irrevocable, unqualified and<br />

unconditional Standby Letter of Credit (SLC) issued by a Belgian banking<br />

institution fully governed by Belgian legislation or issued by a non-<br />

Belgian financial institution and confirmed by a Belgian banking<br />

institution fully governed by Belgian legislation. In the latter case signed<br />

original letters from both the issuing institution and the confirming<br />

institution must be provided. The confirming Belgian bank shall clearly<br />

state that it will guarantee the funds, the drawing against can be made by<br />

the NCI Agency at its premises in Belgium. Bid Guarantees shall be<br />

made payable to the Treasurer, NCI Agency.<br />

Book I, Page I-19<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-20<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2.11.2. Alternatively, a Bidder may elect to post the required Guarantee by<br />

certified cheque. If the latter method is selected, Bidders are informed<br />

that the Purchaser will cash the cheque on the Bid Closing Date or as<br />

soon as possible thereafter.<br />

2.11.3. If the Bid Closing Date is extended after a Bidder's financial institution<br />

has issued a Bid Guarantee, it is the obligation of the Bidder to have<br />

such Bid Guarantee (and confirmation, as applicable) extended to reflect<br />

the revised Bid Validity date occasioned by such extension.<br />

2.11.4. Failure to furnish the required Bid Guarantee in the proper amount,<br />

and/or in the proper form and/or for the appropriate duration by the Bid<br />

Closing Date may be cause for the Bid to be determined non-compliant.<br />

2.11.5. In the event that a Bid Guarantee is submitted directly by a banking<br />

institution, the Bidder shall furnish a copy of said document in the Bid<br />

Administration Package.<br />

2.11.6. The Purchaser will make withdrawals against the amount stipulated in<br />

the Bid Guarantee under the following conditions:<br />

2.11.6.1. The Bidder has submitted a Bid and, after Bid Closing Date (including<br />

extensions thereto) and prior to the selection the compliant Bid<br />

determined to represent the best value, withdraws his Bid, or states that<br />

he does not consider his Bid valid or agree to be bound by his Bid, or<br />

2.11.6.2. The Bidder has submitted a compliant Bid determined by the Agency to<br />

represent the best value, but the Bidder declines to sign the Contract<br />

offered by the Agency, such Contract being consistent with the terms of<br />

the Invitation for Bid.<br />

2.11.6.3. The Purchaser has offered the Bidder the Contract for execution but the<br />

Bidder has been unable to demonstrate compliance with the security<br />

requirements of the Contract within a reasonable time,<br />

2.11.6.4. The Purchaser has entered into the Contract with the Bidder but the<br />

Bidder has been unable or unwilling to provide the Performance<br />

Guarantee required under the terms of the Contract within the time<br />

frame required.<br />

2.11.7. Bid Guarantees will be returned to Bidders as follows:<br />

2.11.7.1. to non-compliant Bidders forty-five (45) days after notification by the<br />

Purchaser of a non-compliant Bid (except where such determination is<br />

challenged by the Bidder; in which case the Bid Guarantee will be<br />

returned forty-five (45) days after a final determination of noncompliance);<br />

2.11.7.2. to all other unsuccessful Bidders within thirty (30) days following the<br />

award of the Contract to the successful Bidder;


NATO UNCLASSIFIED<br />

Book I, Page I-21<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2.11.7.3. to the successful Bidder upon submission of the Performance<br />

Guarantee required by the Contract or, if there is no requirement for<br />

such a Performance Guarantee, upon Contract execution by both<br />

parties.<br />

2.11.7.4. pursuant to paragraph 2.10.4.2 above.<br />

2.11.8. “Standby Letter of Credit" or “SLC” as used herein, means a written<br />

commitment by a Belgian financial institution either on its own behalf or<br />

as a confirmation of the Standby Letter of Credit issued by a non-Belgian<br />

bank to pay all or part of a stated amount of money, until the expiration<br />

date of the letter, upon presentation by the Purchaser of a written<br />

demand therefore. Neither the financial institution nor the Contractor can<br />

revoke or condition the Standby Letter of Credit. The term “Belgian<br />

financial institution” includes non-Belgian financial institutions licensed to<br />

operate in Belgium,<br />

2.12. Cancellation of Invitation for Bid<br />

2.12.1. The Purchaser may cancel, suspend or withdraw for re-issue at a later<br />

date this IFB at any time prior to Contract award. No legal liability on the<br />

part of the Purchaser for payment of any sort shall arise and in no event<br />

will any Bidder have cause for action against the Purchaser for the<br />

recovery of costs incurred in connection with preparation and submission<br />

of a Bid in response to this IFB.<br />

2.13. Electronic Transmission of Information and Data<br />

2.13.1. The Purchaser will endeavour to communicate answers to requests for<br />

clarification and amendments to this IFB to the prospective Bidders as<br />

soon as practicable.<br />

2.13.2. Bidders are cautioned that except for those cases in which electronic<br />

transmission of documentation is not permissible (i.e. documents with<br />

security classification mandating specific transmission methods) the<br />

Purchaser will rely exclusively on electronic means (i.e. electronic mail<br />

communication and use of a dedicated IFB webportal) to manage all<br />

correspondence related to this IFB, including IFB amendments and<br />

clarifications.<br />

2.13.3. Notwithstanding paragraph 2.13.2 above and subject to feasibility,<br />

prospective Bidders may request to be notified also by fax or regular mail<br />

when IFB correspondence is released to them. Such requests shall be<br />

submitted to the points of contact specified in paragraph 2.5.1 above.<br />

Such requested method of notification shall not be construed as the<br />

Bidders’ right to obtain an extension of the Bid Closing Date.<br />

2.13.4. Bidders shall note that where voluminous documentation is to be<br />

transmitted the Purchaser will consider electronic transmission as the<br />

sole feasible manner to promptly notify all Bidders pursuant to the


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

prescription is paragraph 2.13.1. Consequently, in such cases, the<br />

Purchaser will notify the Bidders’ of the impossibility to resort to<br />

alternative methods of transmissions if this has been requested.<br />

2.14. Supplemental Agreements<br />

2.14.1. Bidders are required, in accordance with the certificate at Annex B-7 of<br />

these Instructions to Bidders, to disclose any prospective Supplemental<br />

Agreements that are required by national governments to be executed by<br />

NATO/ NCIA as a condition of Contract performance.<br />

2.14.2. Supplemental Agreements are typically associated with, but not<br />

necessarily limited to, national export control regulations, technology<br />

transfer restrictions and end user agreements or undertakings.<br />

2.14.3. Bidders are cautioned that failure to provide full disclosure of the<br />

anticipated requirements and the terms thereof, to the best of the<br />

Bidder’s knowledge and experience, may result in the Purchaser<br />

withholding award of the Contract or cancelling an executed Contract if it<br />

is discovered that the terms of such Supplemental Agreements contradict<br />

salient conditions of the Prospective Contract to the extent that either key<br />

objectives cannot be accomplished or basic Contract principles and<br />

Purchaser rights have been abridged.<br />

2.15. Notice of Limitations on Use of Intellectual Property Delivered to the<br />

Purchaser<br />

2.15.1. Bidders are instructed to review Clause 30 of the Contract General<br />

Provisions set forth Part III of Book II herein. This Clause sets forth the<br />

definitions, terms and conditions regarding the rights of the Parties<br />

concerning Intellectual Property developed and/or delivered under this<br />

Contract or used as a basis of development under this Contract.<br />

2.15.2. Bidders are required to disclose, in accordance with Annex B-10, Annex<br />

B-11, the Intellectual Property proposed to be used by the Bidder that will<br />

be delivered with either Background Intellectual Property Rights or Third<br />

Party Intellectual Property Rights. Bidders are required to identify such<br />

Intellectual Property and the basis on which the claim of Background or<br />

Third Party Intellectual Property is made.<br />

2.15.3. Bidders are further required to identify any restrictions on Purchaser use<br />

of the Intellectual Property that is not in accordance with the definitions<br />

and rights set forth in Clause 30 of the Contract General Provisions, or<br />

any other provision of the Contract concerning use or dissemination of<br />

such Intellectual Property.<br />

2.15.4. Bidders are reminded that restrictions on use or dissemination of<br />

Intellectual Property conflicting with Clause 30 of the Contract General<br />

Provisions or with the objectives and purposes of the Purchaser as<br />

Book I, Page I-22<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

stated in the Prospective Contract shall result in a determination of a<br />

non-compliant Bid.<br />

2.16. Mandatory Quality Assurance and Quality Control Standards<br />

2.16.1. Bidders are requested to note that, in accordance with the Certificate at<br />

Annex B-8 hereto, Bidders shall provide documentary evidence that the<br />

Bidder possesses a current certification that is compliant with the<br />

requirements of Allied Quality Assurance Publication (AQAP) 2110, ISO<br />

9001:2008, or an equivalent QA/QC regime.<br />

2.16.2. Bidders shall further demonstrate that such regime is applied within the<br />

Bidder’s internal organisation, as well as extended to its relationships<br />

with Subcontractors.<br />

2.16.3. If the Bidder is offering a QA/QC regime that is claimed to be equivalent<br />

to AQAP 2110 or ISO 9001:2008, the burden of proof of such<br />

equivalency shall be on the Bidder and such evidence of equivalency<br />

shall be submitted with the Certificate at Annex B-8 in the Bid<br />

Administration Package.<br />

2.16.4. Failure to execute this Certificate, or failure to provide documentary<br />

evidence of compliance with this requirement may result in a<br />

determination of non-compliance for the submitted Bid.<br />

Book I, Page I-23<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 3<br />

BID PREPARATION INSTRUCTIONS<br />

3.1. General<br />

3.1.1. Bidders shall prepare and submit their Bid in accordance with the<br />

requirements and format set forth in this IFB. Compliance with all Bid<br />

submission requirements is mandatory. Failure to submit a Bid in<br />

conformance with the stated requirements may result in a determination<br />

of non-compliance by the Purchaser and the elimination of the Bid from<br />

further consideration.<br />

3.1.2. Bidders shall not simply restate the IFB requirements. A Bid shall<br />

demonstrate that a Bidder understands the terms, conditions and<br />

requirements of the IFB and its ability to provide all the services and<br />

deliverables listed in the Schedules of the prospective Contract.<br />

3.1.3. Bidders are informed that the quality, thoroughness and clarity of the Bid<br />

will affect the overall scoring of the Bid. Although the Purchaser may<br />

request clarification of the Bid, it is not required to do so and may make<br />

its determination on the content of the Bid as written. Therefore, Bidders<br />

shall assume that inconsistencies, omissions, errors, lack of detail and<br />

other qualitative deficiencies in the submitted Bid will have a negative<br />

impact on the final Best Value score.<br />

3.1.4. Partial Bids will be declared non-compliant.<br />

3.1.5. Bidders are advised that the Purchaser reserves the right to incorporate<br />

the successful Bidder’s Offer in whole or in part by reference in the<br />

resulting Contract.<br />

3.1.6. If no specific format has been established for electronic versions/ soft<br />

copies of the Bid documentation to be provided in accordance with<br />

paragraph 3.2 below, Bidders shall deliver this type of documentation in<br />

an electronic format which is best suited for review and maintenance by<br />

the Purchaser (e.g., Project Master Schedule in MS Project format,<br />

Project Highlight Reports in MS Word).<br />

3.1.7. In the event of a discrepancy between the soft and hard copies of the Bid<br />

documentation to be provided in accordance with paragraph 3.2 below,<br />

the hard copy will be considered as the authoritative bid document for the<br />

purpose of evaluation and take precedence.<br />

3.1.8. All documentation submitted as part of the Bid shall be classified no<br />

higher than “NATO UNCLASSIFIED”.<br />

3.1.9. All documentation submitted as part of the Bid shall be in English.<br />

Book I, Page I-24<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.2. Bid Package Content<br />

3.2.1. The complete Bid shall consist of three distinct and separated parts<br />

described in the following subparagraphs. Detailed requirements for the<br />

structure and content of each of these packages are contained in these<br />

Bidding Instructions.<br />

3.2.2. The Bid Administration Package, containing one (1) hard copy and one<br />

(1) soft copy of the documents specified in paragraph ‎3.4 below.<br />

3.2.3. The Price Quotation, containing two (2) hard copies and two (2) soft<br />

copies in MS Excel format of the Price Quotation specified in<br />

paragraph ‎3.5 below.<br />

3.2.4. The Technical Proposal Package as specified below. Each Part shall be<br />

in a separate binder or file for ease of segregation and handling and shall<br />

each be submitted in two (2) hard copies and three (3) soft copies.<br />

3.2.4.1. Part 1 - The Bidder Qualification, as described in paragraph 3.6.1 below.<br />

3.2.4.2. Part 2 - The Key Personnel Proposal, as specified in paragraph 3.6.2<br />

below. Detailed CVs of proposed personnel shall be included in Part 2.<br />

3.2.4.3. Part 3 - The Project Management Proposal, as specified in paragraph<br />

3.6.3 below.<br />

3.2.4.4. Part 4 - The Initial High Level Design, as specified in paragraph 3.6.4<br />

below.<br />

3.2.4.5. Part 5 - The SMC Concept Proposal, as specified in paragraph 3.6.5<br />

below.<br />

3.3. Package Marking<br />

3.3.1. The separate parts of the Bid shall be placed in outer containers for<br />

delivery. All outer containers into which Bidding documents are placed<br />

shall be opaque or wrapped in opaque paper, sealed and identified with<br />

the following markings:<br />

Book I, Page I-25<br />

SEALED BID IFB-CO-13300-ANWI<br />

BOX X of Y (1 of 3, 2 of 3, etc.)<br />

NOTIFY MR S. SCHUMACHER (X8576) / MS D. KOKKALI (X8175)<br />

UPON RECEIPT<br />

3.3.2. Each of the Bid parts placed in the outer container(s) shall be separately<br />

wrapped (multiple copies of the same document may be wrapped<br />

together), and marked as follows:<br />

3.3.2.1. Name and address of the Bidder,<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-26<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.3.2.2. The words “SEALED BID” followed by the reference “IFB-CO-13300-<br />

ANWI”;<br />

3.3.2.3. The appropriate package marking, i.e. “Bid Administration”, “Price<br />

Quotation”, “Technical Proposal”.<br />

3.4. Bid Administration Package<br />

3.4.1. The Package must include the original of the Bid Guarantee required by<br />

paragraph 2.11 of the Bidding Instructions. If the Bid Guarantee is sent<br />

to the Purchaser directly from the Bidder's bank, a letter, in lieu of the<br />

actual Guarantee, shall be included specifying the details of the<br />

transmittal. Bidders are reminded that the Bid Guarantee shall reflect<br />

any extensions to the Bid Validity Date due to extensions in the Bid<br />

Closing Date.<br />

3.4.2. The Package shall include the certificates set forth in the Annex to these<br />

Bidding Instructions, signed in the original by an authorised<br />

representative of the Bidder. The text of the certificates must not be<br />

altered in any way. The certificates are as follows:<br />

3.4.2.1. Annex B-1 (Certificate of Legal Name of Bidder)<br />

3.4.2.2. Annex B-2 (Acknowledgement of Receipt of IFB Amendments)<br />

3.4.2.3. Annex B-3 (Certificate of Independent Determination)<br />

3.4.2.4. Annex B-4 (Certificate of Bid Validity)<br />

3.4.2.5. Annex B-5 (Certificate of Exclusion of Taxes, Duties and Charges)<br />

3.4.2.6. Annex B-6 (Comprehension and Acceptance of Contract Special and<br />

General Provisions)<br />

3.4.2.7. Annex B-7 (Disclosure of Requirements for NCIA Execution of<br />

Supplemental Agreements) with the prospective text of such<br />

Agreements, as applicable.<br />

3.4.2.8. Annex B-8 (Certificate of Compliance AQAP 2110 or ISO 9001:2008 or<br />

Equivalent) with a copy of the relevant quality certification attached to it.<br />

3.4.2.9. Annex B-9 (List of Prospective Subcontractors)<br />

3.4.2.10. Annex B-10 (Bidder Background IPR)<br />

3.4.2.11. Annex B-11(List of Subcontractor IPR)<br />

3.4.2.12. Annex B-12 (Certificate of Origin of Equipment, Services, and<br />

Intellectual Property)<br />

3.4.2.13. Annex B-13 (List of Proposed Key Personnel)


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.4.2.14. Annex B-14 (Certificate of Price Ceiling)<br />

3.4.2.15. Annex B-15 (Disclosure of Conflict of Interest) with mitigation plan and<br />

list of business relationships, as applicable<br />

3.4.2.16. Annex B-16 (Index and Certificate of Compliance of Administrative<br />

Certificates)<br />

3.4.3. Documentation Disclosure of Conflict of Interest<br />

3.4.3.1. A Conflict of Interest means that because of other activities or<br />

relationships with other persons or entities, a Bidder is unable or<br />

potentially unable to render impartial assistance or advice to the<br />

Purchaser or the Bidder’s objectivity in performing the prospective<br />

Contract work is, or might be otherwise impaired, or the Bidder has an<br />

unfair competitive advantage.<br />

3.4.3.2. In compliance with paragraph 4.4.1.5, Bidders and proposed<br />

Subcontractors detailed at Annex B-9, shall identify at Annex B-15 all<br />

business relationships with Contractors/Subcontractors performing work<br />

or having performed work under the New NATO Headquarters (NNHQ)<br />

Project, including but not limited to those resulting from ownership,<br />

share of assets, strategic business agreements regardless of their<br />

nature or financial magnitude of which the Bidders is knowledgeable at<br />

the time of Bid submission. If any of such relationships could constitute<br />

a real or apparent conflict of interest, or could otherwise, in any manner<br />

or form, influence or appear to influence the capacity of the Bidder to<br />

render unbiased service, Bidders shall submit a plan for the mitigation<br />

of the conflict at Annex B-15,detailing the measures the Bidder has or<br />

proposes to put in place for the purpose of preventing unfair advantage<br />

in relation to the performance associated with the prospective Contract.<br />

3.4.3.3. If Bidders consider that no conflict of interest exists, they shall include a<br />

declaration to that effect at Annex B-15, signed by the individual entitled<br />

to commit the company to such statement.<br />

3.4.4. No indication disclosing or contributing to disclose the Bid Price shall be<br />

made part of the Bid Administration Package. Failure to abide to this<br />

prescription may result in the bid being declared non-compliant.<br />

3.5. Price Quotation<br />

3.5.1. Package Contents<br />

3.5.1.1. This envelope must contain the following documentation and media in<br />

the quantities provided in paragraph 3.2.3 above:<br />

Book I, Page I-27<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.5.1.1.1. The completed set of sheets contained in the electronic file “3_IFB-<br />

CO-13300-ANWI-AMD-2-Book-I-Bidding-Sheets_v03.xlsx”<br />

submitted as part of this IFB.<br />

3.5.1.1.2. CD-ROM or DVD containing an electronic version, in MS Excel<br />

format, of the documentation stated in paragraph 3.5.1.1.1 above.<br />

3.5.2. General Rules<br />

3.5.2.1. Bidders are advised that the total price for CLINs 1, 2, 3, 4, 5, 6, 7, 8,<br />

9, 10, 11, 12, 13, 14, 15 and 16 shall not exceed a ceiling of EUR<br />

81,726,023 (eighty-one million seven hundred twenty-six thousand<br />

twenty-three Euro). Bids submitted in excess of this figure may be<br />

determined to be non-compliant and eliminated from further<br />

consideration.<br />

3.5.2.2. Bidders shall prepare their Price Quotation by completing the Bidding<br />

Sheets referred in paragraph 3.5.1.1.1 above, in accordance with the<br />

instructions specified in Annex A-1.<br />

3.5.2.3. The structure of the Bidding Sheets shall not be changed, other than as<br />

indicated elsewhere, nor should any quantity or item description in the<br />

Bidding Sheets. The currency(ies) of each Contract Line Item and subitem<br />

shall be shown. The prices provided shall be intended as the<br />

comprehensive total price offered for the fulfilment of all requirements<br />

as expressed in the IFB documentation including but not limited to those<br />

expressed in the SOW and SRS.<br />

3.5.2.4. Bidders shall furnish Firm Fixed Prices for all required items in<br />

accordance with the format set forth in the Instructions for preparation of<br />

the Bidding Sheets. This includes Firm Fixed Prices for all optional<br />

CLINs, both Evaluated Options (CLINs 16, 17, 18 and 19) and<br />

Non-Evaluated Options (CLIN 20, 21).<br />

3.5.2.5. Offered prices shall not be “conditional" in nature. Any comments<br />

supplied in the Bidding Sheets which are conditional in nature, relative<br />

to the offered prices, may result in a determination that the Bid is noncompliant.<br />

3.5.2.6. Bidders are responsible for the accuracy of their Price Quotations. Price<br />

Quotations that have apparent computational errors may have such<br />

errors resolved in the Purchaser’s favour or, in the case of gross<br />

omissions, inconsistencies or errors, may be determined to be noncompliant.<br />

In the case of inconsistencies between the electronic<br />

version of the Bidding Sheets and the paper “hard copy” of the Bidding<br />

Sheets, the “hard copy” will be considered by the Purchaser to have<br />

precedence over the electronic version.<br />

Book I, Page I-28<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.5.2.7. Bidders shall quote in their own national currency or in EURO. Bidders<br />

may also submit Bids in multiple currencies including other NATO<br />

member states' currencies under the following conditions:<br />

3.5.2.7.1. the currency is of a "participating country" in the project, and<br />

3.5.2.7.2. the Bidder can demonstrate, either through Subcontract<br />

arrangements or in its proposed work methodology, that it will have<br />

equivalent expenses in that currency. All major subcontracts and<br />

their approximate anticipated value should be listed on a separate<br />

sheet and included with the Price Quotation.<br />

3.5.2.8. The Purchaser, by virtue of his status under the terms of Article IX and<br />

X of the Ottawa Agreement, is exempt from all direct and indirect taxes<br />

(incl. VAT) and all customs duties on merchandise imported or<br />

exported.<br />

3.5.2.9. Bidders shall therefore exclude from their price Bid all taxes, duties and<br />

customs charges from which the Purchaser is exempted by international<br />

agreement and are required to certify that they have done so through<br />

execution of the Certificate at Annex B-5.<br />

3.5.2.10. Unless otherwise specified in the instructions for the preparation of<br />

Bidding Sheets in Annex A-1, all prices quoted in the proposal shall be<br />

on the basis that all deliverable items shall be delivered “Delivery Duty<br />

Paid (DDP)” in accordance with the International Chamber of<br />

Commerce INCOTERMS ® 2010.<br />

3.5.2.11. The Bidder’s attention is directed to the fact that Price Quotation shall<br />

contain no document and/or information other than the priced copies of<br />

the Bidding Sheets. Any other document will not be considered for<br />

evaluation.<br />

3.6. Technical Proposal Package<br />

3.6.1. Bidder Qualifications<br />

3.6.1.1. The Bidder shall provide an assessment of corporate experience; the<br />

corporate structure and capabilities; and individual skills and<br />

experience, including the following factors:<br />

3.6.1.2. The Bidder shall provide evidence of relevant and recent experience of<br />

the Bidder in the design and implementation and integration of projects<br />

similar to the subject procurement, including:<br />

3.6.1.2.1. The Bidder shall provide relevant and successful corporate<br />

experience in at least three Contracts within the last three years for<br />

which the Bidder integrated similar service based/oriented systems<br />

to meet military or government requirements.<br />

Book I, Page I-29<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.1.2.2. The Bidder shall provide relevant and successful corporate<br />

experience of the major Subcontractors for the delivery of critical<br />

service oriented capabilities.<br />

3.6.1.2.3. The Bidder shall provide relevant experience and expertise in<br />

providing ITIL based service management and support for NATO,<br />

military, government and/or Contractor Owned Contractor Operated<br />

(COCO) services (warranty, repair-and-replacement service, and<br />

improvement services) for information systems of large,<br />

geographically-dispersed organisations.<br />

3.6.1.3. The Bid shall provide a discussion of the corporate capabilities of the<br />

Bidder, including:<br />

3.6.1.3.1. Adequate and appropriate corporate resources available to support<br />

the Project.<br />

3.6.1.3.2. A well-established and mature level of capability in its system<br />

integration and testing practices and tools.<br />

3.6.1.3.3. Sufficient numbers of individuals with the skill and experience to<br />

meet the requirements of the Contract, including:<br />

3.6.1.3.3.1 The resumes and support data to meet or exceed the experience<br />

and educational criteria stated in the SOW.<br />

3.6.1.3.3.2 Evidence that the individuals have the expected knowledge,<br />

capability and experience to meet the requirements of this Contract.<br />

3.6.2. Key Personnel<br />

3.6.2.1. The Bid shall provide the resumes / Curricula Vitae (CVs) and<br />

supporting certification documentation of proposed Key Personnel that<br />

meet or exceed the experience and educational criteria stated<br />

hereunder and in SOW paragraph 4.2.<br />

3.6.2.2. The Bid shall demonstrate that the proposed Key Personnel have the<br />

required knowledge, capability and experience to meet the<br />

requirements of this Contract.<br />

3.6.2.3. ANWI Project Manager (PM) Requirements<br />

3.6.2.3.1. The ANWI PM shall have a current NATO SECRET security<br />

clearance<br />

3.6.2.3.2. The ANWI PM shall have a University Degree in Electronic<br />

Engineering, Computer Science, Telecommunications, or related<br />

discipline, preferably equivalent to a Master’s, supported by relevant<br />

certificates/ diplomas. Exceptionally, extensive relevant experience<br />

may be considered if the above qualifications are not met.<br />

Book I, Page I-30<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-31<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.2.3.3. The ANWI PM shall have a current Project Management (PRINCE2<br />

Practitioner and/or PMI Project Management Professional (PMP))<br />

certification.<br />

3.6.2.3.4. The ANWI PM shall have a minimum of ten (10) years’ experience<br />

as an ICT Project Manager as supported by project references,<br />

points of contact, and descriptions/scope of the projects managed.<br />

3.6.2.3.5. The ANWI PM shall have a minimum experience of five (5) years<br />

gained within ICT procurement, implementation, migration and<br />

management in projects similar to the ANWI Project, as supported<br />

by project references, points of contact, and description of<br />

role/responsibilities/activities executed.<br />

3.6.2.3.6. The ANWI PM shall have a minimum of one (1) year experience in<br />

ICT QA activities as well as knowledge and experience with QA<br />

standards (either AQAP or ISO), supported by project references,<br />

points of contact, and description of role/responsibilities/activities<br />

executed.<br />

3.6.2.3.7. The ANWI PM shall have knowledge and experience with processes<br />

for integration and testing.<br />

3.6.2.3.8. The ANWI PM shall have minimum of two (2) years’ experience in<br />

projects where ICT migration/transition was exercised in a<br />

managerial role responsible for the planning, designing and<br />

execution of migration/transition activities, as supported by project<br />

references, points of contact, and descriptions of the<br />

role/responsibilities/activities executed.<br />

3.6.2.3.9. The ANWI PM shall have a demonstrated spoken and written<br />

fluency in English, at a minimum level of 4343 as defined in<br />

STANAG 6001.<br />

3.6.2.4. ANWI Technical Lead (TL) Requirements<br />

3.6.2.4.1. The ANWI TL shall have a current NATO SECRET security<br />

clearance.<br />

3.6.2.4.2. The ANWI TL shall have a University Degree in Electronic<br />

Engineering, Computer Science, Telecommunications, or related<br />

discipline, preferably equivalent to a Master’s, supported by relevant<br />

certificates/ diplomas. Exceptionally, extensive relevant experience<br />

may be considered if the above qualifications are not met.<br />

3.6.2.4.3. The ANWI TL shall have demonstrated practical experience in<br />

Infrastructure (processing, virtualisation, storage, switches),<br />

supported by valid certification of at least the following areas:<br />

Microsoft (MCSE), CISCO (CCDP) or valid comparable (products<br />

used in the ANWI design) certification.


NATO UNCLASSIFIED<br />

Book I, Page I-32<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.2.4.4. The ANWI TL shall have a minimum of two (2) years’ experience<br />

designing and implementing high-availability server rooms as<br />

supported by project references, points of contact, and technical<br />

descriptions of the projects implemented.<br />

3.6.2.4.5. The ANWI TL shall have a minimum of three (3) years’ experience<br />

designing and implementing local area networks in projects similar<br />

to the ANWI Project demonstrating a strong network infrastructure<br />

and network service focus with good knowledge of the Information<br />

Assurance and provisioning of core applications, as supported by<br />

project references, points of contact, and description of<br />

role/responsibilities/activities held in these projects.<br />

3.6.2.4.6. The ANWI TL shall have a minimum of two (2) years’ experience as<br />

a technical manager responsible for the planning, designing and<br />

execution of projects where an Active Directory and subsequent<br />

application and data migration/transition activities were exercised; as<br />

supported by project references, points of contact, and technical<br />

description of the role/responsibilities/activities during this time.<br />

3.6.2.4.7. The ANWI TL shall have a minimum of one (1) years’ experience in<br />

ICT QA activities, supported by supported by project references,<br />

point of contact, and description of role/responsibilities/activities.<br />

3.6.2.4.8. The ANWI TL shall have knowledge and experience with QA<br />

standards (either AQAP or ISO), processes for integration and (pre)<br />

migration testing.<br />

3.6.2.4.9. The ANWI TL shall have a minimum of three (3) years’ experience<br />

as a team leader or project manager to ensure the technical<br />

management oversight of a: LAN designer, Server Room designer,<br />

UCC designer, communications engineer and systems integrator; as<br />

supported by project references, points of contact, and technical<br />

description of the role/responsibilities/activities.<br />

3.6.2.4.10. The ANWI TL shall have an up to date ITIL v3 Intermediate Level<br />

Certification having earned at least 12 points in the Service<br />

Capability area.<br />

3.6.2.4.11. The ANWI TL shall have a demonstrated spoken and written fluency<br />

in English, at a minimum level of 4343 as defined in STANAG 6001.<br />

3.6.2.5. ANWI Test Director (TD) Requirements<br />

3.6.2.5.1. The ANWI TD shall have a current NATO SECRET security<br />

clearance.<br />

3.6.2.5.2. The ANWI TD shall have a University Degree in Electronic<br />

Engineering, Computer Science, Telecommunications, or related<br />

discipline, preferably equivalent to a Master’s and supplemented by


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

relevant postgraduate qualifications, supported by relevant<br />

certificates/ diplomas. Exceptionally extensive relevant experience<br />

may be considered if the above qualifications are not met.<br />

3.6.2.5.3. The ANWI TD shall have integration and testing engineering skills<br />

with five (5) years’ experience as part of large ICT projects,<br />

supported by project references, point of contact, and description of<br />

role/responsibilities/activities.<br />

3.6.2.5.4. The ANWI TD shall have demonstrated practical experience in<br />

planning, conducting and assessing Integration and Testing<br />

activities in support of large ICT projects for at least three (3) years,<br />

supported by project references, point of contact, and description of<br />

role/responsibilities/activities.<br />

3.6.2.5.5. The ANWI TD shall have demonstrated practical experience in<br />

testing of IT infrastructure, core services where the role of test<br />

engineer or integration engineer was exercised, supported by project<br />

references, point of contact, and description of<br />

role/responsibilities/activities.<br />

3.6.2.5.6. The ANWI TD shall have demonstrated practical experience in ICT<br />

migrations where the role of test engineer or integration engineer<br />

was exercised for migration of ICT services (Active Directory,<br />

business applications and associated data), supported by project<br />

references, point of contact, and description of<br />

role/responsibilities/activities.<br />

3.6.2.5.7. The ANWI TD shall have demonstrated practical knowledge and<br />

experience with QA standards (either AQAP or ISO), processes for<br />

integration and (pre) migration testing.<br />

3.6.2.5.8. The ANWI TD shall have a demonstrated spoken and written fluency<br />

in English, as defined in STANAG 6001 at a minimum level of 4343.<br />

3.6.3. Project Management Proposal<br />

3.6.3.1. Project Management Plan (PMP)<br />

3.6.3.1.1. The Bidder shall provide a project management plan that provides<br />

detailed information on the management approach to deliver the<br />

ANWI from Contract award till the end of the 5 year O&M period.<br />

3.6.3.1.2. The Bidder shall provide a description of its project management<br />

methodology and approach to be used for this project that is<br />

coherent with delivering the ANWI’s scope and its objectives.<br />

3.6.3.1.3. The proposed PMP shall be compliant with Annex K Appendix 3 of<br />

the SOW.<br />

Book I, Page I-33<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.3.1.4. The proposed PMP shall serve as the initial ANWI PMP.<br />

3.6.3.1.5. The proposed PMP shall contain the project management planning<br />

information so as to constitute a consistent and complete document<br />

that effectively permits the Purchaser to be able to assess the<br />

Bidder’s plan to manage to ANWI project.<br />

3.6.3.1.6. The proposed PMP identifies of the Contractor’s organisation, in<br />

particular all major Contractor units and any Subcontractors involved<br />

in meeting the requirements of the Contract, and the portion of the<br />

overall effort or deliverable item for which they are responsible.<br />

3.6.3.1.7. The proposed PMP shall describe the organization for the proposed<br />

Project Team that identifies all the required roles of the team<br />

members of the PMO, describing the lines of reporting and<br />

oversight.<br />

3.6.3.1.8. The proposed PMP shall describe the PMO in terms of manpower<br />

and resources to conduct and support the management and<br />

administration of operations in order to meet the objectives of the<br />

program, including taking all reasonable steps to ensure continuity of<br />

personnel assigned to work on this project.<br />

3.6.3.1.9. The proposed PMP shall describe the project management<br />

processes; including the stages and their staffing, and schedule<br />

estimate; project control mechanisms for entering and exiting a<br />

stage; and the Purchaser involvement in their project management<br />

process.<br />

3.6.3.1.10. The proposed PMP describes the relationship of the PMP to other<br />

project plans: Project Implementation Plan, Change Management<br />

Plan, Issue Management Plan, Testing and Acceptance Plan,<br />

Configuration Management Plan, Risk Management Plan, Service<br />

Delivery Plan, Integrated Logistic Support Plan and Training Plan.<br />

3.6.3.1.11. The PMP shall detail the mechanism through which the plans will be<br />

maintained during the lifecycle of the Contract and demonstrates<br />

that the Bidder can accommodate changes in scope in a controlled<br />

manner.<br />

3.6.3.2. Project Implementation Plan<br />

3.6.3.2.1. General<br />

3.6.3.2.1.1 The provided PIP shall serve as the ANWI’s initial PIP.<br />

3.6.3.2.1.2 The proposed PIP shall clearly and accurately identify the Bidder’s<br />

understanding of the project’s scope, including major deliverables,<br />

assumptions and constraints.<br />

Book I, Page I-34<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.3.2.1.3 The proposed PIP shall provide the Bidder’s plans, capabilities, and<br />

ability to satisfactorily implement the entire project in conformance<br />

with the requirements as specified in the SOW.<br />

3.6.3.2.1.4 The proposed PIP shall be consistent with the requirements of the<br />

SOW and effectively describe the scope, planning, and resources to<br />

deliver the ANWI requirements. However, differing from the SOW<br />

requirement, this version of the PIP shall not include associated<br />

cost information.<br />

3.6.3.2.2. Schedule<br />

3.6.3.2.2.1 The proposed schedule shall identify all Contract events and<br />

milestones, including Contract-related Purchaser deliverables,<br />

activities and events.<br />

3.6.3.2.2.2 The proposed schedule shall provide the duration, sequence, and<br />

resource effort to deliver tasks providing a realistic assessment of<br />

the scope of work involved.<br />

3.6.3.2.2.3 The schedule shall be compliant with the milestones in Annex A.<br />

3.6.3.2.3. Work Breakdown Structure (WBS)<br />

3.6.3.2.3.1 The Bidder shall provide a WBS to the level of detail reflecting all<br />

necessary activities (stages and their major tasks/work packages<br />

as well as the dependencies between the tasks/work packages) for<br />

the effective planning, management and delivery of the ANWI<br />

capability and provisioning of ANWI services where this is required.<br />

3.6.3.2.3.2 The WBS shall be consistent with the requirements for the SOW in<br />

its description of all engineering efforts for specifying, designing,<br />

developing, testing, accrediting, installing, integrating and<br />

supporting the delivery of the ANWI service based solution.<br />

3.6.3.3. Change Management Plan<br />

3.6.3.3.1. The Bidder shall provide a Change Management Plan that details<br />

the change management process that is to be used in the ANWI<br />

project.<br />

3.6.3.3.2. The Bidder shall provide the Change Management request process<br />

that shall be used during the ANWI project including the use and<br />

control of the change management register requirements and<br />

process for reviewing and processing changes.<br />

3.6.3.3.3. The Bidder’s Change Management Plan shall address roles and<br />

responsibilities of the necessary actors to execute the plan.<br />

3.6.3.4. Project Risk Register<br />

Book I, Page I-35<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.3.4.1. The Bidder shall provide an initial ANWI risk register which identifies<br />

and details the top 10 project risks.<br />

3.6.3.5. Project Issue Management Plan<br />

3.6.3.5.1. The Bidder shall provide an Issue Management Plan detailing the<br />

issue process that is to be used throughout the ANWI project.<br />

3.6.3.5.2. The Bidder’s Issue Management Plan shall detail how the Bidder<br />

plans to identify, analyse, manage, act and report on project issues.<br />

3.6.3.5.3. The Bidder’s Issue Management Plan shall address roles and<br />

responsibilities of the necessary actors to execute the plan.<br />

3.6.4. Initial High Level Design<br />

3.6.4.1. The Bidder shall provide a draft initial High Level Design (HLD) and<br />

architectural concepts not to exceed 120 pages; system drawings are to<br />

be included in an annex and will not count against the submitted page<br />

count.<br />

3.6.4.2. The Bidder’s submission shall serve as the ANWI’s initial High Level<br />

Design demonstrating their understanding and maturity of the proposed<br />

technical solution with respect to the requirements of the ANWI SOW.<br />

This initial High Level Design document shall be in line with the design<br />

document structure stated in Annex K Appendix 2 and serve as the<br />

baseline for further development of this deliverable.<br />

3.6.4.3. The Bidder’s HLD shall, at a minimum, contain:<br />

3.6.4.3.1. Design rational against the architectural principles (Annex K<br />

Appendix 2 Section 3.1)<br />

3.6.4.3.2. Logical model diagrams (Annex K Appendix 2 Section 3.2)<br />

3.6.4.3.3. Initial high level system design and how it satisfies the requirement<br />

for the ANWI services in the different security domains and zones<br />

and transfer of information between domains/zones. (Annex K<br />

Appendix 2 Section 4).<br />

3.6.4.3.4. The proposed HLD shall address the following topics :<br />

3.6.4.3.4.1 General overview of the required ANWI services per security<br />

domain including assumptions and dependencies.<br />

3.6.4.3.5. And for each of the two major infrastructures for the associated<br />

security domains the HLD shall address:<br />

3.6.4.3.5.1 Concept of operations - Overview of the different services and<br />

integration level and interfaces between services.<br />

Book I, Page I-36<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.4.3.5.2 Initial component level design that shows how a particular service is<br />

composed of integrated HW and SW components<br />

3.6.4.3.5.3 Server/ Technical Equipment Room (TER) room and rack designs<br />

with estimations of power and cooling requirements<br />

3.6.4.3.5.4 ANWI service design and details on how the service level targets<br />

shall be met including Service management and Control (SMC) and<br />

Information assurance (IA) requirements. (Annex E – I). This shall<br />

include details how the requirements for availability and reliability<br />

are to be achieved.<br />

3.6.4.3.5.5 Expanded Service Management & Control (SMC) design that<br />

explains how the operational status/metrics shall be captured,<br />

routed, monitored, “billed” and displayed in the Network Operations<br />

Centre (NOC) to show that the service is meeting its Service Level<br />

Agreement (SLA).<br />

3.6.4.3.5.6 Bandwidth design for both the wired and wireless networks; this<br />

bandwidth design shall incorporate all the ANWI services like<br />

Unified Communications and Collaboration (UCC), Client<br />

provisioning and IPTV.<br />

3.6.4.3.5.7 As there are numerous networks and numerous services, the<br />

Bidder shall explain how he will deliver and seamlessly integrate the<br />

ANWI deliverables and NATO PFE into a coherent highly available<br />

network.<br />

3.6.4.3.5.8 Detailed design of security mechanisms supporting the Bidder’s<br />

initial Security Risk Assessment (SRA).<br />

3.6.4.3.5.9 A SIP (of the bidder’s choosing) for one of the six cross domain<br />

gateways shall be provided as an appendix to the submitted<br />

design.<br />

3.6.4.3.6. Detailed initial design of the Cross-Domain Gateway modules<br />

(Annex K Appendix 2 Section 4.7)<br />

3.6.4.3.7. Detailed design of the Integrated Test Service solution (Annex K<br />

Appendix 2 Section 4.8). This section shall detail the proposed ITS<br />

components and shall provide full capability to test all required ANWI<br />

services as well as integration testing with Purchaser Furnished<br />

Services and Infrastructure (PFS&I) deliverables (e.g. NATO Public<br />

Key Infrastructure, NATO Enterprise Directory Service, etc.) and<br />

other new NATO Headquarters projects (e.g. Electronic Security<br />

Systems, Building Management System, etc.).<br />

3.6.4.3.8. The HLD shall include the high level concept and discussion of the<br />

other ANWI services that will be detailed in the later design phases.<br />

Book I, Page I-37<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.4.4. The Bidder’s HLD shall include technical details about the different<br />

hardware and software components (note: details shall be provided as<br />

part of the high level design and any individual datasheets are to be<br />

provided in a separate binder not included and not counted as part of<br />

the HLD page count).<br />

3.6.4.5. The Bidder’s HLD shall provide details on the optimizations to the<br />

solution for lowering the overall Total Cost of Ownership (TCO) of the<br />

ANWI while still complying with all requirements in this IFB.<br />

3.6.4.6. The Bidder shall provide a separate service breakdown document listing<br />

all the products (hardware and software) per service. This document<br />

shall be comprehensive and include details of license types and<br />

quantities which shall not count against the page requirement of the<br />

HLD.<br />

3.6.4.7. The Bidder shall address how innovation is embraced in the HLD and<br />

will be realised in the ANWI solution.<br />

3.6.4.8. The Bidder shall provide an initial Security Risk Assessment of the<br />

provided HLD.<br />

3.6.4.9. The Bidder shall provide a Requirements Traceability Matrix<br />

documenting the cross-referencing of contractual requirements to the<br />

contents of the proposed ANWI initial high level design document.<br />

3.6.5. SERVICE MANAGEMENT & CONTROL CONCEPT<br />

3.6.5.1. Operational Support Plan<br />

3.6.5.1.1. The Bidder shall propose an Operational Support Plan (OSP)<br />

describing the management of ANWI services such that the OSP is<br />

in line with ITIL v3.<br />

3.6.5.1.2. The proposal shall serve as the initial OSP (REF SOW 7.4.1). for the<br />

ANWI project and expanded during the project’s implementation<br />

phase along with the respective SLA’s.<br />

3.6.5.1.3. The initial OSP shall detail the different ANWI services and their<br />

operational procedures; including, but not limited to, service<br />

requests, change requests, monitoring and reporting and<br />

configuration management.<br />

3.6.5.1.4. The Bidder’s OSP shall provide details on the proposed service<br />

organisation (with detailed function descriptions and support staff<br />

numbers for each of the described functions) needed to fulfil the<br />

ANWI’s operational support requirements.<br />

Book I, Page I-38<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6.5.1.5. The Bidder’s OSP shall describe the initial ANWI system capacity<br />

requirements and how capacity changes shall be implemented and<br />

managed.<br />

3.6.5.1.6. The OSP shall be used as the basis to estimate the manpower,<br />

hardware and software costs for the ANWI’s Total Cost of<br />

Ownership.<br />

3.6.5.2. Integrated Logistics Support Plan (ILSP)<br />

3.6.5.2.1. The Bidder shall provide an initial ILSP that addresses the<br />

maintenance and warranty concept for NATO owned property and<br />

identifies the ANWI equipment warranty and maintenance support<br />

procedures irrespective if the equipment is NATO or Contractor<br />

operated.<br />

Book I, Page I-39<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 4<br />

BID EVALUATION AND CONTRACT AWARD<br />

4.1. General<br />

4.1.1. The evaluation of Bids will be made by the Purchaser solely on the basis<br />

of the requirements specified in this Invitation for Bid.<br />

4.1.2. All Bids will be evaluated solely using the formula, evaluation criteria and<br />

factors contained herein. Technical Proposals will be evaluated strictly<br />

against the technical criteria and not against other Technical Proposals<br />

submitted.<br />

4.1.3. The evaluation of Bids and the determination as to the Best Value Score<br />

will be based only on that information furnished by the Bidder and<br />

contained in his Bid. The Purchaser shall not be responsible for locating<br />

or securing any information that is not identified in the Bid.<br />

4.1.4. The Bidder shall furnish with his Bid all information requested by the<br />

Purchaser in Book I, Section 3, Bid Preparation Instructions. Significant<br />

omissions and/or cursory submissions will result in a reduced Best Value<br />

Score and may result in a determination of non-compliance without<br />

recourse to further clarification. The information provided by the Bidder in<br />

its proposal shall be to a level of detail necessary for the Purchaser to<br />

fully comprehend exactly what the Bidder proposes to furnish as well as<br />

his approach and methodologies.<br />

4.1.5. During the evaluation, the Purchaser may request clarification of the Bid<br />

from the Bidder and the Bidder shall provide sufficient detailed<br />

information in connection with such requests as to permit the Purchaser<br />

to make a final assessment of the Bid based upon the facts. The purpose<br />

of such clarifications will be to resolve ambiguities in the Bid and to<br />

permit the Bidder to state his intentions regarding certain statements<br />

contained therein. The purpose of the clarification stage is not to elicit<br />

additional information from the Bidder that was not contained in the<br />

original submission or to allow the Bidder to supplement cursory answers<br />

or omitted aspects of the Bid. The Bidder is not permitted any cardinal<br />

alteration of the Bid regarding technical matters and shall not make any<br />

change to his price quotation at any time.<br />

4.1.6. The Purchaser reserves the right, during the evaluation and selection<br />

process, to verify any statements made concerning experience, facilities,<br />

or existing designs or materials by making a physical inspection of the<br />

Bidder's facilities and capital assets. This includes the right to validate,<br />

by physical inspection, the facilities and assets of proposed<br />

Subcontractors.<br />

4.1.7. The evaluation will be conducted in accordance with NATO Infrastructure<br />

Bidding Procedures as set forth in the document, and the Best Value<br />

evaluation procedures set forth in AC/4-D(2008)0002-REV1, “Procedures<br />

Book I, Page I-40<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-41<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

and Practices for Conducting NSIP International Competitive Bidding<br />

Using Best Value Methodology”. The Bid evaluation methodology to be<br />

followed, including the top-level evaluation criteria and their weighting<br />

factors, were agreed by the NATO Infrastructure Committee.<br />

4.2. Best Value Award Approach and Bid Evaluation Factors<br />

4.2.1. The Contract resulting from this IFB will be awarded to the Bidder whose<br />

conforming offer provides the Best Value to NATO, as evaluated by the<br />

Purchaser in compliance with the requirements of this IFB and according<br />

to the evaluation method specified in this SECTION 4 .<br />

4.2.2. The overall score for each compliant Bidder will be derived using the<br />

following formula:<br />

Best Value Score = E+M+S+R+P<br />

where:<br />

E = Weighted Engineering Score<br />

M = Weighted Management Score<br />

S = Weighted Supportability Score<br />

R = Weighted Risk Score<br />

P = Weighted Price Score<br />

4.2.3. The maximum possible Best Value Score is 100; the minimum possible<br />

is zero. The Bid with the highest Best Value Score will be will be<br />

recommended to be the Apparent Successful Bidder.<br />

4.2.4. Only for the purpose of the Best Value evaluation, P (the Weighted Price<br />

Score) is defined as the Total Cost of Ownership as detailed in the TCO<br />

Calculation tab of the Bidding Sheets<br />

4.2.5. Evaluation Criteria.<br />

4.2.5.1. Price: 50% weight, with the Price Score (P) derived using the following<br />

formula:<br />

Price Score = 100 * (1-(Bid Price / (2*Average Bid Price))<br />

4.2.5.1.1. Using this formula, a price quotation that is exactly equal to the<br />

average price of all Bids would receive a score of 25 of the 50 points<br />

available. A price quotation that is one-half of the average price of<br />

all Bids would receive a score of 37.5 of the 50 points available, and<br />

a price quotation of two times the average Bid price would receive a<br />

score of 0. Price Quotations in excess of two times the average Bid


NATO UNCLASSIFIED<br />

Book I, Page I-42<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

price would likewise receive a score of 0, even though the formula<br />

would generate a negative figure.<br />

4.2.5.1.2. Bidders shall note that any Bid in excess of the stated ceiling price<br />

set forth in paragraph 3.5.2.1 above may not be scored as the Bid<br />

may be determined to be non-compliant.<br />

4.2.5.2. Technical 50 % weight, with the cumulative Technical Score determined<br />

by evaluating and scoring the different technical (sub-)criteria in<br />

accordance with the prescriptions of the paragraphs below.<br />

4.2.5.2.1. Engineering: 70% weight, based on the following sub-criteria which<br />

appear in descending order of importance:<br />

4.2.5.2.1.1 ANWI Service Design<br />

4.2.5.2.1.2 Integrated Test Service (ITS) design<br />

4.2.5.2.1.3 Innovation<br />

4.2.5.2.2. Management: 15% weight, based on the following sub-criteria listed<br />

in order of descending importance:<br />

4.2.5.2.2.1 Project Plans<br />

4.2.5.2.2.2 Bidder Qualifications<br />

4.2.5.2.3. Supportability: 10% weight, based on the following sub-criteria listed<br />

in descending order of importance:<br />

4.2.5.2.3.1 Support Plan<br />

4.2.5.2.3.2 Design Components<br />

4.2.5.2.4. Risk: 5% weight based on the following sub-criteria listed in order of<br />

descending importance:<br />

4.2.5.2.4.1 Project Risk<br />

4.2.5.2.4.2 Design Risk<br />

4.3. Evaluation Procedure<br />

4.3.1. The evaluation will be done in a four step process, as described below:<br />

4.3.1.1. Step 1: Administrative and Contractual Compliance<br />

4.3.1.1.1. Bids received will be reviewed for compliance with the mandatory<br />

administrative requirements specified in paragraph ‎4.4 and<br />

contractual compliance. Bids not meeting all of the mandatory<br />

administrative or contractual requirements may be determined to be<br />

non-compliant and not considered for further evaluation.


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.3.1.2. Step 2: Technical Evaluation<br />

4.3.1.2.1. In Step 2 Bids will have their Technical Proposals evaluated against<br />

predetermined top-level criteria and identified sub-criteria (see<br />

paragraph 4.2.5.2 above), and scored accordingly. This evaluation<br />

will result in “raw” or unweighted technical scores against the<br />

criteria.<br />

4.3.1.2.2. Bidders are advised that any Bid whose Technical Proposal receives<br />

a score of less than 20% of the unweighted raw score possible in<br />

any of the sub-criteria listed in paragraph 4.2.5.2 may be determined<br />

by the Purchaser to be non-compliant and not considered for further<br />

evaluation.<br />

4.3.1.3. Step 3: Price Evaluation<br />

4.3.1.3.1. The Price Quotations of all Bids not considered non-compliant under<br />

the previous steps will be opened, evaluated and scored in<br />

accordance with paragraph 4.6.<br />

4.3.1.4. Step 4: Determination of Apparent Successful Bidder<br />

4.3.1.4.1. Upon completion of the Price Evaluation, the Apparent Successful<br />

Bid will be determined in accordance with paragraph 4.7 hereafter.<br />

4.4. Evaluation Step 1 - Administrative and Contractual Compliance<br />

4.4.1. Bids will be reviewed for compliance with the formal requirements for Bid<br />

submission as stated in this IFB and the content of the Bid Administration<br />

Package. The evaluation of the Bid Administration Package will be made<br />

on its completeness, conformity and compliance to the requested<br />

information. This evaluation is not subject to scoring in accordance with<br />

Best Value procedures but is made to determine if a Bid complies with<br />

the requirements of the Bidding Instructions and Prospective Contract.<br />

Specifically, the following requirements shall be verified:<br />

4.4.1.1. The Bid was received by the Bid Closing Date and Time,<br />

4.4.1.2. The Bid is packaged and marked properly,<br />

4.4.1.3. The Bid Administration Package contains the documentation listed in<br />

paragraph 3.4 above and complies with the formal requirements<br />

established in paragraph 3.1 above.<br />

4.4.1.4. The Bidder has not taken exception to the Terms and Conditions of the<br />

Prospective Contract or has not qualified or otherwise conditioned his<br />

offer on a modification or alteration of the Terms and Conditions or the<br />

language of the Statement of Work.<br />

4.4.1.5. Evaluation of Conflict of Interest Documentation<br />

Book I, Page I-43<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.4.1.5.1. The Purchaser will evaluate the Bidder’s submission as detailed in<br />

Book I Section III Paragraph 3.4.3 and resort to the disqualification<br />

of the Bid in those cases in which it is deemed that the Bidder’s<br />

relationships with Contractors/Subcontractors performing work or<br />

having performed work under the New NATO Headquarters (NNHQ)<br />

Project could constitute a real or apparent conflict of interest, could<br />

in any manner or form influence or appear to influence the capacity<br />

of the Bidder to render unbiased service or otherwise result in an<br />

advantage during the course of the performance under the<br />

prospective Contract and any proposed conflict of interest mitigation<br />

plan proposed by the Bidder does not satisfactory resolve the<br />

conflict of interest in place.<br />

4.4.1.5.2. Conversely, should the Purchaser deem that the Bidder’s conflict of<br />

interest mitigation plan adequately addresses the concerns relevant<br />

to any conflict of interest, it will make such plan part of any<br />

awarded Contract and subject to the stipulation of Clause 25 of the<br />

prospective Contract Special Provisions. Equally in those cases<br />

where the Bidder declares that no apparent or real conflict of interest<br />

exists such condition shall be reflected in any resulting Contract and<br />

made subject to the prescription of Clause 25 of the prospective<br />

Contract Special Provisions.<br />

4.4.1.5.3. In the event that, during the evaluation of the Bids, the Purchaser<br />

determines or suspects that the Bidder has not disclosed a real or<br />

apparent conflict of interest of which it was knowledgeable at the<br />

time of Bid submission, in breach of paragraphs 4.4.1.5.1 and<br />

4.4.1.5.2, the Purchaser reserves the right to declare the Bid noncompliant.<br />

4.4.1.6. Contractual compliance will be determined primarily by receipt of an<br />

unqualified and completed Annex B-6.<br />

4.4.2. A Bid that fails to conform to the above requirements may be declared<br />

non-compliant and may not be evaluated further by the Purchaser.<br />

4.4.3. Bids that are determined to be administratively compliant will proceed to<br />

Step 2, Technical Evaluation.<br />

4.4.4. Notwithstanding paragraph 4.4.3, if it is later discovered in the evaluation<br />

of the Bid Administration Package, Technical Proposal or the Price<br />

Quotation that the Bidder has taken exception to the Terms and<br />

Conditions of the Prospective Contract, or has qualified and/or otherwise<br />

conditioned his offer on a modification or alteration of the Terms and<br />

Conditions or the language of the Statement of Work, the Bidder may be<br />

determined to have submitted a non-compliant Bid at the point in time of<br />

discovery.<br />

Book I, Page I-44<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5. Evaluation Step 2 - Technical Evaluation<br />

4.5.1. The Technical Proposal will be evaluated against the criteria and subcriteria<br />

set forth in paragraph 4.2 above. For some sub-criteria, there<br />

may be additional supporting factors at the next lower level. These lower<br />

level factors are not published here but are predetermined and included<br />

in the Technical Evaluation Weighting Scheme sealed before Bid<br />

Opening. The following paragraphs identify the aspects to be examined<br />

in the Technical Proposal evaluation and rating.<br />

4.5.2. Bidder Qualifications<br />

4.5.2.1. Bidder qualifications will be evaluated based on an assessment of<br />

corporate experience; the corporate structure and capabilities; and<br />

individual skills and experience of the prime contractor and his identified<br />

Subcontractors/partners, including the following factors:<br />

4.5.2.2. The Bid provides evidence of relevant and recent experience of the<br />

Bidder in the design and implementation and integration of projects<br />

similar to the subject procurement, including:<br />

4.5.2.3. The Bid provides relevant and successful corporate experience in at<br />

least three contracts within the last three years for which the Bidder<br />

integrated similar systems to meet military or government requirements.<br />

4.5.2.4. The Bid provides examples of previous experience of the Prime<br />

Contractor in designing, integrating, implementing, testing and fielding<br />

systems that store, process and transmit either NATO (or military or<br />

governmental) classified or business confidential information, and in<br />

consequence, subject to security accreditation, in accordance with<br />

NATO (or military or governmental or business confidential) Security<br />

Policy and supporting directives and guidance.<br />

4.5.2.5. The Bid provides relevant and successful corporate experience of the<br />

major Subcontractors for critical components.<br />

4.5.2.6. The Bid provides relevant experience and expertise in providing<br />

warranty support and repair-and-replacement service for information<br />

systems for large, geographically-dispersed organisations.<br />

4.5.2.7. The Bid provides evidence of appropriate corporate capabilities of the<br />

Bidder, including:<br />

4.5.2.7.1. Adequate and appropriate corporate resources available to support<br />

the Project.<br />

4.5.2.7.2. A well-established and mature level of capability in its system<br />

integration and testing practices and tools.<br />

4.5.2.7.3. Evidence of sufficient numbers of individuals with the skill and<br />

experience to meet the requirements of the Contract, including:<br />

Book I, Page I-45<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.2.7.4. For each role identified including those identified by the Bidder,<br />

evidence that the resumes and support data provided meet or<br />

exceed the experience and educational criteria stated in the SOW.<br />

4.5.2.7.5. Evidence that the proposed individuals have the expected<br />

knowledge, capability and experience to meet the requirements of<br />

this contract. The more the resumes of the proposed individuals<br />

exceed the experience and educational criteria; the more those<br />

individuals have already faced and accomplished successfully<br />

challenges similar to those raised by this project; and the more this<br />

experience is detailed and justified, the better.<br />

4.5.3. Key Personnel<br />

The Bid clearly identifies the contractor’s current cleared staff and provides the same<br />

information required above for the major Subcontractors.<br />

4.5.3.1. The Bidder has provided the resumes (CVs) and supporting certification<br />

documentation of proposed Key Personnel that meet or exceed the<br />

experience and educational criteria stated hereunder and in the SOW<br />

4.5.3.2. The Bidder explains his vetting process ensuring that the proposed Key<br />

Personnel have the expected knowledge, capability and experience to<br />

meet the requirements of this Contract.<br />

4.5.3.3. ANWI Project Manager<br />

4.5.3.3.1. The ANWI Contractor has designated an ANWI Project Manager<br />

(PM) who will direct and co-ordinate the activities of the ANWI<br />

Contractor's project team.<br />

4.5.3.3.2. The ANWI PM has a current NATO SECRET security clearance.<br />

4.5.3.3.3. The ANWI PM is the ANWI Contractor's primary interface to the<br />

Purchaser’s Project Manager and shall conduct all major project<br />

design, test, and review meetings.<br />

4.5.3.3.4. The ANWI PM has a University Degree in Electronic Engineering,<br />

Computer Science, Telecommunications, or related discipline,<br />

preferably equivalent to a Master’s, supported by relevant<br />

certificates/ diplomas. Exceptionally, extensive relevant experience<br />

may be considered if the above qualifications are not met.<br />

4.5.3.3.5. The ANWI PM has a current Project Management (e.g. PRINCE2<br />

Practitioner and/or PMI Project Management Professional ( PMP))<br />

certification.<br />

4.5.3.3.6. The ANWI PM has a minimum of ten (10) years’ experience as an<br />

ICT Project Manager as supported by project references, points of<br />

contact, and descriptions/scope of the projects managed.<br />

Book I, Page I-46<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-47<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.3.3.7. The ANWI PM has a minimum experience of five (5) years (outside<br />

the time a Project Manager) gained within ICT procurement,<br />

implementation and management in projects similar to the ANWI<br />

Project, as supported by project references, points of contact, and<br />

description of role/responsibilities/activities executed.<br />

4.5.3.3.8. The ANWI PM has a minimum of 1 year experience in ICT QA<br />

activities, supported by supported by project references, points of<br />

contact, and description of role/responsibilities/activities executed.<br />

4.5.3.3.9. The ANWI PM has minimum of 2 years’ experience in projects<br />

where ICT migration/transition was exercised in a managerial<br />

(technical or project) role responsible for the planning, designing and<br />

execution of migration/transition activities, as supported by project<br />

references, points of contact, and descriptions of the<br />

role/responsibilities/activities executed.<br />

4.5.3.3.10. The ANWI PM has knowledge and experience with processes for<br />

integration and testing.<br />

4.5.3.3.11. The ANWI PM has a demonstrated spoken and written fluency in<br />

English, at a minimum level of 4343as defined in STANAG 6001.<br />

4.5.3.4. ANWI Technical Lead<br />

4.5.3.4.1. The ANWI Contractor has designated a Technical Lead (TL) for the<br />

project to lead the analysis, design, development, integration, and<br />

follow-on enhancement efforts of the Contractor.<br />

4.5.3.4.2. The ANWI TL has a current NATO SECRET security clearance.<br />

4.5.3.4.3. The ANWI TL has a University Degree in Electronic Engineering,<br />

Computer Science, Telecommunications, or related discipline,<br />

preferably equivalent to a Master’s, supported by relevant<br />

certificates/ diplomas. Exceptionally, extensive relevant experience<br />

may be considered if the above qualifications are not met.<br />

4.5.3.4.4. The ANWI TL has demonstrated practical experience in<br />

Infrastructure (processing, virtualization, storage, switches),<br />

supported by valid certification of at least the following areas:<br />

Microsoft (MCSE), CISCO (CCSP) or valid comparable (products<br />

used in the ANWI design) certification.<br />

4.5.3.4.5. The ANWI TL has a minimum of two (2) years’ experience designing<br />

and implementing high-availability server rooms as supported by<br />

project references, points of contact, and technical descriptions of<br />

the projects implemented.<br />

4.5.3.4.6. The ANWI TL has a minimum of three (3) years’ experience<br />

designing and implementing local area networks in projects similar<br />

to the ANWI Project, as supported by project references, points of


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

contact, and description of role/responsibilities/activities held in<br />

these projects.<br />

4.5.3.4.7. The ANWI TL has a minimum of two (2) years’ experience as a<br />

technical manager responsible for the planning, designing and<br />

execution of projects where an Active Directory and subsequent<br />

application and data migration/transition activities were exercised; as<br />

supported by project references, points of contact, and technical<br />

description of the role/responsibilities/activities during this time.<br />

4.5.3.4.8. The ANWI TL has a minimum of 1 years’ experience in ICT QA<br />

activities, supported by supported by project references, point of<br />

contact, and description of role/responsibilities/activities.<br />

4.5.3.4.9. The ANWI TL has a minimum of three (3) years’ experience as a<br />

team leader or project manager to ensure the technical management<br />

oversight of a: LAN designer, Server Room designer, UCC designer,<br />

communications engineer and systems integrator; as supported by<br />

project references, points of contact, and technical description of the<br />

role/responsibilities/activities.<br />

4.5.3.4.10. The ANWI TL has knowledge and experience with QA standards<br />

(either AQAP or ISO), processes for integration and (pre) migration<br />

testing.<br />

4.5.3.4.11. The ANWI TL has a demonstrated spoken and written fluency in<br />

English, at a minimum level of 4343as defined in STANAG 6001.<br />

4.5.3.4.12. The ANWI TL has an ITIL v3 Intermediate Level Certification and<br />

has at least 12 points in the Service Capability Area.<br />

4.5.3.5. Test Director<br />

4.5.3.5.1. The ANWI Contractor has designated a qualified individual to serve<br />

as the ANWI Test Director (TD) for the ANWI Contractor provided<br />

Integration Test Service (ITS) and responsible for all ANWI testing<br />

as well as reporting oversight of all NNHQ Host Nation related test<br />

activities conducted in either the ITS or NNHQ.<br />

4.5.3.5.2. The ANWI TD oversees the ITS manager (where the ITS manager is<br />

responsible for providing the ITS as a service (see Section 24.2.7 for<br />

labour category requirements)).<br />

4.5.3.5.3. The ANWI TD has a University Degree in Electronic Engineering,<br />

Computer Science, Telecommunications, or related discipline,<br />

preferably equivalent to a Master’s and supplemented by relevant<br />

postgraduate qualifications, supported by relevant certificates/<br />

diplomas. Exceptionally extensive relevant experience may be<br />

considered if the above qualifications are not met.<br />

Book I, Page I-48<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.3.5.4. The ANWI TD has integration and testing engineering skills with five<br />

(5) years’ experience as part of large ICT projects, supported by<br />

project references, point of contact, and description of<br />

role/responsibilities/activities.<br />

4.5.3.5.5. The ANWI TD has demonstrated practical experience in planning,<br />

conducting and assessing Integration and Testing activities in<br />

support of large ICT projects for at least three (3) years, supported<br />

by project references, point of contact, and description of<br />

role/responsibilities/activities.<br />

4.5.3.5.6. The ANWI TD has demonstrated practical experience in testing of IT<br />

infrastructure, core services where the role of test engineer or<br />

integration engineer was exercised, supported by project references,<br />

point of contact, and description of role/responsibilities/activities.<br />

4.5.3.5.7. The ANWI TD has demonstrated practical experience in ICT<br />

migrations where the role of test engineer or integration engineer<br />

was exercised for migration of ICT services (Active Directory,<br />

business applications and associated data), supported by project<br />

references, point of contact, and description of<br />

role/responsibilities/activities.<br />

4.5.3.5.8. The ANWI TD has demonstrated practical knowledge and<br />

experience with QA standards (either AQAP or ISO), processes for<br />

integration and (pre) migration testing.<br />

4.5.3.5.9. The ANWI TD has a demonstrated spoken and written fluency in<br />

English, as defined in STANAG 6001 at a minimum level of 4343.<br />

4.5.4. Project Management<br />

4.5.4.1. Project Management Plan<br />

4.5.4.1.1. The Bidder provides a description of their project management<br />

approach to be used for this project that is coherent with delivering<br />

the ANWI’s scope and its objectives.<br />

4.5.4.1.2. The proposed PMP is compliant with Annex K Appendix 3.<br />

4.5.4.1.3. The Bid states that the PMP serves as the initial ANWI PMP.<br />

4.5.4.1.4. The proposed PMP contains the project management planning<br />

information so as to constitute a consistent and complete document<br />

that effectively permits the Purchaser to be able to assess the<br />

Bidder’s plan to manage to ANWI project.<br />

4.5.4.1.5. The proposed PMP has decomposed the project into manageable<br />

stages where each stage identifies the required input and exit<br />

approval criteria.<br />

Book I, Page I-49<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-50<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.4.1.6. The proposed PMP identifies the Contractor’s organisation, in<br />

particular all major Contractor units and any Subcontractors involved<br />

in meeting the requirements of the Contract, and the portion of the<br />

overall effort or deliverable item for which they are responsible. In<br />

case several Contractor units or Subcontractors are involved, the<br />

management of these units and Subcontractors are described,<br />

reasons for this organisation are justified, and expected benefits of<br />

this organisation for the Purchaser are explained.<br />

4.5.4.1.7. The proposed PMP describes the organisation for the proposed<br />

Project Team that identifies all the required roles (key and others) of<br />

the team members of the PMO, describing the lines of reporting and<br />

oversight. The description reflects clear lines of responsibility,<br />

authority, and reporting. For each role identified, the proposed<br />

individuals meet or exceed the experience and educational criteria<br />

stated in SOW.<br />

4.5.4.1.8. The proposed PMP demonstrates that individuals have the expected<br />

knowledge, capability, and experience to meet the requirements of<br />

this Contract. The team collectively represents a solid knowledge<br />

and experience base for carrying out the project.<br />

4.5.4.1.9. The proposed PMP describes the PMO in terms of manpower and<br />

resources to conduct and support the management and<br />

administration of operations in order to meet the objectives of the<br />

program, including taking all reasonable steps to ensure continuity of<br />

personnel assigned to work on this project. The proposed resources<br />

are adequate for the tasks.<br />

4.5.4.1.10. The proposed PMP describes the project management processes,<br />

including the phases and their staffing, schedule estimate, project<br />

control mechanisms, issue management, configuration<br />

management, security management and the Purchaser involvement<br />

in the project management. The proposed approach is based on<br />

recognized project management practices and reflects a mature<br />

level of management capability.<br />

4.5.4.1.11. The proposed PMP describes the relationship of the PMP to the<br />

various project management plans: Project Implementation Plan,<br />

Testing and Acceptance Plan, Configuration Management Plan, Risk<br />

Management Plan, Service Delivery Plan, Integrated Logistic<br />

Support Plan and Training Plan, so that the approach shows a<br />

coherent and integrated approach to implementation and support.<br />

4.5.4.1.12. The proposed PMP details the mechanism through which the plans<br />

will be maintained during the lifecycle of the Contract and<br />

demonstrates that the Bidder can accommodate changes in scope in<br />

a controlled manner.<br />

4.5.4.2. Project Implementation Plan (PIP)


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.4.2.1. The Bid states that the provided PIP serves as the ANWI’s initial<br />

PIP.<br />

4.5.4.2.2. The proposed PIP clearly and accurately identifies the Bidder’s<br />

understanding of the project’s scope, including: major deliverables;<br />

stages with associated activities and resources; assumptions;<br />

timelines and constraints/dependencies.<br />

4.5.4.2.3. The proposed PIP provides the Purchaser with insight into the<br />

Bidder’s plans, capabilities, and ability to satisfactorily implement the<br />

entire project in conformance with the requirements as specified in<br />

the SOW.<br />

4.5.4.3. Schedule<br />

4.5.4.3.1. The proposed schedule identifies all Contract events and<br />

milestones, including Contract-related Purchaser activities and<br />

events. The schedule correlates with the WBS and is traceable to<br />

performance and delivery requirements of the SOW.<br />

4.5.4.3.2. The duration, sequence, and resourcing of the tasks reflect a<br />

coherent approach to execution and a realistic assessment of the<br />

scope of work involved. The implementation and deployment of<br />

capabilities support the delivery of ANWI services and are compliant<br />

with meeting the NNHQ programme milestones such that the project<br />

shall be complaint with the milestones in Annex A of the SOW.<br />

4.5.4.3.3. The Purchaser will evaluate the Bidder’s ability to propose an<br />

effective Project Schedule as part of the Proposed PMP, as<br />

described in the SOW.<br />

4.5.4.3.4. The proposed PMP clearly defines the Schedule Control<br />

mechanisms implemented by the Bidders.<br />

4.5.4.4. Work Breakdown Structure (WBS)<br />

4.5.4.4.1. The Bidder provides a WBS that provides the level of detail of all<br />

necessary activities for the effective planning and management of<br />

the ANWI project to ensure that the Bidder shall be able to<br />

effectively control the project.<br />

4.5.4.4.2. The WBS is consistent with the requirements for the SOW in its<br />

description of all engineering efforts for specifying, designing,<br />

developing, testing, accrediting, installing, integrating and supporting<br />

the delivery of the ANWI solution.<br />

4.5.4.4.3. The proposed WBS includes a definition of the major tasks/work<br />

packages and the relationship between the tasks/work packages the<br />

sub-CLINs.<br />

Book I, Page I-51<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.4.4.4. The provided WBS is compliant to the SOW and adequately and<br />

appropriately decomposes the tasks/work packages to a level that<br />

exposes all project risk factors and allows accurate estimate of each<br />

work item’s duration, resource requirements, inputs and outputs, and<br />

predecessors and successors.<br />

4.5.4.4.5. The Bidder’s WBS incorporates the identified NNHQ programme<br />

milestones and reflects the time constraints in realising the ANWI<br />

solution.<br />

4.5.4.4.6. The Bidder’s WBS incorporates and reflects all Subcontractor ANWI<br />

tasks and external contractor dependencies.<br />

4.5.4.4.7. The proposed WBS provides appropriate and sufficient support for<br />

the Project Management activity and demonstrates that the Bidder<br />

has a realistic knowledge of the level of effort and labour mix<br />

associated with the different tasks necessary to complete this<br />

Contract.<br />

4.5.4.5. Change Management Plan<br />

4.5.4.5.1. The Purchaser will evaluate the appropriateness and completeness<br />

of the change management process against the Bidder’s preferred<br />

project management methodology.<br />

4.5.4.5.2. The Bidder reflects the importance of the Change Management Plan<br />

to the ANWI project.<br />

4.5.4.6. Risk Register<br />

4.5.4.6.1. The Purchaser will assess the Bidder’s ability to identify critical<br />

project risks and to assess and propose technical and organizational<br />

measures to mitigate these risks.<br />

4.5.4.7. Issue Management Plan<br />

4.5.4.7.1. The Purchaser will evaluate the appropriateness and efficiency of<br />

the proposed Issue Management process.<br />

4.5.5. ANWI Initial High Level Design<br />

4.5.5.1. The Purchaser will assess that the Bidder provided draft of the initial<br />

high level design and architectural concepts does not exceed 120<br />

pages; system drawings are to be included in an annex and will not<br />

count against the submitted page count.<br />

4.5.5.2. The Purchaser will evaluate the quality and adequacy of the proposed<br />

ANWI initial high level design with respect to its ability to successfully<br />

satisfy the requirements of the ANWI SOW.<br />

Book I, Page I-52<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-53<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.5.3. The proposed ANWI initial high level design will be evaluated on the<br />

basis of the comprehensiveness of the approach and the maturity of its<br />

proposed technical solution for the cross domain gateways, the server<br />

room and technical equipment room (TER) design, the network<br />

infrastructure service designs of the four security domains, the ITS<br />

design solution and approach to other ANWI service designs.<br />

4.5.5.4. The proposed ANWI initial high level design will be evaluated regarding<br />

its feasibility and suitability to the requirements.<br />

4.5.5.5. Specific aspects of the proposed initial high level design address that<br />

will be assessed:<br />

4.5.5.5.1. The Bidder’s documented estimate of the power and cooling<br />

requirements needed for his proposed ANWI design for each<br />

security domain, the collective installation of each server room and<br />

for each Technical Equipment Room (TER) to demonstrate that the<br />

proposed design complies with the design constraints.<br />

4.5.5.5.2. That the Bidder has mathematically demonstrated how the proposed<br />

design meets or exceeds the availability and reliability targets for<br />

each capability and service.<br />

4.5.5.5.3. The Bidder has provided written proof (calculations) of ANWI<br />

services meet the performance, capacity, availability requirements.<br />

4.5.5.5.4. The Bidder has provided a list of components defining the ITS and<br />

how the provided components will be combined to support all<br />

possible ANWI tests with 100 simulated users.<br />

4.5.5.5.5. The Bidder has described the SMC concept design and high level<br />

outlined processes.<br />

4.5.5.5.6. The Bidder has provided a detailed cross domain gateway design for<br />

the various types of gateways.<br />

4.5.5.5.7. The Bidder has proposed the concepts for the solution for the other<br />

ANWI services that will be designed later in the ANWI project<br />

process.<br />

4.5.5.5.8. The Bidder has addressed how he plans to embrace innovation and<br />

how innovation will be incorporated and supported in his design thus<br />

ensuring that a modern capability is provided for the new NATO<br />

Headquarters building.<br />

4.5.5.5.9. The Bidder has addressed the bandwidth design for the wired and<br />

wireless networks.<br />

4.5.5.5.10. The Bidder has provided a logical model diagram of the proposed<br />

ANWI Design demonstrating the Bidder’s understanding of the<br />

SOW’s requirements.


NATO UNCLASSIFIED<br />

Book I, Page I-54<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.5.5.11. That the proposed ANWI Design includes an initial Security Risk<br />

Assessment (SRA of the proposed design) and the description of the<br />

security mechanisms needed to mitigate the risks of the Bidder’s<br />

proposed design.<br />

4.5.5.5.12. The Bid provides the Bidder’s understanding and ability to identify<br />

and assess critical security design risks, producing security-related<br />

documentation, conducting security testing activities, delivering<br />

security hardened solutions implementing (NATO) security settings<br />

and propose technical and organizational measures to mitigate<br />

these risks.<br />

4.5.5.5.13. The Bidder has provided a Requirements Traceability Matrix<br />

documenting the cross-referencing of Contractual requirements to<br />

the contents of the proposed ANWI initial high level design<br />

document.<br />

4.5.5.5.14. The SIP (of the bidder’s choosing) is one of the six cross domain<br />

gateways, meets the SIP requirements and is provided as an<br />

appendix to the submitted design.<br />

4.5.6. SMC concept<br />

4.5.6.1. Proposed Operational Support Plan<br />

4.5.6.1.1. The Bid provides a proposed Operational Support Plan (OSP)<br />

consistent with the requirements of the SOW (SOW section 7.4)<br />

describing processes and activities to effectively meet requirements<br />

for service delivery supporting ANWI FOC.<br />

4.5.6.1.2. The Purchaser will evaluate how the Bidder proposes to handle:<br />

service requests, change requests, monitoring and reporting and<br />

configuration management.<br />

4.5.6.1.3. The Purchaser will evaluate the details on the proposed service<br />

organisation offered to fulfil the operational support requirements.<br />

4.5.6.1.4. The Purchaser will evaluate the detailed functional duty descriptions<br />

and appropriateness of support staff numbers for each of the<br />

described service operational functions.<br />

4.5.6.1.5. Total Cost of Ownership<br />

4.5.6.1.5.1 The Purchaser will evaluate the Bidder’s ability to propose a<br />

comprehensible total cost of ownership rationale (as reflected in the<br />

Operational Support Plan Proposal) with respect to its rationales to<br />

minimise the total cost of ownership.<br />

4.5.6.1.5.2 The Purchaser will evaluate the suitability of the proposed<br />

comprehensible total cost of ownership rationale in the OSP to<br />

balance costs expenditures and controls between implementation


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

phase and support phases. Detailed Business Cases for each<br />

relevant or significant configuration items of the proposed solution<br />

shall be explicitly given.<br />

4.5.6.1.5.3 The Purchaser must understand from the Bid the Bidder’s methods<br />

in selecting the different COTS and/or in executing<br />

integration/development activities to build their proposed solution<br />

for ANWI FOC, in order to minimise the total cost of ownership.<br />

4.5.6.1.6. The Bid addresses how the ANWI service management will be<br />

performed and addresses the roles and functions with supporting<br />

process concepts that are aligned with ITIL v3.<br />

4.5.6.2. Integrated Logistics Support Plan<br />

4.5.6.2.1. The Purchaser will evaluate the quality and adequacy of the<br />

proposed life-cycle support planning documentation (i.e., Proposed<br />

Service Delivery Plan and Proposed Integrated Logistic Support<br />

Plan) with respect to its ability to successfully satisfy the<br />

requirements for supportability of the ANWI FOC.<br />

4.5.6.2.2. The Purchaser will evaluate the proposed life-cycle support planning<br />

documentation will be evaluated on the basis of the<br />

comprehensiveness of the approach, its feasibility, and<br />

appropriateness to the requirements.<br />

4.5.6.2.3. The proposed life-cycle support documentation will be evaluated in<br />

its compliance to the requirements for the respective plans specified<br />

in the SOW and the sufficiency of the detail provided.<br />

4.6. Evaluation Step 3 - Price Evaluation<br />

4.6.1. The Bidder’s Price Quotation will be first assessed for compliance<br />

against the following standards:<br />

4.6.1.1. The total price for CLINs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14,15<br />

and 16 does not exceed EUR 81,726,023 (eighty-one million seven<br />

hundred twenty-six thousand twenty-three Euro).<br />

4.6.1.2. The Price Quotation meets the requirements for preparation and<br />

submission of the Price Quotation set forth in the Bid Preparation<br />

Section and the Instructions for Preparation of the Bidding Sheets in<br />

Annex A-1<br />

4.6.1.3. Detailed pricing information has been provided and is adequate,<br />

accurate, traceable, and complete.<br />

4.6.1.4. The Price Quotation meets requirements for price realism and balance<br />

as described below in paragraph 4.6.4.<br />

Book I, Page I-55<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Page I-56<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.6.2. A Bid which fails to meet the compliance standards defined in this<br />

section may be declared non-compliant and may not be evaluated further<br />

by the Purchaser.<br />

4.6.3. Basis of Price Comparison<br />

4.6.3.1. The Purchaser will convert all prices quoted into EURO for purposes of<br />

comparison and computation of price scores. The exchange rate to be<br />

utilised by the Purchaser will be the average of the official buying and<br />

selling rates of the European Central Bank at close of business on the<br />

last working day preceding the Bid Closing Date.<br />

4.6.3.2. The Price to be inserted into the formula specified at paragraph 4.2.5.1<br />

will be derived from the Grand Total of CLINs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10,<br />

11, 12, 13, 14, 15, including Evaluated Options CLIN 16, 17, 18 ,19.<br />

4.6.3.3. Please see 4.2.4 for clarification of the Total Cost of Ownership<br />

4.6.4. Price Balance and Realism<br />

4.6.4.1. In those cases in which the prices quoted in relation with this Invitation<br />

for Bid appear to be unreasonably low in relation to the performance<br />

required under the prospective Contract and/or the level of effort<br />

associated with the tasks, the Purchaser will reserve the right to request<br />

the Bidder clarifications aimed to demonstrate the rationale for such<br />

circumstances.<br />

4.6.4.2. Indicators of an unrealistically low Bid may be the following, amongst<br />

others:<br />

4.6.4.2.1. Labour Costs that, when amortised over the expected or proposed<br />

direct labour hours, indicate average labour rates far below those<br />

prevailing in the Bidder’s locality for the types of labour proposed.<br />

4.6.4.2.2. Direct Material costs that are considered to be too low for the<br />

amounts and types of material proposed, based on prevailing market<br />

prices for such material.<br />

4.6.4.2.3. Numerous Line Item prices for supplies and services that are<br />

provided at no cost or at nominal prices.<br />

4.6.4.3. If the Purchaser has reason to suspect that a Bidder has artificially<br />

debased its prices in order to secure Contract award, the Purchaser will<br />

request clarification of the Bid in this regard and the Bidder shall provide<br />

explanation on one of the following bases:<br />

4.6.4.3.1. An error was made in the preparation of the price quotation. In such<br />

a case, the Bidder must document the nature of the error and show<br />

background documentation concerning the preparation of the price<br />

quotation that makes a convincing case that a mistake was made by<br />

the Bidder. In such a case, the Bidder shall petition the Purchaser to


NATO UNCLASSIFIED<br />

Book I, Page I-57<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

either remain in the competition or accept the Contract at the offered<br />

price, or to withdraw from the competition.<br />

4.6.4.3.2. The Bidder has a competitive advantage due to prior experience or<br />

industrial/technological processes that demonstrably reduce the<br />

costs of Bidder performance and therefore the price offered is<br />

realistic. Such an argument must support the technical proposal<br />

offered and convincingly and objectively describe the competitive<br />

advantage and the net savings achieved by this advantage over<br />

standard market practices and technology.<br />

4.6.4.3.3. The Bidder recognises that the submitted price quotation is<br />

unrealistically low compared to its cost of performance and, for<br />

business reasons, the Bidder is willing to absorb such a loss. Such<br />

as statement can only be made by the head of the business unit<br />

submitting the Bid and will normally be made at the level of Chief<br />

Operating Officer or Chief Executive Officer. In such a case, the<br />

Bidder shall estimate the potential loss and show that the financial<br />

resources of the Bidder are adequate to withstand such reduction in<br />

revenue.<br />

4.6.4.4. If a Bidder fails to submit a comprehensive and compelling response on<br />

one of the bases above, the Purchaser may determine the Bid<br />

submitted as non-compliant. If the Bidder responds on the basis of<br />

4.6.4.3.1 above and requests to withdraw from the competition, the<br />

Purchaser may, depending on the nature and gravity of the mistake,<br />

allow the Bidder to withdraw.<br />

4.6.4.5. If the Purchaser accepts the Bidder’s explanation of mistake in<br />

paragraph 4.6.4.3.1 and allows the Bidder to accept the Contract at the<br />

offered price, or the Purchaser accepts the Bidder’s explanation<br />

pursuant to paragraph 4.6.4.3.3 above, the Bidder shall agree that the<br />

supporting pricing data submitted with his Bid will be incorporated by<br />

reference in the resultant Contract. The Bidder shall agree as a<br />

condition of Contract signature, that the pricing data will be the basis of<br />

determining fair and reasonable pricing for all subsequent negotiations<br />

for modifications of or additions to the Contract and that no revisions of<br />

proposed prices will be made.<br />

4.6.4.6. If the Bidder presents a convincing rationale pursuant to paragraph<br />

4.6.4.3.2 above, no additional action will be warranted. The Purchaser,<br />

however, reserves its right to reject such an argument if the rationale is<br />

not compelling or capable of objective analysis. In such a case the Bid<br />

may be determined to be non-compliant.<br />

4.6.4.7. The Agency reserves the right to request prime Contractors, or the<br />

Subcontractor to separately identify each of the direct/indirect costs,<br />

advise why each is required, and provide supporting documentation to<br />

substantiate each charge, such as: 1) catalogue price lists and any<br />

applicable discounts, 2) copies of the Subcontractor's orders from


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

others for the same or similar items, including explanations for cost<br />

variations, 3) Subcontractor's internal cost estimate, or documentation<br />

of whatever means the Subcontractor used to arrive at the charge.<br />

4.6.5. Once the offered prices as described in paragraph 4.6.3.2 have been<br />

calculated and checked, the formula set forth in paragraph 4.2.5.1 above<br />

will be applied to derive the Price Score of each Bid.<br />

4.7. Evaluation Step 4 – Calculation of Best Value Scores<br />

4.7.1. Upon conclusion and approval of the Price Evaluation results, the predetermined<br />

weighting scheme for the Technical Evaluation will be<br />

unsealed and the scores for the Engineering, Management,<br />

Supportability, and Risk factors will be calculated for each compliant Bid.<br />

Then all partial scores will be fed into the formula stated in paragraph<br />

4.2.2 in order to obtain the Best Value Score of each Bid.<br />

4.7.2. The highest scored Bid will be recommended as the Successful Bid.<br />

4.7.3. In the unlikely event in which the calculation referred in paragraph 4.7.1<br />

above results in a statistical tie, the Purchaser will recommend as the<br />

Successful Bid the one with the best cost/technical ratio, defined as the<br />

lowest cost per technical score, i.e. Bid price divided by technical score.<br />

For the purpose of this paragraph the term Statistical Tie shall be<br />

construed to indicate the situation where the total weighted score of the<br />

highest scoring bid, that is, the weighted score of price and technical<br />

combined, is within 1.0% of the total weighted score of one or more<br />

Bidders<br />

Book I, Page I-58<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex A<br />

Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-1


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex A-1.<br />

Instructions for the Preparation of the Bidding<br />

Sheets<br />

1. INTRODUCTION<br />

Bid pricing requirements as addressed in this Annex are mandatory. Failure to abide<br />

to the prescriptions of Bid submission referred in this section may lead to the Bid<br />

being declared non-compliant and not being taken into consideration for award.<br />

No alteration of the Bidding sheets including but not limited to quantity indications,<br />

descriptions or titles are allowed with the sole exception of those explicitly indicated<br />

as allowed in this document. Additional price columns may be added if multiple<br />

currencies are Bid, including extra provisions for all totals.<br />

2. GENERAL REQUIREMENTS<br />

Bidders are required, in preparing their Price Quotation to utilise the Bidding Sheets<br />

following the instructions detailed in Section III – Bid Preparation Instructions,<br />

Paragraph 3.3 – Price Quotation (Part II) and hereunder.<br />

The prices and quantities entered on the document shall reflect the total items<br />

required to meet the Contractual requirements. The total price shall be indicated in<br />

the appropriate columns.<br />

In preparing the Bidding Sheets, Bidders shall ensure that the prices of the Subitems<br />

total the price of the major item of which they constitute a part.<br />

All metrics (e.g., cost associated with labour) will be assumed to be standard or<br />

normalised to 7.6 hour/day, for a five day working week at NATO and National sites<br />

and Contractor facilities.<br />

Should the Best Value Bid be in other than Euro currency, the award of the Contract<br />

will be made in the currency or currencies of the Bid.<br />

Bidders are advised that formulae are designed to ease evaluation of the Bidders<br />

proposal have been inserted in the electronic copies of the Bidding Sheets.<br />

Notwithstanding this the Bidder remains responsible for ensuring that their figures<br />

are correctly calculated and should not rely on the accuracy of the formulae<br />

electronic copies of the Bidding Sheets..<br />

If the Bidder identifies an error in the spreadsheet, it should notify the Purchaser who<br />

will make a correction and notify all the Bidders of the update.<br />

Prices shall not include any provision for taxes or duties for which the Purchaser is<br />

exempt.<br />

Book I, Annex A, Page A-2<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

3. INSTRUCTIONS FOR COMPLETION OF BIDDING SHEETS<br />

General<br />

1. The Excel workbook that comprises the Bidding Sheets consists of multiple<br />

sheets. The main sheet is the prospective SSS that comprises all the<br />

pricing information that will establish the Firm Fixed Price offer.<br />

2. The SSS-sheet also lists optional items that are subject to Purchaser<br />

approval before actual procurement. Some of the options are taken into the<br />

total price during the Bid evaluation. These options are clearly marked.<br />

3. The SSS is built up from different CLINs that are bundled into logical<br />

groupings. These instructions provide information how to complete the<br />

different CLIN with pricing information.<br />

4. Notwithstanding the above Bidders are also required to directly insert a<br />

“Final Total Price” in the Prospective SSS in column J. This allows a Bidder<br />

to make business decisions related to his price offer which may modify the<br />

price generated by the formulae in the Bidding Sheets. If a Bidder uses this<br />

opportunity a full explanation of the Price variance between the price in<br />

column I (Total Price) and the price manually entered in column J (Final<br />

Total Price) must be given. An explanation is not required if both prices are<br />

identical. For the purpose of the Best Value price evaluation, the prices<br />

entered in column J (Final Total Price) will be used.<br />

5. Within the Bidding Sheets the Purchaser has marked the cells requiring<br />

Bidders input with a yellow colour. The Bidders shall complete all yellow<br />

cells in the Bidding Sheets.<br />

6. The "Manpower (ICTM)" worksheet is included for informational purposes<br />

only. It indicates the current ICTM manpower in place to support NATO<br />

HQ. Bidder input is not required in this worksheet.<br />

Specific instruction for every Contract Line Item Number (CLIN)<br />

CLIN 1: Project Management<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN.<br />

2. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 2: ANWI Service and System Design<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN<br />

2. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 3: Site Survey<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN<br />

2. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 4: Testing<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN<br />

2. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 5: ANWI Implementation and Transition<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN<br />

2. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 6: ANWI Service and System Operations<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN<br />

Book I, Annex A, Page A-3<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-4<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2. The Bidder shall provide pricing for the documentation and implementation of<br />

the SMC processes in line with the requirement in SOW Section 7 and Annex E<br />

Appendix 1. The required software shall be listed under CLIN 10.<br />

3. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 7: ANWI Service Improvement<br />

1. Enter Price details in the SSS-sheet per Sub-CLIN<br />

2. The Bidder shall provide pricing for the documentation and implementation of<br />

the SMC processes in line with the requirement in SOW Section 8 and Annex E<br />

Appendix 1. The required software shall be listed under CLIN 10.<br />

3. Provide Cost breakdown details in the “Implementation Services”-sheet<br />

CLIN 8: Infrastructure Services Hardware and Software<br />

CLIN 8.1: Processing Service Equipment<br />

1. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Processing-Sheet.<br />

2. On the processing sheet:<br />

1. Insert the requested information in the Server baseline Hardware and<br />

Server baseline Software tables. (this shall cover all security domains<br />

- NS,EAPC, Business and Public)<br />

2. In the Hardware baseline table the Bidder is requested to create a<br />

line item for every unique type of hardware he is offering for the<br />

ANWI processing service to cover the ANWI processing<br />

Requirement. - The Bidder is free to add as many rows as required.<br />

3. The Bidder shall provide details for every line item on:<br />

a. Description<br />

b. Part number<br />

c. Number of units<br />

d. Expected power requirement (including cooling power)<br />

e. Unit price<br />

f. Yearly support cost for up to 5 years<br />

4. For CLIN 8.1.1.1 - the procurement cost and support cost for<br />

YEAR 1,2 and 3 are transferred to the SSS-Sheet<br />

5. In the Software baseline table the Bidder is requested to create a line<br />

item for every unique type of software he is offering for the ANWI<br />

processing service to cover the ANWI processing Requirement. - The<br />

Bidder is free to add as many rows as required.<br />

6. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

7. The Bidder shall provide details for every line item on:<br />

a. Description<br />

b. Part number<br />

c. Number of units<br />

b. Unit price<br />

c. Yearly support cost for up to 5 years<br />

8. For CLIN 8.1.2.1 - the procurement cost and support cost for<br />

YEAR 1 are transferred to the SSS-Sheet<br />

CLIN 8.2: Storage Service Equipment<br />

1. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Storage-Sheet.


NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-5<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2. On the Storage sheet:<br />

1. Insert the requested information in the Storage baseline Hardware<br />

and Storage Baseline Software baseline tables. (this shall cover all<br />

security domains - NS,EAPC, Business and Public)<br />

2. In the Hardware baseline table the Bidder is requested to create a<br />

line item for every unique type of hardware he is offering for the<br />

ANWI Storage service to cover the ANWI Storage Requirement. -<br />

The Bidder is free to add as many rows as required.<br />

3. The Bidder shall provide details for every line item on:<br />

a. Description<br />

b. Part number<br />

c. Number of units<br />

d. Expected power requirement (including cooling power)<br />

e. Unit price<br />

d. Yearly support cost for up to 5 years<br />

4. For CLIN 8.2.1. - the procurement cost and support cost for<br />

YEAR 1,2 and 3 are transferred to the SSS-Sheet<br />

5. In the Software baseline table the Bidder is requested to create a line<br />

item for every unique type of software he is offering for the ANWI<br />

processing service to cover the ANWI Storage Requirement.<br />

6. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

7. The Bidder shall provide details for every line item on:<br />

a. Description<br />

b. Part number<br />

c. Number of units<br />

b. Unit price<br />

c. Yearly support cost for up to 5 years<br />

8. For CLIN 8.2.2. - the procurement cost and support cost for<br />

YEAR 1 are transferred to the SSS-Sheet<br />

CLIN 8.3 Print/Scan Services<br />

1. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Print-Scan-Sheet.<br />

2. Print/Scan services is a Contractor Owned/Contractor Operated (COCO)<br />

Service. Therefore the Purchaser expects a cost for the service instead of<br />

a procurement cost with support.<br />

3. The Purchaser expects a monthly service cost per print device/location<br />

augmented with a cost per page for B/W and Colour.<br />

4. On the Print/Scan sheet:<br />

1. Update the quantity of print locations based on the proposed<br />

print/scan solution (Cross -domain or not)<br />

Service locations (location where a device is available to<br />

print/scan/copy up to a certain classification)<br />

187 MFP Colour printers:<br />

58 for NS<br />

107 for NR<br />

18 for EAPC<br />

4 for Public


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

In case of cross domain NR/NS printing nr of printers is reduced to<br />

129:<br />

107 Cross-domain NR/NS printers<br />

18 for EAPC<br />

4 for Public<br />

12. Provide a Unit price (per printer/location) price per year.<br />

3. Provide a per page price for both B/W and Colour print/Copy.<br />

a. The estimated number of printed/copied pages per year is<br />

.10.000.000 of which 70% is B/W and 30% is Colour<br />

4. For CLIN 8.3.1 the quantity, unit price (yearly support price) is<br />

transferred to the SSS-Sheet.<br />

5. For CLIN 8.3.2 the unit price per B/W page is transferred to the<br />

SSS-Sheet<br />

6. For CLIN 8.3.3 the unit price per Colour Page is transferred to<br />

the SSS-Sheet<br />

CLIN 8.4 Network Infrastructure Services<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the ANWI Applications-Sheet.<br />

b. On the ANWI Applications-Sheet under the Infrastructure Services<br />

1. list the applications (licenses numbers , cost and support cost)<br />

required to fulfil the infrastructure network requirements provided in<br />

SOW Annex F Appendix 5. - The Bidder is free to add as many rows<br />

as required. - this shall cover all security domains - NS,EAPC,<br />

Business and Public<br />

2. Any server or storage hardware needed for the ANWI infrastructure<br />

services Shall be included in the ANWI processing and ANWI storage<br />

tables as described for CLIN 8.1 and 8.2<br />

3. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

4. For CLIN 8.4.1 the total procurement cost of all infrastructure<br />

services software including the total of 1 year support is<br />

transferred to the SSS-Sheet<br />

CLIN 8.5 Wired Network Component Equipment / CLIN 8.6 Wireless LAN<br />

Component equipment<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Networking-Sheet.<br />

b. On the Networking Sheet list all networking components (per type)<br />

required for the ANWI project in the SOW Annex F Appendix 6. This shall<br />

cover all security domains - NS, EAPC, Business and Public.<br />

1. Per Device type the Bidder shall provide information about every<br />

switch or switch component<br />

a. Description<br />

b. Quantity in units and ports<br />

c. Power/Cooling Requirements<br />

d. Unit price<br />

e. Yearly Support/Warranty cost<br />

Book I, Annex A, Page A-6<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

2. For CLIN 8.5.1 the total procurement cost and Year 1,2 and 3<br />

support cost of the FO Access switches is transferred to the<br />

SSS.<br />

3. For CLIN 8.5.2.the total procurement cost and Year 1,2 and 3<br />

support cost of the PoE Access switches is transferred to the<br />

SSS.<br />

4. For CLIN 8.5.3.the total procurement cost and Year 1,2 and 3<br />

support cost of the Core switches is transferred to the SSS.<br />

5. For CLIN 8.5.4.the total procurement cost and Year 1,2 and 3<br />

support cost of the Server switches is transferred to the SSS.<br />

6. For CLIN 8.5.5.the total procurement cost and Year 1,2 and 3<br />

support cost of the Conference Switching is transferred to the<br />

SSS.<br />

7. For CLIN 8.6.1 the total procurement cost and Year 1,2 and 3<br />

support cost of the WLAN hardware is transferred to the SSS.<br />

CLIN 8.7 Cross-Domain Module Component Equipment<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the CDGW-Sheet.<br />

b. On the CDGW Sheet list per Type of cross Domain Gateway all<br />

processing, Storage and networking hardware components as well as the<br />

Cross domain Software licenses required to fulfil SOW Annex E -<br />

Appendix 2 requirements.<br />

1. Per Device the Bidder shall provide information on:<br />

a. Description<br />

b. Quantity (units)<br />

c. Power/Cooling requirement (Not Applicable for Software)<br />

d. Unit price<br />

e. Yearly Support/Warranty Cost<br />

2. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

3. For CLIN 8.7.1 the total procurement cost and Year 1, 2 and 3<br />

support cost of the CDGW1 Hardware is transferred to the SSS.<br />

4. For CLIN 8.7.2 the total procurement cost and Year 1 Support<br />

cost of the CDGW1 Software is transferred to the SSS.<br />

5. For CLIN 8.7.3 the total procurement cost and Year 1, 2 and 3<br />

support cost of the CDGW2 Hardware is transferred to the SSS.<br />

6. For CLIN 8.7.4 the total procurement cost and Year 1 Support<br />

cost of the CDGW2 Software is transferred to the SSS.<br />

7. For CLIN 8.7.5 the total procurement cost and Year 1, 2 and 3<br />

support cost of the CDGW3 Hardware is transferred to the SSS.<br />

8. For CLIN 8.7.6 the total procurement cost and Year 1 Support<br />

cost of the CDGW3 Software is transferred to the SSS.<br />

9. For CLIN 8.7.7 the total procurement cost and Year 1, 2 and 3<br />

support cost of the CDGW4 Hardware is transferred to the SSS.<br />

10. For CLIN 8.7.8 the total procurement cost and Year 1 Support<br />

cost of the CDGW4 Software is transferred to the SSS.<br />

Book I, Annex A, Page A-7<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

11. For CLIN 8.7.9 the total procurement cost and Year 1, 2 and 3<br />

support cost of the CDGW5 Hardware is transferred to the SSS.<br />

12. For CLIN 8.7.10 the total procurement cost and Year 1 Support<br />

cost of the CDGW5 Software is transferred to the SSS.<br />

13. For CLIN 8.7.11 the total procurement cost and Year 1, 2 and 3<br />

support cost of the CDGW6 Hardware is transferred to the SSS.<br />

14. For CLIN 8.7.12 the total procurement cost and Year 1 Support<br />

cost of the CDGW6 Software is transferred to the SSS.<br />

CLIN 9 UCC Services<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the ANWI Applications-Sheet.<br />

b. On the ANWI Applications-Sheet under the respective UCC service<br />

1. List the applications (licenses numbers, cost and support cost)<br />

required to fulfil the respective UCC requirements provided in SOW<br />

Annex G Appendix 1-11. - The Bidder is free to add as many rows as<br />

required. - this shall cover all security domains - NS,EAPC, Business<br />

and Public<br />

2. Any server or storage hardware needed for the ANWI UCC services<br />

Shall be included in the ANWI processing and ANWI storage tables<br />

as described for CLIN 8.1 and 8.2<br />

3. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

4. For CLIN 9.1.1 the total procurement cost of all Voice and<br />

Voicemail services software including the total of 1 year support<br />

is transferred to the SSS-Sheet<br />

5. For CLIN 9.2.1 the total procurement cost of all e-mail services<br />

software including the total of 1 year support is transferred to<br />

the SSS-Sheet<br />

6. For CLIN 9.3.1 the total procurement cost of all Fax services<br />

software including the total of 1 year support is transferred to<br />

the SSS-Sheet<br />

7. For CLIN 9.4.1 the total procurement cost of all IM/Chat services<br />

software including the total of 1 year support is transferred to<br />

the SSS-Sheet<br />

8. For CLIN 9.5.1 the total procurement cost of all Presence<br />

services software including the total of 1 year support is<br />

transferred to the SSS-Sheet<br />

9. For CLIN 9.6.1 the total procurement cost of all UCC directory<br />

services software including the total of 1 year support is<br />

transferred to the SSS-Sheet<br />

10. For CLIN 9.7.1 the total procurement cost of all Collaboration<br />

services software including the total of 1 year support is<br />

transferred to the SSS-Sheet<br />

11. For CLIN 9.8.1 the total procurement cost of all Unified<br />

Messaging and Mobility Service services software including the<br />

total of 1 year support is transferred to the SSS-Sheet<br />

Book I, Annex A, Page A-8<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

CLIN 10 SMC Software<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the SMC-sheet<br />

b. On the SMC sheet:<br />

1. Under Service Design - List the applications (licenses numbers and<br />

cost and support cost) required to fulfil the SMC - Service design<br />

requirements provides in SOW Annex E Appendix 1.<br />

2. Under Service Transition: List the applications (licenses numbers<br />

and cost and support cost) required to fulfil the SMC - Service<br />

Transition<br />

Requirements provides in SOW Annex E Appendix 1.<br />

c. Under Service Operations: List the applications (licenses numbers<br />

and cost and support cost) required to fulfil the SMC - Service<br />

Operation<br />

Requirements provides in SOW Annex E Appendix 1.<br />

4. Under Service Improvement: List the applications (licenses numbers<br />

and cost and support cost) required to fulfil the SMC - Service<br />

Improvement requirements provides in SOW Annex E Appendix 1.<br />

5. Any server, storage or networking hardware needed for the ANWI<br />

SMC services Shall be included in the ANWI processing and ANWI<br />

storage tables as described for CLIN 8.1 and 8.2 and 8.5<br />

6. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

CLIN 11 Client Provisioning Hardware and Software<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Client-sheet.<br />

b. On the Client Sheet under the respective type of Client Hardware/Software<br />

table<br />

1. List all Hardware components or software licenses needed to fulfil the<br />

client requirements from the SOW ANNEX H Appendix 1 -3. The<br />

Bidder is free to add as many rows as required. - this shall cover all<br />

security domains - NS,EAPC, Business and Public<br />

2. Per Device/Component the Bidder shall provide information on:<br />

a. Description<br />

b. Quantity (units)<br />

c. Power/Cooling requirement (Not Applicable for Software)<br />

d. Unit price<br />

e. Yearly Support/Warranty Cost<br />

3. NATO provides as PFE:<br />

a. Office Professional Plus<br />

b. Enterprise Client Access Licenses (e-CAL) for Windows Server,<br />

Exchange Server, SharePoint Server, Lync Server, System<br />

Centre, Forefront and SQL Server.<br />

4. For CLIN 11.1.1 the total procurement cost of all Standard<br />

Desktop Client hardware including the total of year 1,2 and 3<br />

support is transferred to the SSS-Sheet<br />

Book I, Annex A, Page A-9<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-10<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

5. For CLIN 11.1.2 the total procurement cost of all High<br />

Performance Desktop Client hardware including the total of year<br />

1,2 and 3 support is transferred to the SSS-Sheet<br />

6. For CLIN 11.1.3 the total procurement cost of all Network<br />

Agnostic Desktop Client hardware including the total of year 1,2<br />

and 3 support is transferred to the SSS-Sheet<br />

7. For CLIN 11.1.4 the total procurement cost of all Mobile Client<br />

hardware including the total of year 1,2 and 3 support is<br />

transferred to the SSS-Sheet<br />

8. For CLIN 11.1.5 the total procurement cost of all<br />

PDA/Smartphone Client hardware including the total of year 1,2<br />

and 3 support is transferred to the SSS-Sheet<br />

9. For CLIN 11.1.6 the total procurement cost of all IP phone Client<br />

hardware including the total of year 1,2 and 3 support is<br />

transferred to the SSS-Sheet<br />

10. For CLIN 11.1.7 the total procurement cost of all IP phone<br />

secretariat Client hardware including the total of year 1,2 and 3<br />

support is transferred to the SSS-Sheet<br />

11. For CLIN 11.2.1 the total procurement cost of all Standard<br />

Desktop Client Software including the total of year 1 support is<br />

transferred to the SSS-Sheet<br />

12. For CLIN 11.2.2 the total procurement cost of all High<br />

Performance Desktop Client Software including the total of year<br />

1 support is transferred to the SSS-Sheet<br />

13. For CLIN 11.2.3 the total procurement cost of all Network<br />

Agnostic Desktop Client Software including the total of year 1<br />

support is transferred to the SSS-Sheet<br />

14. For CLIN 11.2.4 the total procurement cost of all Mobile Client<br />

Software including the total of year 1 support is transferred to<br />

the SSS-Sheet<br />

15. For CLIN 11.2.5 the total procurement cost of all<br />

PDA/Smartphone Client Software including the total of year 1<br />

support is transferred to the SSS-Sheet<br />

16. For CLIN 11.2.6 the total procurement cost of all IP phone Client<br />

Software including the total of year 1 support is transferred to<br />

the SSS-Sheet<br />

17. For CLIN 11.2.7 the total procurement cost of all IP phone<br />

secretariat Client Software including the total of year 1support is<br />

transferred to the SSS-Sheet<br />

18. For CLIN 11.2.8 the total procurement cost of all UCC Client<br />

Software including the total of year 1support is transferred to<br />

the SSS-Sheet<br />

19. For CLIN 11.2.9 the total procurement cost of all IPTV Client<br />

Software including the total of year 1support is transferred to<br />

the SSS-Sheet<br />

c. On the ANWI Clients Sheet under the respective type of Client<br />

provisioning Software table<br />

1. List all Software components or and licenses needed to fulfil the client<br />

requirements from the SOW ANNEX H Appendix 1 -3. The Bidder is


NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-11<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

free to add as many rows as required. - this shall cover all security<br />

domains - NS,EAPC, Business and Public<br />

2. Any server or storage hardware needed for the Client Provisioning<br />

services shall be included in the ANWI processing and ANWI storage<br />

tables as described for CLIN 8.1 and 8.2<br />

3. Per Device/Component the Bidder shall provide information on:<br />

a. Description<br />

b. Quantity (units & supported Clients)<br />

c. Unit price<br />

d. Yearly Support/Warranty Cost<br />

4. For CLIN 11.2.10 the total procurement cost of all Client<br />

Provisioning Software including the total of year 1support is<br />

transferred to the SSS-Sheet<br />

CLIN 12.1 GSM Communications<br />

a. CLIN 12.1.1 - Enter price details in the SSS for the CoCo GSM<br />

Coverage Service.<br />

b. For CLIN 12.1.2 and 12.1.3 DO NOT enter direct price details in the SSSsheet<br />

because the price details are calculated from the other systems-<br />

Sheet.<br />

c. On the Other systems Sheet under the respective type of Hardware table<br />

1. Fill out the GSM HW/SW table to fulfil the requirements is the SOW<br />

Annex I Appendix 2<br />

a. Per Device/Component the Bidder shall provide information on:<br />

a. Description<br />

b. Quantity (units)<br />

c. Power/Cooling requirement (Not Applicable for Software)<br />

d. Unit price<br />

e. Yearly Support/Warranty Cost<br />

2. For CLIN 12.1.2 the total procurement cost of all GSM Blocking<br />

hardware including the total of year 1,2 and 3 support is<br />

transferred to the SSS-Sheet<br />

3. For CLIN 12.1.3 the total procurement cost of all WLAN Blocking<br />

hardware including the total of year 1,2 and 3 support is<br />

transferred to the SSS-Sheet<br />

CLIN 12.2 Security Communications<br />

a. Enter Price details in the SSS-sheet per Sub-CLIN<br />

b. Provide Cost breakdown detail in the “Implementation Services”-sheet<br />

CLIN 12.3 IPTV<br />

a. CLIN 12.3.1 - Enter price details in the SSS for the CoCo IPTV Service<br />

(Yearly Service Fee)<br />

b. For 12.3.2 DO NOT enter direct price details in the SSS-sheet because<br />

the price details are calculated from the Other systems-Sheet.<br />

c. On the Other systems Sheet under the IPTV Endpoints table<br />

1. List all required items in the IPTV Endpoint table to fulfil the<br />

requirements is the SOW Annex I Appendix 6<br />

a. Per Device/Component the Bidder shall provide information on:<br />

a. Description


NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-12<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

b. Quantity (units)<br />

c. Power/Cooling requirement (Not Applicable for Software)<br />

d. Unit price<br />

e. Yearly Support/Warranty Cost<br />

2. For CLIN 12.3.2 the total procurement cost of all IPTV endpoint<br />

hardware including the total of year 1,2 and 3 support is<br />

transferred to the SSS-Sheet<br />

CLIN 13 ITS<br />

a. All Sub-CLINs except 13.2, 13.3 and 13.4.2 - Enter price details in the<br />

SSS for ITS Services<br />

b. All Sub-CLINs except 13.2, 13.3 and 13.4.2 - Provide Cost breakdown<br />

detail in the “Implementation Services”-sheet<br />

c. For CLIN 13.2, 13.3 and 13.4.2 DO NOT enter direct price details in the<br />

SSS-sheet because the price details are calculated from the ITS-Sheet.<br />

d. On the ITS Sheet list all hardware components as well as the Software<br />

licenses required to fulfil SOW Annex J requirements for the ITS service.<br />

1. Per Device the Bidder shall provide information on:<br />

a. Description<br />

b. Quantity (units)<br />

c. Power/Cooling requirement (Not Applicable for Software)<br />

d. Unit price<br />

e. Yearly Support/Warranty Cost<br />

2. List and provide price for all required Microsoft software under the<br />

PFE heading<br />

3. For CLIN 13.2 the total procurement cost of all ITS hardware<br />

including the total of year 1,2 and 3 support is transferred to the<br />

SSS-Sheet<br />

4. For CLIN 13.3 the total procurement cost of all ITS Software<br />

including the total of year 1 support is transferred to the SSS-<br />

Sheet<br />

d. On the ITS sheet list all manpower (in man-days) to provide ITS<br />

sustainment and Test Support to fulfil the ITS requirements in SOW Annex<br />

J.<br />

1. For CLIN 13.4.2 the total procurement cost of all ITS manpower<br />

support is transferred to the SSS-Sheet<br />

CLIN 14: Nations and Partners<br />

a. This section is reserved – do NOT fill out.<br />

CLIN 15 Remote Sites<br />

b. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Remote Sites -Sheet.<br />

c. On the Remote Sites Sheet under the respective type of<br />

Hardware/Software table<br />

1. List all Hardware components or software licenses needed to fulfil the<br />

client requirements from the SOW ANNEX M. The Bidder is free to<br />

add as many rows as required. - this shall cover 2 security domains -<br />

NS both Business<br />

2. Per Device/Component the Bidder shall provide information on:


NATO UNCLASSIFIED<br />

Book I, Annex A, Page A-13<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

a. Description<br />

b. Quantity (units)<br />

c. Unit price<br />

d. Yearly Support/Warranty Cost<br />

3. For CLIN 15.1 the total procurement cost of all Remote Site 1<br />

hardware including the total of year 1,2 and 3 support and all<br />

Remote site 1 software including the total of year 1 support is<br />

transferred to the SSS-Sheet<br />

4. For CLIN 15.2 the total procurement cost of all Remote Site 2<br />

hardware including the total of year 1,2 and 3 support and all<br />

Remote site2 software including the total of year 1 support is<br />

transferred to the SSS-Sheet<br />

5. For CLIN 15.3 the total procurement cost of all Remote Site 3<br />

hardware including the total of year 1,2 and 3 support and all<br />

Remote site3 software including the total of year 1 support is<br />

transferred to the SSS-Sheet<br />

6. For CLIN 15.4 the total procurement cost of all Remote Site 4<br />

hardware including the total of year 1,2 and 3 support and all<br />

Remote site 4 software including the total of year 1 support is<br />

transferred to the SSS-Sheet<br />

7. For CLIN 15.5 the total procurement cost of all Remote Site 5<br />

hardware including the total of year 1,2 and 3 support and all<br />

Remote site 5 software including the total of year 1 support is<br />

transferred to the SSS-Sheet<br />

CLIN 16 ANWI Standing Ordering Agreement<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the processing, Storage and networking -<br />

Sheets.<br />

b. On the respective excel sheets provide all Hardware and Software<br />

components that are required to fulfil the capacity requirement from the<br />

SOW Annex F. For the Standing ordering agreement the additional<br />

requirements for:<br />

1. Processing is related to the ICTM business applications processing -<br />

Ref Annex F Appendix 2<br />

2. Storage is related to the storage requirement beyond the ANWI<br />

services - Ref Annex F Appendix 3<br />

3. Networking is related to the connectivity requirement for additional<br />

processing and storage resources referenced above.<br />

4. Per Device/Component the Bidder shall provide information on:<br />

a. Description<br />

b. Quantity (units)<br />

c. Unit price<br />

d. Yearly Support/Warranty Cost<br />

5. For CLIN 16.1. - the procurement cost and support cost for<br />

YEAR 1,2 and 3 for processing Hardware is transferred to the<br />

SSS-Sheet<br />

6. For CLIN 16.2. - the procurement cost and support cost for<br />

YEAR 1 for processing Software is transferred to the SSS-Sheet


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

7. For CLIN 16.3. - the procurement cost and support cost for<br />

YEAR 1,2 and 3 for Storage Hardware is transferred to the SSS-<br />

Sheet<br />

8. For CLIN 16.4. - the procurement cost and support cost for<br />

YEAR 1 for Storage Software is transferred to the SSS-Sheet<br />

9. For CLIN 16.5. - the procurement cost and support cost for<br />

YEAR 1,2 and 3 for Networking Hardware is transferred to the<br />

SSS-Sheet<br />

CLIN 17 - Life-Cycle Support and Warranty<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the processing, storage, networking, CDGW,<br />

clients, ANWI-Applications, Other systems, ITS and Remote Sites-Sheets.<br />

b. On the Sheets indicated above a yearly support price for 5 year is<br />

required. Under the initial procurement a 3 year support for Hardware and<br />

1 year support for software is included. CLIN 17 - Sub-CLINS contain the<br />

remaining 2 year support for Hardware and 4 year support for Software.<br />

c. For the 17.1 Sub-CLINS the sum of the Year 4 and Year 5 hardware<br />

warranty and Support costs are transferred to the SSS-sheet.<br />

d. For the 17.2 Sub-CLINs the sum of Year 2 to 5 software warranty and<br />

support costs are transferred to the SSS-sheet<br />

CLIN 18 - Service Life-Cycle support - Operation<br />

a. DO NOT enter direct price details in the SSS-sheet because the price<br />

details are calculated from the Service Operations sheet<br />

b. In the Service Operations sheet the Bidder shall provide yearly costing<br />

details per service to operate the respective service. This shall include a<br />

indicative manpower expressed in FTE's or man-days.<br />

1. The SMC Service Support operation shall include the manpower for<br />

1st level support, incident and problem management.<br />

2. The SMC Service Transition and management operations shall<br />

include the manpower for Change and configuration management as<br />

well as the overall Service Level and service catalogue management.<br />

3. The other identified services on the Service Operation sheet shall<br />

include the manpower for day-to-day operations, 2nd level support to<br />

include Performance and capacity Management<br />

CLIN 19 – CoCo Services Year 2-5<br />

a. For CLIN 19.1 – 19.4 DO NOT enter direct price details in the SSS-sheet<br />

because the price details are calculated from the Print-Scan sheet<br />

1. Print/Scan services is a Contractor Owned/Contractor Operated<br />

(COCO) Service. Therefore the Purchaser expects a cost for the<br />

service instead of a procurement cost with support.<br />

2. The respective yearly support and per page prices are<br />

transferred to the SSS-sheet<br />

b. CLIN 19.5 – 19.8 - Enter price details in the SSS for the CoCo IPTV<br />

Service (Yearly Service Fee)<br />

Book I, Annex A, Page A-14<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

CLIN 20 – Optional Hardware and software (non-evaluated)<br />

a. Do NOT enter price details in the SSS Sheet.<br />

b. The Bidder shall provide pricing for optional/additional Hardware and<br />

software in the ANWI IDIQ equipment sheet.<br />

c. The Bidder shall provide staggered pricing details as indicated in the<br />

ANWI IDIQ equipment sheet<br />

CLIN 21: System Administrator training (non-evaluated)<br />

a. Enter price details for the development and conduct of the different<br />

administrator trainings satisfying the requirements in the referenced SOW<br />

sections.<br />

b. The provided price information shall include training materials.<br />

Book I, Annex A, Page A-15<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

4. COMPLETING THE PRICING SUMMARY BREAKDOWN<br />

(Bidding Sheets - Worksheet “Pricing Summary”)<br />

IFB-CO-13300-ANWI-AMD-2<br />

1. DIRECT MATERIAL<br />

A. Purchased Parts: Provide a consolidated priced summary of individual<br />

material quantities included in the various tasks, orders, or Contract line items being<br />

proposed and the basis for pricing (vendor quotes, invoice prices, etc.).<br />

B. Subcontracted Items: Show the total cost of Subcontract effort.<br />

C. Other:<br />

(1) Raw Material: Consists of material in a form or state that requires further<br />

processing. Provide priced quantities of items required for the proposal. Show total<br />

cost.<br />

(2) Standard Commercial Items: Consists of items that the Bidder normally<br />

fabricates, in whole or in part, and that are generally stocked in inventory. Provide<br />

an appropriate explanation of the basis for pricing on attached schedule.<br />

2. MATERIAL OVERHEAD<br />

This is the overhead charged to prices for material handling and/or other overhead<br />

associated with material costs. This may or may not apply to your prices.<br />

3. DIRECT LABOR<br />

Show the hourly rate and the total hours for the categories and disciplines of direct<br />

labour proposed. Indicate whether actual rates or escalated rates are used. If<br />

escalation is included, state the degree (percent) and rationale used.<br />

4. LABOUR OVERHEAD<br />

This is labour overhead.<br />

5. OTHER DIRECT COSTS<br />

A. Special Tooling/Equipment. Identify and support specific equipment and<br />

unit prices. Use a separate schedule if necessary.<br />

B. Travel. Identify total cost for transportation and per diem rates, including the<br />

Not To Exceed values of the CLINs.<br />

C. Individual Consultant Services. Identify and support the proposed<br />

contemplated consulting. State the amount of services estimated to be required and<br />

the consultant’s quoted daily or hourly rate.<br />

D. Other Costs. List all other direct charge costs not otherwise included in the<br />

categories described above (e.g., services of specialized trades, computer services,<br />

preservation, packaging and packing, leasing of equipment and provide bases for<br />

pricing.<br />

6. GENERAL AND ADMINISTRATIVE EXPENSE<br />

This is the overhead charged or General and Administrative (G&A) expenses.<br />

7. FEE OR PROFIT<br />

Enter the total of all proposed Fee or Profit.<br />

Book I, Annex A, Page A-16<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

8. OTHER FACTORS<br />

This would be any other overhead factors applied to Bidders prices.<br />

9. GRAND TOTAL<br />

This is the Bidders final Firm Fixed Price total for the identified WP and should in<br />

essence match the price entered in the corresponding SSS WP in Section 1 of the<br />

Bidding sheets.<br />

Book I, Annex A, Page A-17<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex A-2.<br />

Bidding Sheets – Excel Format<br />

The Bidding Sheets are contained in the electronic file “3_IFB-CO-13300-ANWI-<br />

AMD-2-Book-I-Bidding Sheets_v03.xlsx” submitted as part of this IFB.<br />

Book I, Annex A, Page A-18<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B<br />

Prescribed Administrative Forms and Certificates<br />

NATO UNCLASSIFIED<br />

Book I, Annex B, Page B-1


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-1.<br />

Certificate of Legal Name of Bidder<br />

This Bid is prepared and submitted on behalf of the legal corporate entity specified<br />

below:<br />

FULL NAME OF CORPORATION:<br />

DIVISION (IF APPLICABLE):<br />

SUB DIVISION (IF APPLICABLE):<br />

____________________________________<br />

____________________________________<br />

____________________________________<br />

OFFICIAL MAILING ADDRESS<br />

__________________________________________________________________<br />

__________________________________________________________________<br />

__________________________________________________________________<br />

E-MAIL ADDRESS:<br />

TELEFAX No:<br />

____________________________________<br />

____________________________________<br />

POINT OF CONTACT REGARDING THIS BID:<br />

NAME:<br />

POSITION:<br />

TELEPHONE:<br />

____________________________________<br />

____________________________________<br />

____________________________________<br />

ALTERNATIVE POINT OF CONTACT:<br />

NAME:<br />

POSITION:<br />

TELEPHONE:<br />

____________________________________<br />

____________________________________<br />

____________________________________<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-2<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-2.<br />

Acknowledgement of Receipt of IFB<br />

Amendments<br />

I confirm that the following amendments to Invitation for Bid CO-13300-ANWI<br />

have been received and the Bid, as submitted, reflects the content of such<br />

amendments.<br />

Amendment no.<br />

Date of<br />

Issued<br />

Date of<br />

receipt<br />

Initials<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

NATO UNCLASSIFIED<br />

Book I, Annex B, Page B-3


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-3.<br />

Certificate of Independent Determination<br />

It is hereby stated that:<br />

a. We have read and understand all documentation issued as part of CO-13300-<br />

ANWI. Our Bid submitted in response to the referred solicitation is fully compliant with<br />

the provisions of the IFB and the prospective Contract.<br />

b. Our Bid has been arrived at independently, without consultation,<br />

communication or agreement, for the purpose of restricting competition, with any<br />

other Bidder or with any competitor;<br />

b. The contents of our Bid have not been knowingly disclosed by the Bidder and<br />

will not knowingly be disclosed by the Bidder prior to award, directly or indirectly to<br />

any other Bidder or to any competitor; and<br />

c. No attempt has been made, or will be made by the Bidder to induce any other<br />

person or firm to submit, or not to submit, a Bid for the purpose of restricting<br />

competition.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-4<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-4.<br />

Certificate of Bid Validity<br />

I, the undersigned, as an authorised representative of the firm submitting this Bid, do<br />

hereby certify that the pricing and all other aspects of our Bid will remain valid for a<br />

period of twelve (12) months from the Bid Closing Date of this Invitation for Bid.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-5<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-5.<br />

Certificate of Exclusion of Taxes, Duties and<br />

Charges<br />

I hereby certify that the prices offered in the price quotation of this Bid exclude all<br />

taxes, duties and customs charges from which the Purchaser has been exempted by<br />

international agreement.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-6<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-6.<br />

Comprehension and Acceptance of Contract<br />

Special and General Provisions<br />

The Bidder hereby certifies that he has reviewed the Special Contract Provisions and<br />

the NCIA General Provisions set forth in the Prospective Contract, Book II of this<br />

Invitation for Bid. The Bidder hereby provides his confirmation that he fully<br />

comprehends the rights, obligations and responsibilities of the Contractor as set forth<br />

in the Articles and Clauses of the Prospective Contract. The Bidder additionally<br />

certifies that the offer submitted by the Bidder is without prejudice, qualification or<br />

exception to any of the Terms and Conditions and he will accept and abide by the<br />

stated Special and General Provisions if awarded the Contract as a result of this<br />

Invitation for Bid.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-7<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

ANNEX B-7.<br />

Disclosure of Requirements for NCIA<br />

Execution of Supplemental Agreements<br />

I, the undersigned, as an authorised representative of _______________________,<br />

certify the following statement:<br />

All supplemental agreements, defined as agreements, documents and/or<br />

permissions outside the body of the Contract but are expected to be required by my<br />

Government, and the governments of my Subcontractors, to be executed by the<br />

NCIA as a condition of my firm’s performance of the Contract, have been identified,<br />

as part of the Bid.<br />

These supplemental agreements are listed as follows:<br />

(insert list of supplemental agreements or specify “none”)<br />

Examples of the terms and conditions of these agreements have been provided in<br />

our Offer. The anticipated restrictions to be imposed on NATO, if any, have been<br />

identified in our offer along with any potential conflicts with the terms, conditions and<br />

specifications of the Prospective Contract. These anticipated restrictions and<br />

potential conflicts are based on our knowledge of and prior experience with such<br />

agreements and their implementing regulations. We do not certify that the language<br />

or the terms of these agreements will be exactly as we have anticipated.<br />

The processing time for these agreements has been calculated into our delivery and<br />

performance plans and contingency plans made in the case that there is delay in<br />

processing on the part of the issuing government(s).<br />

We recognise that additional supplemental agreements, documents and permissions<br />

presented as a condition of Contract performance or MOU signature after our firm<br />

would be selected as the successful Bidder may be cause for the NCIA to determine<br />

the submitted Bid to be non-compliant with the requirements of the IFB;<br />

We accept that should the resultant supplemental agreements issued in final form by<br />

the government(s) result in an impossibility to perform the Contract in accordance<br />

with its schedule, terms or specifications, the Contract may be terminated by the<br />

Purchaser at no cost to either Party.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Book I, Annex B, Page B-8<br />

Company<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-8.<br />

Certificate of Compliance AQAP 2110 or ISO<br />

9001:2008 or Equivalent<br />

I hereby certify that _________________________(name of Company) possesses<br />

and applies Quality Assurance Procedures/Plans that are equivalent to the AQAP<br />

2110 or ISO 9001:2008 as evidenced through the attached documentation 1 .<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

1 Bidders must attach copies of any relevant quality certification.<br />

Book I, Annex B, Page B-9<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-9.<br />

List of Prospective Subcontractors<br />

Name and<br />

Address of Sub-<br />

Bidder<br />

DUNS<br />

Number<br />

2<br />

Primary<br />

Location of<br />

Work<br />

Items/Services to<br />

be Provided<br />

Estimated<br />

Value of<br />

Subcontract<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

2 Data Universal Numbering System (DUNS). Bidders are requested to provide this data in order to<br />

help NCIA to correctly identify Subcontractors. If a Subcontractor’s DUNS is not known this field may<br />

be left blank.<br />

Book I, Annex B, Page B-10<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-10.<br />

Bidder Background IPR<br />

I, the undersigned, as an authorised representative of Bidder<br />

_______________________, warrant, represent, and undertake that:<br />

a. The Contractor Background IPR specified in the table below will be used for<br />

the purpose of carrying out work pursuant to the prospective Contract.<br />

ITEM<br />

DESCRIPTION<br />

b. The stated Bidder has and will continue to have, for the duration of the<br />

prospective Contract, all necessary rights in and to the Background IPR<br />

specified above.<br />

c. The Background IPR stated above complies with the terms specified in Clause<br />

30 of the Contract General Provisions.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Book I, Annex B, Page B-11<br />

Company<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-11.<br />

List of Subcontractor IPR<br />

I, the undersigned, as an authorised representative of Bidder<br />

_______________________, warrant, represent, and undertake that:<br />

a. The Subcontractor IPR specified in the table below will be used for the<br />

purpose of carrying out work pursuant to the prospective Contract.<br />

ITEM<br />

DESCRIPTION<br />

b. The stated Bidder has and will continue to have, for the duration of the<br />

prospective Contract, all necessary rights in and to the IPR specified above<br />

necessary to perform the Contractor’s obligations under the Contract.<br />

c. The Subcontractor IPR stated above complies with the terms Clause 30 the<br />

Contract General Provisions.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Book I, Annex B, Page B-12<br />

Company<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-12.<br />

Certificate of Origin of Equipment, Services,<br />

and Intellectual Property<br />

The Bidder hereby certifies that, if awarded the Contract pursuant to this solicitation,<br />

he will perform the Contract subject to the following conditions:<br />

(a) none of the work, including project design, labour and services shall be<br />

performed other than by firms from and within participating NATO member countries;<br />

(b) no material or items of equipment down to and including identifiable<br />

sub-assemblies shall be manufactured or assembled by a firm other than from and<br />

within a participating NATO member country. (A sub-assembly is defined as a<br />

portion of an assembly consisting of two or more parts that can be provisioned and<br />

replaced as an entity); and<br />

(c) The intellectual property rights to all design documentation and related<br />

system operating software shall reside in NATO member countries, and no license<br />

fees or royalty charges shall be paid by the Bidder to firms, individuals or<br />

Governments other than within the NATO member countries.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-13<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-13.<br />

List of Proposed Key Personnel<br />

Position SOW<br />

Reference<br />

Labour<br />

Category<br />

Name Designation<br />

Period<br />

Project Manager 4.2.3 EDC thru<br />

Contract<br />

expiration<br />

date<br />

Technical Lead 4.2.4 EDC thru<br />

Contract<br />

expiration<br />

date<br />

Test Director 4.2.5 EDC thru<br />

Contract<br />

expiration<br />

date<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-14<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-14.<br />

Certificate of Price Ceiling<br />

I hereby certify that the total price offered in the price quotation of this Bid for CLINs<br />

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 and 16 of the Bidding Sheets does not<br />

exceed EUR 81,726,023 (eighty-one million seven hundred twenty-six thousand<br />

twenty-three Euro) as described in paragraph 3.5.2 of Book I.<br />

Note: Price information of your Bid shall not be disclosed in the Bid Administration Package, or the<br />

Technical Proposal Package.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-15<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-15.<br />

Disclosure of Conflict of Interest<br />

I, the undersigned, as an authorised representative of _______________________,<br />

(company name) certify that 3 :<br />

(check one of the following statements:)<br />

☐ a real or apparent conflict of interest as defined in paragraph 3.4.3.1 of the<br />

Bidding Instructions does not exist.<br />

☐<br />

a real or apparent conflict of interest as defined in paragraph 3.4.3.1 of the<br />

Bidding Instructions may exist and a plan for the mitigation of the conflict is<br />

provided in attachment to this Certificate.<br />

(check one of the following statements:)<br />

☐<br />

☐<br />

business relationships as defined under paragraph 3.4.3.2 of the Bidding<br />

Instructions do not exist.<br />

business relationships as defined under paragraph 3.4.3.2 of the Bidding<br />

Instructions exist and have been identified in attachment to this Certificate.<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

3 Bidders are to check the appropriate box(es).<br />

Book I, Annex B, Page B-16<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex B-16.<br />

Index and Certificate of Compliance of<br />

Administrative Certificates<br />

The Bidder hereby certifies that he complies with, and has duly signed, all<br />

Administrative Certificates required under this IFB as indexed below. The Bidder<br />

further certifies that he has submitted the required Administrative Certificates without<br />

prejudice, qualification or exception, and that he has not made any changes or<br />

alterations to the original wording of any of the Administrative Certificates.<br />

Index of Administrative Certificates:<br />

Annex B-1 (Certificate of Legal Name of Bidder)<br />

Annex B-2 (Acknowledgement of Receipt of IFB Amendments)<br />

Annex B-3 (Certificate of Independent Determination)<br />

Annex B-4 (Certificate of Bid Validity)<br />

Annex B-5 (Certificate of Exclusion of Taxes, Duties and Charges)<br />

Annex B-6 (Comprehension and Acceptance of Contract Special and General<br />

Provisions)<br />

Annex B-7 (Disclosure of Requirements for NCIA Execution of Supplemental<br />

Agreements) with the prospective text of such Agreements, as applicable.<br />

Annex B-8 (Certificate of Compliance AQAP or ISO 9001:2008 or Equivalent) with a<br />

copy of the relevant quality certification attached to it.<br />

Annex B-9 (List of Prospective Subcontractors)<br />

Annex B-10 (Bidder Background IPR)<br />

Annex B-11(List of Subcontractor IPR)<br />

Annex B-12 (Certificate of Origin of Equipment, Services, and Intellectual Property)<br />

Annex B-13 (List of Proposed Key Personnel)<br />

Annex B-14 (Certificate of Price Ceiling)<br />

Annex B-15 (Disclosure of Conflict of Interest)<br />

Annex B-16 (Index and Certificate of Compliance of Administrative Certificates)<br />

Date<br />

Signature of Authorised Representative<br />

Printed Name<br />

Title<br />

Company<br />

Book I, Annex B, Page B-17<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex C<br />

Bid Guarantee - Standby Letter of Credit<br />

Standby Letter of Credit Number:<br />

Issue Date:<br />

Beneficiary:<br />

___________________________<br />

NCI Agency,<br />

Financial Management Resource Centre,<br />

Boulevard Leopold III,<br />

B-1110 Brussels,<br />

Belgium<br />

Expiry Date: ___________________________<br />

1. We, (issuing bank) hereby establish in your favour our irrevocable standby<br />

letter of credit number {number} by order and for the account of (NAME AND<br />

ADDRESS OF BIDDER) in the original amount of € 500,000.00 (Five Hundred<br />

Thousand Euro). We are advised this Guarantee fulfils a requirement under<br />

Invitation for Bid IFB-CO-13300-ANWI dated __________________.<br />

2. Funds under this standby letter of credit are available to you upon first<br />

demand and without question or delay against presentation of a certificate from the<br />

NCI Agency Contracting Officer that:<br />

a) (NAME OF BIDDER) has submitted a Bid and, after Bid Closing Date<br />

(including extensions thereto) and prior to the selection of the lowest priced,<br />

technically compliant Bid, has withdrawn his Bid, or stated that he does not<br />

consider his Bid valid or agree to be bound by his Bid, or<br />

b) (NAME OF BIDDER) has submitted a Bid determined by the Agency to<br />

be the lowest priced, technically compliant Bid, but (NAME OF BIDDER) has<br />

declined to execute the Contract offered by the Agency, such Contract being<br />

consistent with the terms of the Invitation for Bid, or<br />

c) The NCI Agency has offered (NAME OF BIDDER) the Contract for<br />

execution but (NAME OF BIDDER) has been unable to demonstrate<br />

compliance with the security requirements of the Contract within a reasonable<br />

time, or<br />

d) The NCI Agency has entered into the Contract with (NAME OF<br />

BIDDER) but (NAME OF BIDDER) has been unable or unwilling to provide the<br />

Performance Guarantee required under the terms of the Contract within the<br />

time frame required.<br />

3. This Letter of Credit is effective the date hereof and shall expire at our office<br />

located at (Bank Address) on __________________. All demands for payment<br />

must be made prior to the expiry date.<br />

Book I, Annex C, Page C-1<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

4. It is a condition of this letter of credit that the expiry date will be automatically<br />

extended without amendment for a period of sixty (60) calendar days from the current<br />

or any successive expiry date unless at least thirty (30) calendar days prior to the<br />

then current expiry date the NCI Agency Contracting Officer notifies us that the Letter<br />

of Credit is not required to be extended or is required to be extended for a shorter<br />

duration.<br />

5. We may terminate this letter of credit at any time upon sixty (60) calendar days<br />

notice furnished to both (NAME OF BIDDER) and the NCI Agency by registered mail.<br />

6. In the event we (the issuing bank) notify you that we elect not to extend the<br />

expiry date in accordance with paragraph 4 above, or, at any time, to terminate the<br />

letter of credit, funds under this credit will be available to you without question or<br />

delay against presentation of a certificate signed by the NCI Agency Contracting<br />

Officer which states<br />

“The NCI Agency has been notified by {issuing bank} of its election not to<br />

automatically extend the expiry date of letter of credit number {number} dated {date}<br />

pursuant to the automatic renewal clause (or to terminate the letter of credit). As of<br />

the date of this certificate, no suitable replacement letter of credit, or equivalent<br />

financial guarantee has been received by the NCI Agency from, or on behalf of<br />

(NAME OF BIDDER), and the NCI Agency, as beneficiary, hereby draws on the<br />

standby letter of credit number ________ in the amount of € (Amount up to the<br />

maximum available under the LOC), such funds to be transferred to the account of<br />

the Beneficiary number ___________________ (to be identified when certificate is<br />

presented).”<br />

Such certificate shall be accompanied by the original of this letter of credit and a copy<br />

of the letter from the issuing bank that it elects not to automatically extend the<br />

standby letter of credit, or terminating the letter of credit.<br />

7. The Beneficiary may not present the certificate described in paragraph 6<br />

above until 20 (twenty) calendar days prior to a) the date of expiration of the letter of<br />

credit should {issuing bank} elect not to automatically extend the expiration date of<br />

the letter of credit, b) the date of termination of the letter of credit if {issuing bank}<br />

notifies the Beneficiary that the letter of credit is to be terminated in accordance with<br />

paragraph 6 above.<br />

8. Multiple drawings are allowed.<br />

9. Drafts drawn hereunder must be marked, “Drawn under {issuing bank} Letter<br />

of Credit No. {number}“ and indicate the date hereof.<br />

10. This letter of credit sets forth in full the terms of our undertaking, and this<br />

undertaking shall not in any way be modified, amended, or amplified by reference to<br />

any document, instrument, or agreement referred to herein (except the International<br />

Standby Practices (ISP 98) hereinafter defined) or in which this letter of credit is<br />

referred to or to which this letter of credit relates, and any such reference shall not be<br />

deemed to incorporate herein by reference any document, instrument, or agreement.<br />

NATO UNCLASSIFIED<br />

Book I, Annex C, Page C-2


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

11. We hereby engage with you that drafts drawn under and in compliance with<br />

the terms of this letter of credit will be duly honoured upon presentation of documents<br />

to us on or before the expiration date of this letter of credit.<br />

12. This Letter of Credit is subject to The International Standby Practices-ISP98<br />

(1998 Publication) International Chamber of Commerce Publication No.590.<br />

Book I, Annex C, Page C-3<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Annex D<br />

Clarification Request Form<br />

INSERT COMPANY NAME HERE<br />

INSERT SUBMISSION DATE HERE<br />

INVITATION FOR BID<br />

IFB-CO-13300-ANWI<br />

NEW NATO HEADQUARTERS<br />

ACTIVE NETWORK INFRASTRUCTURE<br />

(NNHQ ANWI)<br />

Annex D - CLARIFICATION REQUEST FORM<br />

NATO UNCLASSIFIED<br />

Book I, Annex D, Page D-1


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

INSERT COMPANY NAME HERE<br />

INSERT SUBMISSION DATE HERE<br />

ADMINISTRATION or CONTRACTING<br />

Serial<br />

No.<br />

A.1<br />

IFB<br />

REF<br />

BIDDER’S QUESTION NCIA ANSWER STATUS<br />

A.2<br />

A.3<br />

A.4<br />

A.5<br />

Book I, Annex D, Page D-2<br />

NATO UNCLASSIFIED


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

INSERT COMPANY NAME HERE<br />

INSERT SUBMISSION DATE HERE<br />

PRICE<br />

Serial<br />

No.<br />

P.1<br />

IFB<br />

REF<br />

BIDDER’S QUESTION NCIA ANSWER STATUS<br />

P.2<br />

P.3<br />

P.4<br />

P.5<br />

NATO UNCLASSIFIED<br />

Book I, Annex D, Page D-3


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

INSERT COMPANY NAME HERE<br />

INSERT SUBMISSION DATE HERE<br />

TECHNICAL<br />

Serial<br />

No.<br />

T.1<br />

IFB<br />

REF<br />

BIDDER’S QUESTION NCIA ANSWER STATUS<br />

T.2<br />

T.3<br />

T.4<br />

T.5<br />

NATO UNCLASSIFIED<br />

Book I, Annex D, Page D-4


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO COMMUNICATIONS AND INFORMATION<br />

AGENCY<br />

IFB-CO-13300-ANWI<br />

NEW NATO HEADQUARTERS<br />

ACTIVE NETWORK INFRASTRUCTURE<br />

(NNHQ - ANWI)<br />

BOOK I - ANNEX A<br />

BIDDING SHEETS<br />

VERSION 03<br />

(issued under IFB Amendment No.2)<br />

NATO UNCLASSIFIED<br />

Book I - Cover - Page 1 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

1 Project Management<br />

1.1 Project Management Documentation, containing 4.3; Annex K Appendix 1<br />

1.1.1 Project Status Report (PSR) NCIA (BEL) EDC+4 weeks 4.5; Annex K Appendix 15 15<br />

1.1.2 Project Management Plan (PMP) NCIA (BEL) EDC+2 weeks 4.3; Annex K Appendix 3 1<br />

1.1.3 Project Implementation Plan (PIP) EDC+2 weeks 4.3; Annex K Appendix 4 1<br />

1.1.3.1 Work Breakdown Structure (WBS) NCIA (BEL) EDC+2 weeks 4.3; Annex K Appendix 4 1<br />

1.1.3.2 Project Schedule NCIA (BEL) EDC+2 weeks 4.3; Annex K Appendix 4 1<br />

1.1.4 Change Management Plan NCIA (BEL) EDC+2 weeks 4.4.2 1<br />

1.1.5 Risk Management Plan (RMP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 5 1<br />

1.1.6 Quality Assurance Plan (QAP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 6 1<br />

1.1.7 Test and Acceptance Plan (TAP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 8<br />

1.1.8 Configuration Management Plan (CMP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 7 1<br />

1.1.9 Migration Plan (MP) NCIA (BEL) 30-Sep-14 4.3; Annex K Appendix 16 1<br />

1.1.10 Security Accreditation Documentation<br />

1.1.10.1 Security Risk Assessment NCIA (BEL) EDC+8 weeks 6.6.1; Annex K Appendix 11 1<br />

1.1.10.2 System Security Requirement Statement input NCIA (BEL) EDC+8 weeks 6.6.2; Annex K Appendix 13 1<br />

1.1.10.3 System Interconnection Security Requirement Statement NCIA (BEL) EDC+8 weeks 6.6.2; Annex K Appendix 13 1<br />

1.1.10.4 Security Test & Evaluation NCIA (BEL) EDC+8 weeks 6.2; Annex K Appendix 12 1<br />

1.1.11 Logistic Support Plan (LSP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 9 1<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

Remarks<br />

1.1.12<br />

NATO Material Data Sheet<br />

NCIA (BEL)<br />

01-Sep-14<br />

6.10.2.2; Annex K Appendix 10 1<br />

1.2 Project Progress Review Meeting (PPRM) NCIA (BEL) EDC+2 weeks 4.5; Annex K Appendix 14 15+<br />

2 ANWI Service and System Design<br />

2.1 Preliminary Design Review Meeting NCIA (NLD) EDC+4 weeks 5.2 1<br />

2.2 Design Document (4 Stages)<br />

2.2.1 CDGW & Infrastructure & IA NCIA (BEL) EDC+8 weeks 5.3; Annex K Appendix 2 1<br />

2.2.2 Service Management and Control (SMC) NCIA (BEL) EDC+16 weeks 5.3; Annex K Appendix 2 1<br />

2.2.3 UCC Services and Client provisioning NCIA (BEL) EDC+24 weeks 5.3; Annex K Appendix 2 1<br />

2.2.4 GSM & Secure Communications NCIA (BEL) EDC+32 weeks 5.3; Annex K Appendix 2 1<br />

2.3 Critical Design Review Briefings NCIA (NLD) 5.6<br />

2.3.1 CDGW & Infrastructure & IA - CDR Briefing NCIA (NLD) EDC+8 weeks 5.6 1<br />

2.3.2 Service Management and Control (SMC) - CDR Briefing NCIA (NLD) EDC+16 weeks 5.6 1<br />

2.3.3 UCC Services and Client provisioning - CDR Briefing NCIA (NLD) EDC+24 weeks 5.6 1<br />

2.3.4 GSM & Secure Communications - CDR Briefing NCIA (NLD) EDC+32 weeks 5.6 1<br />

2.4 Critical Design Review Feedback Meetings<br />

2.4.1 CDGW & Infrastructure & IA - CDR Briefing NCIA (NLD) EDC+12 weeks 5.7 1<br />

2.4.2 Service Management and Control (SMC) - CDR Briefing NCIA (NLD) EDC+20 weeks 5.7 1<br />

2.4.3 UCC Services and Client provisioning - CDR Briefing NCIA (NLD) EDC+28 weeks 5.7 1<br />

2.4.4 GSM & Secure Communications - CDR Briefing NCIA (NLD) EDC+36 weeks 5.7 1<br />

2.5 Acceptance of Design Document<br />

1st PPRM is Kickoff<br />

Meeting<br />

ITS included in CLIN<br />

13.1<br />

2.5.1 CDGW & Infrastructure & IA - Design Document Acceptance NCIA (BEL) EDC+14 weeks 5.8 1<br />

2.5.2<br />

2.5.3<br />

Service Management and Control (SMC) - Design Document<br />

Acceptance<br />

UCC Services and Client provisioning - Design Document<br />

Acceptance<br />

NCIA (BEL) EDC+22 weeks 5.8 1<br />

NCIA (BEL) EDC+30 weeks 5.8 1<br />

2.5.4 GSM & Secure Communications - Design Document Acceptance NCIA (BEL) EDC+38 weeks 5.8 1<br />

3 Site Survey<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 2 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

3.1 Site survey workbook NCIA (BEL) EDC+52 weeks 6.5.3 1<br />

3.2 Conduct Site Survey NNHQ EDC+56 weeks 3.10.2; 6.5.3 1<br />

3.3 Site survey report NCIA (BEL) EDC+58 weeks 6.5.3 1<br />

4 Testing<br />

4.1 Test Status Meeting NCIA (BEL) 30-Apr-16 6.7 1<br />

4.2 Proof of Concept Test (PCT)<br />

4.2.1 PCT - SMC ITS Site EDC+30 weeks 6.8.3; Annex E Appendix 1 1<br />

4.2.2 PCT - CDM ITS Site EDC+24 weeks 6.8.3; 14.2.1 1<br />

4.2.3 PCT - UCC ITS Site EDC+38 weeks 6.8.3; Annex G Appendix 1 1<br />

4.2.4 PCT - Client Provisioning ITS Site EDC+35 weeks 6.8.3; Annex H Appendix 2 1<br />

4.3 Capability Acceptance Test 6.8.2<br />

4.3.1 Processing Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 2 1<br />

4.3.2 Storage Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 3 1<br />

4.3.3 Printing and Scanning Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 4 1<br />

4.3.4 Network Infrastucture Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 5 1<br />

4.3.5 LAN Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 6 1<br />

4.3.6 Cross Domain Service NNHQ Campus 30-Jun-15 6.8.2; 6.13; 14.2.1 1<br />

4.3.7 Voice Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 2 1<br />

4.3.8 VoiceMail Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 3 1<br />

4.3.9 VTC Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 4 1<br />

4.3.10 Email Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 5 1<br />

4.3.11 Unified Messaging Service Commponent NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 6 1<br />

4.3.12 FAX Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 7 1<br />

4.3.13 Instant Messaging/Chat Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 8 1<br />

4.3.14 Presence Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 9 1<br />

4.3.15 Directory Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 10 1<br />

4.3.16 Collaboration Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 11 1<br />

4.3.17 Mobility Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 12 1<br />

4.3.18 UCC Client NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 1 1<br />

4.3.19 Software Provisioning NNHQ Campus 30-Jun-15 6.8.2; Annex H Appendix 2 1<br />

4.3.20 Client Devices NNHQ Campus 30-Jun-15 6.8.2; Annex H Appendix 3 1<br />

4.3.21 GSM Blocking NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 3 1<br />

4.3.22 Wireless Blocking NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 4 1<br />

4.3.23 Site Security Comms NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 5 1<br />

4.3.24 GSM Continuity Services NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 2 1<br />

4.3.25 IPTV services NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 6 1<br />

4.4 Service Certification Test 6.8.4<br />

4.4.1 Infrastructure Services NNHQ 30-Jun-15 6.8.4; Annex F Appendix 1 1<br />

4.4.2 UCC Services NNHQ 30-Jun-15 6.8.4; Annex G Appendix 1 1<br />

4.4.3 Client Provisioning Service NNHQ 30-Jun-15 6.8.4; Annex H Appendix 1 1<br />

4.4.4 Supplementary Services NNHQ<br />

6.8.4; Annex I Appendix 1,<br />

30-Jun-15 Appendix 2, Appendix 6<br />

1<br />

4.4.5 Service Management and Control NNHQ 30-Jun-15 6.8.4; Annex E Appendix 1 1<br />

4.5 System Activation Test NNHQ 31-Oct-15 6.8.5 1<br />

4.6 Final Site Test NNHQ 30-Apr-16 6.8.6 1<br />

4.7 Security Implementation Verification Procedures NNHQ 30-Apr-15 6.8.7, Annex K Appendix 12 1<br />

4.8 Requirements Traceability Matrix NCIA (BEL) EDC+ 4 weeks 6.8.8 1<br />

4.9 Test reports NCIA (BEL) 30-Jun-16 3.10.7; Annex K Appendix 8 1<br />

5 ANWI Implementation and Transition<br />

5.1 ANWI Installation<br />

5.1.1 Server rooms NNHQ 31-Mar-15 6.10.2; 6.10.3; 6.10.4 1<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

Remarks<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 3 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

5.1.2 User Area NNHQ 30-Apr-16 6.10.2; 6.10.3; 6.10.4 1<br />

5.2 Service Activation NNHQ 30-Sep-15 6.10.6 1<br />

5.3 Service Activation Test NNHQ 31-Oct-15 6.10.7 1<br />

Unit Price<br />

Total Price<br />

5.4 Physical Configuration Audit<br />

NNHQ<br />

30-Sep-15<br />

6.10.8 1<br />

5.5 Initial Operating Capability NNHQ 31-Oct-15 6.13; 6,14 1<br />

5.6 Support from IOC to FOC NNHQ 30-Apr-16 6.14 1<br />

5.7 Migration to ANWI Environment NNHQ 30-Apr-16 6.10.10 1<br />

5.8 Support during migration NNHQ 30-Apr-16 6.10.12 1<br />

5.9 Final Operating Capability NNHQ 30-Apr-16 6.15; 6.16 1<br />

5.10 Support from FOC to FSA NNHQ 30-Oct-16 6.16 1<br />

5.11 Final System Acceptance NNHQ 30-Oct-16 6.17 1<br />

5.12 ANWI Knowledge base NNHQ 30-Jun-16 6.12 1<br />

5.13 Client Environment Training NNHQ 30-Apr-16 6.10.9 1<br />

6 ANWI Service and System Operations Processes<br />

6.1 ANWI Operational Support Plan NNHQ 31-Mar-15 7.4.1 1<br />

6.2 Training Needs Analysis for NONO services and users NCIA (BEL) 31-Mar-15 6.10.9.2 1<br />

6.3 ANWI Operations Event Management NNHQ 31-Mar-15 7.3.5; Annex E Appendix 1 1<br />

6.4 ANWI Operations Incident Management & Troubleshooting NNHQ 31-Mar-15 7.3.1; Annex E Appendix 1 1<br />

6.5 ANWI Request for Service NNHQ 31-Mar-15 7.3.3; Annex E Appendix 1 1<br />

6.6 ANWI Problem Management NNHQ 31-Mar-15 7.3.2; Annex E Appendix 1 1<br />

6.7 ANWI Access Management NNHQ 31-Mar-15 7.3.4; Annex E Appendix 1 1<br />

6.8 ANWI Monitoring NNHQ 31-Mar-15 7.4.3; Annex E Appendix 1 1<br />

6.9 Operational Procedures/Operating Instructions NCIA (BEL) 31-Mar-15 7.4.2; Annex E Appendix 1 1<br />

7 ANWI Service Improvement<br />

7.1 Identification of CSF NCIA (BEL) 30-Apr-15 8.5; Annex E Appendix 1 1<br />

7.2 Identification of KPIs for ANWI Services NCIA (BEL) 30-Apr-15 8.5; Annex E Appendix 1 1<br />

7.3 Service Level Agreement Reporting NCIA (BEL) 30-Apr-15 8.6.7.1; Annex E Appendix 1 1<br />

7.4 Improvement Recommendations change proposal NNHQ 31-Oct-16 8.6.7.2; Annex E Appendix 1 1<br />

7.5 Implement the Improvements NNHQ 31-Oct-16 8.6.8; Annex E Appendix 1 1<br />

8 Infrastructure Services Hardware and Software<br />

8.1 Processing Service Equipment<br />

8.1.1 Hardware<br />

8.1.1.1 Processing Hardware (Base Contract) including 3 year Warranty and<br />

NNHQ<br />

Annex F Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

8.1.2 Software<br />

8.1.2.1 Processing Software Procurement (Base Contract) including 1 year<br />

NNHQ<br />

Annex F Appendix 2<br />

warranty and support<br />

31-Mar-15<br />

1 n.a -<br />

8.2 Storage Services Equipment<br />

8.2.1 Hardware<br />

8.2.1.1 Storage Hardware (Base Contract) including 3 year Warranty and<br />

NNHQ<br />

Annex F Appendix 3<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

8.2.2 Software<br />

8.2.2.1 Storage Software (Base Contract) including 1 year warranty and<br />

NNHQ<br />

Annex F Appendix 3<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

8.3 Print-Scan Services<br />

8.3.1<br />

Contractor Owned / Contractor operated Print/Scan Service for Large<br />

MFP device<br />

NNHQ 01-Dec-15 Annex F Appendix 4<br />

8.3.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-15 Annex F Appendix 4<br />

Final<br />

Total Price<br />

Remarks<br />

Inclucing Batiment Z and<br />

Remote sites<br />

187 - - Yearly service Cost<br />

Price per page - QTY based<br />

on 1 year estimate printed<br />

7000000 - -<br />

pages<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 4 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

8.3.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-15 Annex F Appendix 4<br />

3000000 - -<br />

8.4 Network Infrastructure Services<br />

8.4.1 Network Infrastructure Services Software - including 1 year warranty<br />

NNHQ<br />

Annex F Appendix 5<br />

and support<br />

31-Mar-15<br />

1 n.a -<br />

8.5 Wired Network Component Equipment<br />

8.5.1 Access Switches FO - including 3 year Warranty and support NNHQ 01-Dec-15 Annex F Appendix 6 1 n.a. -<br />

8.5.2 Access Switches RJ45 PoE - including 3 year Warranty and support<br />

NNHQ<br />

Annex F Appendix 6<br />

01-Dec-15<br />

1 n.a. -<br />

8.5.3 Core Switches - including 3 year Warranty and support<br />

NNHQ<br />

Annex F Appendix 6<br />

31-Mar-15<br />

1 n.a. -<br />

8.5.4 Server Switches - including 3 year Warranty and support NNHQ 31-Mar-15 Annex F Appendix 6 1 n.a. -<br />

8.5.5 Wired-Network-Conference Centre - including 3 year Warranty and<br />

NNHQ<br />

Annex F Appendix 6<br />

support<br />

01-Dec-15<br />

1 n.a. -<br />

8.6 Wireless Network Component Equipment<br />

8.6.1 WLAN - including 3 year Warranty and support NNHQ 01-Dec-15 Annex F Appendix 6 1 n.a. -<br />

8.7 Cross-Domain Module Component Equipment<br />

8.7.1 NS-NGCS-HW - including 3 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.2 NS-NGCS-SW - including 1 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.3 Business-NGCS/Public -HW - including 3 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.4 Business-NGCS/Public -SW - including 1 year Warranty and support<br />

NNHQ<br />

Annex E Appendix 2<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.5 Public - Internet Access HW - including 3 year Warranty and support<br />

NNHQ<br />

Annex E Appendix 2<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.6 Public - Internet Access SW- including 1 year Warranty and support<br />

NNHQ<br />

Annex E Appendix 2<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.7 NS-EAPC-HW - including 3 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.8 NS-EAPC-SW - including 1 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.9 NS-Business-Info-Sharing-HW- including 3 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.10 NS-Business-Info-Sharing-SW- including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.11 CIS Management Info-Sharing HW- including 3 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.12 CIS Management Info-Sharing SW- including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

9 UCC Services<br />

9.1 Voice & VioceMail Component Equipment<br />

9.1.1 Voice & Voicemail Software - including 1 year Warranty and<br />

support<br />

NNHQ<br />

Annex G<br />

Appendix 2 & 3 1 n.a. -<br />

31-Mar-15<br />

9.2 Email Service Component Equipment<br />

9.2.1 E-mail service software - including 1 year Warranty and support NNHQ 31-Mar-15 Annex G Appendix 5 1 n.a. -<br />

9.3 FAX Service Component Equipment<br />

9.3.1 Fax service software - including 1 year Warranty and support NNHQ 31-Mar-15 Annex G Appendix 7 1 n.a. -<br />

9.4 IM/Chat Service Component Equipment<br />

9.4.1 IM/Chat service software - including 1 year Warranty and supportt NNHQ 31-Mar-15 Annex G Appendix 8 1 n.a. -<br />

9.5 Presence Service Component Equipment<br />

9.5.1 Presence service software - including 1 year Warranty and support NNHQ 31-Mar-15 Annex G Appendix 9 1 n.a. -<br />

9.6 UCC Directory Service Component Equipment<br />

Final<br />

Total Price<br />

Remarks<br />

Price per page - QTY based<br />

on 1 year estimate printed<br />

pages<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 5 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

9.6.1 UCC Directory service software - including 1 year Warranty and<br />

support<br />

9.7 Collaboration Service Component Equipment<br />

9.7.1 Collaboration service software - including 1 year Warranty and<br />

support<br />

9.8 Unified Messaging and Mobility Service Component Equipment<br />

NNHQ<br />

NNHQ<br />

31-Mar-15<br />

31-Mar-15<br />

Annex G Appendix 10<br />

Annex G Appendix 11<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

1 n.a. -<br />

1 n.a. -<br />

Final<br />

Total Price<br />

Remarks<br />

9.8.1 UM & Mobility service software - including 1 year Warranty and<br />

Annex G<br />

NNHQ<br />

support<br />

31-Mar-15<br />

Appendix 6 & 12 1 n.a. -<br />

10 SMC Components<br />

10.1 SMC - Service Design Software - including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.9<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

10.2 SMC - Service Transition Software - including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.10<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

10.3 SMC - Service Operations Software - including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.11<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

10.4 SMC - Service Improvement Software - including 1 year Warranty<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.12<br />

and support<br />

31-Mar-15<br />

1 n.a -<br />

11 Client Provisioning Hardware and Software<br />

11.1 Hardware<br />

11.1.1 Standard Desktop Client - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 1981 - -<br />

11.1.2 High Performance Desktop Client - including 3 year Warranty and<br />

162<br />

NNHQ<br />

Annex H Appendix 3<br />

support<br />

01-Dec-15<br />

- -<br />

11.1.3 Network Agnostic Desktop Client - including 3 year Warranty and<br />

284<br />

NNHQ<br />

Annex H Appendix 3<br />

support<br />

01-Dec-15<br />

- -<br />

11.1.4 Mobile Client - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 1600 - -<br />

11.1.5 PDA/SmartPhone - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 573 - -<br />

11.1.6 IP Phone - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 493 - -<br />

11.1.7 IP Phone Secretariat - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 246 - -<br />

11.1.8 ANWI Travel Kit Client Hardware incl 3 year warranty and support NNHQ 01-Dec-15 Annex M 10 - -<br />

11.1.9 ANWI Travel Kit Back-end Hardware incl 3 year warranty and<br />

1<br />

NNHQ<br />

support<br />

01-Dec-15<br />

Annex M<br />

- -<br />

11.2 Software<br />

11.2.1 Software - Standard Client - including 1 year Warranty and support<br />

NNHQ<br />

Annex H Appendix 2<br />

01-Dec-15<br />

1981 - -<br />

11.2.2 Software - High Performance Client - including 1 year Warranty and<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

162 - -<br />

11.2.3 Software - Network Agnostic clients - including 1 year Warranty and<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

284 - -<br />

11.2.4 Software - Mobile Client - including 1 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 2 1600 - -<br />

11.2.5 Software - PDA/SmartPhone - including 1 year Warranty and<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

573 - -<br />

11.2.6 Software - IP Phone - including 1 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 2 493 - -<br />

11.2.7 Software - IP Phone Secretariat - including 1 year Warranty and<br />

246<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

- -<br />

11.2.8 UCC Client Software - including 1 year Warranty and support NNHQ 01-Dec-15 Annex G 1 - -<br />

11.2.9 IPTV Client Software - including 1 year Warranty and support NNHQ 01-Dec-15 Annex I Appendix 6 1 - -<br />

11.2.10 Client Provisioning Software Solution - including 1 year Warranty<br />

1<br />

NNHQ<br />

Annex H Appendix 1-2<br />

and support<br />

01-Dec-15<br />

- -<br />

11.2.11 ANWI Travel Kit Client Software incl 1 year warranty and support NNHQ 01-Dec-15 Annex M 10 - -<br />

12 Supplementary Services Hardware and Software<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 6 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Final<br />

Unit Price Total Price<br />

Days<br />

Total Price<br />

Remarks<br />

12.1 GSM Communications<br />

12.1.1 GSM Coverage NNHQ Campus 01-Dec-15 Annex I Appendix 2 1<br />

12.1.2 GSM Blocking - including 3 year Warranty and support<br />

4<br />

NNHQ<br />

Annex I Appendix 3<br />

01-Dec-15<br />

- -<br />

12.1.3 Wireless Blocking - including 3 year Warranty and support NNHQ 01-Dec-15 Annex I Appendix 4 4 - -<br />

12.2 Security Communications<br />

12.2.1 Tetra secure communication coverage and penetration survey +<br />

1<br />

NNHQ<br />

Annex I Appendix 5<br />

Report<br />

31-Mar-15<br />

12.2.2 Tetra Secure Communications Antenna and Base Station relocation NNHQ 31-Mar-15 Annex I Appendix 5 1<br />

12.3 IPTV<br />

12.3.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300)<br />

NNHQ 01-Dec-15 Annex I Appendix 6<br />

1 Service cost year 1<br />

12.3.2 IPTV endpoint - including 3 year warranty NNHQ 01-Dec-15 Annex I Appendix 6 425 - -<br />

13 Integration and Testing Service (ITS)<br />

13.1 ITS Design NCIA (NLD) EDC+8 weeks Annex K Appendix 1 1<br />

13.2 ITS Hardware (including 3 year warranty and support) ITS Site 30-Oct-13 Annex E-F-G-H-I-J 1 n.a. -<br />

13.3 ITS Software (including 1 year warranty and support) ITS Site 30-Oct-13 Annex E-F-G-H-I-J 1 n.a. -<br />

13.4 Installation, Operation and Maintenance<br />

13.4.1 ITS Installation ITS Site 30-Oct-13 Annex J 1<br />

13.4.2 ITS Sustainment and Test Support (manpower) ITS Site 31-Dec-15 Annex J 1 n.a. -<br />

13.4.3 Documentation, initial spares ITS Site 30-Oct-13 Annex J 1<br />

13.5 ITS Acceptance ITS Site 30-Oct-13 Annex J 1<br />

14 Nations and Partners<br />

14.1 Nations - RESERVED NNHQ 31-Dec-15 Annex L n.a. n.a. n.a.<br />

14.2 Partners - RESERVED NNHQ 31-Dec-15 Annex L n.a. n.a. n.a.<br />

15 Remote Sites<br />

15.1 Site location 1 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Residence of SG 31-Dec-15<br />

1 n.a. -<br />

15.2 Site location 2 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) New-York 31-Dec-15<br />

1 n.a. -<br />

15.3 Site location 3 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Kabul 31-Dec-15<br />

1 n.a. -<br />

15.4 Site location 4 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Moscow 31-Dec-15<br />

1 n.a. -<br />

15.5 Site location 5 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Kiev 31-Dec-15<br />

1 n.a. -<br />

Evaluated Options<br />

16 Standing Ordering Agreement - SOA<br />

16.1 Processing Hardware(Standing Ordering Agreement) Including 3<br />

NNHQ<br />

Annex F Appendix 2<br />

Year Warranty and Support<br />

31-Mar-15<br />

1 n.a - Support Year 1-3<br />

16.2 Processing Software (Standing Ordering Agreement) Including 1<br />

NNHQ<br />

Annex F Appendix 2<br />

Year Warranty and Support<br />

31-Mar-15<br />

1 n.a - Support Year 1<br />

16.3 Storage Hardware (Standing Ordering Agreement) including 3 year<br />

NNHQ<br />

Annex F Appendix 3<br />

Warranty and support<br />

31-Mar-15<br />

1 n.a - Support Year 1-3<br />

16.4 Storage Software (Standing Ordering Agreement) including 1 year<br />

NNHQ<br />

Annex F Appendix 3<br />

warranty and support<br />

31-Mar-15<br />

1 n.a - Support Year 1<br />

16.5 Networking Hardware(Standing Ordering Agreement) Including 3<br />

NNHQ<br />

Annex F Appendix 6<br />

Year Warranty and Support<br />

31-Mar-15<br />

1 n.a - Support Year 1-3<br />

17 Hardware and Software LifeCycle Support and Warranty<br />

SUB TOTAL FIRM FIXED PRICE CLINS 1 - 16 (FOR COMPARISON WITH CEILING PRICE) (state currency):<br />

-<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 7 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

17.1 Hardware Support and Warranty - Year 4 and 5<br />

17.1.1 Processing Hardware (Base Contract)<br />

year 4 - 5 Warranty and support<br />

17.1.2 Storage Hardware (Base Contract)<br />

year 4 - 5 Warranty and support<br />

17.1.3 Access Switches FO<br />

year 4 - 5 Warranty and support<br />

17.1.4 Access Switches RJ45 PoE<br />

year 4 - 5 Warranty and support<br />

17.1.5 Core Switches<br />

year 4 - 5 Warranty and support<br />

17.1.6 Server Switches<br />

year 4 - 5 Warranty and support<br />

17.1.7 Wired-Network-Conference Centre<br />

year 4 - 5 Warranty and support<br />

17.1.8 WLAN<br />

year 4 - 5 Warranty and support<br />

17.1.9 NS-NGCS-HW<br />

year 4 - 5 Warranty and support<br />

17.1.10 Business-NGCS/Public -HW<br />

year 4 - 5 Warranty and support<br />

17.1.11 Public - Internet Access HW<br />

year 4 - 5 Warranty and support<br />

17.1.12 NS-EAPC-HW<br />

year 4 - 5 Warranty and support<br />

17.1.13 NS-Business-Info-Sharing-HW<br />

year 4 - 5 Warranty and support<br />

17.1.14 CIS Management Info-Sharing HW<br />

year 4 - 5 Warranty and support<br />

17.1.15 Standard Desktop Client<br />

year 4 - 5 Warranty and support<br />

17.1.16 High Performance Desktop Client<br />

year 4 - 5 Warranty and support<br />

17.1.17 Network Agnostic Desktop Client<br />

year 4 - 5 Warranty and support<br />

17.1.18 Mobile Client<br />

year 4 - 5 Warranty and support<br />

17.1.19 PDA/SmartPhone<br />

year 4 - 5 Warranty and support<br />

17.1.20 IP Phone<br />

year 4 - 5 Warranty and support<br />

17.1.21 IP Phone Secretariat<br />

year 4 - 5 Warranty and support<br />

17.1.22 GSM Blocking<br />

year 4 - 5 Warranty and support<br />

17.1.23 Wireless Blocking<br />

year 4 - 5 Warranty and support<br />

17.1.24 IPTV endpoint<br />

year 4 - 5 Warranty and support<br />

17.1.25 ITS Hardware<br />

year 4 - 5 Warranty and support<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 8 of 41<br />

Final<br />

Total Price<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

17.1.26 Remotes Sites - Hardware<br />

year 4 - 5 Warranty and support<br />

17.1.27 Processing Hardware(Standing Ordering Agreement) year 4 - 5<br />

Warranty and support<br />

17.1.28 Storage Hardware (Standing Ordering Agreement) year 4 - 5<br />

Warranty and support<br />

17.1.29 Networking Hardware(Standing Ordering Agreement) year 4 - 5<br />

Warranty and support<br />

17.1.30 ANWI Travel Kit Client Hardware<br />

Year 4 - 5 Warranty and support<br />

17.1.31 ANWI Travel Kit Back-end Hardware<br />

Year 4 - 5 Warranty and support<br />

17.2 Software Support and Warranty - Year 2 to 5<br />

17.2.1 Processing Software Procurement (Base Contract)<br />

year 2-5 warranty and support<br />

17.2.2 Storage Software (Base Contract)<br />

year 2-5 warranty and support<br />

17.2.3 Network Infrastructure Services Software<br />

year 2-5 warranty and support<br />

17.2.4 NS-NGCS-SW<br />

year 2-5 warranty and support<br />

17.2.5 Business-NGCS/Public -SW<br />

year 2-5 warranty and support<br />

17.2.6 Public - Internet Access SW<br />

year 2-5 warranty and support<br />

17.2.7 NS-EAPC-SW<br />

year 2-5 warranty and support<br />

17.2.8 NS-Business-Info-Sharing-SW<br />

year 2-5 warranty and support<br />

17.2.9 CIS Management Info-Sharing SW<br />

year 2-5 warranty and support<br />

17.2.10 Voice & Voicemail Software<br />

year 2-5 warranty and support<br />

17.2.11 E-mail service software<br />

year 2-5 warranty and support<br />

17.2.12 Fax service software<br />

year 2-5 warranty and support<br />

17.2.13 IM/Chat service software<br />

year 2-5 warranty and support<br />

17.2.14 Presence service software<br />

year 2-5 warranty and support<br />

17.2.15 UCC Directory service software<br />

year 2-5 warranty and support<br />

17.2.16 Collaboration service software<br />

year 2-5 warranty and support<br />

17.2.17 UM & Mobility service software<br />

year 2-5 warranty and support<br />

17.2.18 Software - Standard Client<br />

year 2-5 warranty and support<br />

17.2.19 Software - High Performance Client<br />

year 2-5 warranty and support<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 9 of 41<br />

Final<br />

Total Price<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price Total Price<br />

17.2.20 Software - Network Agnostic clients<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.21 Software - Mobile Client<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.22 Software - PDA/SmartPhone<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.23 Software - IP Phone<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.24 Software - IP Phone Secretarial<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.25 UCC Client Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.26 IPTV Client Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.27 Client Provisioning Software Solution<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.28 ITS Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.29 Remotes Sites - Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.30 Processing Software (Standing Ordering Agreement) year 2-5<br />

NNHQ<br />

warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.31 Storage Software (Standing Ordering Agreement) year 2-5 warranty<br />

NNHQ<br />

and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.32 ANWI Travel Kit Client Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.33 SMC - Service Design Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.34 SMC - Service Transition Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.35 SMC - Service Operations Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.36 SMC - Service Improvement Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

18 Service Life-Cycle Support - Operation (5 year Lifecycle)<br />

18.1 Year 1 Service Life-Cycle support - Operations<br />

18.1.1 SMC Service Support operations NNHQ 01-Dec-15 7.4.1, Annex E Appendix 1 1 - -<br />

18.1.2 SMC Service Transition and management operations NNHQ 01-Dec-15 7.4.1, Annex E Appendix 1 1 - -<br />

18.1.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-15 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.1.4 Storage Service NNHQ 01-Dec-15 7.4.1, Annex F Appendix 3 1 - -<br />

18.1.5 Print/Scan Service NNHQ 01-Dec-15 7.4.1, Annex F Appendix 4 1 - -<br />

18.1.6 LAN Service (wired and Wireless) NNHQ 01-Dec-15 7.4.1, Annex F Appendix 6 1 - -<br />

18.1.7 UCC service NNHQ 01-Dec-15 7.4.1, Annex G 1 - -<br />

18.1.8 Client Provisioning/Client Devices services NNHQ 01-Dec-15 7.4.1, Annex H 1 - -<br />

18.1.9 IPTV service NNHQ 01-Dec-15 7.4.1, Annex I Appendix 6 1 - -<br />

18.2 Year 2 Service Life-Cycle support - Operations<br />

18.2.1 SMC Service Support operations NNHQ 01-Dec-16 7.4.1, Annex E Appendix 1 1 - -<br />

18.2.2 SMC Service Transition and management operations NNHQ 01-Dec-16 7.4.1, Annex E Appendix 1 1 - -<br />

18.2.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-16 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.2.4 Storage Service NNHQ 01-Dec-16 7.4.1, Annex F Appendix 3 1 - -<br />

18.2.5 Print/Scan Service NNHQ 01-Dec-16 7.4.1, Annex F Appendix 4 1 - -<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 10 of 41<br />

Final<br />

Total Price<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price Total Price<br />

18.2.6 LAN Service (wired and Wireless) NNHQ 01-Dec-16 7.4.1, Annex F Appendix 6 1 - -<br />

18.2.7 UCC service NNHQ 01-Dec-16 7.4.1, Annex G 1 - -<br />

18.2.8 Client Provisioning/Client Devices services NNHQ 01-Dec-16 7.4.1, Annex H 1 - -<br />

18.2.9 IPTV service NNHQ 01-Dec-16 7.4.1, Annex I Appendix 6 1 - -<br />

18.3 Year 3 Service Life-Cycle support - Operations<br />

18.3.1 SMC Service Support operations NNHQ 01-Dec-17 7.4.1, Annex E Appendix 1 1 - -<br />

18.3.2 SMC Service Transition and management operations NNHQ 01-Dec-17 7.4.1, Annex E Appendix 1 1 - -<br />

18.3.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-17 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.3.4 Storage Service NNHQ 01-Dec-17 7.4.1, Annex F Appendix 3 1 - -<br />

18.3.5 Print/Scan Service NNHQ 01-Dec-17 7.4.1, Annex F Appendix 4 1 - -<br />

18.3.6 LAN Service (wired and Wireless) NNHQ 01-Dec-17 7.4.1, Annex F Appendix 6 1 - -<br />

18.3.7 UCC service NNHQ 01-Dec-17 7.4.1, Annex G 1 - -<br />

18.3.8 Client Provisioning/Client Devices services NNHQ 01-Dec-17 7.4.1, Annex H 1 - -<br />

18.3.9 IPTV service NNHQ 01-Dec-17 7.4.1, Annex I Appendix 6 1 - -<br />

18.4 Year 4 Service Life-Cycle support - Operations<br />

18.4.1 SMC Service Support operations NNHQ 01-Dec-18 7.4.1, Annex E Appendix 1 1 - -<br />

18.4.2 SMC Service Transition and management operations NNHQ 01-Dec-18 7.4.1, Annex E Appendix 1 1 - -<br />

18.4.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-18 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.4.4 Storage Service NNHQ 01-Dec-18 7.4.1, Annex F Appendix 3 1 - -<br />

18.4.5 Print/Scan Service NNHQ 01-Dec-18 7.4.1, Annex F Appendix 4 1 - -<br />

18.4.6 LAN Service (wired and Wireless) NNHQ 01-Dec-18 7.4.1, Annex F Appendix 6 1 - -<br />

18.4.7 UCC service NNHQ 01-Dec-18 7.4.1, Annex G 1 - -<br />

18.4.8 Client Provisioning/Client Devices services NNHQ 01-Dec-18 7.4.1, Annex H 1 - -<br />

18.4.9 IPTV service NNHQ 01-Dec-18 7.4.1, Annex I Appendix 6 1 - -<br />

18.5 Year 5 Service Life-Cycle support - Operations<br />

18.5.1 SMC Service Support operations NNHQ 01-Dec-19 7.4.1, Annex E Appendix 1 1 - -<br />

18.5.2 SMC Service Transition and management operations NNHQ 01-Dec-19 7.4.1, Annex E Appendix 1 1 - -<br />

18.5.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-19 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.5.4 Storage Service NNHQ 01-Dec-19 7.4.1, Annex F Appendix 3 1 - -<br />

18.5.5 Print/Scan Service NNHQ 01-Dec-19 7.4.1, Annex F Appendix 4 1 - -<br />

18.5.6 LAN Service (wired and Wireless) NNHQ 01-Dec-19 7.4.1, Annex F Appendix 6 1 - -<br />

18.5.7 UCC service NNHQ 01-Dec-19 7.4.1, Annex G 1 - -<br />

18.5.8 Client Provisioning/Client Devices services NNHQ 01-Dec-19 7.4.1, Annex H 1 - -<br />

18.5.9 IPTV service NNHQ 01-Dec-19 7.4.1, Annex I Appendix 6 1 - -<br />

19 CoCo Services Year 2 - 5<br />

19.1 Print/Scan Service - Year 2 Service Cost<br />

Final<br />

Total Price<br />

Remarks<br />

19.1.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-16 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.1.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-16 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.1.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-16 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.2 Print/Scan Service - Year 3 Service Cost<br />

19.2.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-17 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.2.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-17 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.2.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-17 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.3 Print/Scan Service - Year 4 Service Cost<br />

19.3.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-18 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.3.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-18 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 11 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Final<br />

Unit Price Total Price<br />

Days<br />

Total Price<br />

Remarks<br />

19.3.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-18 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.4 Print/Scan Service - Year 5 Service Cost<br />

19.4.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-19 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.4.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-19 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.4.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-19 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.5 IPTV Service - Year 2 Service Cost<br />

19.5.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300)<br />

NNHQ 01-Dec-16 Annex I Appendix 6<br />

1 Service cost/year<br />

19.6 IPTV Service - Year 3 Service Cost<br />

19.6.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300)<br />

NNHQ 01-Dec-17 Annex I Appendix 6<br />

1 Service cost/year<br />

19.7 IPTV Service - Year 4 Service Cost<br />

19.7.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300)<br />

NNHQ 01-Dec-18 Annex I Appendix 6<br />

1 Service cost/year<br />

19.8 IPTV Service - Year 5 Service Cost<br />

19.8.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300)<br />

NNHQ 01-Dec-19 Annex I Appendix 6<br />

1 Service cost/year<br />

GRAND TOTAL FIRM FIXED PRICE CLINS 1 - 19 (state currency):<br />

20 Optional Hardware and Software (non Evaluated)<br />

20.1 Printing<br />

20.1.1 CoCo Personal/Workgroup Printer (B/W and Colour) NNHQ n.a. Annex F Appendix 4 1 NP NP NP Sheet ANWI IDIQ<br />

20.2 Switching<br />

20.2.1 24 Port Access Switch with uplinks- FO - including 3 year Warranty<br />

NNHQ<br />

Annex F Appendix 6<br />

and support<br />

n.a.<br />

1 NP NP NP Sheet ANWI IDIQ<br />

20.2.2 24 Port Access Switch with uplinks- FO<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.2.3 48 Port Access Switch - RJ45 with uplinks - including 3 year<br />

NNHQ<br />

Annex F Appendix 6<br />

Warranty and support<br />

n.a.<br />

1 NP NP NP Sheet ANWI IDIQ<br />

20.2.4 48 Port Access Switch - RJ45 with uplinks<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.2.5 WLAN Access Point - including 3 year Warranty and support NNHQ n.a. Annex F Appendix 6 1 NP NP NP Sheet ANWI IDIQ<br />

20.2.6 WLAN<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3 Clients<br />

20.3.1 Standard Desktop Client - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.2 Standard Desktop Client<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.3 High Performance Desktop Client - including 3 year Warranty and<br />

NNHQ<br />

support<br />

n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.4 High Performance Desktop Client<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.5 Mobile Client - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.6 Mobile Client<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.7 PDA/SmartPhone - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.8 PDA/SmartPhone<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.9 IP Phone - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

-<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 12 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

20.3.10 IP Phone<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.11 IP Phone Secretariat - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.12 IP Phone Secretariat<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.13 IPTV endpoint - including 3 year warranty and support NNHQ n.a. Annex I Appendix 6 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.14 IPTV endpoint<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.15 2nd Monitor (21") - - including 3 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.16 2nd Monitor (21")<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.17 Monitor Upgrade (24")<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.18 Monitor Upgrade (24") - including 3 year warranty and support NNHQ n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.19 2nd Monitor (24") - including 3 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.20 2nd Monitor (24")<br />

year 4 - 5 Warranty and support<br />

NNHQ<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.21 Softphone Handset - including 3 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.22 Softphone Handset<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.23 Client Software baseline - including 1 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.24 Client Software baseline - year 2 - 5 Warranty and support NNHQ n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.25 UCC Client Software - including 1 year Warranty and support NNHQ n.a. Annex G 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.26 UCC Client Software<br />

year 2-5 warranty and support<br />

NNHQ<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.27 Client Provisioning Software Solution - including 1 year Warranty<br />

NNHQ<br />

Annex H Appendix 1-2<br />

and support<br />

n.a.<br />

1 NP NP NP Sheet ANWI IDIQ<br />

20.3.28 Client Provisioning Software Solution<br />

NNHQ<br />

year 2-5 warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.4 Secure Site Communications - TETRA<br />

20.4.1 Handset NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.2 Vehicle-based NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.3 Office-based NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.4 Base Station NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.5 Repeater NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.6 Mast NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

21 System Administrator Training<br />

21.1 Network Service<br />

21.1.1 Storage (Capacity) Service NNHQ Campus 31-Mar-15 Annex F Appendix 3 1 incl. Training material<br />

21.1.2 Print/Scan Service NNHQ Campus 31-Mar-15 Annex F Appendix 4 1 incl. Training material<br />

21.1.3 Cross Domain Services NNHQ Campus 31-Mar-15 Annex E Appendix 2 1 incl. Training material<br />

21.2 Local Area Network (LAN) Services<br />

21.2.1 Switching Service NNHQ Campus 31-Mar-15 Annex F Appendix 6 1 incl. Training material<br />

21.2.2 Wireless Service NNHQ Campus 31-Mar-15 Annex F Appendix 6 1 incl. Training material<br />

21.2.3 Wireless Blocking Service NNHQ Campus 01-Dec-15 Annex I Appendix 3 1 incl. Training material<br />

21.2.4 GSM Blocking Service NNHQ Campus 01-Dec-15 Annex I Appendix 4 1 incl. Training material<br />

21.3 Unified Communications Capability Services<br />

21.3.1 Voice NNHQ Campus 01-Dec-15 Annex G Appendix 1 1 incl. Training material<br />

21.3.2 VoiceMail NNHQ Campus 01-Dec-15 Annex G Appendix 2 1 incl. Training material<br />

21.3.3 E-Mail NNHQ Campus 01-Dec-15 Annex G Appendix 5 1 incl. Training material<br />

21.3.4 Presence NNHQ Campus 01-Dec-15 Annex G Appendix 9 1 incl. Training material<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 13 of 41<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Final<br />

Unit Price Total Price<br />

Days<br />

Total Price<br />

Remarks<br />

21.3.5 Instant Messaging NNHQ Campus 01-Dec-15 Annex G Appendix 8 1 incl. Training material<br />

21.3.6 Collaboration (Whiteboard) NNHQ Campus 01-Dec-15 Annex G Appendix 11 1 incl. Training material<br />

21.3.7 Video Tele-Conferencing (VTC) NNHQ Campus 01-Dec-15 Annex G Appendix 4 1 incl. Training material<br />

21.3.8 VMR NNHQ Campus 01-Dec-15 Annex G Appendix 4 1 incl. Training material<br />

21.4 Client Provisioning<br />

21.4.1 Client provisioning service NNHQ Campus 31-Dec-15 Annex H Appendix 3 1 incl. Training material<br />

21.5 Supplementary Services<br />

21.5.1 GSM NNHQ Campus 31-Dec-15 Annex I Appendix 2 1 incl. Training material<br />

21.5.2 IPTV NNHQ Campus 31-Dec-15 Annex I Appendix 6 1 incl. Training material<br />

21.5.3 Security Communications (radio) NNHQ Campus 31-Dec-15 Annex I Appendix 5 1 incl. Training material<br />

TOTAL PRICE FOR BID EVALUATION - CLIN 1 -19 + ESTIMATED ENERGY COST (ref. TCO Calculation Sheet)<br />

(state currency): -<br />

NATO UNCLASSIFIED<br />

Book I - SSS - Page 14 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

TCO<br />

Acquisition (ca) Commissioning (cc) Operation (co) Support / Service Fees (cs) TOTAL<br />

TOTAL TCO - - - - -<br />

TCO = ca + cc + co + cs<br />

Cost Type Service Cost CLIN Summation<br />

Cost of Acquisition (CA)<br />

Cost of Commissioning (CC)<br />

Cost of Operation (CO)<br />

SMC - 10<br />

Processing - 8.1, 16.1, 16.2<br />

Storage - 8.2, 16.3, 16.4<br />

Networking - 8.5, 8.6, 16.5<br />

Cross-Domain gateways - 8.7<br />

Network Infrastructure Services - 8.4<br />

Clients & Client provisioning - 11<br />

UCC - 9<br />

Print/Scan Service n.a. n.a.<br />

Remote Sites - 15<br />

IPTV Service - 12.3.2<br />

ITS - 13.2, 13.3<br />

GSM & Blocking - 12.1.2, 12.1.3<br />

(Manpower and other costs related to design/install/commission<br />

Manpower, Software and tools & travel - 1, 2, 3, 4, 5, 6, 7, 12.2, 13(excl 13.2 & 13.3)<br />

(ManPower and Power Cost)<br />

SMC - 18.1.1, 18.1.2, 18.2.1, 18.2.2,18.3.1, 18.3.2, 18.4.1, 18.4.2, 18.5.1, 18.5.2<br />

Processing (including network Infrastructure<br />

and CDGW Services) - 18.1.3, 18.2.3, 18.3.3, 18.4.3, 18.5.3 + Power cost of Processing Sheet & CDGW Sheet<br />

Storage - 18.1.4, 18.2.4, 18.3.4, 18.4.4, 18.5.4 + Power cost of Storage Sheet<br />

Networking - 18.1.6, 18.2.6, 18.3.6, 18.4.6, 18.5.6 + Power cost of Networking Sheet<br />

Clients & Client provisioning (including<br />

Remote sites) - 18.1.8, 18.2.8, 18.3.8, 18.4.8, 18.5.8 + Power cost of Client Sheet<br />

UCC - 18.1.7, 18.2.7, 18.3.7, 18.4.7, 18.5.7<br />

Print/Scan Service - 18.1.5, 18.2.5, 18.3.5, 18.4.5, 18.5.5 + Power cost of Print-Scan Sheet<br />

IPTV Service - 18.1.9, 18.2.9, 18.3.9, 18.4.9, 18.5.9 + Power cost of IPTV Sheet<br />

Cost of Support - Service Fees (CS)<br />

(Support/Maintenance contracts)<br />

SMC - 17.2.33 - 36<br />

Processing - 17.1.1, 17.1.27, 17.2.1, 17.2.30<br />

Storage - 17.1.2, 17.1.28, 17.2.2, 17.2.31<br />

Networking - 17.1.3 - 8, 17.1.29<br />

Cross-Domain gateways - 17.1.9 - 14, 17.2.4 - 9<br />

Network Infrastructure Services - 17.2.3<br />

Clients & Client provisioning - 17.1.15 - 21, 17.1.26, 17.1.30 - 31, 17.2.18 - 27, 17.2.29, 17.2.32<br />

UCC - 17.2.10 - 17<br />

Print/Scan Service - 8.3, 19.1, 19.2, 19.3, 19.4<br />

IPTV Service - 12.3.1, 19.5, 19.6, 19.7, 19.8, 17.1.24<br />

ITS - 17.1.25, 17.2.28<br />

GSM - 12.1.1, 17.1.22 - 23<br />

NATO UNCLASSIFIED<br />

Book I - TCO Calculation - Page 15 of 41


NATO UNCLASSIFIED<br />

Item Profile Profile Description Day Price Month Price Year price<br />

(Please list all types of manpower resources that are offered for the ANWI Project)<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

1 Senior Project Manager<br />

2 Add Lines - Complete as needed<br />

NATO UNCLASSIFIED<br />

Book I - Manpower Resources - Page 16 of 41


Item Description Part Number Vendor SOW Reference<br />

1 Printing<br />

CoCo Personal/Workgroup Printer (B/W and Colour) - Yearly<br />

1.1 Service Cost<br />

Annex F Appendix 4<br />

2 Switching<br />

24 Port Access Switch with uplinks- FO - including 3 year<br />

2.1 Warranty and support<br />

Annex F Appendix 6<br />

24 Port Access Switch with uplinks- FO<br />

2.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

48 Port Access Switch - RJ45 with uplinks - including 3 year<br />

2.3 Warranty and support<br />

Annex F Appendix 6<br />

48 Port Access Switch - RJ45 with uplinks<br />

2.4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

WLAN Access Point - including 3 year Warranty and support<br />

Annex F Appendix 6<br />

2.5<br />

WLAN<br />

2.6 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3 Clients<br />

Standard Desktop Client - including 3 year Warranty and<br />

3.1 support Annex H Appendix 3<br />

Standard Desktop Client<br />

3.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

High Performance Desktop Client - including 3 year<br />

3.3 Warranty and support Annex H Appendix 3<br />

High Performance Desktop Client<br />

3.4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3.5 Mobile Client - including 3 year Warranty and support Annex H Appendix 3<br />

Mobile Client<br />

3.6 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3.7 PDA/SmartPhone - including 3 year Warranty and support Annex H Appendix 3<br />

PDA/SmartPhone<br />

3.8 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3.9 IP Phone - including 3 year Warranty and support Annex H Appendix 3<br />

IP Phone<br />

4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

4.1 IP Phone Secretariat - including 3 year Warranty and support Annex H Appendix 3<br />

IP Phone Secretariat<br />

4.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

4.3 IPTV endpoint - including 3 year warranty and support Annex I Appendix 6<br />

IPTV endpoint<br />

4.4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

4.5 2nd Monitor (21") - - including 3 year warranty and support Annex H Appendix 3<br />

2nd Monitor (21")<br />

4.6 year 4 - 5 Warranty and support Annex K Appendix 9<br />

Monitor Upgrade (24")<br />

4.7 year 4 - 5 Warranty and support Annex H Appendix 3<br />

Monitor Upgrade (24") - including 3 year warranty and<br />

4.8 support Annex K Appendix 9<br />

4.9 2nd Monitor (24") - including 3 year warranty and support Annex H Appendix 3<br />

2nd Monitor (24")<br />

5 year 4 - 5 Warranty and support Annex K Appendix 9<br />

5.1 Softphone Handset - including 3 year warranty and support Annex H Appendix 3<br />

Softphone Handset<br />

5.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

Client Software baseline - including 1 year warranty and<br />

5.3 support Annex H Appendix 3<br />

5.4 Client Software baseline - year 2 - 5 Warranty and support Annex K Appendix 9<br />

UCC Client Software - including 1 year Warranty and support<br />

Annex G<br />

5.5<br />

UCC Client Software<br />

5.6 year 2-5 warranty and support Annex K Appendix 9<br />

Client Provisioning Software Solution - including 1 year<br />

5.7 Warranty and support<br />

Annex H Appendix 1-2<br />

Client Provisioning Software Solution<br />

5.8 year 2-5 warranty and support Annex K Appendix 9<br />

4 Secure Site Communications - TETRA<br />

4.1 Handset Annex I Appendix 5<br />

4.2 Vehicle-based Annex I Appendix 5<br />

4.3 Office-based Annex I Appendix 5<br />

4.4 Base Station Annex I Appendix 5<br />

4.5 Repeater Annex I Appendix 5<br />

4.6 Mast Annex I Appendix 5<br />

NATO UNCLASSIFIED<br />

Quantity - 1 Quantity - 1 > < 50<br />

Quantity - 50 > < 100<br />

Quantity - 50 > < 100<br />

Unit price<br />

Unit price<br />

Unit price<br />

Unit price<br />

Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - IDIQ Equipment - Page 17 of 41


CLIN Description Resource type Company<br />

Instructions:<br />

Mandays/U<br />

nit<br />

NATO UNCLASSIFIED<br />

Please list under each Top level CLIN all the resources required for ALL Sub-CLIN's<br />

Manpower resources listed here shall also be listed under the ANWI Manpower Resources sheet<br />

The bidder shall also indentify the company the resource is from. Sub-contractors shall be named.<br />

The bidder shall provide the manpower, Software & Tools and travel prices under the respective headers<br />

Day Price Total Unit price Total Nr Travels Travel Cost<br />

Manpower Software and tools Travel<br />

1 Project Management 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

2 ANWI Service and System Design 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

3 Site Survey 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

4 Testing 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

5 ANWI Implementation and Transition 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

6 ANWI Service and System Operations Processes 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

7 ANWI Service Improvement 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

12.2 Security Communications 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

-<br />

Add Lines - Complete as needed -<br />

13 Integration and Testing<br />

Service (ITS)<br />

0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

-<br />

Add Lines - Complete as needed -<br />

TOTAL 0.00 0.00 0.00<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - Implementation - Page 18 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Ref CLIN Service - Manpower Resource Profile Year 1 Year 2 Year 3 Year 4 Year 5<br />

TOTAL (O&M)<br />

FTE Cost FTE Cost FTE Cost FTE Cost FTE Cost<br />

18.1.1 SMC Service - support<br />

ex. Service desk engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.2 SMC Service - Transition and management<br />

ex. Service level manager - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.3 Processing Service (including Network infrastructure services & CDGW)<br />

ex. Server Administrators - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.4 Storage Service<br />

ex. Storage Administrators - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.6 LAN Service (wired and Wireless)<br />

ex. Network Administrators - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.8 Client Provisioning/Client Devices services (including Remote Sites)<br />

ex. Support engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.7 UCC service<br />

ex. UCC engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.5 Print/Scan Service<br />

ex. Support engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.9 IPTV Service<br />

ex. Support engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - Service Operations - Page 19 of 41


NATO UNCLASSIFIED<br />

SMC Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

SMC - Service Design 10.1 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

SMC - Service Transition 10.2 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

SMC - Service Operations 10.3 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

SMC - Service Improvement 10.4 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

TOTAL n.a. - - - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) n.a. n.a. n.a. n.a. n.a. -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - SMC - Page 20 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Total<br />

Units<br />

Combined Power/<br />

Cooling<br />

Nr of Servers<br />

(Max)<br />

Requirement<br />

(KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Server Hardware<br />

Server Baseline Hardware (ANWI) 8.1.1.1 0 - - - - - -<br />

ANWI Physical Server 0 - - - - - - - - - -<br />

ANWI VM Host Server 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Server SOA Hardware 16.1 0 - - - - - -<br />

ICTM Physical Server 0 0 - - - - - - - - - -<br />

ICTM VM Host Server 0 0 - - - - - - - - - -<br />

Server Software<br />

Server Baseline Software (ANWI) 8.1.2.1 - - - - - -<br />

Virtualisation Software n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

Server SOA Software 16.2 - - - - - -<br />

Virtualisation Software n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

TOTAL 0 0 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Server per FTE<br />

Avg cost per server (year)<br />

#DIV/0!<br />

#DIV/0!<br />

NATO UNCLASSIFIED<br />

Book I - Processing - Page 21 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Power/<br />

Unit price Year 1 Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Cooling<br />

Requirement<br />

Units TB (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Storage Hardware<br />

Storage Baseline Hardware (ANWI) 8.2.1.1 - - - - - -<br />

SAN Infrastructure 0 n.a. - - - - - - - - -<br />

ANWI Tier 1 Storage 0 0 - - - - - - - - - -<br />

ANWI Tier 2 Storage 0 0 - - - - - - - - - -<br />

ANWI Tier 3 Storage 0 0 - - - - - - - - -<br />

Removable Media 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Storage SOA Hardware 16.3 - - - - - -<br />

SAN Infrastructure - - - - - - - - -<br />

ANWI Tier 1 Storage 0 591 - - - - - - - - - -<br />

ANWI Tier 2 Storage 0 350 - - - - - - - - - -<br />

ANWI Tier 3 Storage 0 1015 - - - - - - - - - -<br />

Removable Media 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Storage Software<br />

Storage Baseline Software (ANWI) 8.2.2.1 - - - - - -<br />

xxxx 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

Storage SOA Software 16.4 - - - - - -<br />

xxxx 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

TOTAL 0 1956 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Cost per TB -<br />

NATO UNCLASSIFIED<br />

Book I - Storage - Page 22 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Power/ Cooling<br />

Units Ports Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

HARDWARE (Baseline)<br />

Core Switches 8.5.3 - - - - - - -<br />

Core switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Access Switches FO 8.5.1 - - - - - - -<br />

Access Switches FO 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Access Switches PoE 8.5.2 - - - - - - -<br />

Access Switches PoE 0 0 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Server Switches 8.5.4 - - - - - - -<br />

Server Switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Confrence Switching 8.5.5 - - - - - - -<br />

Agnostic switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

WLAN Hardware 8.6.1 - - - - - - -<br />

WLAN Access Points 0 0 - - - - - - - - - -<br />

WLAN Controllers 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

HARDWARE (SOA) 16.5 - - - - - -<br />

Core Switches - - - - - - -<br />

Core switch components 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Server Switches - - - - - - -<br />

Server Switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

TOTAL 0 0 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower cost - - - - - -<br />

TOTAL - - - - - -<br />

Description Year Month<br />

Cost Per port #DIV/0! #DIV/0!<br />

NATO UNCLASSIFIED<br />

Book I - Networking - Page 23 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

TOTAL<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Cross-Domain HW<br />

CDGW 1 Hardware 8.7.1 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 2 Hardware 8.7.3 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 3 Hardware 8.7.5 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 4 Hardware 8.7.7 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 5 Hardware 8.7.9 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 6 Hardware 8.7.11 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Cross-Domain SW<br />

CDGW 1 8.7.2 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

NATO UNCLASSIFIED<br />

Book I - CDGW - Page 24 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

TOTAL<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 2 8.7.4 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 3 8.7.6 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 4 8.7.8 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 5 8.7.10 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 6 8.7.12 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost n.a n.a n.a n.a n.a -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - CDGW - Page 25 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Power Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

CLIENTS -HARDWARE<br />

Desktop Client - Standard 11.1.1 1981 - - - - - -<br />

Desktop Client 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Desktop Client - High Perf 11.1.2 162 - - - - - -<br />

Desktop Client 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Desktop Client - Agnostic 11.1.3 284 - - - - - -<br />

Desktop Client 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Mobile Client 11.1.4 1600 - - - - - -<br />

Mobile Client - Laptop 0 - - - - - - - - - -<br />

Mobile Client - Tablet 0 - - - - - - - - - -<br />

Docking solution 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Smartphone/PDA 11.1.5 573 - - - - - -<br />

Smartphone/PDA 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

UCC phone - Standard 11.1.6 493 - - - - - -<br />

UCC Phone 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

UCC phone - Secretarial 11.1.7 246 - - - - - -<br />

UCC secretatial phone 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

CLIENTS -SOFTWARE<br />

Client Provisioning 11.2.10 - - - - - -<br />

Client provisioning SW 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

Desktop Client - Standard 11.2.1 1981 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Desktop Client - High Performance 11.2.2 162 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Desktop Client - Agnostic 11.2.3 284 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Mobile Client 11.2.4 1600 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - Clients - Page 26 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Power Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Smartphone/PDA 11.2.5 573 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

IP Phone 11.2.6 493 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

IP Phone Secretarial 11.2.7 246 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

UCC Client Software 11.2.8 - - - - - - -<br />

UCC Softphone Client 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

IPTV Client Software 11.2.9 - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

TOTAL 5339 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Average Cost per client (year) -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - Clients - Page 27 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units<br />

clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

Infrastructure Services 8.4.1 - - - - - -<br />

NAC Software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

TOTAL - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.12€ KW/h) n.a. n.a. n.a. n.a. n.a. -<br />

Manpower Cost n.a. n.a. n.a. n.a. n.a. -<br />

TOTAL - - - - - -<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units<br />

clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

UCC Services<br />

Voice & Voicemail 9.1.1 - - - - - -<br />

xxxx 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

E-mail 9.2.1 - - - - - -<br />

E-mail software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

Fax Service 9.3.1 - - - - - -<br />

Fax software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 - n.a. - - - - - - - - -<br />

IM/Chat Service 9.4.1 - - - - - -<br />

IM/Chat software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

Presence Service 9.5.1 - - - - - -<br />

Presence software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

UCC Directory Service 9.6.1 - - - - - -<br />

Presence software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

Collaboration Service 9.7.1 - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - Applications - Page 28 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units<br />

clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

collaboration software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

Unified Messaging and Mobility<br />

Service 9.8.1 - - - - - -<br />

UM software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

Summary Table for UCC Service<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - Applications - Page 29 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1 Year 2 Year 3 Year 4 Year 5 Total<br />

Units<br />

n.a.<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

(KW/H per year)<br />

Service Cost/<br />

per Unit- Page<br />

Service Cost/<br />

per Unit- Page<br />

Service Cost/<br />

per Unit-<br />

Page<br />

Service Cost/<br />

per Unit- Page<br />

Service Cost/ per<br />

Unit- Page<br />

Lifecycle<br />

(5 year)<br />

Print/Scan Baseline<br />

Print/Scan service MFP printer 8.3.1 187 n.a. - - - - -<br />

CoCo Print Server - n.a. n.a. n.a. n.a. n.a. n.a n.a.<br />

CoCo MFP Colour printer - n.a. n.a. n.a. n.a. n.a. n.a n.a.<br />

Add Lines - Complete as needed - - - - - - - -<br />

-<br />

Pay-per-page - - - - -<br />

Price per page B/W 8.3.2 7,000,000.00 n.a. n.a. n.a. - - - - - -<br />

Price per page Colour 8.3.3 3,000,000.00 n.a. n.a. n.a. - - - - - -<br />

n.a. n.a. - -<br />

TOTAL 0 - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement n.a. n.a. n.a. n.a. n.a. -<br />

Usage (Pages) - - - - - -<br />

Service Fee - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - Print-Scan - Page 30 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Total<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

IPTV Service<br />

IPTV Endpoints 12.3.2 - - - - - - -<br />

60" display screens with integrated<br />

IPTV media player 425 - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Service Fee - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

Total<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

(KW/H per unit per<br />

Units year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

GSM Service<br />

GSM Blocking 12.1.2 - - - - - - -<br />

GSM Blocking Equipment 1 - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

WLan Blocking 12.1.3 - - - - - - -<br />

WLan Blocking Equipment 1 - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Service Fee - NP NP NP NP -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost n.a. n.a. n.a. n.a. n.a. -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - Other Systems - Page 31 of 41


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Total<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

ITS Hardware<br />

Hardware 13.2 0 - - - - - -<br />

Servers - - - - - - - - - - -<br />

Storage - - - - - - - - - - -<br />

Networking (including ITS Cabling) - - - - - - - - - - -<br />

Cross-domain Components - - - - - - - - - - -<br />

Client Infrastructure - - - - - - - - - - -<br />

Print Scan - - - - - - - - - - -<br />

IPTV - - - - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - - - - -<br />

Server Software<br />

Software 13.3 - - - - - -<br />

Virtualisation Software - n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - -<br />

PFE SW<br />

ex. Microsoft License n.a. - - - - - - - -<br />

Add Lines - Complete as needed - n.a. - - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

ITS Test Support and sustainment<br />

Manpower 13.4.2 n.a. - - - - -<br />

System Engineer - n.a. - - - - - - - - -<br />

Add Lines - Complete as needed - n.a. - - - - - - - - -<br />

TOTAL - n.a. - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - ITS - Page 32 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Power<br />

Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Requirement<br />

Units (KW/H per year) Unit Price Procurement Support Support Support Support Support Procurement Support<br />

Remote Locations - Hardware - -<br />

Location 1 15.1 - - - - - - - -<br />

NS Workstation 5 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 2 15.2 - - - - - - - -<br />

NS Workstation 2 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 3 15.3 - - - - - - - -<br />

NS Workstation 4 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 4 15.4 - - - - - - - -<br />

NS Workstation 2 - - - - - - - - - -<br />

NR Workstation 30 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 5 15.5 - - - - - - - -<br />

NS Workstation 2 - - - - - - - - - -<br />

NR Workstation 30 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Travel Kits - Clients Hardware 11.1.8 - - - - - - - -<br />

NS mobile client 1 - - - - - - - - - -<br />

Small formfactor printer 1 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Travel Kits - Back-end Equipment 11.1.9 - - - - - - - -<br />

VPN Concentrator 0 - - - - - - - - - -<br />

Switching 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Remote Locations - Software - -<br />

Location 1 15.1 - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 2 15.2 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 3 15.3 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 4 15.4 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 5 15.5 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Travel Kits - Clients Software 11.2.11 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

TOTAL 77 - - - - - - - - -<br />

NATO UNCLASSIFIED<br />

Book I - Remote Sites - Page 33 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - - - - - -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost n.a n.a n.a n.a n.a -<br />

TOTAL - - - - - -<br />

Average Cost per client (year) -<br />

NATO UNCLASSIFIED<br />

Book I - Remote Sites - Page 34 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

CONTRACTOR PRICING SUMMARY<br />

DETAILED DESCRIPTION OF COST ELEMENTS<br />

1. DIRECT MATERIAL QUANTITY UNIT COST UNIT COST € TOTAL EST COST € REFERENCE<br />

A. PURCHASED PARTS<br />

B. SUBCONTRACTED ITEMS<br />

C. OTHER- (1)Raw Material<br />

(2) Standard Commercial Items (COTS)<br />

2. MATERIAL OVERHEAD (RATE % X TOTAL EST COST € BASE)<br />

TOTAL DIRECT MATERIAL<br />

3. DIRECT LABOR (INDICATE LABOR CATEGORIES) EST HRS RATE/HR RATE € TOTAL EST COST € REFERENCE (CLIN)<br />

TOTAL DIRECT LABOR<br />

4. LABOR OVERHEAD O.H. RATE (X) BASE<br />

TOTAL LABOR OVERHEAD<br />

5. OTHER DIRECT COSTS QUANTITY UNIT COST UNIT COST € TOTAL EST COST € REFERENCE<br />

A. SPECIAL EQUIPMENT/CFE/NFE<br />

TOTAL SPECIAL EQUIPMENT<br />

B. TRAVEL<br />

(1) TRANSPORTATION<br />

(2) PER DIEM<br />

TOTAL TRAVEL<br />

C. CONSULTANTS OTHER SERVICES<br />

TOTAL INDIVIDUAL CONSULTANT SERVICES<br />

D. OTHER<br />

TOTAL OTHER<br />

SUBTOTAL DIRECT COST & OVERHEAD<br />

6. GENERAL & ADMINISTRATIVE (G&A) (RATE % X TOTAL EST COST € BASE)<br />

7. TOTAL ESTIMATED FEE/ PROFIT %<br />

8. OTHER FACTORS<br />

9. GRAND TOTAL<br />

NATO UNCLASSIFIED<br />

Book I - Pricing Summary - Page 35 of 41


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

ICTM<br />

1 ICTM-Ops Manager 1 Manage ICTM-Ops ITIL, Senior ICT manager, PRINCE2<br />

2 ICTM-Ops Change Manager 1 Change Management process owner ITIL expert<br />

3 ICTM-Ops Configuration Manager 1 CM process owner ITIL expert<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

4 ICTM-Ops-Systems Mngt Manager 1 Manage ICTM-Ops-Systems Management team Managerial level infosec knowledge<br />

5 ICTM-Ops-Systems Mngt Infosec Analyst 5<br />

Infosec operations, operate the ICT security<br />

systems, respond to Infosec incidents<br />

6 ICTM-Ops-Network Mngt Manager 1 Manage ICTM-Ops Network Management<br />

7 ICTM-Ops-Network Mngt Network Engineer 1<br />

Project related network engineering work. 3rd line<br />

network management support<br />

8 ICTM-Ops-Network Mngt Network Analysts 2 1st & second line network management support<br />

LRE CPE installation, 1st line support, modifying<br />

wiring, install new wiring & patch panels, mounting<br />

9 ICTM-Ops-Network Mngt Network Data Cabling Engineer 2 physical equipment<br />

1 Senior and 4 professional level Infosec product<br />

specialists. Operate and set up infosec systems. Detect<br />

security incidents. By analysing usage patterns.<br />

Senior network engineering level knowledge (LAN<br />

switches, routers, firewall, media conversion, cable<br />

management, network management, voice, VOIP, WAN).<br />

PRINCE2, ITIL<br />

Senior network engineering level knowledge (LAN<br />

switches, routers, firewall, media conversion, cable<br />

management, network management, voice). PRINCE2,<br />

ITIL.<br />

Professional level network engineering knowledge (LAN<br />

switches, routers, firewall, media conversion, cable<br />

management, network management). ITIL<br />

Junior LAN engineer, Cabling techniologies (F.O.,<br />

structured cabling, coax) including measurement (OTDR,<br />

UTP). Cabling management system.<br />

10 ICTM-Ops-Network Mngt Senior Voice Engineer 2 1st and 2nd line support, PABX system changes<br />

Senior level TDM-based PABX knowledge (Philips Sopho<br />

30xx series), voice mail system, tarification system.<br />

11 ICTM-Ops-Network Mngt junior Voice Engineer 2 1st line voice support, voice installations (IMAC)<br />

Manage & maintain conference room AV and<br />

ICTM-Ops-Mulimedia<br />

interpretation systems, supporting events on and<br />

12 Systems Mngt Multimedia Engineer 3 off site.<br />

Management and support on databases and<br />

Junior level TDM-based PABX knowledge (Philips Sopho<br />

30xx series), voice mail system, tarification system.<br />

Senior level AV technical knowledge.<br />

13 ICTM-Ops-Database Support Database Administrator 2 related infrastructure.<br />

Advanced DBA & system administrator, MS SQL, Oracle<br />

Manage the Service Center organisation, ITIL, Incident & problem management, professional ICT<br />

14 ICTM-Ops-Service Center Manager/Deputy Manager 2 commmunicate with end users<br />

management level<br />

ICTM-Ops-Service Center-<br />

15 Service Desk Team Leader 2 Trouble shooting Broad ICT knowledge<br />

ICTM-Ops-Service Center-<br />

16 Service Desk Senior Analyst 1 Trouble shooting Broad ICT knowledge<br />

ICTM-Ops-Service Center-<br />

17 Service Desk Analyst 2 Trouble shooting Broad ICT knowledge<br />

ICTM-Ops-Service Center-<br />

18 Service Desk Junior Analyst 3 Call intake, Resolve majority calls Broad ICT knowledge<br />

Patching, Software deployment, User<br />

ICTM-Ops-Service Center-<br />

administration, Workstation manegment and Altiris knowledge, Deep Active Directory & Microsoft OS,<br />

19 Workst SW Mngt Team Leader 1 image development<br />

network administration knowledge<br />

20<br />

21<br />

ICTM-Ops-Service Center-<br />

Workst SW Mngt Senior Analyst 2<br />

ICTM-Ops-Service Center-<br />

IMAC Team Leader 1<br />

Patching, Software deployment, User<br />

administration, Workstation manegment and<br />

image development<br />

Workstation staging & repair, end user equipment<br />

deployment<br />

Altiris knowledge, Deep Active Directory & Microsoft OS,<br />

network administration knowledge<br />

ICT hardware knowledge, client OS knowledge, Altiris<br />

experience, AD experience<br />

NATO UNCLASSIFIED<br />

Book I - Manpower (ICTM) - Page 36 of 41


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

ICTM-Ops-Service Center-<br />

Workstation staging & repair, end user equipment ICT hardware knowledge, client OS knowledge, Altiris<br />

22 IMAC Analyst 7 deployment<br />

experience, AD experience<br />

23 ICTM-Ops-Server Mngt Manager 1<br />

Manage the Server & Security systems team.<br />

Deputise for Head ICTM OPS. Role in projects<br />

related to servers & storage.<br />

ITIL, PRINCE2, ICT manager, senior system<br />

administrator, storage management, VM Ware<br />

virtualisation, multi-vendor servers management<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

24 ICTM-Ops-Server Mngt Server Support Assistant 3<br />

Manage continuously the server, storage and<br />

virtualisation environment as well as related<br />

services e.g. Blackberry. Trouble ticket resolution.<br />

Professional level system administrator, multi-vendor<br />

server management, VM Ware<br />

Manage continuously the server, storage and<br />

25 ICTM-Ops-Server Mngt Junior Server Support Assistant 2<br />

virtualisation environment as well as related<br />

services e.g. Blackberry. Trouble ticket resolution.<br />

Junior system administrator, multi-vendor server<br />

management, VM Ware<br />

26 ICTM-Arch Mngt Infrastructure Architect 2<br />

Infrastructure & ICT security related architecture<br />

development<br />

NAF, ICT security architecture training, deep<br />

infrastructure & ICT security knowledge<br />

27 ICTM-Arch Mngt CAM Engineer 1 Design of server & storage solutions MCSE, senior level server & storage knowledge<br />

Sub-total ICTM 54<br />

COMMCEN<br />

47 COMMCEN-Video VTC-Technican 3<br />

48 COMMCEN-Video VTC-Operator 3<br />

49 COMMCEN-Video VTC-Planner 2<br />

Technical analysis of functional business<br />

requirements;<br />

Develop, install & maintain VTC solutions (NGCS<br />

and NON NGCS);<br />

Develop, install & maintain AV systems (NGCS<br />

and NON NGCS);<br />

Provide support as Second line Service Desk.<br />

Prepare, test & monitor VTC sessions (NGCS and<br />

NON NGCS)<br />

Book and plan VTC request (NGCS and NON<br />

NGCS)<br />

Support VTC Testing<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of VTC and AV systems<br />

Knowledge of ICT architectural design<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of ICT<br />

Knowledge of VTC and AV systems<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of VTC and AV systems<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

50 COMMCEN-Voice System-Engineer 3<br />

51 COMMCEN-Data Client Support Technician 2<br />

Install, Maintain and Support all Voice systems<br />

under Combranch Authority (in NGCS and NON<br />

NGCS);<br />

Update and Keying of all Secure Voice Systems<br />

(NGCS and NON NGCS);<br />

Provide support as Second line Service Desk<br />

Support all Client orientated Software/hardware<br />

applications under Combranch authority;<br />

Provide support as Second line Service Desk.<br />

Knowledge of Voice communications (Analogue, digital<br />

and VOIP)<br />

Knowledge in Data communications (Analogue, digital<br />

and IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

ADP Processing, office automation tools<br />

Knowledge of common OS<br />

System related knowledge of NATO Infosec regulations<br />

NATO UNCLASSIFIED<br />

Book I - Manpower (ICTM) - Page 37 of 41


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

Technical analysis of functional business<br />

requirements<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Develop, install & maintain local and remote LANs Knowledge of common OS<br />

under Combranch authority;<br />

Knowledge of Server administration<br />

52 COMMCEN-Data LAN Manager 2<br />

Provide support as Second line Service Desk. Knowledge of Network administration<br />

Knowledge of programming network devices<br />

Knowledge in DATA Communication (IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

53 COMMCEN-Data Network Engineer 2<br />

54 COMMCEN-Data Software Developper 2<br />

Technical analysis of functional business<br />

requirements;<br />

Support all WAN services under Combranch<br />

authority;<br />

Provide support as Second line Service Desk.<br />

Technical analysis of functional business<br />

requirements;<br />

Develop, install & maintain Software Applications<br />

under Combranch authority;<br />

Provide support as Second line Service Desk.<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of common OS<br />

Knowledge of Server administration<br />

Knowledge of Network administration<br />

Knowledge of programming network devices<br />

Knowledge in DATA Communication (IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of common OS<br />

Knowledge of Common programming languages &<br />

webdesign<br />

System related knowledge of NATO Infosec regulations<br />

55 COMMCEN-COMCEN Communication Technician 7<br />

56 COMMCEN-COMCEN Communication Service Desk Operator 7<br />

Operate and maintain all NGCS and NON-NGCS<br />

systems installed in NATO HQ (24/7);<br />

Deliver service desk services and first line support<br />

for all communication systems under Combranch<br />

authority;<br />

Supervise, monitor and troubleshoot on all NGCS<br />

and NON NGCS transmission trunks and/or<br />

circuits;<br />

Install,configurate and program all NGCS Crypto<br />

Equipment including Key changes.<br />

Operate NATO HQ's Military Message Handling<br />

System and distribution on NON-NGCS in the HQ<br />

(24/7);<br />

Deliver service desk services and first line support<br />

for all communication systems under Combranch<br />

authority;<br />

Operate the NATO HQ private Switchboard<br />

outside normal business hours (24/7);<br />

Deliver transport services within the Combranch<br />

outside business hours.<br />

Knowledge of Voice communications (Analogue, digital<br />

and VOIP)<br />

Knowledge in Data communications (Analogue, digital<br />

and IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of formal Msg handling and distribution<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

NATO UNCLASSIFIED<br />

Book I - Manpower (ICTM) - Page 38 of 41


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

57 COMMCEN-COMCEN COMCEN Duty Communication Officer 7<br />

58 COMMCEN-COMCEN Dept Head COMCEN 1<br />

59 COMMCEN-COMCEN Head COMCEN 1<br />

60 COMMCEN-PABX PABX Operator Assistant 2<br />

Supervises, operates and support all<br />

Communication Center activities<br />

Deliver service desk services and first line support<br />

for all communication systems under Combranch<br />

authority, including maintaining an incident<br />

reporting database (24/7);<br />

Maintain the 24/7 facilities in coordination with BE<br />

Administration section outside business hours<br />

Participate in managing daily operations of the<br />

Comcentre, including PABX and Service Desk;<br />

Support quality assurance of all Comcentre<br />

services and take the appropiate actions if<br />

required;<br />

Support the daily people management in the<br />

Comcentre;<br />

Support the planning for training activities to bring<br />

and keep all Comcentre staff at the required<br />

quality level;<br />

Participate in overviewing issue and incident<br />

reporting and initiate problem requests when<br />

appropriate<br />

Manage daily operations of the Comcentre,<br />

including PABX and Service Desk<br />

Guarantee the quality assurance of all Comcentre<br />

services and take the appropiate actions if<br />

required;<br />

Take care of daily people management in the<br />

Comcentre;<br />

Plan training activities to bring and keep all<br />

Comcentre staff at the required quality level;<br />

Overview issue and incident reporting and initiate<br />

problem requests when appropriate.<br />

Operates the NATO Telephone Switchboard<br />

during business hours<br />

Knowledge of ACP 127<br />

Knowledge of formal Msg handling and distribution<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Leadership capacities<br />

Administration processes<br />

Knowledge of ACP 127<br />

Knowledge of formal Msg handling and distribution<br />

Knowledge of SLA management<br />

Leadership capacities<br />

Administration processes<br />

Knowledge of ACP 127<br />

Knowledge of formal Msg handling and distribution<br />

ADP Processing, office automation tools<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

61 COMMCEN-PABX PABX Operator 2<br />

Operates the NATO Telephone Switchboard<br />

during business hours<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

NATO UNCLASSIFIED<br />

Book I - Manpower (ICTM) - Page 39 of 41


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

Maintain all contacts with the business units on<br />

communication service delivery, including user<br />

requirements gathering for new systems and<br />

system modifications.<br />

Administrate SLA management between the<br />

Combranch and the business units or other<br />

62<br />

COMMCEN- Comms<br />

service providers.<br />

Business Demand and Quality Assurance 3<br />

Supporting Services<br />

Coordination and development of test procedures<br />

in support of system acceptance and/or<br />

accreditation.<br />

Deliver administrative support for standardization<br />

of internal processes.<br />

Deliver administrative support for standardization<br />

of internal processes.<br />

63<br />

64<br />

65<br />

COMMCEN- Comms<br />

Supporting Services<br />

COMMCEN- Comms<br />

Supporting Services<br />

COMMCEN- Comms<br />

Supporting Services<br />

Communication Security Administrator 1<br />

Crypto Custodian 2<br />

Logistic, Contracting and Infra Administrator 2<br />

Sub-total COMMCEN 54<br />

66 PASP-ACCS Sr Programmer/Analyst 1<br />

67 PASP-ACCS Programmer/Analyst 2<br />

Drafts and evaluates all security documents<br />

related to systems under Combranch Authority;<br />

Deliver support in security acreditation testing<br />

procedures.<br />

Manage and control all NATO HQ CCI - Mat<br />

(including Key-distribution and destruction)<br />

Administrate security clearances for Combranch<br />

staff;<br />

Controls all assigned subaccounts<br />

Deliver Logistic Support for NATO HQ's NGCS:<br />

Control and inventory of all NGCS material,<br />

including administation, and maintaining records<br />

on all transactions including repair, calibration and<br />

inventory;<br />

Deliver Logistic Support to NATO HQ's NON-<br />

NGCS: Control and inventory of all NON-NGCS<br />

material, including administration and maintaining<br />

records on all transactions including repair and<br />

inventory;<br />

Budget Planning: Participate in the budget<br />

planning process by administrating the different<br />

budget lines allocated to the Combranch;<br />

Budget Execution: Participate in the procurement<br />

process by prospecting and administation of<br />

procurement processes;<br />

Administrate and monitor all NON-NGCS<br />

maintenance contacts;<br />

Administer and request maintenance works on<br />

space allocated to the Combranch including office<br />

furniture<br />

PASP<br />

Senior programmer & system analyst, DBA,<br />

network administrator, security officer, application<br />

support, meeting support for Data Management<br />

Experts Group<br />

Programmer/Analyst, deputise the roles of the<br />

above, application support, meeting support for<br />

Data Management Experts Group.<br />

Knowledge of business requirement gathering processes<br />

Knowledge of Program Management Methodologies<br />

Knowledge of SLA management<br />

ADP Processing, office automation tools<br />

ADP Processing, office automation tools<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Budgetary and costing model processes<br />

Administration processes<br />

SME on treaty & arms control. Professional database<br />

administration, network administration, system<br />

administration. ITIL, PRINCE2 (scheduled)<br />

SME on treaty & arms control. Professional database<br />

administration, network administration, system<br />

administration.<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - Manpower (ICTM) - Page 40 of 41


68 PASP-ACCS Junior engineer 1<br />

Sub-total PASP 4<br />

NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

Taking back-ups, staging of equipment meeting<br />

support for Data Management Experts Group.<br />

Professional level system development, professional level<br />

hardware & OS software, system administration.<br />

IFB-CO-13300-ANWI-AMD-2<br />

Book I - Bidding Instructions<br />

Annex A - Bidding Sheets<br />

NATO UNCLASSIFIED<br />

Book I - Manpower (ICTM) - Page 41 of 41


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO COMMUNICATIONS AND INFORMATION<br />

AGENCY<br />

IFB-CO-13300-ANWI<br />

NEW NATO HEADQUARTERS<br />

ACTIVE NETWORK INFRASTRUCTURE<br />

(NNHQ - ANWI)<br />

BOOK II - PART I<br />

SCHEDULE OF SUPPLIES AND SERVICES<br />

VERSION 03<br />

(issued under IFB Amendment No.2)<br />

NATO UNCLASSIFIED<br />

Book II - Cover - Page I-1 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

1 Project Management<br />

1.1 Project Management Documentation, containing 4.3; Annex K Appendix 1<br />

1.1.1 Project Status Report (PSR) NCIA (BEL) EDC+4 weeks 4.5; Annex K Appendix 15 15<br />

1.1.2 Project Management Plan (PMP) NCIA (BEL) EDC+2 weeks 4.3; Annex K Appendix 3 1<br />

1.1.3 Project Implementation Plan (PIP) EDC+2 weeks 4.3; Annex K Appendix 4 1<br />

1.1.3.1 Work Breakdown Structure (WBS) NCIA (BEL) EDC+2 weeks 4.3; Annex K Appendix 4 1<br />

1.1.3.2 Project Schedule NCIA (BEL) EDC+2 weeks 4.3; Annex K Appendix 4 1<br />

1.1.4 Change Management Plan NCIA (BEL) EDC+2 weeks 4.4.2 1<br />

1.1.5 Risk Management Plan (RMP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 5 1<br />

1.1.6 Quality Assurance Plan (QAP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 6 1<br />

1.1.7 Test and Acceptance Plan (TAP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 8<br />

1.1.8 Configuration Management Plan (CMP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 7 1<br />

1.1.9 Migration Plan (MP) NCIA (BEL) 30-Sep-14 4.3; Annex K Appendix 16 1<br />

1.1.10 Security Accreditation Documentation<br />

1.1.10.1 Security Risk Assessment NCIA (BEL) EDC+8 weeks 6.6.1; Annex K Appendix 11 1<br />

1.1.10.2 System Security Requirement Statement input NCIA (BEL) EDC+8 weeks 6.6.2; Annex K Appendix 13 1<br />

1.1.10.3 System Interconnection Security Requirement Statement NCIA (BEL) EDC+8 weeks 6.6.2; Annex K Appendix 13 1<br />

1.1.10.4 Security Test & Evaluation NCIA (BEL) EDC+8 weeks 6.2; Annex K Appendix 12 1<br />

1.1.11 Logistic Support Plan (LSP) NCIA (BEL) EDC+4 weeks 4.3; Annex K Appendix 9 1<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

Remarks<br />

1.1.12<br />

NATO Material Data Sheet<br />

NCIA (BEL)<br />

01-Sep-14<br />

6.10.2.2; Annex K Appendix 10 1<br />

1.2 Project Progress Review Meeting (PPRM) NCIA (BEL) EDC+2 weeks 4.5; Annex K Appendix 14 15+<br />

2 ANWI Service and System Design<br />

2.1 Preliminary Design Review Meeting NCIA (NLD) EDC+4 weeks 5.2 1<br />

2.2 Design Document (4 Stages)<br />

2.2.1 CDGW & Infrastructure & IA NCIA (BEL) EDC+8 weeks 5.3; Annex K Appendix 2 1<br />

2.2.2 Service Management and Control (SMC) NCIA (BEL) EDC+16 weeks 5.3; Annex K Appendix 2 1<br />

2.2.3 UCC Services and Client provisioning NCIA (BEL) EDC+24 weeks 5.3; Annex K Appendix 2 1<br />

2.2.4 GSM & Secure Communications NCIA (BEL) EDC+32 weeks 5.3; Annex K Appendix 2 1<br />

2.3 Critical Design Review Briefings NCIA (NLD) 5.6<br />

2.3.1 CDGW & Infrastructure & IA - CDR Briefing NCIA (NLD) EDC+8 weeks 5.6 1<br />

2.3.2 Service Management and Control (SMC) - CDR Briefing NCIA (NLD) EDC+16 weeks 5.6 1<br />

2.3.3 UCC Services and Client provisioning - CDR Briefing NCIA (NLD) EDC+24 weeks 5.6 1<br />

2.3.4 GSM & Secure Communications - CDR Briefing NCIA (NLD) EDC+32 weeks 5.6 1<br />

2.4 Critical Design Review Feedback Meetings<br />

2.4.1 CDGW & Infrastructure & IA - CDR Briefing NCIA (NLD) EDC+12 weeks 5.7 1<br />

2.4.2 Service Management and Control (SMC) - CDR Briefing NCIA (NLD) EDC+20 weeks 5.7 1<br />

2.4.3 UCC Services and Client provisioning - CDR Briefing NCIA (NLD) EDC+28 weeks 5.7 1<br />

2.4.4 GSM & Secure Communications - CDR Briefing NCIA (NLD) EDC+36 weeks 5.7 1<br />

2.5 Acceptance of Design Document<br />

1st PPRM is Kickoff<br />

Meeting<br />

ITS included in CLIN<br />

13.1<br />

2.5.1 CDGW & Infrastructure & IA - Design Document Acceptance NCIA (BEL) EDC+14 weeks 5.8 1<br />

2.5.2<br />

2.5.3<br />

Service Management and Control (SMC) - Design Document<br />

Acceptance<br />

UCC Services and Client provisioning - Design Document<br />

Acceptance<br />

NCIA (BEL) EDC+22 weeks 5.8 1<br />

NCIA (BEL) EDC+30 weeks 5.8 1<br />

2.5.4 GSM & Secure Communications - Design Document Acceptance NCIA (BEL) EDC+38 weeks 5.8 1<br />

3 Site Survey<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-2 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

3.1 Site survey workbook NCIA (BEL) EDC+52 weeks 6.5.3 1<br />

3.2 Conduct Site Survey NNHQ EDC+56 weeks 3.10.2; 6.5.3 1<br />

3.3 Site survey report NCIA (BEL) EDC+58 weeks 6.5.3 1<br />

4 Testing<br />

4.1 Test Status Meeting NCIA (BEL) 30-Apr-16 6.7 1<br />

4.2 Proof of Concept Test (PCT)<br />

4.2.1 PCT - SMC ITS Site EDC+30 weeks 6.8.3; Annex E Appendix 1 1<br />

4.2.2 PCT - CDM ITS Site EDC+24 weeks 6.8.3; 14.2.1 1<br />

4.2.3 PCT - UCC ITS Site EDC+38 weeks 6.8.3; Annex G Appendix 1 1<br />

4.2.4 PCT - Client Provisioning ITS Site EDC+35 weeks 6.8.3; Annex H Appendix 2 1<br />

4.3 Capability Acceptance Test 6.8.2<br />

4.3.1 Processing Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 2 1<br />

4.3.2 Storage Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 3 1<br />

4.3.3 Printing and Scanning Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 4 1<br />

4.3.4 Network Infrastucture Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 5 1<br />

4.3.5 LAN Service NNHQ Campus 30-Jun-15 6.8.2; Annex F Appendix 6 1<br />

4.3.6 Cross Domain Service NNHQ Campus 30-Jun-15 6.8.2; 6.13; 14.2.1 1<br />

4.3.7 Voice Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 2 1<br />

4.3.8 VoiceMail Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 3 1<br />

4.3.9 VTC Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 4 1<br />

4.3.10 Email Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 5 1<br />

4.3.11 Unified Messaging Service Commponent NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 6 1<br />

4.3.12 FAX Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 7 1<br />

4.3.13 Instant Messaging/Chat Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 8 1<br />

4.3.14 Presence Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 9 1<br />

4.3.15 Directory Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 10 1<br />

4.3.16 Collaboration Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 11 1<br />

4.3.17 Mobility Service Component NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 12 1<br />

4.3.18 UCC Client NNHQ Campus 30-Jun-15 6.8.2; Annex G Appendix 1 1<br />

4.3.19 Software Provisioning NNHQ Campus 30-Jun-15 6.8.2; Annex H Appendix 2 1<br />

4.3.20 Client Devices NNHQ Campus 30-Jun-15 6.8.2; Annex H Appendix 3 1<br />

4.3.21 GSM Blocking NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 3 1<br />

4.3.22 Wireless Blocking NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 4 1<br />

4.3.23 Site Security Comms NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 5 1<br />

4.3.24 GSM Continuity Services NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 2 1<br />

4.3.25 IPTV services NNHQ Campus 30-Jun-15 6.8.2; Annex I Appendix 6 1<br />

4.4 Service Certification Test 6.8.4<br />

4.4.1 Infrastructure Services NNHQ 30-Jun-15 6.8.4; Annex F Appendix 1 1<br />

4.4.2 UCC Services NNHQ 30-Jun-15 6.8.4; Annex G Appendix 1 1<br />

4.4.3 Client Provisioning Service NNHQ 30-Jun-15 6.8.4; Annex H Appendix 1 1<br />

4.4.4 Supplementary Services NNHQ<br />

6.8.4; Annex I Appendix 1,<br />

30-Jun-15 Appendix 2, Appendix 6<br />

1<br />

4.4.5 Service Management and Control NNHQ 30-Jun-15 6.8.4; Annex E Appendix 1 1<br />

4.5 System Activation Test NNHQ 31-Oct-15 6.8.5 1<br />

4.6 Final Site Test NNHQ 30-Apr-16 6.8.6 1<br />

4.7 Security Implementation Verification Procedures NNHQ 30-Apr-15 6.8.7, Annex K Appendix 12 1<br />

4.8 Requirements Traceability Matrix NCIA (BEL) EDC+ 4 weeks 6.8.8 1<br />

4.9 Test reports NCIA (BEL) 30-Jun-16 3.10.7; Annex K Appendix 8 1<br />

5 ANWI Implementation and Transition<br />

5.1 ANWI Installation<br />

5.1.1 Server rooms NNHQ 31-Mar-15 6.10.2; 6.10.3; 6.10.4 1<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

Remarks<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-3 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

5.1.2 User Area NNHQ 30-Apr-16 6.10.2; 6.10.3; 6.10.4 1<br />

5.2 Service Activation NNHQ 30-Sep-15 6.10.6 1<br />

5.3 Service Activation Test NNHQ 31-Oct-15 6.10.7 1<br />

Unit Price<br />

Total Price<br />

5.4 Physical Configuration Audit<br />

NNHQ<br />

30-Sep-15<br />

6.10.8 1<br />

5.5 Initial Operating Capability NNHQ 31-Oct-15 6.13; 6,14 1<br />

5.6 Support from IOC to FOC NNHQ 30-Apr-16 6.14 1<br />

5.7 Migration to ANWI Environment NNHQ 30-Apr-16 6.10.10 1<br />

5.8 Support during migration NNHQ 30-Apr-16 6.10.12 1<br />

5.9 Final Operating Capability NNHQ 30-Apr-16 6.15; 6.16 1<br />

5.10 Support from FOC to FSA NNHQ 30-Oct-16 6.16 1<br />

5.11 Final System Acceptance NNHQ 30-Oct-16 6.17 1<br />

5.12 ANWI Knowledge base NNHQ 30-Jun-16 6.12 1<br />

5.13 Client Environment Training NNHQ 30-Apr-16 6.10.9 1<br />

6 ANWI Service and System Operations Processes<br />

6.1 ANWI Operational Support Plan NNHQ 31-Mar-15 7.4.1 1<br />

6.2 Training Needs Analysis for NONO services and users NCIA (BEL) 31-Mar-15 6.10.9.2 1<br />

6.3 ANWI Operations Event Management NNHQ 31-Mar-15 7.3.5; Annex E Appendix 1 1<br />

6.4 ANWI Operations Incident Management & Troubleshooting NNHQ 31-Mar-15 7.3.1; Annex E Appendix 1 1<br />

6.5 ANWI Request for Service NNHQ 31-Mar-15 7.3.3; Annex E Appendix 1 1<br />

6.6 ANWI Problem Management NNHQ 31-Mar-15 7.3.2; Annex E Appendix 1 1<br />

6.7 ANWI Access Management NNHQ 31-Mar-15 7.3.4; Annex E Appendix 1 1<br />

6.8 ANWI Monitoring NNHQ 31-Mar-15 7.4.3; Annex E Appendix 1 1<br />

6.9 Operational Procedures/Operating Instructions NCIA (BEL) 31-Mar-15 7.4.2; Annex E Appendix 1 1<br />

7 ANWI Service Improvement<br />

7.1 Identification of CSF NCIA (BEL) 30-Apr-15 8.5; Annex E Appendix 1 1<br />

7.2 Identification of KPIs for ANWI Services NCIA (BEL) 30-Apr-15 8.5; Annex E Appendix 1 1<br />

7.3 Service Level Agreement Reporting NCIA (BEL) 30-Apr-15 8.6.7.1; Annex E Appendix 1 1<br />

7.4 Improvement Recommendations change proposal NNHQ 31-Oct-16 8.6.7.2; Annex E Appendix 1 1<br />

7.5 Implement the Improvements NNHQ 31-Oct-16 8.6.8; Annex E Appendix 1 1<br />

8 Infrastructure Services Hardware and Software<br />

8.1 Processing Service Equipment<br />

8.1.1 Hardware<br />

8.1.1.1 Processing Hardware (Base Contract) including 3 year Warranty and<br />

NNHQ<br />

Annex F Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

8.1.2 Software<br />

8.1.2.1 Processing Software Procurement (Base Contract) including 1 year<br />

NNHQ<br />

Annex F Appendix 2<br />

warranty and support<br />

31-Mar-15<br />

1 n.a -<br />

8.2 Storage Services Equipment<br />

8.2.1 Hardware<br />

8.2.1.1 Storage Hardware (Base Contract) including 3 year Warranty and<br />

NNHQ<br />

Annex F Appendix 3<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

8.2.2 Software<br />

8.2.2.1 Storage Software (Base Contract) including 1 year warranty and<br />

NNHQ<br />

Annex F Appendix 3<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

8.3 Print-Scan Services<br />

8.3.1<br />

Contractor Owned / Contractor operated Print/Scan Service for Large<br />

MFP device<br />

NNHQ 01-Dec-15 Annex F Appendix 4<br />

8.3.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-15 Annex F Appendix 4<br />

Final<br />

Total Price<br />

Remarks<br />

Inclucing Batiment Z and<br />

Remote sites<br />

187 - - Yearly service Cost<br />

Price per page - QTY based<br />

on 1 year estimate printed<br />

7000000 - -<br />

pages<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-4 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

8.3.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-15 Annex F Appendix 4<br />

3000000 - -<br />

8.4 Network Infrastructure Services<br />

8.4.1 Network Infrastructure Services Software - including 1 year warranty<br />

NNHQ<br />

Annex F Appendix 5<br />

and support<br />

31-Mar-15<br />

1 n.a -<br />

8.5 Wired Network Component Equipment<br />

8.5.1 Access Switches FO - including 3 year Warranty and support NNHQ 01-Dec-15 Annex F Appendix 6 1 n.a. -<br />

8.5.2 Access Switches RJ45 PoE - including 3 year Warranty and support<br />

NNHQ<br />

Annex F Appendix 6<br />

01-Dec-15<br />

1 n.a. -<br />

8.5.3 Core Switches - including 3 year Warranty and support<br />

NNHQ<br />

Annex F Appendix 6<br />

31-Mar-15<br />

1 n.a. -<br />

8.5.4 Server Switches - including 3 year Warranty and support NNHQ 31-Mar-15 Annex F Appendix 6 1 n.a. -<br />

8.5.5 Wired-Network-Conference Centre - including 3 year Warranty and<br />

NNHQ<br />

Annex F Appendix 6<br />

support<br />

01-Dec-15<br />

1 n.a. -<br />

8.6 Wireless Network Component Equipment<br />

8.6.1 WLAN - including 3 year Warranty and support NNHQ 01-Dec-15 Annex F Appendix 6 1 n.a. -<br />

8.7 Cross-Domain Module Component Equipment<br />

8.7.1 NS-NGCS-HW - including 3 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.2 NS-NGCS-SW - including 1 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.3 Business-NGCS/Public -HW - including 3 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.4 Business-NGCS/Public -SW - including 1 year Warranty and support<br />

NNHQ<br />

Annex E Appendix 2<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.5 Public - Internet Access HW - including 3 year Warranty and support<br />

NNHQ<br />

Annex E Appendix 2<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.6 Public - Internet Access SW- including 1 year Warranty and support<br />

NNHQ<br />

Annex E Appendix 2<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.7 NS-EAPC-HW - including 3 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.8 NS-EAPC-SW - including 1 year Warranty and support NNHQ 31-Mar-15 Annex E Appendix 2 1 n.a. -<br />

8.7.9 NS-Business-Info-Sharing-HW- including 3 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.10 NS-Business-Info-Sharing-SW- including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.11 CIS Management Info-Sharing HW- including 3 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

8.7.12 CIS Management Info-Sharing SW- including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 2<br />

support<br />

31-Mar-15<br />

1 n.a. -<br />

9 UCC Services<br />

9.1 Voice & VioceMail Component Equipment<br />

9.1.1 Voice & Voicemail Software - including 1 year Warranty and<br />

support<br />

NNHQ<br />

Annex G<br />

Appendix 2 & 3 1 n.a. -<br />

31-Mar-15<br />

9.2 Email Service Component Equipment<br />

9.2.1 E-mail service software - including 1 year Warranty and support NNHQ 31-Mar-15 Annex G Appendix 5 1 n.a. -<br />

9.3 FAX Service Component Equipment<br />

9.3.1 Fax service software - including 1 year Warranty and support NNHQ 31-Mar-15 Annex G Appendix 7 1 n.a. -<br />

9.4 IM/Chat Service Component Equipment<br />

9.4.1 IM/Chat service software - including 1 year Warranty and supportt NNHQ 31-Mar-15 Annex G Appendix 8 1 n.a. -<br />

9.5 Presence Service Component Equipment<br />

9.5.1 Presence service software - including 1 year Warranty and support NNHQ 31-Mar-15 Annex G Appendix 9 1 n.a. -<br />

9.6 UCC Directory Service Component Equipment<br />

Final<br />

Total Price<br />

Remarks<br />

Price per page - QTY based<br />

on 1 year estimate printed<br />

pages<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-5 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

9.6.1 UCC Directory service software - including 1 year Warranty and<br />

support<br />

9.7 Collaboration Service Component Equipment<br />

9.7.1 Collaboration service software - including 1 year Warranty and<br />

support<br />

9.8 Unified Messaging and Mobility Service Component Equipment<br />

NNHQ<br />

NNHQ<br />

31-Mar-15<br />

31-Mar-15<br />

Annex G Appendix 10<br />

Annex G Appendix 11<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

1 n.a. -<br />

1 n.a. -<br />

Final<br />

Total Price<br />

Remarks<br />

9.8.1 UM & Mobility service software - including 1 year Warranty and<br />

Annex G<br />

NNHQ<br />

support<br />

31-Mar-15<br />

Appendix 6 & 12 1 n.a. -<br />

10 SMC Components<br />

10.1 SMC - Service Design Software - including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.9<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

10.2 SMC - Service Transition Software - including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.10<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

10.3 SMC - Service Operations Software - including 1 year Warranty and<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.11<br />

support<br />

31-Mar-15<br />

1 n.a -<br />

10.4 SMC - Service Improvement Software - including 1 year Warranty<br />

NNHQ<br />

Annex E Appendix 1 - 13.1.12<br />

and support<br />

31-Mar-15<br />

1 n.a -<br />

11 Client Provisioning Hardware and Software<br />

11.1 Hardware<br />

11.1.1 Standard Desktop Client - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 1981 - -<br />

11.1.2 High Performance Desktop Client - including 3 year Warranty and<br />

162<br />

NNHQ<br />

Annex H Appendix 3<br />

support<br />

01-Dec-15<br />

- -<br />

11.1.3 Network Agnostic Desktop Client - including 3 year Warranty and<br />

284<br />

NNHQ<br />

Annex H Appendix 3<br />

support<br />

01-Dec-15<br />

- -<br />

11.1.4 Mobile Client - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 1600 - -<br />

11.1.5 PDA/SmartPhone - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 573 - -<br />

11.1.6 IP Phone - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 493 - -<br />

11.1.7 IP Phone Secretariat - including 3 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 3 246 - -<br />

11.1.8 ANWI Travel Kit Client Hardware incl 3 year warranty and support NNHQ 01-Dec-15 Annex M 10 - -<br />

11.1.9 ANWI Travel Kit Back-end Hardware incl 3 year warranty and<br />

1<br />

NNHQ<br />

support<br />

01-Dec-15<br />

Annex M<br />

- -<br />

11.2 Software<br />

11.2.1 Software - Standard Client - including 1 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 2 1981 - -<br />

11.2.2 Software - High Performance Client - including 1 year Warranty and<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

162 - -<br />

11.2.3 Software - Network Agnostic clients - including 1 year Warranty and<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

284 - -<br />

11.2.4 Software - Mobile Client - including 1 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 2 1600 - -<br />

11.2.5 Software - PDA/SmartPhone - including 1 year Warranty and<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

573 - -<br />

11.2.6 Software - IP Phone - including 1 year Warranty and support NNHQ 01-Dec-15 Annex H Appendix 2 493 - -<br />

11.2.7 Software - IP Phone Secretariat - including 1 year Warranty and<br />

246<br />

NNHQ<br />

Annex H Appendix 2<br />

support<br />

01-Dec-15<br />

- -<br />

11.2.8 UCC Client Software - including 1 year Warranty and support NNHQ 01-Dec-15 Annex G 1 - -<br />

11.2.9 IPTV Client Software - including 1 year Warranty and support NNHQ 01-Dec-15 Annex I Appendix 6 1 - -<br />

11.2.10 Client Provisioning Software Solution - including 1 year Warranty<br />

1<br />

NNHQ<br />

Annex H Appendix 1-2<br />

and support<br />

01-Dec-15<br />

- -<br />

11.2.11 ANWI Travel Kit Client Software incl 1 year warranty and support NNHQ 01-Dec-15 Annex M 10 - -<br />

12 Supplementary Services Hardware and Software<br />

12.1 GSM Communications<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-6 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Final<br />

Unit Price Total Price<br />

Days<br />

Total Price<br />

Remarks<br />

12.1.1 GSM Coverage NNHQ Campus 01-Dec-15 Annex I Appendix 2 1<br />

12.1.2 GSM Blocking - including 3 year Warranty and support<br />

4<br />

NNHQ<br />

Annex I Appendix 3<br />

01-Dec-15<br />

- -<br />

12.1.3 Wireless Blocking - including 3 year Warranty and support NNHQ 01-Dec-15 Annex I Appendix 4 4 - -<br />

12.2 Security Communications<br />

12.2.1 Tetra secure communication coverage and penetration survey +<br />

1<br />

NNHQ<br />

Annex I Appendix 5<br />

Report<br />

31-Mar-15<br />

12.2.2 Tetra Secure Communications Antenna and Base Station relocation NNHQ 31-Mar-15 Annex I Appendix 5 1<br />

12.3 IPTV<br />

12.3.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300) NNHQ 01-Dec-15 Annex I Appendix 6 1 Service cost year 1<br />

12.3.2 IPTV endpoint - including 3 year warranty NNHQ 01-Dec-15 Annex I Appendix 6 425 - -<br />

13 Integration and Testing Service (ITS)<br />

13.1 ITS Design NCIA (NLD) EDC+8 weeks Annex K Appendix 1 1<br />

13.2 ITS Hardware (including 3 year warranty and support) ITS Site 30-Oct-13 Annex E-F-G-H-I-J 1 n.a. -<br />

13.3 ITS Software (including 1 year warranty and support) ITS Site 30-Oct-13 Annex E-F-G-H-I-J 1 n.a. -<br />

13.4 Installation, Operation and Maintenance<br />

13.4.1 ITS Installation ITS Site 30-Oct-13 Annex J 1<br />

13.4.2 ITS Sustainment and Test Support (manpower) ITS Site 31-Dec-15 Annex J 1 n.a. -<br />

13.4.3 Documentation, initial spares ITS Site 30-Oct-13 Annex J 1<br />

13.5 ITS Acceptance ITS Site 30-Oct-13 Annex J 1<br />

14 Nations and Partners<br />

14.1 Nations - RESERVED NNHQ 31-Dec-15 Annex L n.a. n.a. n.a.<br />

14.2 Partners - RESERVED NNHQ 31-Dec-15 Annex L n.a. n.a. n.a.<br />

15 Remote Sites<br />

15.1 Site location 1 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Residence of SG 31-Dec-15<br />

1 n.a. -<br />

15.2 Site location 2 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) New-York 31-Dec-15<br />

1 n.a. -<br />

15.3 Site location 3 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Kabul 31-Dec-15<br />

1 n.a. -<br />

15.4 Site location 4 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Moscow 31-Dec-15<br />

1 n.a. -<br />

15.5 Site location 5 - Hardware (including 3 year warranty and support)<br />

Annex M<br />

and Software (including 1 year warranty and support) Kiev 31-Dec-15<br />

1 n.a. -<br />

Evaluated Options<br />

16 Standing Ordering Agreement - SOA<br />

16.1 Processing Hardware(Standing Ordering Agreement) Including 3<br />

NNHQ<br />

Annex F Appendix 2<br />

Year Warranty and Support<br />

31-Mar-15<br />

1 n.a - Support Year 1-3<br />

16.2 Processing Software (Standing Ordering Agreement) Including 1<br />

NNHQ<br />

Annex F Appendix 2<br />

Year Warranty and Support<br />

31-Mar-15<br />

1 n.a - Support Year 1<br />

16.3 Storage Hardware (Standing Ordering Agreement) including 3 year<br />

NNHQ<br />

Annex F Appendix 3<br />

Warranty and support<br />

31-Mar-15<br />

1 n.a - Support Year 1-3<br />

16.4 Storage Software (Standing Ordering Agreement) including 1 year<br />

NNHQ<br />

Annex F Appendix 3<br />

warranty and support<br />

31-Mar-15<br />

1 n.a - Support Year 1<br />

16.5 Networking Hardware(Standing Ordering Agreement) Including 3<br />

NNHQ<br />

Annex F Appendix 6<br />

Year Warranty and Support<br />

31-Mar-15<br />

1 n.a - Support Year 1-3<br />

17 Hardware and Software LifeCycle Support and Warranty<br />

17.1 Hardware Support and Warranty - Year 4 and 5<br />

17.1.1 Processing Hardware (Base Contract)<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-7 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

17.1.2 Storage Hardware (Base Contract)<br />

year 4 - 5 Warranty and support<br />

17.1.3 Access Switches FO<br />

year 4 - 5 Warranty and support<br />

17.1.4 Access Switches RJ45 PoE<br />

year 4 - 5 Warranty and support<br />

17.1.5 Core Switches<br />

year 4 - 5 Warranty and support<br />

17.1.6 Server Switches<br />

year 4 - 5 Warranty and support<br />

17.1.7 Wired-Network-Conference Centre<br />

year 4 - 5 Warranty and support<br />

17.1.8 WLAN<br />

year 4 - 5 Warranty and support<br />

17.1.9 NS-NGCS-HW<br />

year 4 - 5 Warranty and support<br />

17.1.10 Business-NGCS/Public -HW<br />

year 4 - 5 Warranty and support<br />

17.1.11 Public - Internet Access HW<br />

year 4 - 5 Warranty and support<br />

17.1.12 NS-EAPC-HW<br />

year 4 - 5 Warranty and support<br />

17.1.13 NS-Business-Info-Sharing-HW<br />

year 4 - 5 Warranty and support<br />

17.1.14 CIS Management Info-Sharing HW<br />

year 4 - 5 Warranty and support<br />

17.1.15 Standard Desktop Client<br />

year 4 - 5 Warranty and support<br />

17.1.16 High Performance Desktop Client<br />

year 4 - 5 Warranty and support<br />

17.1.17 Network Agnostic Desktop Client<br />

year 4 - 5 Warranty and support<br />

17.1.18 Mobile Client<br />

year 4 - 5 Warranty and support<br />

17.1.19 PDA/SmartPhone<br />

year 4 - 5 Warranty and support<br />

17.1.20 IP Phone<br />

year 4 - 5 Warranty and support<br />

17.1.21 IP Phone Secretariat<br />

year 4 - 5 Warranty and support<br />

17.1.22 GSM Blocking<br />

year 4 - 5 Warranty and support<br />

17.1.23 Wireless Blocking<br />

year 4 - 5 Warranty and support<br />

17.1.24 IPTV endpoint<br />

year 4 - 5 Warranty and support<br />

17.1.25 ITS Hardware<br />

year 4 - 5 Warranty and support<br />

17.1.26 Remotes Sites - Hardware<br />

year 4 - 5 Warranty and support<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

Final<br />

Total Price<br />

Remarks<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-8 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

17.1.27 Processing Hardware(Standing Ordering Agreement) year 4 - 5<br />

Warranty and support<br />

17.1.28 Storage Hardware (Standing Ordering Agreement) year 4 - 5<br />

Warranty and support<br />

17.1.29 Networking Hardware(Standing Ordering Agreement) year 4 - 5<br />

Warranty and support<br />

17.1.30 ANWI Travel Kit Client Hardware<br />

Year 4 - 5 Warranty and support<br />

17.1.31 ANWI Travel Kit Back-end Hardware<br />

Year 4 - 5 Warranty and support<br />

17.2 Software Support and Warranty - Year 2 to 5<br />

17.2.1 Processing Software Procurement (Base Contract)<br />

year 2-5 warranty and support<br />

17.2.2 Storage Software (Base Contract)<br />

year 2-5 warranty and support<br />

17.2.3 Network Infrastructure Services Software<br />

year 2-5 warranty and support<br />

17.2.4 NS-NGCS-SW<br />

year 2-5 warranty and support<br />

17.2.5 Business-NGCS/Public -SW<br />

year 2-5 warranty and support<br />

17.2.6 Public - Internet Access SW<br />

year 2-5 warranty and support<br />

17.2.7 NS-EAPC-SW<br />

year 2-5 warranty and support<br />

17.2.8 NS-Business-Info-Sharing-SW<br />

year 2-5 warranty and support<br />

17.2.9 CIS Management Info-Sharing SW<br />

year 2-5 warranty and support<br />

17.2.10 Voice & Voicemail Software<br />

year 2-5 warranty and support<br />

17.2.11 E-mail service software<br />

year 2-5 warranty and support<br />

17.2.12 Fax service software<br />

year 2-5 warranty and support<br />

17.2.13 IM/Chat service software<br />

year 2-5 warranty and support<br />

17.2.14 Presence service software<br />

year 2-5 warranty and support<br />

17.2.15 UCC Directory service software<br />

year 2-5 warranty and support<br />

17.2.16 Collaboration service software<br />

year 2-5 warranty and support<br />

17.2.17 UM & Mobility service software<br />

year 2-5 warranty and support<br />

17.2.18 Software - Standard Client<br />

year 2-5 warranty and support<br />

17.2.19 Software - High Performance Client<br />

year 2-5 warranty and support<br />

17.2.20 Software - Network Agnostic clients<br />

year 2-5 warranty and support<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

NNHQ<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-19 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-9 of 40<br />

Final<br />

Total Price<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price Total Price<br />

17.2.21 Software - Mobile Client<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.22 Software - PDA/SmartPhone<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.23 Software - IP Phone<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.24 Software - IP Phone Secretarial<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.25 UCC Client Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.26 IPTV Client Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.27 Client Provisioning Software Solution<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.28 ITS Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.29 Remotes Sites - Software<br />

NNHQ<br />

year 2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.30 Processing Software (Standing Ordering Agreement) year 2-5<br />

NNHQ<br />

warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.31 Storage Software (Standing Ordering Agreement) year 2-5 warranty<br />

NNHQ<br />

and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.32 ANWI Travel Kit Client Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.33 SMC - Service Design Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.34 SMC - Service Transition Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.35 SMC - Service Operations Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

17.2.36 SMC - Service Improvement Software<br />

NNHQ<br />

2-5 warranty and support<br />

01-Jan-17 Annex K Appendix 9 1 n.a. -<br />

18 Service Life-Cycle Support - Operation (5 year Lifecycle)<br />

18.1 Year 1 Service Life-Cycle support - Operations<br />

18.1.1 SMC Service Support operations NNHQ 01-Dec-15 7.4.1, Annex E Appendix 1 1 - -<br />

18.1.2 SMC Service Transition and management operations NNHQ 01-Dec-15 7.4.1, Annex E Appendix 1 1 - -<br />

18.1.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-15 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.1.4 Storage Service NNHQ 01-Dec-15 7.4.1, Annex F Appendix 3 1 - -<br />

18.1.5 Print/Scan Service NNHQ 01-Dec-15 7.4.1, Annex F Appendix 4 1 - -<br />

18.1.6 LAN Service (wired and Wireless) NNHQ 01-Dec-15 7.4.1, Annex F Appendix 6 1 - -<br />

18.1.7 UCC service NNHQ 01-Dec-15 7.4.1, Annex G 1 - -<br />

18.1.8 Client Provisioning/Client Devices services NNHQ 01-Dec-15 7.4.1, Annex H 1 - -<br />

18.1.9 IPTV service NNHQ 01-Dec-15 7.4.1, Annex I Appendix 6 1 - -<br />

18.2 Year 2 Service Life-Cycle support - Operations<br />

18.2.1 SMC Service Support operations NNHQ 01-Dec-16 7.4.1, Annex E Appendix 1 1 - -<br />

18.2.2 SMC Service Transition and management operations NNHQ 01-Dec-16 7.4.1, Annex E Appendix 1 1 - -<br />

18.2.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-16 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.2.4 Storage Service NNHQ 01-Dec-16 7.4.1, Annex F Appendix 3 1 - -<br />

18.2.5 Print/Scan Service NNHQ 01-Dec-16 7.4.1, Annex F Appendix 4 1 - -<br />

18.2.6 LAN Service (wired and Wireless) NNHQ 01-Dec-16 7.4.1, Annex F Appendix 6 1 - -<br />

18.2.7 UCC service NNHQ 01-Dec-16 7.4.1, Annex G 1 - -<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-10 of 40<br />

Final<br />

Total Price<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price Total Price<br />

18.2.8 Client Provisioning/Client Devices services NNHQ 01-Dec-16 7.4.1, Annex H 1 - -<br />

18.2.9 IPTV service NNHQ 01-Dec-16 7.4.1, Annex I Appendix 6 1 - -<br />

18.3 Year 3 Service Life-Cycle support - Operations<br />

18.3.1 SMC Service Support operations NNHQ 01-Dec-17 7.4.1, Annex E Appendix 1 1 - -<br />

18.3.2 SMC Service Transition and management operations NNHQ 01-Dec-17 7.4.1, Annex E Appendix 1 1 - -<br />

18.3.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-17 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.3.4 Storage Service NNHQ 01-Dec-17 7.4.1, Annex F Appendix 3 1 - -<br />

18.3.5 Print/Scan Service NNHQ 01-Dec-17 7.4.1, Annex F Appendix 4 1 - -<br />

18.3.6 LAN Service (wired and Wireless) NNHQ 01-Dec-17 7.4.1, Annex F Appendix 6 1 - -<br />

18.3.7 UCC service NNHQ 01-Dec-17 7.4.1, Annex G 1 - -<br />

18.3.8 Client Provisioning/Client Devices services NNHQ 01-Dec-17 7.4.1, Annex H 1 - -<br />

18.3.9 IPTV service NNHQ 01-Dec-17 7.4.1, Annex I Appendix 6 1 - -<br />

18.4 Year 4 Service Life-Cycle support - Operations<br />

18.4.1 SMC Service Support operations NNHQ 01-Dec-18 7.4.1, Annex E Appendix 1 1 - -<br />

18.4.2 SMC Service Transition and management operations NNHQ 01-Dec-18 7.4.1, Annex E Appendix 1 1 - -<br />

18.4.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-18 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.4.4 Storage Service NNHQ 01-Dec-18 7.4.1, Annex F Appendix 3 1 - -<br />

18.4.5 Print/Scan Service NNHQ 01-Dec-18 7.4.1, Annex F Appendix 4 1 - -<br />

18.4.6 LAN Service (wired and Wireless) NNHQ 01-Dec-18 7.4.1, Annex F Appendix 6 1 - -<br />

18.4.7 UCC service NNHQ 01-Dec-18 7.4.1, Annex G 1 - -<br />

18.4.8 Client Provisioning/Client Devices services NNHQ 01-Dec-18 7.4.1, Annex H 1 - -<br />

18.4.9 IPTV service NNHQ 01-Dec-18 7.4.1, Annex I Appendix 6 1 - -<br />

18.5 Year 5 Service Life-Cycle support - Operations<br />

18.5.1 SMC Service Support operations NNHQ 01-Dec-19 7.4.1, Annex E Appendix 1 1 - -<br />

18.5.2 SMC Service Transition and management operations NNHQ 01-Dec-19 7.4.1, Annex E Appendix 1 1 - -<br />

18.5.3 Processing Service (including Network infrastructure services) NNHQ 01-Dec-19 7.4.1, Annex F Appendix 2/5 1 - -<br />

18.5.4 Storage Service NNHQ 01-Dec-19 7.4.1, Annex F Appendix 3 1 - -<br />

18.5.5 Print/Scan Service NNHQ 01-Dec-19 7.4.1, Annex F Appendix 4 1 - -<br />

18.5.6 LAN Service (wired and Wireless) NNHQ 01-Dec-19 7.4.1, Annex F Appendix 6 1 - -<br />

18.5.7 UCC service NNHQ 01-Dec-19 7.4.1, Annex G 1 - -<br />

18.5.8 Client Provisioning/Client Devices services NNHQ 01-Dec-19 7.4.1, Annex H 1 - -<br />

18.5.9 IPTV service NNHQ 01-Dec-19 7.4.1, Annex I Appendix 6 1 - -<br />

19 CoCo Services Year 2 - 5<br />

19.1 Print/Scan Service - Year 2 Service Cost<br />

Final<br />

Total Price<br />

Remarks<br />

19.1.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-16 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.1.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-16 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.1.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-16 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.2 Print/Scan Service - Year 3 Service Cost<br />

19.2.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-17 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.2.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-17 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.2.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-17 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.3 Print/Scan Service - Year 4 Service Cost<br />

19.3.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-18 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.3.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-18 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.3.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-18 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.4 Print/Scan Service - Year 5 Service Cost<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-11 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

Remarks<br />

19.4.1 Contractor Owned / Contractor operated Print/Scan Service NNHQ 01-Dec-19 Annex F Appendix 4 187.00<br />

Yearly service Cost<br />

- -<br />

19.4.2 CoCo Print/Scan Service - Price per page B/W NNHQ 01-Dec-19 Annex F Appendix 4 7,000,000.00 - - Estimate - volume<br />

19.4.3 CoCo Print/Scan Service - Price per page Colour NNHQ 01-Dec-19 Annex F Appendix 4 3,000,000.00 - - Estimate - volume<br />

19.5 IPTV Service - Year 2 Service Cost<br />

19.5.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300) NNHQ 01-Dec-16 Annex I Appendix 6 1 Service cost/year<br />

19.6 IPTV Service - Year 3 Service Cost<br />

19.6.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300) NNHQ 01-Dec-17 Annex I Appendix 6 1 Service cost/year<br />

19.7 IPTV Service - Year 4 Service Cost<br />

19.7.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300) NNHQ 01-Dec-18 Annex I Appendix 6 1 Service cost/year<br />

19.8 IPTV Service - Year 5 Service Cost<br />

19.8.1 CoCo IPTV Service with Basic 30 Channels subscription (max 300) NNHQ 01-Dec-19 Annex I Appendix 6 1 Service cost/year<br />

GRAND TOTAL FIRM FIXED PRICE CLINS 1 - 19 (state currency):<br />

20 Optional Hardware and Software (non Evaluated)<br />

20.1 Printing<br />

20.1.1 CoCo Personal/Workgroup Printer (B/W and Colour) NNHQ n.a. Annex F Appendix 4 1 NP NP NP Sheet ANWI IDIQ<br />

20.2 Switching<br />

20.2.1 24 Port Access Switch with uplinks- FO - including 3 year Warranty<br />

NNHQ<br />

Annex F Appendix 6<br />

and support<br />

n.a.<br />

1 NP NP NP Sheet ANWI IDIQ<br />

20.2.2 24 Port Access Switch with uplinks- FO<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.2.3 48 Port Access Switch - RJ45 with uplinks - including 3 year<br />

NNHQ<br />

Annex F Appendix 6<br />

Warranty and support<br />

n.a.<br />

1 NP NP NP Sheet ANWI IDIQ<br />

20.2.4 48 Port Access Switch - RJ45 with uplinks<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.2.5 WLAN Access Point - including 3 year Warranty and support NNHQ n.a. Annex F Appendix 6 1 NP NP NP Sheet ANWI IDIQ<br />

20.2.6 WLAN<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3 Clients<br />

20.3.1 Standard Desktop Client - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.2 Standard Desktop Client<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.3 High Performance Desktop Client - including 3 year Warranty and<br />

NNHQ<br />

support<br />

n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.4 High Performance Desktop Client<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.5 Mobile Client - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.6 Mobile Client<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.7 PDA/SmartPhone - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.8 PDA/SmartPhone<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.9 IP Phone - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.10 IP Phone<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.11 IP Phone Secretariat - including 3 year Warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.12 IP Phone Secretariat<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.13 IPTV endpoint - including 3 year warranty and support NNHQ n.a. Annex I Appendix 6 1 NP NP NP Sheet ANWI IDIQ<br />

-<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-12 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

20.3.14 IPTV endpoint<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.15 2nd Monitor (21") - - including 3 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.16 2nd Monitor (21")<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.17 Monitor Upgrade (24")<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.18 Monitor Upgrade (24") - including 3 year warranty and support NNHQ n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.19 2nd Monitor (24") - including 3 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.20 2nd Monitor (24")<br />

year 4 - 5 Warranty and support<br />

NNHQ<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.21 Softphone Handset - including 3 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.22 Softphone Handset<br />

NNHQ<br />

year 4 - 5 Warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.23 Client Software baseline - including 1 year warranty and support NNHQ n.a. Annex H Appendix 3 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.24 Client Software baseline - year 2 - 5 Warranty and support NNHQ n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.25 UCC Client Software - including 1 year Warranty and support NNHQ n.a. Annex G 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.26 UCC Client Software<br />

year 2-5 warranty and support<br />

NNHQ<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.3.27 Client Provisioning Software Solution - including 1 year Warranty<br />

NNHQ<br />

Annex H Appendix 1-2<br />

and support<br />

n.a.<br />

1 NP NP NP Sheet ANWI IDIQ<br />

20.3.28 Client Provisioning Software Solution<br />

NNHQ<br />

year 2-5 warranty and support<br />

n.a. Annex K Appendix 9 1 NP NP NP Sheet ANWI IDIQ<br />

20.4 Secure Site Communications - TETRA<br />

20.4.1 Handset NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.2 Vehicle-based NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.3 Office-based NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.4 Base Station NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.5 Repeater NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

20.4.6 Mast NNHQ n.a. Annex I Appendix 5 1 NP NP NP Sheet ANWI IDIQ<br />

21 System Administrator Training<br />

21.1 Network Service<br />

21.1.1 Storage (Capacity) Service NNHQ Campus 31-Mar-15 Annex F Appendix 3 1 incl. Training material<br />

21.1.2 Print/Scan Service NNHQ Campus 31-Mar-15 Annex F Appendix 4 1 incl. Training material<br />

21.1.3 Cross Domain Services NNHQ Campus 31-Mar-15 Annex E Appendix 2 1 incl. Training material<br />

21.2 Local Area Network (LAN) Services<br />

21.2.1 Switching Service NNHQ Campus 31-Mar-15 Annex F Appendix 6 1 incl. Training material<br />

21.2.2 Wireless Service NNHQ Campus 31-Mar-15 Annex F Appendix 6 1 incl. Training material<br />

21.2.3 Wireless Blocking Service NNHQ Campus 01-Dec-15 Annex I Appendix 3 1 incl. Training material<br />

21.2.4 GSM Blocking Service NNHQ Campus 01-Dec-15 Annex I Appendix 4 1 incl. Training material<br />

21.3 Unified Communications Capability Services<br />

21.3.1 Voice NNHQ Campus 01-Dec-15 Annex G Appendix 1 1 incl. Training material<br />

21.3.2 VoiceMail NNHQ Campus 01-Dec-15 Annex G Appendix 2 1 incl. Training material<br />

21.3.3 E-Mail NNHQ Campus 01-Dec-15 Annex G Appendix 5 1 incl. Training material<br />

21.3.4 Presence NNHQ Campus 01-Dec-15 Annex G Appendix 9 1 incl. Training material<br />

21.3.5 Instant Messaging NNHQ Campus 01-Dec-15 Annex G Appendix 8 1 incl. Training material<br />

21.3.6 Collaboration (Whiteboard) NNHQ Campus 01-Dec-15 Annex G Appendix 11 1 incl. Training material<br />

21.3.7 Video Tele-Conferencing (VTC) NNHQ Campus 01-Dec-15 Annex G Appendix 4 1 incl. Training material<br />

21.3.8 VMR NNHQ Campus 01-Dec-15 Annex G Appendix 4 1 incl. Training material<br />

21.4 Client Provisioning<br />

21.4.1 Client provisioning service NNHQ Campus 31-Dec-15 Annex H Appendix 3 1 incl. Training material<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-13 of 40<br />

Remarks


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

CLIN Description Delivery place Delivery Date Reference<br />

QTY / Man-<br />

Days<br />

Unit Price<br />

Total Price<br />

Final<br />

Total Price<br />

21.5 Supplementary Services<br />

21.5.1 GSM NNHQ Campus 31-Dec-15 Annex I Appendix 2 1 incl. Training material<br />

21.5.2 IPTV NNHQ Campus 31-Dec-15 Annex I Appendix 6 1 incl. Training material<br />

21.5.3 Security Communications (radio) NNHQ Campus 31-Dec-15 Annex I Appendix 5 1 incl. Training material<br />

Remarks<br />

NATO UNCLASSIFIED<br />

Book II - SSS - Page I-14 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

TCO<br />

Acquisition (ca) Commissioning (cc) Operation (co) Support / Service Fees (cs) TOTAL<br />

TOTAL TCO - - - - -<br />

TCO = ca + cc + co + cs<br />

Cost Type Service Cost CLIN Summation<br />

Cost of Acquisition (CA)<br />

Cost of Commissioning (CC)<br />

Cost of Operation (CO)<br />

SMC - 10<br />

Processing - 8.1, 16.1, 16.2<br />

Storage - 8.2, 16.3, 16.4<br />

Networking - 8.5, 8.6, 16.5<br />

Cross-Domain gateways - 8.7<br />

Network Infrastructure Services - 8.4<br />

Clients & Client provisioning - 11<br />

UCC - 9<br />

Print/Scan Service n.a. n.a.<br />

Remote Sites - 15<br />

IPTV Service - 12.3.2<br />

ITS - 13.2, 13.3<br />

GSM & Blocking - 12.1.2, 12.1.3<br />

(Manpower and other costs related to design/install/commission<br />

Manpower, Software and tools & travel - 1, 2, 3, 4, 5, 6, 7, 12.2, 13(excl 13.2 & 13.3)<br />

(ManPower and Power Cost)<br />

SMC - 18.1.1, 18.1.2, 18.2.1, 18.2.2,18.3.1, 18.3.2, 18.4.1, 18.4.2, 18.5.1, 18.5.2<br />

Processing (including network Infrastructure<br />

and CDGW Services) - 18.1.3, 18.2.3, 18.3.3, 18.4.3, 18.5.3 + Power cost of Processing Sheet & CDGW Sheet<br />

Storage - 18.1.4, 18.2.4, 18.3.4, 18.4.4, 18.5.4 + Power cost of Storage Sheet<br />

Networking - 18.1.6, 18.2.6, 18.3.6, 18.4.6, 18.5.6 + Power cost of Networking Sheet<br />

Clients & Client provisioning (including<br />

Remote sites) - 18.1.8, 18.2.8, 18.3.8, 18.4.8, 18.5.8 + Power cost of Client Sheet<br />

UCC - 18.1.7, 18.2.7, 18.3.7, 18.4.7, 18.5.7<br />

Print/Scan Service - 18.1.5, 18.2.5, 18.3.5, 18.4.5, 18.5.5 + Power cost of Print-Scan Sheet<br />

IPTV Service - 18.1.9, 18.2.9, 18.3.9, 18.4.9, 18.5.9 + Power cost of IPTV Sheet<br />

Cost of Support - Service Fees (CS)<br />

(Support/Maintenance contracts)<br />

SMC - 17.2.33 - 36<br />

Processing - 17.1.1, 17.1.27, 17.2.1, 17.2.30<br />

Storage - 17.1.2, 17.1.28, 17.2.2, 17.2.31<br />

Networking - 17.1.3 - 8, 17.1.29<br />

Cross-Domain gateways - 17.1.9 - 14, 17.2.4 - 9<br />

Network Infrastructure Services - 17.2.3<br />

Clients & Client provisioning - 17.1.15 - 21, 17.1.26, 17.1.30 - 31, 17.2.18 - 27, 17.2.29, 17.2.32<br />

UCC - 17.2.10 - 17<br />

Print/Scan Service - 8.3, 19.1, 19.2, 19.3, 19.4<br />

IPTV Service - 12.3.1, 19.5, 19.6, 19.7, 19.8, 17.1.24<br />

ITS - 17.1.25, 17.2.28<br />

GSM - 12.1.1, 17.1.22 - 23<br />

NATO UNCLASSIFIED<br />

Book II - TCO Calculation - Page I-15 of 40


NATO UNCLASSIFIED<br />

Item Profile Profile Description Day Price Month Price Year price<br />

(Please list all types of manpower resources that are offered for the ANWI Project)<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

1 Senior Project Manager<br />

2 Add Lines - Complete as needed<br />

NATO UNCLASSIFIED<br />

Book II - Manpower Resources - Page I-16 of 40


Item Description Part Number Vendor SOW Reference<br />

1 Printing<br />

CoCo Personal/Workgroup Printer (B/W and Colour) - Yearly<br />

1.1 Service Cost<br />

Annex F Appendix 4<br />

2 Switching<br />

24 Port Access Switch with uplinks- FO - including 3 year<br />

2.1 Warranty and support<br />

Annex F Appendix 6<br />

24 Port Access Switch with uplinks- FO<br />

2.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

48 Port Access Switch - RJ45 with uplinks - including 3 year<br />

2.3 Warranty and support<br />

Annex F Appendix 6<br />

48 Port Access Switch - RJ45 with uplinks<br />

2.4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

WLAN Access Point - including 3 year Warranty and support<br />

Annex F Appendix 6<br />

2.5<br />

WLAN<br />

2.6 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3 Clients<br />

Standard Desktop Client - including 3 year Warranty and<br />

3.1 support Annex H Appendix 3<br />

Standard Desktop Client<br />

3.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

High Performance Desktop Client - including 3 year<br />

3.3 Warranty and support Annex H Appendix 3<br />

High Performance Desktop Client<br />

3.4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3.5 Mobile Client - including 3 year Warranty and support Annex H Appendix 3<br />

Mobile Client<br />

3.6 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3.7 PDA/SmartPhone - including 3 year Warranty and support Annex H Appendix 3<br />

PDA/SmartPhone<br />

3.8 year 4 - 5 Warranty and support Annex K Appendix 9<br />

3.9 IP Phone - including 3 year Warranty and support Annex H Appendix 3<br />

IP Phone<br />

4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

4.1 IP Phone Secretariat - including 3 year Warranty and support Annex H Appendix 3<br />

IP Phone Secretariat<br />

4.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

4.3 IPTV endpoint - including 3 year warranty and support Annex I Appendix 6<br />

IPTV endpoint<br />

4.4 year 4 - 5 Warranty and support Annex K Appendix 9<br />

4.5 2nd Monitor (21") - - including 3 year warranty and support Annex H Appendix 3<br />

2nd Monitor (21")<br />

4.6 year 4 - 5 Warranty and support Annex K Appendix 9<br />

Monitor Upgrade (24")<br />

4.7 year 4 - 5 Warranty and support Annex H Appendix 3<br />

Monitor Upgrade (24") - including 3 year warranty and<br />

4.8 support Annex K Appendix 9<br />

4.9 2nd Monitor (24") - including 3 year warranty and support Annex H Appendix 3<br />

2nd Monitor (24")<br />

5 year 4 - 5 Warranty and support Annex K Appendix 9<br />

5.1 Softphone Handset - including 3 year warranty and support Annex H Appendix 3<br />

Softphone Handset<br />

5.2 year 4 - 5 Warranty and support Annex K Appendix 9<br />

Client Software baseline - including 1 year warranty and<br />

5.3 support Annex H Appendix 3<br />

5.4 Client Software baseline - year 2 - 5 Warranty and support Annex K Appendix 9<br />

UCC Client Software - including 1 year Warranty and support<br />

Annex G<br />

5.5<br />

UCC Client Software<br />

5.6 year 2-5 warranty and support Annex K Appendix 9<br />

Client Provisioning Software Solution - including 1 year<br />

5.7 Warranty and support<br />

Annex H Appendix 1-2<br />

Client Provisioning Software Solution<br />

5.8 year 2-5 warranty and support Annex K Appendix 9<br />

4 Secure Site Communications - TETRA<br />

4.1 Handset Annex I Appendix 5<br />

4.2 Vehicle-based Annex I Appendix 5<br />

4.3 Office-based Annex I Appendix 5<br />

4.4 Base Station Annex I Appendix 5<br />

4.5 Repeater Annex I Appendix 5<br />

4.6 Mast Annex I Appendix 5<br />

NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Quantity - 1 Quantity - 1 > < 50<br />

Quantity - 50 > < 100<br />

Quantity - 50 > < 100<br />

Unit price<br />

Unit price<br />

Unit price<br />

Unit price<br />

Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5<br />

NATO UNCLASSIFIED<br />

Book II - IDIQ Equipment - Page I-17 of 40


CLIN Description Resource type Company<br />

Instructions:<br />

Mandays/U<br />

nit<br />

NATO UNCLASSIFIED<br />

Please list under each Top level CLIN all the resources required for ALL Sub-CLIN's<br />

Manpower resources listed here shall also be listed under the ANWI Manpower Resources sheet<br />

The bidder shall also indentify the company the resource is from. Sub-contractors shall be named.<br />

The bidder shall provide the manpower, Software & Tools and travel prices under the respective headers<br />

Day Price Total Unit price Total Nr Travels Travel Cost<br />

Manpower Software and tools Travel<br />

1 Project Management 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

2 ANWI Service and System Design 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

3 Site Survey 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

4 Testing 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

5 ANWI Implementation and Transition 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

6 ANWI Service and System Operations Processes 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

7 ANWI Service Improvement 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

- -<br />

Add Lines - Complete as needed - -<br />

12.2 Security Communications 0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

-<br />

Add Lines - Complete as needed -<br />

13 Integration and Testing<br />

Service (ITS)<br />

0.00 0.00 0.00<br />

Resource (eg. project Manager,<br />

Software Tool, License Costs)<br />

-<br />

Add Lines - Complete as needed -<br />

TOTAL 0.00 0.00 0.00<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO UNCLASSIFIED<br />

Book II - Implementation - Page I-18 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Ref CLIN Service - Manpower Resource Profile Year 1 Year 2 Year 3 Year 4 Year 5<br />

TOTAL (O&M)<br />

FTE Cost FTE Cost FTE Cost FTE Cost FTE Cost<br />

18.1.1 SMC Service - support<br />

ex. Service desk engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.2 SMC Service - Transition and management<br />

ex. Service level manager - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.3 Processing Service (including Network infrastructure services & CDGW)<br />

ex. Server Administrators - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.4 Storage Service<br />

ex. Storage Administrators - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.6 LAN Service (wired and Wireless)<br />

ex. Network Administrators - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.8 Client Provisioning/Client Devices services (including Remote Sites)<br />

ex. Support engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.7 UCC service<br />

ex. UCC engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.5 Print/Scan Service<br />

ex. Support engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

18.1.9 IPTV Service<br />

ex. Support engineer - - - - - -<br />

Add Lines - Complete as needed - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - Service Operations - Page I-19 of 40


NATO UNCLASSIFIED<br />

SMC Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

SMC - Service Design 10.1 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

SMC - Service Transition 10.2 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

SMC - Service Operations 10.3 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

SMC - Service Improvement 10.4 - - - - - -<br />

Ex. Software ABC 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

TOTAL n.a. - - - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) n.a. n.a. n.a. n.a. n.a. -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - SMC - Page I-20 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Total<br />

Units<br />

Combined Power/<br />

Cooling<br />

Nr of Servers<br />

(Max)<br />

Requirement<br />

(KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Server Hardware<br />

Server Baseline Hardware (ANWI) 8.1.1.1 0 - - - - - -<br />

ANWI Physical Server 0 - - - - - - - - - -<br />

ANWI VM Host Server 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Server SOA Hardware 16.1 0 - - - - - -<br />

ICTM Physical Server 0 0 - - - - - - - - - -<br />

ICTM VM Host Server 0 0 - - - - - - - - - -<br />

Server Software<br />

Server Baseline Software (ANWI) 8.1.2.1 - - - - - -<br />

Virtualisation Software n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

Server SOA Software 16.2 - - - - - -<br />

Virtualisation Software n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

TOTAL 0 0 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Server per FTE<br />

Avg cost per server (year)<br />

#DIV/0!<br />

#DIV/0!<br />

NATO UNCLASSIFIED<br />

Book II - Processing - Page I-21 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Power/<br />

Unit price Year 1 Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Cooling<br />

Requirement<br />

Units TB (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Storage Hardware<br />

Storage Baseline Hardware (ANWI) 8.2.1.1 - - - - - -<br />

SAN Infrastructure 0 n.a. - - - - - - - - -<br />

ANWI Tier 1 Storage 0 0 - - - - - - - - - -<br />

ANWI Tier 2 Storage 0 0 - - - - - - - - - -<br />

ANWI Tier 3 Storage 0 0 - - - - - - - - -<br />

Removable Media 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Storage SOA Hardware 16.3 - - - - - -<br />

SAN Infrastructure - - - - - - - - -<br />

ANWI Tier 1 Storage 0 591 - - - - - - - - - -<br />

ANWI Tier 2 Storage 0 350 - - - - - - - - - -<br />

ANWI Tier 3 Storage 0 1015 - - - - - - - - - -<br />

Removable Media 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Storage Software<br />

Storage Baseline Software (ANWI) 8.2.2.1 - - - - - -<br />

xxxx 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

Storage SOA Software 16.4 - - - - - -<br />

xxxx 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

TOTAL 0 1956 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Cost per TB -<br />

NATO UNCLASSIFIED<br />

Book II - Storage - Page I-22 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Power/ Cooling<br />

Units Ports Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

HARDWARE (Baseline)<br />

Core Switches 8.5.3 - - - - - - -<br />

Core switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Access Switches FO 8.5.1 - - - - - - -<br />

Access Switches FO 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Access Switches PoE 8.5.2 - - - - - - -<br />

Access Switches PoE 0 0 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Server Switches 8.5.4 - - - - - - -<br />

Server Switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Confrence Switching 8.5.5 - - - - - - -<br />

Agnostic switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

WLAN Hardware 8.6.1 - - - - - - -<br />

WLAN Access Points 0 0 - - - - - - - - - -<br />

WLAN Controllers 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

HARDWARE (SOA) 16.5 - - - - - -<br />

Core Switches - - - - - - -<br />

Core switch components 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

Server Switches - - - - - - -<br />

Server Switches 0 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 - - - - - - - - - -<br />

TOTAL 0 0 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower cost - - - - - -<br />

TOTAL - - - - - -<br />

Description Year Month<br />

Cost Per port #DIV/0! #DIV/0!<br />

NATO UNCLASSIFIED<br />

Book II - Networking - Page I-23 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Cross-Domain HW<br />

CDGW 1 Hardware 8.7.1 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 2 Hardware 8.7.3 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 3 Hardware 8.7.5 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 4 Hardware 8.7.7 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 5 Hardware 8.7.9 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

CDGW 6 Hardware 8.7.11 0 - - - - - -<br />

Processing<br />

ANWI Physical Server 0 n.a. - - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Storage<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Networking<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - - -<br />

Cross-Domain SW<br />

CDGW 1 8.7.2 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

TOTAL<br />

NATO UNCLASSIFIED<br />

Book II - CDGW - Page I-24 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 2 8.7.4 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 3 8.7.6 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 4 8.7.8 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 5 8.7.10 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - - - - - - -<br />

CDGW 6 8.7.12 - - - - - -<br />

to be completed 0 n.a. n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - - -<br />

PFE SW<br />

Microsoft OS n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed n.a. n.a. - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a n.a n.a n.a -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost n.a n.a n.a n.a n.a -<br />

TOTAL - - - - - -<br />

TOTAL<br />

NATO UNCLASSIFIED<br />

Book II - CDGW - Page I-25 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Power Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

CLIENTS -HARDWARE<br />

Desktop Client - Standard 11.1.1 1981 - - - - - -<br />

Desktop Client 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Desktop Client - High Perf 11.1.2 162 - - - - - -<br />

Desktop Client 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Desktop Client - Agnostic 11.1.3 284 - - - - - -<br />

Desktop Client 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Mobile Client 11.1.4 1600 - - - - - -<br />

Mobile Client - Laptop 0 - - - - - - - - - -<br />

Mobile Client - Tablet 0 - - - - - - - - - -<br />

Docking solution 0 - - - - - - - - - -<br />

TFT Monitor 0 - - - - - - - - - -<br />

Multimedia Keyboard 0 - - - - - - - - - -<br />

Mouse 0 - - - - - - - - - -<br />

Smart-Card Reader 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Smartphone/PDA 11.1.5 573 - - - - - -<br />

Smartphone/PDA 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

UCC phone - Standard 11.1.6 493 - - - - - -<br />

UCC Phone 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

UCC phone - Secretarial 11.1.7 246 - - - - - -<br />

UCC secretatial phone 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

CLIENTS -SOFTWARE<br />

Client Provisioning 11.2.10 - - - - - -<br />

Client provisioning SW 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

Desktop Client - Standard 11.2.1 1981 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Desktop Client - High Performance 11.2.2 162 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Desktop Client - Agnostic 11.2.3 284 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Mobile Client 11.2.4 1600 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO UNCLASSIFIED<br />

Book II - Clients - Page I-26 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Power Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

Smartphone/PDA 11.2.5 573 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. n.a.<br />

IP Phone 11.2.6 493 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

IP Phone Secretarial 11.2.7 246 - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

UCC Client Software 11.2.8 - - - - - - -<br />

UCC Softphone Client 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

IPTV Client Software 11.2.9 - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

TOTAL 5339 - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Average Cost per client (year) -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO UNCLASSIFIED<br />

Book II - Clients - Page I-27 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units<br />

clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

Infrastructure Services 8.4.1 - - - - - -<br />

NAC Software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

TOTAL - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.12€ KW/h) n.a. n.a. n.a. n.a. n.a. -<br />

Manpower Cost n.a. n.a. n.a. n.a. n.a. -<br />

TOTAL - - - - - -<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units<br />

clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

UCC Services<br />

Voice & Voicemail 9.1.1 - - - - - -<br />

xxxx 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

E-mail 9.2.1 - - - - - -<br />

E-mail software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

Fax Service 9.3.1 - - - - - -<br />

Fax software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 - n.a. - - - - - - - - -<br />

IM/Chat Service 9.4.1 - - - - - -<br />

IM/Chat software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

Presence Service 9.5.1 - - - - - -<br />

Presence software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

UCC Directory Service 9.6.1 - - - - - -<br />

Presence software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

Collaboration Service 9.7.1 - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - Applications - Page I-28 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Ref Quantity<br />

Combined Unit Price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

supported Power/ Cooling<br />

Units<br />

clients Requirement<br />

Procurement Support Support Support Support Support Procurement Support<br />

collaboration software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

Unified Messaging and Mobility<br />

Service 9.8.1 - - - - - -<br />

UM software 0 0 n.a. - - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

ex. Microsoft License n.a. n.a. - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

TOTAL - - - - - - - - - - -<br />

Summary Table for UCC Service<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO UNCLASSIFIED<br />

Book II - Applications - Page I-29 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1 Year 2 Year 3 Year 4 Year 5 Total<br />

Units<br />

n.a.<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

(KW/H per year)<br />

Service Cost/<br />

per Unit- Page<br />

Service Cost/<br />

per Unit- Page<br />

Service Cost/<br />

per Unit-<br />

Page<br />

Service Cost/<br />

per Unit- Page<br />

Service Cost/ per<br />

Unit- Page<br />

Lifecycle<br />

(5 year)<br />

Print/Scan Baseline<br />

Print/Scan service MFP printer 8.3.1 187 n.a. - - - - -<br />

CoCo Print Server - n.a. n.a. n.a. n.a. n.a. n.a n.a.<br />

CoCo MFP Colour printer - n.a. n.a. n.a. n.a. n.a. n.a n.a.<br />

Add Lines - Complete as needed - - - - - - - -<br />

-<br />

Pay-per-page - - - - -<br />

Price per page B/W 8.3.2 7,000,000.00 n.a. n.a. n.a. - - - - - -<br />

Price per page Colour 8.3.3 3,000,000.00 n.a. n.a. n.a. - - - - - -<br />

n.a. n.a. - -<br />

TOTAL 0 - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement n.a. n.a. n.a. n.a. n.a. -<br />

Usage (Pages) - - - - - -<br />

Service Fee - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - Print-Scan - Page I-30 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Total<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

IPTV Service<br />

IPTV Endpoints 12.3.2 - - - - - - -<br />

60" display screens with integrated<br />

IPTV media player 425 - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Service Fee - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

Total<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

(KW/H per unit per<br />

Units year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

GSM Service<br />

GSM Blocking 12.1.2 - - - - - - -<br />

GSM Blocking Equipment 1 - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

WLan Blocking 12.1.3 - - - - - - -<br />

WLan Blocking Equipment 1 - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Service Fee - NP NP NP NP -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost n.a. n.a. n.a. n.a. n.a. -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - Other Systems - Page I-31 of 40


NATO UNCLASSIFIED<br />

Description Partnumber Vendor SSS Reference Quantity<br />

Unit price Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Total<br />

Combined Power/<br />

Cooling<br />

Requirement<br />

Units (KW/H per year)<br />

Procurement Support Support Support Support Support Procurement Support<br />

ITS Hardware<br />

Hardware 13.2 0 - - - - - -<br />

Servers - - - - - - - - - - -<br />

Storage - - - - - - - - - - -<br />

Networking (including ITS Cabling) - - - - - - - - - - -<br />

Cross-domain Components - - - - - - - - - - -<br />

Client Infrastructure - - - - - - - - - - -<br />

Print Scan - - - - - - - - - - -<br />

IPTV - - - - - - - - - - -<br />

Add Lines - Complete as needed - - - - - - - - - - -<br />

Server Software<br />

Software 13.3 - - - - - -<br />

Virtualisation Software - n.a. - - - - - - - - -<br />

Add Lines - Complete as needed n.a. - - -<br />

PFE SW<br />

ex. Microsoft License n.a. - - - - - - - -<br />

Add Lines - Complete as needed - n.a. - - - - - - - - -<br />

TOTAL - - - - - - - - -<br />

ITS Test Support and sustainment<br />

Manpower 13.4.2 n.a. - - - - -<br />

System Engineer - n.a. - - - - - - - - -<br />

Add Lines - Complete as needed - n.a. - - - - - - - - -<br />

TOTAL - n.a. - - - - - - -<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - n.a. n.a. n.a. n.a. -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost - - - - - -<br />

TOTAL - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - ITS - Page I-32 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

Description Partnumber Vendor SSS REF Quantity<br />

Combined Power<br />

Year 1<br />

Year 2 Year 3 Year 4 Year 5<br />

TOTAL<br />

Requirement<br />

Units (KW/H per year) Unit Price Procurement Support Support Support Support Support Procurement Support<br />

Remote Locations - Hardware - -<br />

Location 1 15.1 - - - - - - - -<br />

NS Workstation 5 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 2 15.2 - - - - - - - -<br />

NS Workstation 2 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 3 15.3 - - - - - - - -<br />

NS Workstation 4 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 4 15.4 - - - - - - - -<br />

NS Workstation 2 - - - - - - - - - -<br />

NR Workstation 30 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Location 5 15.5 - - - - - - - -<br />

NS Workstation 2 - - - - - - - - - -<br />

NR Workstation 30 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Travel Kits - Clients Hardware 11.1.8 - - - - - - - -<br />

NS mobile client 1 - - - - - - - - - -<br />

Small formfactor printer 1 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Travel Kits - Back-end Equipment 11.1.9 - - - - - - - -<br />

VPN Concentrator 0 - - - - - - - - - -<br />

Switching 0 - - - - - - - - - -<br />

Add Lines - Complete as needed 0 - - - - - - - - - -<br />

Remote Locations - Software - -<br />

Location 1 15.1 - - - - - - - -<br />

Add Lines - Complete as needed 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 2 15.2 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 3 15.3 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 4 15.4 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Location 5 15.5 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

Travel Kits - Clients Software 11.2.11 - - - - - - - -<br />

Add Lines - Complete as needed 0 0 n.a. - - - - - - - - -<br />

PFE SW<br />

NATO Desktop n.a. n.a. NATO PFE<br />

TOTAL 77 - - - - - - - - -<br />

NATO UNCLASSIFIED<br />

Book II - Remote Sites - Page I-33 of 40


NATO UNCLASSIFIED<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

COSTS Year 1 Year 2 Year 3 Year 4 Year 5 TOTAL<br />

Procurement - - - - - -<br />

Support - - - - - -<br />

Power (@0.1182€ KW/h) - - - - - -<br />

Manpower Cost n.a n.a n.a n.a n.a -<br />

TOTAL - - - - - -<br />

Average Cost per client (year) -<br />

NATO UNCLASSIFIED<br />

Book II - Remote Sites - Page I-34 of 40


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

ICTM<br />

1 ICTM-Ops Manager 1 Manage ICTM-Ops ITIL, Senior ICT manager, PRINCE2<br />

2 ICTM-Ops Change Manager 1 Change Management process owner ITIL expert<br />

3 ICTM-Ops Configuration Manager 1 CM process owner ITIL expert<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

4 ICTM-Ops-Systems Mngt Manager 1 Manage ICTM-Ops-Systems Management team Managerial level infosec knowledge<br />

5 ICTM-Ops-Systems Mngt Infosec Analyst 5<br />

Infosec operations, operate the ICT security<br />

systems, respond to Infosec incidents<br />

6 ICTM-Ops-Network Mngt Manager 1 Manage ICTM-Ops Network Management<br />

7 ICTM-Ops-Network Mngt Network Engineer 1<br />

Project related network engineering work. 3rd line<br />

network management support<br />

8 ICTM-Ops-Network Mngt Network Analysts 2 1st & second line network management support<br />

LRE CPE installation, 1st line support, modifying<br />

wiring, install new wiring & patch panels, mounting<br />

9 ICTM-Ops-Network Mngt Network Data Cabling Engineer 2 physical equipment<br />

1 Senior and 4 professional level Infosec product<br />

specialists. Operate and set up infosec systems. Detect<br />

security incidents. By analysing usage patterns.<br />

Senior network engineering level knowledge (LAN<br />

switches, routers, firewall, media conversion, cable<br />

management, network management, voice, VOIP, WAN).<br />

PRINCE2, ITIL<br />

Senior network engineering level knowledge (LAN<br />

switches, routers, firewall, media conversion, cable<br />

management, network management, voice). PRINCE2,<br />

ITIL.<br />

Professional level network engineering knowledge (LAN<br />

switches, routers, firewall, media conversion, cable<br />

management, network management). ITIL<br />

Junior LAN engineer, Cabling techniologies (F.O.,<br />

structured cabling, coax) including measurement (OTDR,<br />

UTP). Cabling management system.<br />

10 ICTM-Ops-Network Mngt Senior Voice Engineer 2 1st and 2nd line support, PABX system changes<br />

Senior level TDM-based PABX knowledge (Philips Sopho<br />

30xx series), voice mail system, tarification system.<br />

11 ICTM-Ops-Network Mngt junior Voice Engineer 2 1st line voice support, voice installations (IMAC)<br />

Manage & maintain conference room AV and<br />

ICTM-Ops-Mulimedia<br />

interpretation systems, supporting events on and<br />

12 Systems Mngt Multimedia Engineer 3 off site.<br />

Management and support on databases and<br />

Junior level TDM-based PABX knowledge (Philips Sopho<br />

30xx series), voice mail system, tarification system.<br />

Senior level AV technical knowledge.<br />

13 ICTM-Ops-Database Support Database Administrator 2 related infrastructure.<br />

Advanced DBA & system administrator, MS SQL, Oracle<br />

Manage the Service Center organisation, ITIL, Incident & problem management, professional ICT<br />

14 ICTM-Ops-Service Center Manager/Deputy Manager 2 commmunicate with end users<br />

management level<br />

ICTM-Ops-Service Center-<br />

15 Service Desk Team Leader 2 Trouble shooting Broad ICT knowledge<br />

ICTM-Ops-Service Center-<br />

16 Service Desk Senior Analyst 1 Trouble shooting Broad ICT knowledge<br />

ICTM-Ops-Service Center-<br />

17 Service Desk Analyst 2 Trouble shooting Broad ICT knowledge<br />

ICTM-Ops-Service Center-<br />

18 Service Desk Junior Analyst 3 Call intake, Resolve majority calls Broad ICT knowledge<br />

Patching, Software deployment, User<br />

ICTM-Ops-Service Center-<br />

administration, Workstation manegment and Altiris knowledge, Deep Active Directory & Microsoft OS,<br />

19 Workst SW Mngt Team Leader 1 image development<br />

network administration knowledge<br />

20<br />

21<br />

ICTM-Ops-Service Center-<br />

Workst SW Mngt Senior Analyst 2<br />

ICTM-Ops-Service Center-<br />

IMAC Team Leader 1<br />

Patching, Software deployment, User<br />

administration, Workstation manegment and<br />

image development<br />

Workstation staging & repair, end user equipment<br />

deployment<br />

Altiris knowledge, Deep Active Directory & Microsoft OS,<br />

network administration knowledge<br />

ICT hardware knowledge, client OS knowledge, Altiris<br />

experience, AD experience<br />

NATO UNCLASSIFIED<br />

Book II - Manpower (ICTM) - Page I-35 of 40


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

ICTM-Ops-Service Center-<br />

Workstation staging & repair, end user equipment ICT hardware knowledge, client OS knowledge, Altiris<br />

22 IMAC Analyst 7 deployment<br />

experience, AD experience<br />

23 ICTM-Ops-Server Mngt Manager 1<br />

Manage the Server & Security systems team.<br />

Deputise for Head ICTM OPS. Role in projects<br />

related to servers & storage.<br />

ITIL, PRINCE2, ICT manager, senior system<br />

administrator, storage management, VM Ware<br />

virtualisation, multi-vendor servers management<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

24 ICTM-Ops-Server Mngt Server Support Assistant 3<br />

Manage continuously the server, storage and<br />

virtualisation environment as well as related<br />

services e.g. Blackberry. Trouble ticket resolution.<br />

Professional level system administrator, multi-vendor<br />

server management, VM Ware<br />

Manage continuously the server, storage and<br />

25 ICTM-Ops-Server Mngt Junior Server Support Assistant 2<br />

virtualisation environment as well as related<br />

services e.g. Blackberry. Trouble ticket resolution.<br />

Junior system administrator, multi-vendor server<br />

management, VM Ware<br />

26 ICTM-Arch Mngt Infrastructure Architect 2<br />

Infrastructure & ICT security related architecture<br />

development<br />

NAF, ICT security architecture training, deep<br />

infrastructure & ICT security knowledge<br />

27 ICTM-Arch Mngt CAM Engineer 1 Design of server & storage solutions MCSE, senior level server & storage knowledge<br />

Sub-total ICTM 54<br />

COMMCEN<br />

47 COMMCEN-Video VTC-Technican 3<br />

48 COMMCEN-Video VTC-Operator 3<br />

49 COMMCEN-Video VTC-Planner 2<br />

Technical analysis of functional business<br />

requirements;<br />

Develop, install & maintain VTC solutions (NGCS<br />

and NON NGCS);<br />

Develop, install & maintain AV systems (NGCS<br />

and NON NGCS);<br />

Provide support as Second line Service Desk.<br />

Prepare, test & monitor VTC sessions (NGCS and<br />

NON NGCS)<br />

Book and plan VTC request (NGCS and NON<br />

NGCS)<br />

Support VTC Testing<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of VTC and AV systems<br />

Knowledge of ICT architectural design<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of ICT<br />

Knowledge of VTC and AV systems<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of VTC and AV systems<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

50 COMMCEN-Voice System-Engineer 3<br />

51 COMMCEN-Data Client Support Technician 2<br />

Install, Maintain and Support all Voice systems<br />

under Combranch Authority (in NGCS and NON<br />

NGCS);<br />

Update and Keying of all Secure Voice Systems<br />

(NGCS and NON NGCS);<br />

Provide support as Second line Service Desk<br />

Support all Client orientated Software/hardware<br />

applications under Combranch authority;<br />

Provide support as Second line Service Desk.<br />

Knowledge of Voice communications (Analogue, digital<br />

and VOIP)<br />

Knowledge in Data communications (Analogue, digital<br />

and IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

ADP Processing, office automation tools<br />

Knowledge of common OS<br />

System related knowledge of NATO Infosec regulations<br />

NATO UNCLASSIFIED<br />

Book II - Manpower (ICTM) - Page I-36 of 40


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

Technical analysis of functional business<br />

requirements<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Develop, install & maintain local and remote LANs Knowledge of common OS<br />

under Combranch authority;<br />

Knowledge of Server administration<br />

52 COMMCEN-Data LAN Manager 2<br />

Provide support as Second line Service Desk. Knowledge of Network administration<br />

Knowledge of programming network devices<br />

Knowledge in DATA Communication (IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

53 COMMCEN-Data Network Engineer 2<br />

54 COMMCEN-Data Software Developper 2<br />

Technical analysis of functional business<br />

requirements;<br />

Support all WAN services under Combranch<br />

authority;<br />

Provide support as Second line Service Desk.<br />

Technical analysis of functional business<br />

requirements;<br />

Develop, install & maintain Software Applications<br />

under Combranch authority;<br />

Provide support as Second line Service Desk.<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of common OS<br />

Knowledge of Server administration<br />

Knowledge of Network administration<br />

Knowledge of programming network devices<br />

Knowledge in DATA Communication (IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of ICT<br />

ADP Processing, office automation tools<br />

Knowledge of common OS<br />

Knowledge of Common programming languages &<br />

webdesign<br />

System related knowledge of NATO Infosec regulations<br />

55 COMMCEN-COMCEN Communication Technician 7<br />

56 COMMCEN-COMCEN Communication Service Desk Operator 7<br />

Operate and maintain all NGCS and NON-NGCS<br />

systems installed in NATO HQ (24/7);<br />

Deliver service desk services and first line support<br />

for all communication systems under Combranch<br />

authority;<br />

Supervise, monitor and troubleshoot on all NGCS<br />

and NON NGCS transmission trunks and/or<br />

circuits;<br />

Install,configurate and program all NGCS Crypto<br />

Equipment including Key changes.<br />

Operate NATO HQ's Military Message Handling<br />

System and distribution on NON-NGCS in the HQ<br />

(24/7);<br />

Deliver service desk services and first line support<br />

for all communication systems under Combranch<br />

authority;<br />

Operate the NATO HQ private Switchboard<br />

outside normal business hours (24/7);<br />

Deliver transport services within the Combranch<br />

outside business hours.<br />

Knowledge of Voice communications (Analogue, digital<br />

and VOIP)<br />

Knowledge in Data communications (Analogue, digital<br />

and IP)<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Knowledge of formal Msg handling and distribution<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

NATO UNCLASSIFIED<br />

Book II - Manpower (ICTM) - Page I-37 of 40


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

57 COMMCEN-COMCEN COMCEN Duty Communication Officer 7<br />

58 COMMCEN-COMCEN Dept Head COMCEN 1<br />

59 COMMCEN-COMCEN Head COMCEN 1<br />

60 COMMCEN-PABX PABX Operator Assistant 2<br />

Supervises, operates and support all<br />

Communication Center activities<br />

Deliver service desk services and first line support<br />

for all communication systems under Combranch<br />

authority, including maintaining an incident<br />

reporting database (24/7);<br />

Maintain the 24/7 facilities in coordination with BE<br />

Administration section outside business hours<br />

Participate in managing daily operations of the<br />

Comcentre, including PABX and Service Desk;<br />

Support quality assurance of all Comcentre<br />

services and take the appropiate actions if<br />

required;<br />

Support the daily people management in the<br />

Comcentre;<br />

Support the planning for training activities to bring<br />

and keep all Comcentre staff at the required<br />

quality level;<br />

Participate in overviewing issue and incident<br />

reporting and initiate problem requests when<br />

appropriate<br />

Manage daily operations of the Comcentre,<br />

including PABX and Service Desk<br />

Guarantee the quality assurance of all Comcentre<br />

services and take the appropiate actions if<br />

required;<br />

Take care of daily people management in the<br />

Comcentre;<br />

Plan training activities to bring and keep all<br />

Comcentre staff at the required quality level;<br />

Overview issue and incident reporting and initiate<br />

problem requests when appropriate.<br />

Operates the NATO Telephone Switchboard<br />

during business hours<br />

Knowledge of ACP 127<br />

Knowledge of formal Msg handling and distribution<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Leadership capacities<br />

Administration processes<br />

Knowledge of ACP 127<br />

Knowledge of formal Msg handling and distribution<br />

Knowledge of SLA management<br />

Leadership capacities<br />

Administration processes<br />

Knowledge of ACP 127<br />

Knowledge of formal Msg handling and distribution<br />

ADP Processing, office automation tools<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

61 COMMCEN-PABX PABX Operator 2<br />

Operates the NATO Telephone Switchboard<br />

during business hours<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

NATO UNCLASSIFIED<br />

Book II - Manpower (ICTM) - Page I-38 of 40


NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

Maintain all contacts with the business units on<br />

communication service delivery, including user<br />

requirements gathering for new systems and<br />

system modifications.<br />

Administrate SLA management between the<br />

Combranch and the business units or other<br />

62<br />

COMMCEN- Comms<br />

service providers.<br />

Business Demand and Quality Assurance 3<br />

Supporting Services<br />

Coordination and development of test procedures<br />

in support of system acceptance and/or<br />

accreditation.<br />

Deliver administrative support for standardization<br />

of internal processes.<br />

Deliver administrative support for standardization<br />

of internal processes.<br />

63<br />

64<br />

65<br />

COMMCEN- Comms<br />

Supporting Services<br />

COMMCEN- Comms<br />

Supporting Services<br />

COMMCEN- Comms<br />

Supporting Services<br />

Communication Security Administrator 1<br />

Crypto Custodian 2<br />

Logistic, Contracting and Infra Administrator 2<br />

Sub-total COMMCEN 54<br />

66 PASP-ACCS Sr Programmer/Analyst 1<br />

67 PASP-ACCS Programmer/Analyst 2<br />

Drafts and evaluates all security documents<br />

related to systems under Combranch Authority;<br />

Deliver support in security acreditation testing<br />

procedures.<br />

Manage and control all NATO HQ CCI - Mat<br />

(including Key-distribution and destruction)<br />

Administrate security clearances for Combranch<br />

staff;<br />

Controls all assigned subaccounts<br />

Deliver Logistic Support for NATO HQ's NGCS:<br />

Control and inventory of all NGCS material,<br />

including administation, and maintaining records<br />

on all transactions including repair, calibration and<br />

inventory;<br />

Deliver Logistic Support to NATO HQ's NON-<br />

NGCS: Control and inventory of all NON-NGCS<br />

material, including administration and maintaining<br />

records on all transactions including repair and<br />

inventory;<br />

Budget Planning: Participate in the budget<br />

planning process by administrating the different<br />

budget lines allocated to the Combranch;<br />

Budget Execution: Participate in the procurement<br />

process by prospecting and administation of<br />

procurement processes;<br />

Administrate and monitor all NON-NGCS<br />

maintenance contacts;<br />

Administer and request maintenance works on<br />

space allocated to the Combranch including office<br />

furniture<br />

PASP<br />

Senior programmer & system analyst, DBA,<br />

network administrator, security officer, application<br />

support, meeting support for Data Management<br />

Experts Group<br />

Programmer/Analyst, deputise the roles of the<br />

above, application support, meeting support for<br />

Data Management Experts Group.<br />

Knowledge of business requirement gathering processes<br />

Knowledge of Program Management Methodologies<br />

Knowledge of SLA management<br />

ADP Processing, office automation tools<br />

ADP Processing, office automation tools<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of NATO security policies & processes<br />

System related knowledge of NATO Infosec regulations<br />

Knowledge of Crypto systems & procedures<br />

Budgetary and costing model processes<br />

Administration processes<br />

SME on treaty & arms control. Professional database<br />

administration, network administration, system<br />

administration. ITIL, PRINCE2 (scheduled)<br />

SME on treaty & arms control. Professional database<br />

administration, network administration, system<br />

administration.<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO UNCLASSIFIED<br />

Book II - Manpower (ICTM) - Page I-39 of 40


68 PASP-ACCS Junior engineer 1<br />

Sub-total PASP 4<br />

NATO UNCLASSIFIED<br />

Nr Org Unit Job Type Nr Staff Main Activities Skill level<br />

Taking back-ups, staging of equipment meeting<br />

support for Data Management Experts Group.<br />

Professional level system development, professional level<br />

hardware & OS software, system administration.<br />

IFB-CO-13300-ANWI-AMD-2<br />

Part I - Schedule of Supplies and Services<br />

NATO UNCLASSIFIED<br />

Book II - Manpower (ICTM) - Page I-40 of 40


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

NATO COMMUNICATIONS AND INFORMATION<br />

AGENCY<br />

IFB-CO-13300-ANWI<br />

NEW NATO HEADQUARTERS<br />

ACTIVE NETWORK INFRASTRUCTURE<br />

(NNHQ - ANWI)<br />

BOOK II – PART IV<br />

STATEMENT OF WORK<br />

VERSION 03<br />

(issued under IFB Amendment No.2)<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-i


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 1. REFERENCE DOCUMENTS ....................................................................... 1<br />

1.1 Applicable Documents ................................................................................................. 1<br />

1.1.1 NATO ................................................................................................................... 1<br />

1.1.2 Non-NATO ........................................................................................................... 5<br />

SECTION 2. INTRODUCTION .......................................................................................... 6<br />

2.1 Purpose ......................................................................................................................... 6<br />

2.2 Background .................................................................................................................. 6<br />

2.3 Scope ............................................................................................................................ 7<br />

2.3.1 Geographic Scope ................................................................................................. 7<br />

2.3.2 Functional Scope ................................................................................................... 7<br />

2.3.3 Service Provisioning Model .................................................................................. 7<br />

2.3.4 Overview of Deliverables ..................................................................................... 8<br />

2.4 NNHQ Key Programme Planning Factors ................................................................... 9<br />

2.5 Statement of Work (SOW) Organisation ................................................................... 10<br />

SECTION 3. HIGH LEVEL ANWI STRATEGIC REQUIREMENTS ........................... 12<br />

3.1 ANWI Business Benefits ........................................................................................... 12<br />

3.2 Overall NNHQ Programme Structure ........................................................................ 12<br />

3.3 High Level ANWI Strategic Principles ..................................................................... 13<br />

3.4 NNHQ Users .............................................................................................................. 13<br />

3.5 Security Domains ....................................................................................................... 14<br />

3.6 High Availability ........................................................................................................ 14<br />

3.7 Life-Cycle and Innovation ......................................................................................... 15<br />

3.7.1 Life-Cycle ........................................................................................................... 15<br />

3.7.2 Innovation ........................................................................................................... 16<br />

3.7.3 Capability to Service Evolution .......................................................................... 17<br />

3.7.4 Service Level Management (SLM)..................................................................... 17<br />

3.7.5 Service Provisioning Models .............................................................................. 18<br />

3.7.6 Contractor ICT Support Following Acceptance ................................................. 19<br />

3.8 Design ........................................................................................................................ 19<br />

3.9 Interfacing with NATO Provided Services ................................................................ 22<br />

3.10 Implementation .......................................................................................................... 23<br />

3.10.1 General ................................................................................................................ 23<br />

3.10.2 Site Survey .......................................................................................................... 24<br />

3.10.3 Installation ........................................................................................................... 24<br />

3.10.4 Migration and Interoperability ............................................................................ 24<br />

3.10.5 Service Provisioning ........................................................................................... 24<br />

3.10.6 Training ............................................................................................................... 26<br />

3.10.7 Testing & Acceptance ......................................................................................... 27<br />

3.10.8 Support ................................................................................................................ 27<br />

3.10.9 Total Cost of Ownership (TCO) Assessment ..................................................... 28<br />

3.11 Integration and Testing Services ................................................................................ 28<br />

3.12 Nations and Partners .................................................................................................. 28<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-ii


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-iii<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 4. PROJECT MANAGEMENT ....................................................................... 29<br />

4.1 Introduction ................................................................................................................ 29<br />

4.2 Organisation ............................................................................................................... 29<br />

4.2.1 Purchaser Project Organisation and Responsibilities.......................................... 29<br />

4.2.2 ANWI Contractor Project Management Office .................................................. 29<br />

4.2.3 ANWI Project Manager (PM)............................................................................. 30<br />

4.2.4 ANWI Technical Lead (TL) ............................................................................... 31<br />

4.2.5 ANWI Test Director (TD)................................................................................... 32<br />

4.2.6 Key Supporting Staff .......................................................................................... 33<br />

4.3 Project Management Documentation ......................................................................... 33<br />

4.4 Project Controls .......................................................................................................... 34<br />

4.4.1 Stages and Transition .......................................................................................... 34<br />

4.4.2 Change Management .......................................................................................... 35<br />

4.4.3 Change Requests ................................................................................................. 36<br />

4.4.4 Off-Specifications ............................................................................................... 36<br />

4.5 Project-Level Communications .................................................................................. 36<br />

4.5.1 General ................................................................................................................ 36<br />

4.5.2 Formal Meetings ................................................................................................. 36<br />

4.5.3 Informal Meetings ............................................................................................... 38<br />

4.5.4 Project Status Reports ......................................................................................... 38<br />

4.5.5 Project Web Space .............................................................................................. 38<br />

SECTION 5. ANWI SERVICE AND SYSTEM DESIGN ............................................... 40<br />

5.1 General ....................................................................................................................... 40<br />

5.2 Preliminary Design Review (PDR) Meeting ............................................................. 40<br />

5.3 Design Document Package ........................................................................................ 41<br />

5.3.1 General ................................................................................................................ 41<br />

5.3.2 Design Document ................................................................................................ 41<br />

5.3.3 Service Interface Profiles (SIPs) ......................................................................... 45<br />

5.3.4 Security Design & Accreditation ........................................................................ 45<br />

5.3.5 Change Request Log ........................................................................................... 45<br />

5.3.6 Off-Specification Document ............................................................................... 46<br />

5.3.7 Requirements Traceability and Changes ............................................................ 46<br />

5.4 Service Management Design ..................................................................................... 46<br />

5.5 Integrated Test Service (ITS) Design ......................................................................... 46<br />

5.6 Critical Design Review (CDR) .................................................................................. 46<br />

5.7 Critical Design Review (CDR) Feedback Meeting .................................................... 47<br />

5.8 Acceptance of the Design Document ......................................................................... 48<br />

SECTION 6. ANWI IMPLEMENTATION AND TRANSITION .................................... 49<br />

6.1 General ....................................................................................................................... 49<br />

6.2 Transition Planning and Support Process .................................................................. 50<br />

6.3 Change Management .................................................................................................. 50<br />

6.3.1 General ................................................................................................................ 50<br />

6.3.2 Types of Service Change .................................................................................... 51


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-iv<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.3.3 Change Requests ................................................................................................. 51<br />

6.3.4 Change Process ................................................................................................... 51<br />

6.3.5 Change Advisory Board (CAB).......................................................................... 51<br />

6.3.6 Change Models ................................................................................................... 51<br />

6.3.7 Change Remediation ........................................................................................... 51<br />

6.4 Service Asset and Configuration Management .......................................................... 52<br />

6.5 Release and Deployment Management Process ......................................................... 52<br />

6.5.1 Release and Deployment Management Process ................................................. 52<br />

6.5.2 Release and Deployment Planning Phase ........................................................... 53<br />

6.6 Accreditation Documentation .................................................................................... 56<br />

6.6.1 Security Risk Assessment ................................................................................... 56<br />

6.6.2 Security Documentation ...................................................................................... 56<br />

6.6.3 Server Security Roles .......................................................................................... 56<br />

6.7 Release Build and Test Phase .................................................................................... 56<br />

6.8 Testing ........................................................................................................................ 57<br />

6.8.1 General ................................................................................................................ 57<br />

6.8.2 Capability Acceptance Testing (CAT)................................................................ 58<br />

6.8.3 Proof of Concept Testing (PCT) ......................................................................... 59<br />

6.8.4 Service Certification Tests (SCT)....................................................................... 59<br />

6.8.5 System Activation Testing (SAT)....................................................................... 60<br />

6.8.6 Final Site Testing (FST)...................................................................................... 60<br />

6.8.7 Security Implementation Verification Procedures (SIVP).................................. 60<br />

6.8.8 Requirements Traceability Matrix ...................................................................... 61<br />

6.8.9 Test Failures ........................................................................................................ 61<br />

6.8.10 System Off-Specifications .................................................................................. 62<br />

6.9 Integration and Testing Service (ITS) ........................................................................ 63<br />

6.10 Deployment ................................................................................................................ 64<br />

6.10.1 General ................................................................................................................ 64<br />

6.10.2 Delivery of Equipment ........................................................................................ 64<br />

6.10.3 Preparations for Installation ................................................................................ 67<br />

6.10.4 Capability and Service Implementation .............................................................. 67<br />

6.10.5 Installation Back Out .......................................................................................... 69<br />

6.10.6 ANWI Service Activation ................................................................................... 70<br />

6.10.7 ANWI System Activation Testing ...................................................................... 70<br />

6.10.8 Physical Configuration Audits ............................................................................ 71<br />

6.10.9 On-Site Training ................................................................................................. 71<br />

6.10.10 Migration to the ANWI Environment ................................................................. 72<br />

6.10.11 ICT Migration Key Milestones ........................................................................... 74<br />

6.10.12 ANWI Contractor Task ....................................................................................... 74<br />

6.10.13 Migration Concept and Business Principles ....................................................... 77<br />

6.11 Review and Close ....................................................................................................... 77<br />

6.12 Knowledge Management ........................................................................................... 77<br />

6.13 Initial Operating Capability (IOC milestone) ............................................................ 78<br />

6.13.1 ANWI System Activation Testing ...................................................................... 78


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.13.2 ANWI Site Activation ......................................................................................... 79<br />

6.13.3 “As Built” Drawings and Documentation ........................................................... 79<br />

6.14 Initial Operating Capability (IOC) Acceptance ......................................................... 79<br />

6.15 Final Operating Capability (FOC milestone) ............................................................. 80<br />

6.16 Final Operating Capability (FOC) Acceptance .......................................................... 80<br />

6.17 Final System Acceptance (FSA milestone) ............................................................... 81<br />

SECTION 7. ANWI SERVICE AND SYSTEM OPERATIONS ..................................... 82<br />

7.1 ITIL Service Operation .............................................................................................. 82<br />

7.2 ANWI Service Operation Functions .......................................................................... 82<br />

7.2.1 Support Overview ............................................................................................... 82<br />

7.2.2 First Level Support ............................................................................................. 82<br />

7.2.3 Second Level Support ......................................................................................... 82<br />

7.2.4 Third Level Support ............................................................................................ 83<br />

7.2.5 ITIL Mapping ...................................................................................................... 83<br />

7.2.6 Service Desk ....................................................................................................... 83<br />

7.2.7 Technical Management ....................................................................................... 84<br />

7.2.8 IT Operation Management .................................................................................. 84<br />

7.3 ANWI Service Operations Processes ......................................................................... 84<br />

7.3.1 Incident Management .......................................................................................... 84<br />

7.3.2 Problem Management ......................................................................................... 85<br />

7.3.3 Request Fulfilment .............................................................................................. 86<br />

7.3.4 Access Management ........................................................................................... 86<br />

7.3.5 Event Management ............................................................................................. 87<br />

7.4 ANWI Operational Support ....................................................................................... 89<br />

7.4.1 Operational Support ............................................................................................ 89<br />

7.4.2 Operational Procedures/Operating Instructions .................................................. 92<br />

7.4.3 Monitor and Control ........................................................................................... 93<br />

7.4.4 Life-Cycle Support .............................................................................................. 93<br />

SECTION 8. ANWI SERVICE IMPROVEMENT ........................................................... 95<br />

8.1 ANWI Service Improvement Purpose ....................................................................... 95<br />

8.2 ANWI CSI Assumptions ............................................................................................ 95<br />

8.3 CSI Register ............................................................................................................... 96<br />

8.4 CSI Board ................................................................................................................... 96<br />

8.5 CSI Metrics ................................................................................................................ 96<br />

8.6 Seven-Steps Improvement Process ............................................................................ 97<br />

8.6.1 General ................................................................................................................ 97<br />

8.6.2 Step-1: Define What Should Be Measured ......................................................... 97<br />

8.6.3 Step-2: Define What CanBe Measured ............................................................... 97<br />

8.6.4 Step-3: Gather the Data ....................................................................................... 97<br />

8.6.5 Step-4: Process the Data ..................................................................................... 98<br />

8.6.6 Step-5: Analyse the Information and Data .......................................................... 98<br />

8.6.7 Step-6: Present and Use the Information ............................................................ 99<br />

8.6.8 Step-7: Implement the Improvements ................................................................. 99<br />

8.7 CSI Interactions with Other Processes ..................................................................... 100<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-v


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-vi<br />

IFB-CO-13300-ANWI-AMD-2<br />

8.8 Win-Win Relationship and Management ................................................................. 101<br />

SECTION 9. ANNEX A: SCHEDULE OF KEY PROGRAM MILESTONES ............. 102<br />

9.1 ANWI Schedule ....................................................................................................... 102<br />

9.2 Integration Test Service ........................................................................................... 103<br />

SECTION 10. ANNEX B: PURCHASER FURNISHED INFRASTRUCTURE &<br />

SERVICES (hereafter known as PFE) ................................................................................... 104<br />

10.1 INTRODUCTION ................................................................................................... 104<br />

10.2 Global Construction Contract (GCC) Project (HN: Belgium) ................................. 104<br />

10.2.1 General .............................................................................................................. 104<br />

10.2.2 Server Rooms .................................................................................................... 104<br />

10.2.3 Technical Control Facility (TCF) Rooms (Communications Rooms) .............. 105<br />

10.2.4 Technical Equipment Room (TER) .................................................................. 105<br />

10.2.5 Power and Cooling ............................................................................................ 105<br />

10.2.6 Passive Network Infrastructure (PNWI) ........................................................... 106<br />

10.3 Building Management Services (BMS) Project (HN: Belgium) ............................. 107<br />

10.4 Electronic Security Services (ESS) PROJECT (HN: Belgium) ............................... 108<br />

10.5 Audio Visual Infrastructure (AVI) PROJECT (HN: Belgium) ............................... 108<br />

10.6 NNHQ Office Furniture Project (HN: HQPO) ........................................................ 108<br />

10.7 NATO General Purpose Segment Communication System (NGCS) Project (HN:<br />

NCIA) ................................................................................................................................. 109<br />

10.8 Domain Name System(DNS) Project (HN: NCIA) ................................................. 110<br />

10.9 Firewalls Project (HN: NCIA) ................................................................................. 110<br />

10.10 Active Directory AIS Single Forest Single Domain (AD AIS SFSD) Project (HN:<br />

NCIA) ................................................................................................................................. 110<br />

10.11 AIS Microsoft Exchange Services Project (HN: NCIA) ......................................... 111<br />

10.12 Automated Information System Enterprise Management System (AIS EMS) Project<br />

(HN: NCIA) ........................................................................................................................ 111<br />

10.13 Current HQ Baseline (HN: HQ ICTM) .................................................................... 111<br />

10.14 Video Tele Conference(VTC) Project (HN: NCIA) ................................................ 112<br />

10.15 NATO Enterprise Directory Services(NEDS) Project (HN: NCIA) ....................... 113<br />

10.16 NATO Cyber Defence Incident Response Centre (NCIRC) FOC Project (HN:NCIA)114<br />

10.17 NATO Public Key Infrastructure(NPKI) Project (HN: NCIA) ............................... 115<br />

10.18 Public Internet Access (PIA) Project (HN: NCIA) .................................................. 116<br />

10.19 Programme Management and Integration Capability(PMIC) Project (HN:NCIA) . 117<br />

10.20 NATO Messaging Services(NMS) Project (HN: NCIA) ......................................... 117<br />

10.21 Bâtiment Z Space to Support Integration and Testing Services (ITS) (HN: NCIA) 118<br />

10.22 Current NATO HQ Security Communications (TETRA) ....................................... 118<br />

10.23 Enterprise Agreement Software (HN: NCIA) .......................................................... 118<br />

SECTION 11. Annex C: ANWI Architecture ”Logical View” ......................................... 119<br />

11.1 Introduction .............................................................................................................. 119<br />

11.1.1 Purpose .............................................................................................................. 119<br />

11.1.2 Annex Structure ................................................................................................ 119<br />

11.2 Architecture Governance and Principles .................................................................. 119<br />

11.2.1 NNHQ Architecture Governance ...................................................................... 119


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-vii<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.3 Services Framework ................................................................................................. 124<br />

11.3.1 Applied Service Framework References........................................................... 124<br />

11.3.2 C3 Taxonomy Services Framework .................................................................. 124<br />

11.3.3 Services Framework Main Concepts ................................................................ 124<br />

11.4 ANWI services ......................................................................................................... 127<br />

11.4.1 ANWI ICT Technical Services Groupings ....................................................... 127<br />

11.4.2 ANWI Services Listing ..................................................................................... 127<br />

11.4.3 Identification of ANWI related End-to-End Services ....................................... 128<br />

11.5 ANWI Information Infrastructures, Domains, Zoning and User Types .................. 129<br />

11.5.1 Introduction ....................................................................................................... 129<br />

11.5.2 ANWI Security Domains .................................................................................. 131<br />

11.5.3 User Types ........................................................................................................ 133<br />

11.6 Node Connectivity Diagrams ................................................................................... 136<br />

11.6.1 NS Infrastructure Node Connectivity ............................................................... 137<br />

11.6.2 Business Infrastructure Node Connectivity ...................................................... 139<br />

11.7 Information Exchange Requirements (IERs) ........................................................... 140<br />

11.7.1 ANWI NS Infrastructure IERs .......................................................................... 140<br />

11.7.2 ANWI Business Infrastructure IERs ................................................................. 142<br />

11.8 Overarching Information Assurance Architecture Concept and Requirements ....... 144<br />

11.8.1 ANWI IA Services Architecture ....................................................................... 144<br />

11.8.2 Information Assurance Architecture Compliance Approach ............................ 145<br />

SECTION 12. ANNEX D: ANWI Architecture Initial System and Technical View ....... 166<br />

12.1 Introduction .............................................................................................................. 166<br />

12.1.1 Purpose .............................................................................................................. 166<br />

12.1.2 Annex Structure ................................................................................................ 166<br />

12.2 Design Drivers ......................................................................................................... 166<br />

12.2.1 General .............................................................................................................. 166<br />

12.2.2 Mobility ............................................................................................................. 166<br />

12.2.3 Identity Management ........................................................................................ 167<br />

12.2.4 Infrastructure as a Service (IaaS) ...................................................................... 167<br />

12.2.5 Green IT ............................................................................................................ 167<br />

12.2.6 Virtualization .................................................................................................... 168<br />

12.2.7 User Experience ................................................................................................ 169<br />

12.2.8 Standardization ................................................................................................. 169<br />

12.2.9 High Available NNHQ ICT Environment ........................................................ 170<br />

12.2.10 Additional Availability Requirements .............................................................. 170<br />

12.2.11 Modularity Principle ......................................................................................... 171<br />

12.2.12 Reduced ICT Capacity ...................................................................................... 171<br />

12.3 Initial System View .................................................................................................. 173<br />

12.3.1 ANWI System View ......................................................................................... 173<br />

12.3.2 External Entities ................................................................................................ 174


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-viii<br />

IFB-CO-13300-ANWI-AMD-2<br />

12.3.3 Cross Domain Gateways (CDGW) ................................................................... 176<br />

12.3.4 ANWI NS Infrastructure System View ............................................................ 178<br />

12.3.5 ANWI NU/NR/Public Level Infrastructure System View ................................ 179<br />

12.3.6 NATO HQ NS to NU/NR/Public Cross Domain Infrastructure ....................... 181<br />

12.3.7 Cross Domain Gateway Coherency View ........................................................ 182<br />

12.4 ANWI Modules and Internal Interfaces Identification ............................................ 183<br />

12.4.1 ANWI Modules ................................................................................................. 183<br />

12.4.2 ANWI Module Internal Interface Identification ............................................... 188<br />

12.5 External Interfaces ................................................................................................... 189<br />

12.5.1 Facility-Physical Interfaces ............................................................................... 189<br />

12.5.2 NS Infrastructure External/Internal Interfaces .................................................. 191<br />

12.5.3 Business Infrastructure External Interfaces ...................................................... 193<br />

12.6 End to End Services ................................................................................................. 196<br />

SECTION 13. ANNEX E: SMC and IA SERVICES ........................................................ 202<br />

13.1 Appendix 1: Service Management and Control ....................................................... 202<br />

13.1.1 Definition .......................................................................................................... 202<br />

13.1.2 Scope ................................................................................................................. 202<br />

13.1.3 Governance ....................................................................................................... 203<br />

13.1.4 Architecture ....................................................................................................... 204<br />

13.1.5 Installation ......................................................................................................... 205<br />

13.1.6 Service Desk ..................................................................................................... 206<br />

13.1.7 Trouble Ticketing .............................................................................................. 206<br />

13.1.8 Performance Management ................................................................................ 207<br />

13.1.9 Service Design Processes .................................................................................. 207<br />

13.1.10 Service Transition Processes ............................................................................. 212<br />

13.1.11 Service Operations Processes............................................................................ 215<br />

13.1.12 Continuous Service Improvement Processes .................................................... 219<br />

13.1.13 Key Performance Indicators (KPIs) and Metrics .............................................. 220<br />

13.1.14 End-to-End Scenario Testing ............................................................................ 227<br />

13.1.15 Training ............................................................................................................. 228<br />

13.1.16 Cross Domain Requirements ............................................................................ 228<br />

13.1.17 Future Technology Requirements ..................................................................... 228<br />

13.1.18 SMC Service Level Agreement/Target ............................................................. 229<br />

13.1.19 Management and Operational Requirements .................................................... 229<br />

13.2 Appendix 2: Information Assurance ........................................................................ 231<br />

13.2.1 Cross Domain Module (CDM) ......................................................................... 232<br />

13.2.2 AV management ............................................................................................... 260<br />

13.2.3 NPKI ................................................................................................................. 261<br />

13.2.4 Incident Management ........................................................................................ 263<br />

13.2.5 Security Patches and Configuration Management ............................................ 266<br />

SECTION 14. ANNEX F: INFRASTRUCTURE SERVICES ......................................... 267<br />

14.1 APPENDIX 1: Introduction to Infrastructure Services ............................................ 267<br />

14.1.1 Definition .......................................................................................................... 267


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-ix<br />

IFB-CO-13300-ANWI-AMD-2<br />

14.1.2 Service Overview .............................................................................................. 267<br />

14.1.3 Scope ................................................................................................................. 267<br />

14.1.4 Service Requirements ....................................................................................... 268<br />

14.1.5 Service Level Agreement/Targets ..................................................................... 269<br />

14.1.6 Service Testing and Reporting .......................................................................... 269<br />

14.1.7 Dependencies .................................................................................................... 269<br />

14.2 APPENDIX 2: Processing Services ......................................................................... 271<br />

14.2.1 Definition .......................................................................................................... 271<br />

14.2.2 Scope/Scenario .................................................................................................. 271<br />

14.2.3 Service Requirements ....................................................................................... 271<br />

14.2.4 Management and Operational Requirements .................................................... 276<br />

14.2.5 Testing ............................................................................................................... 277<br />

14.2.6 Training ............................................................................................................. 277<br />

14.3 APPENDIX 3: Storage services ............................................................................... 278<br />

14.3.1 Definition .......................................................................................................... 278<br />

14.3.2 Scope/Scenario .................................................................................................. 278<br />

14.3.3 Service Requirements ....................................................................................... 278<br />

14.3.4 Information Assurance ...................................................................................... 281<br />

14.3.5 Management and Operational Requirements .................................................... 282<br />

14.3.6 Testing ............................................................................................................... 283<br />

14.3.7 Training ............................................................................................................. 283<br />

14.4 APPENDIX 4: Printing and Scanning Services ....................................................... 284<br />

14.4.1 Definition .......................................................................................................... 284<br />

14.4.2 Scope/Scenario .................................................................................................. 284<br />

14.4.3 Service Requirements ....................................................................................... 284<br />

14.4.4 Management and Operational Requirements .................................................... 287<br />

14.4.5 Training ............................................................................................................. 287<br />

14.5 APPENDIX 5: Infrastructure Network Services ..................................................... 289<br />

14.5.1 Definition .......................................................................................................... 289<br />

14.5.2 Scope/Scenario .................................................................................................. 289<br />

14.5.3 Service Requirements ....................................................................................... 289<br />

14.5.4 Management and Operational Requirements .................................................... 295<br />

14.5.5 Training ............................................................................................................. 296<br />

14.6 APPENDIX 6: LAN services ................................................................................... 298<br />

14.6.1 Definition .......................................................................................................... 298<br />

14.6.2 Scope/Scenario .................................................................................................. 298<br />

14.6.3 Service Requirements ....................................................................................... 299<br />

14.6.4 Conference Room Infrastructure ....................................................................... 302<br />

14.6.5 Information Assurance ...................................................................................... 302<br />

14.6.6 Service Management ......................................................................................... 303<br />

14.6.7 Management and Operational Requirements .................................................... 305<br />

14.6.8 Testing ............................................................................................................... 305<br />

14.6.9 Training ............................................................................................................. 305<br />

SECTION 15. ANNEX G: UCC SERVICES .................................................................... 306


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

15.1 APPENDIX 1: Introduction to UCC Services ......................................................... 306<br />

15.1.1 Definition .......................................................................................................... 306<br />

15.1.2 Scope ................................................................................................................. 306<br />

15.1.3 Logical Model ................................................................................................... 310<br />

15.1.4 ANWI UCC Architecture.................................................................................. 311<br />

15.1.5 UCC Services and NNHQ Multiple Classification Networks .......................... 314<br />

15.1.6 UCC Service Management Requirements ........................................................ 315<br />

15.1.7 Service Level Agreement/Targets ..................................................................... 316<br />

15.1.8 Service Testing and Reporting .......................................................................... 320<br />

15.2 APPENDIX 2: Voice ServiceComponent ................................................................ 321<br />

15.2.1 Definition .......................................................................................................... 321<br />

15.2.2 Scope / Scenario ................................................................................................ 321<br />

15.2.3 Service Requirements ....................................................................................... 321<br />

15.2.4 Management and Operational Requirements .................................................... 325<br />

15.2.5 Testing ............................................................................................................... 326<br />

15.2.6 Training ............................................................................................................. 326<br />

15.3 APPENDIX 3: Voicemail ServiceComponent ........................................................ 327<br />

15.3.1 Definition .......................................................................................................... 327<br />

15.3.2 Scope / Scenario ................................................................................................ 327<br />

15.3.3 Service Requirements ....................................................................................... 327<br />

15.3.4 Management and Operational Requirements .................................................... 328<br />

15.3.5 Testing ............................................................................................................... 329<br />

15.3.6 Training ............................................................................................................. 330<br />

15.4 APPENDIX 4: VTC ServiceComponent ................................................................. 331<br />

15.4.1 Definition .......................................................................................................... 331<br />

15.4.2 Scope / Scenario ................................................................................................ 331<br />

15.4.3 Service Requirements ....................................................................................... 331<br />

15.4.4 Management and Operational Requirements .................................................... 332<br />

15.4.5 Testing ............................................................................................................... 333<br />

15.4.6 Training ............................................................................................................. 333<br />

15.5 APPENDIX 5: Email Service Component ............................................................... 335<br />

15.5.1 Definition .......................................................................................................... 335<br />

15.5.2 Scope / Scenario ................................................................................................ 335<br />

15.5.3 Service Requirements ....................................................................................... 335<br />

15.5.4 Management and Operational Requirements .................................................... 337<br />

15.5.5 Testing ............................................................................................................... 338<br />

15.5.6 Training ............................................................................................................. 339<br />

15.6 APPENDIX 6: Unified Messaging Service Component .......................................... 340<br />

15.6.1 Definition .......................................................................................................... 340<br />

15.6.2 Scope / Scenario ................................................................................................ 340<br />

15.6.3 Service Requirements ....................................................................................... 340<br />

15.6.4 Testing ............................................................................................................... 341<br />

15.6.5 Training ............................................................................................................. 342<br />

15.7 APPENDIX 7: FAX Service Component ................................................................ 343<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-x


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-xi<br />

IFB-CO-13300-ANWI-AMD-2<br />

15.7.1 Definition .......................................................................................................... 343<br />

15.7.2 Scope / Scenario ................................................................................................ 343<br />

15.7.3 Service Requirements ....................................................................................... 343<br />

15.7.4 Testing ............................................................................................................... 344<br />

15.7.5 Training ............................................................................................................. 345<br />

15.8 APPENDIX 8: Instant Messaging/Chat Service Component .................................. 346<br />

15.8.1 Definition .......................................................................................................... 346<br />

15.8.2 Scope / Scenario ................................................................................................ 346<br />

15.8.3 Service Requirements ....................................................................................... 346<br />

15.8.4 Management and Operational Requirements .................................................... 347<br />

15.8.5 Testing ............................................................................................................... 347<br />

15.8.6 Training ............................................................................................................. 348<br />

15.9 APPENDIX 9: Presence Service Component .......................................................... 349<br />

15.9.1 Definition .......................................................................................................... 349<br />

15.9.2 Scope / Scenario ................................................................................................ 349<br />

15.9.3 Service Requirements ....................................................................................... 349<br />

15.9.4 Management and Operational Requirements .................................................... 350<br />

15.9.5 Testing ............................................................................................................... 351<br />

15.9.6 Training ............................................................................................................. 351<br />

15.10 APPENDIX 10: UCC Directory Service Component .............................................. 352<br />

15.10.1 Definition .......................................................................................................... 352<br />

15.10.2 Scope / Scenario ................................................................................................ 352<br />

15.10.3 Service Requirements ....................................................................................... 352<br />

15.10.4 Management and Operational Requirements .................................................... 353<br />

15.10.5 Testing ............................................................................................................... 353<br />

15.10.6 Training ............................................................................................................. 354<br />

15.11 APPENDIX 11: Collaboration Service Component ................................................ 355<br />

15.11.1 Definition .......................................................................................................... 355<br />

15.11.2 Scope / Scenario ................................................................................................ 355<br />

15.11.3 Service Requirements ....................................................................................... 355<br />

15.11.4 Management and Operational Requirements .................................................... 356<br />

15.11.5 Testing ............................................................................................................... 357<br />

15.11.6 Training ............................................................................................................. 357<br />

15.12 APPENDIX 12: Mobility Service Component ........................................................ 359<br />

15.12.1 Definition .......................................................................................................... 359<br />

15.12.2 Scope / Scenario ................................................................................................ 359<br />

15.12.3 Service Requirements ....................................................................................... 359<br />

15.12.4 Management and Operational Requirements .................................................... 360<br />

15.12.5 Testing ............................................................................................................... 360<br />

15.12.6 Training ............................................................................................................. 361<br />

SECTION 16. ANNEX H: CLIENT-PROVISIONING SERVICE .................................. 362<br />

16.1 APPENDIX 1: Introduction to Client Provisioning Services .................................. 362<br />

16.1.1 Definition .......................................................................................................... 362


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-xii<br />

IFB-CO-13300-ANWI-AMD-2<br />

16.1.2 Service Overview .............................................................................................. 362<br />

16.1.3 Scope ................................................................................................................. 362<br />

16.1.4 Service Requirements ....................................................................................... 363<br />

16.1.5 Service Level Agreement / Targets. .................................................................. 367<br />

16.1.6 Service Testing and Reporting .......................................................................... 367<br />

16.1.7 Dependencies .................................................................................................... 368<br />

16.2 APPENDIX 2: Software Provisioning ..................................................................... 369<br />

16.2.1 Definition .......................................................................................................... 369<br />

16.2.2 Scope/Scenario .................................................................................................. 369<br />

16.2.3 Domains ............................................................................................................ 369<br />

16.2.4 Location ............................................................................................................ 369<br />

16.2.5 Client Platform Provisioning ............................................................................ 369<br />

16.2.6 Application Provisioning .................................................................................. 371<br />

16.2.7 Client provisioning infrastructure ..................................................................... 372<br />

16.2.8 Service Level Agreement/Target ...................................................................... 372<br />

16.2.9 Management and Operational Requirements .................................................... 373<br />

16.2.10 Testing ............................................................................................................... 373<br />

16.2.11 Training ............................................................................................................. 374<br />

16.3 APPENDIX 3: Client Devices ................................................................................. 375<br />

16.3.1 Definition .......................................................................................................... 375<br />

16.3.2 Scope ................................................................................................................. 375<br />

16.3.3 Service Requirements ....................................................................................... 377<br />

16.3.4 ClientDevice’s Information Assurance ............................................................. 380<br />

16.3.5 Service Testing and Reporting .......................................................................... 383<br />

16.3.6 Dependencies .................................................................................................... 383<br />

SECTION 17. ANNEX I: SUPPLEMENTARY SERVICES ........................................... 384<br />

17.1 APPENDIX 1: Introduction to Supplementary Services ......................................... 384<br />

17.1.1 Definition .......................................................................................................... 384<br />

17.1.2 Service Overview .............................................................................................. 384<br />

17.1.3 Scope ................................................................................................................. 384<br />

17.1.4 Service Requirements ....................................................................................... 385<br />

17.1.5 Service Level Agreement / Targets ................................................................... 385<br />

17.1.6 Service Testing and Reporting .......................................................................... 385<br />

17.1.7 Dependencies .................................................................................................... 386<br />

17.2 APPENDIX 2: GSM Service continuity .................................................................. 387<br />

17.2.1 Definition .......................................................................................................... 387<br />

17.2.2 Scope/Scenario .................................................................................................. 387<br />

17.2.3 Service Requirements ....................................................................................... 387<br />

17.2.4 Service Level Agreement/Target ...................................................................... 388<br />

17.2.5 Testing ............................................................................................................... 388<br />

17.3 APPENDIX 3: GSM Blocking ................................................................................ 388<br />

17.3.1 Definition .......................................................................................................... 388<br />

17.3.2 Scope/Scenario .................................................................................................. 388<br />

17.3.3 Service Requirements ....................................................................................... 389


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-xiii<br />

IFB-CO-13300-ANWI-AMD-2<br />

17.3.4 Service Level Agreement/Target ...................................................................... 389<br />

17.3.5 Management and Operational Requirements .................................................... 390<br />

17.3.6 Testing ............................................................................................................... 390<br />

17.3.7 Training ............................................................................................................. 390<br />

17.4 APPENDIX 4: Wireless Blocking ........................................................................... 391<br />

17.4.1 Definition .......................................................................................................... 391<br />

17.4.2 Scope/Scenario .................................................................................................. 391<br />

17.4.3 Service Requirements ....................................................................................... 391<br />

17.4.4 Service Level Agreement/Target ...................................................................... 391<br />

17.4.5 Management and Operational Requirements .................................................... 392<br />

17.4.6 Testing ............................................................................................................... 392<br />

17.4.7 Training ............................................................................................................. 392<br />

17.5 APPENDIX 5: Site Security Comms (TETRA) ...................................................... 393<br />

17.5.1 Definition .......................................................................................................... 393<br />

17.5.2 Scope/Scenario .................................................................................................. 393<br />

17.5.3 Service Requirements ....................................................................................... 393<br />

17.5.4 Service Level Agreement/Target ...................................................................... 393<br />

17.5.5 Management and Operational Requirements .................................................... 394<br />

17.5.6 Testing ............................................................................................................... 394<br />

17.5.7 Training ............................................................................................................. 394<br />

17.6 APPENDIX 6: IPTV ................................................................................................ 395<br />

17.6.1 Definition .......................................................................................................... 395<br />

17.6.2 Scope/Scenario .................................................................................................. 395<br />

17.6.3 Service Requirements ....................................................................................... 395<br />

17.6.4 Service Level Agreement/Target ...................................................................... 398<br />

17.6.5 Management and Operational Requirements .................................................... 400<br />

17.6.6 Testing ............................................................................................................... 400<br />

SECTION 18. ANNEX J: INTEGRATION AND TESTING SERVICES ....................... 401<br />

18.1 APPENDIX 1: Introduction to Integration and Testing Services ............................ 401<br />

18.1.1 Interfaces ........................................................................................................... 401<br />

18.1.2 Security ............................................................................................................. 401<br />

18.1.3 Training ............................................................................................................. 401<br />

18.1.4 Requirements .................................................................................................... 401<br />

18.1.5 Acceptance ........................................................................................................ 402<br />

18.1.6 Documentation .................................................................................................. 402<br />

18.1.7 Architecture and Services ................................................................................. 402<br />

18.1.8 Location and Facility Context ........................................................................... 403<br />

18.1.9 Organisational Support Requirements .............................................................. 404<br />

18.1.10 Management Requirements .............................................................................. 404<br />

18.1.11 Concept of Operations ...................................................................................... 405<br />

18.2 APPENDIX 2: ITS Reference Environment ............................................................ 407<br />

18.2.1 Introduction ....................................................................................................... 407<br />

18.2.2 Testing ............................................................................................................... 408<br />

18.2.3 ITS Infrastructure .............................................................................................. 408


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

18.3 APPENDIX 3: ITS Service Level Agreement (SLA) .............................................. 410<br />

18.3.1 Introduction ....................................................................................................... 410<br />

18.3.2 Service Delivery ................................................................................................ 411<br />

18.3.3 SLA Change Management ................................................................................ 412<br />

18.3.4 Roles and Responsibilities ................................................................................ 413<br />

SECTION 19. ANNEX K: DOCUMENTATION AND REPORTS................................. 415<br />

19.1 Appendix 1: ANWI Document Requirements ......................................................... 415<br />

19.1.1 Purpose .............................................................................................................. 415<br />

19.1.2 Format Requirements for Project Documentation ............................................ 415<br />

19.1.3 Submission of Project Documentation .............................................................. 416<br />

19.1.4 Delivery and Distribution of Project Documentation ....................................... 416<br />

19.1.5 Review of Project Documentation .................................................................... 416<br />

19.1.6 Control Information for Project Documentation ............................................... 417<br />

19.2 APPENDIX 2: Design Document ............................................................................ 419<br />

19.2.1 Introduction/Purpose ......................................................................................... 419<br />

19.2.2 Scope/Assumptions ........................................................................................... 419<br />

19.2.3 Reporting& Provisioning .................................................................................. 419<br />

19.2.4 Document Structure .......................................................................................... 419<br />

19.3 Appendix 3: Project Management Plan (PMP) ........................................................ 445<br />

19.3.1 Introduction/Purpose ......................................................................................... 445<br />

19.3.2 Scope/Assumptions ........................................................................................... 445<br />

19.3.3 Reporting& Provisioning .................................................................................. 445<br />

19.3.4 Document Structure .......................................................................................... 446<br />

19.4 Appendix 4: Project Implementation Plan (PIP) ...................................................... 449<br />

19.4.1 Introduction/Purpose ......................................................................................... 449<br />

19.4.2 Scope/Assumptions ........................................................................................... 449<br />

19.4.3 Reporting & Provisioning ................................................................................. 450<br />

19.4.4 Document Structure .......................................................................................... 451<br />

19.5 Appendix 5: Risk Management Plan (RMP) ........................................................... 455<br />

19.5.1 Introduction/purpose ......................................................................................... 455<br />

19.5.2 Scope/assumptions ............................................................................................ 455<br />

19.5.3 Reporting& Provisioning .................................................................................. 456<br />

19.5.4 Document Structure .......................................................................................... 456<br />

19.6 APPENDIX 6: Quality Assurance Plan (QAP) ....................................................... 464<br />

19.6.1 Introduction/Purpose ......................................................................................... 464<br />

19.6.2 Scope/Assumptions ........................................................................................... 464<br />

19.6.3 Reporting& Provisioning .................................................................................. 464<br />

19.6.4 Document Structure .......................................................................................... 465<br />

19.7 APPENDIX 7: Configuration Management Plan (CMP) ........................................ 470<br />

19.7.1 Introduction/Purpose ......................................................................................... 470<br />

19.7.2 Scope/Assumprion ............................................................................................ 470<br />

19.7.3 Reporting& Provisioning .................................................................................. 472<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-xiv


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-xv<br />

IFB-CO-13300-ANWI-AMD-2<br />

19.7.4 Document Structure .......................................................................................... 473<br />

19.8 APPENDIX 8: Test and Acceptance Plan (TAP) .................................................... 480<br />

19.8.1 Introduction/Purpose ......................................................................................... 480<br />

19.8.2 Scope/Assumptions ........................................................................................... 480<br />

19.8.3 Reporting & Provisioning ................................................................................. 482<br />

19.8.4 Document Structure .......................................................................................... 482<br />

19.9 APPENDIX 9: Integrated Logistics Support Plan (ILSP) ....................................... 486<br />

19.9.1 Introduction/Purpose ......................................................................................... 486<br />

19.9.2 Scope/Assumptions ........................................................................................... 486<br />

19.9.3 Reporting & Provisioning ................................................................................. 486<br />

19.9.4 Document Structure .......................................................................................... 486<br />

19.10 APPENDIX 10: NATO Material Data Sheet ........................................................... 489<br />

19.10.1 Introduction/Purpose ......................................................................................... 489<br />

19.10.2 Scope/Assumptions ........................................................................................... 489<br />

19.10.3 Reporting & Provisioning ................................................................................. 489<br />

19.10.4 Data Sheet Structure ......................................................................................... 489<br />

19.11 APPENDIX 11: Security Risk Assessment ............................................................. 491<br />

19.11.1 Introduction/Purpose ......................................................................................... 491<br />

19.11.2 Scope/Assumptions ........................................................................................... 491<br />

19.11.3 Reporting& Provisioning .................................................................................. 491<br />

19.11.4 Document Structure .......................................................................................... 492<br />

19.12 APPENDIX 12: Security Test and Evaluation (ST&E) Plan .................................. 494<br />

19.12.1 Introduction/Purpose ......................................................................................... 494<br />

19.12.2 Scope/Assumptions ........................................................................................... 494<br />

19.12.3 Reporting & Provisioning ................................................................................. 494<br />

19.12.4 Document Structure .......................................................................................... 495<br />

19.13 APPENDIX 13: Security Documentation Input ...................................................... 498<br />

19.13.1 Introduction/pPurpose ....................................................................................... 498<br />

19.13.2 Scope/Assumptions ........................................................................................... 498<br />

19.13.3 Reporting& Provisioning .................................................................................. 499<br />

19.14 APPENDIX 14: Project Progress Review Meeting (PPRM) ................................... 504<br />

19.14.1 Introduction/Purpose ......................................................................................... 504<br />

19.14.2 Scope/Assumptions ........................................................................................... 504<br />

19.14.3 Reporting & Provisioning ................................................................................. 504<br />

19.14.4 Reporting Structure ........................................................................................... 504<br />

19.15 APPENDIX 15: Project Status Report (PSR) .......................................................... 506<br />

19.15.1 Introduction/Purpose ......................................................................................... 506<br />

19.15.2 Scope/Assumptions ........................................................................................... 506<br />

19.15.3 Reporting & Provisioning ................................................................................. 506<br />

19.15.4 Reporting Structure ........................................................................................... 506<br />

19.16 ANNEX K APPENDIX 16: Migration Plan ............................................................ 508


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

19.16.1 Introduction/Purpose ......................................................................................... 508<br />

19.16.2 Scope/Assumptions ........................................................................................... 508<br />

19.16.3 Reporting & Provisioning ................................................................................. 508<br />

19.16.4 Document Structure .......................................................................................... 509<br />

19.17 ANNEX K APPENDIX 17: Service Interface Profile (SIP) ................................... 515<br />

19.17.1 Introduction/Purpose ......................................................................................... 515<br />

19.17.2 Scope/Assumptions ........................................................................................... 515<br />

19.17.3 Reporting & Provisioning ................................................................................. 515<br />

19.17.4 Document Structure .......................................................................................... 515<br />

19.18 ANNEX K APPENDIX 18: Service Level Agreement ........................................... 518<br />

19.18.1 Introduction/Purpose ......................................................................................... 518<br />

19.18.2 Scope/Assumptions ........................................................................................... 518<br />

19.18.3 Reporting &Provisions ...................................................................................... 518<br />

19.18.4 Document Structure .......................................................................................... 518<br />

SECTION 20. ANNEX L: NATIONS AND PARTNERS ................................................ 520<br />

20.1 Purpose ..................................................................................................................... 520<br />

20.2 NATO Nation ........................................................................................................... 520<br />

20.3 Partner Nations ......................................................................................................... 521<br />

SECTION 21. ANNEX M: REMOTE SITES ................................................................... 522<br />

21.1 Purpose ..................................................................................................................... 522<br />

21.2 Remote Sites ............................................................................................................ 522<br />

21.3 Supporting Additional Remote Needs ..................................................................... 523<br />

21.3.1 Travel Kits. ....................................................................................................... 524<br />

SECTION 22. ACRONYMS ............................................................................................. 526<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-xvi


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 1.<br />

REFERENCE DOCUMENTS<br />

1.1 Applicable Documents<br />

1.1.1 NATO<br />

1.1.1.1 Allied Quality Assurance Publications (AQAP):<br />

1.1.1.1.1 AQAP 2070, NATO Mutual Government Quality Assurance (GQA).<br />

1.1.1.1.2 AQAP 2009, Guidance for the Use of AQAP 2000 series.<br />

1.1.1.1.3 AQAP 160, NATO Quality Assurance Requirements for Software<br />

Development.<br />

1.1.1.2 Allied Configuration Management Publications (ACMP):<br />

1.1.1.2.1 ACMP 1, NATO Requirements for the Preparation of Configuration<br />

Management Plans.<br />

1.1.1.2.2 ACMP 2, NATO Requirements for Configuration Identification.<br />

1.1.1.2.3 ACMP 3, NATO Requirements for Configuration Control--Engineering<br />

Changes, Deviations, and Waivers.<br />

1.1.1.2.4 ACMP 4, NATO Requirements for Configuration Status Accounting.<br />

1.1.1.2.5 ACMP 5, NATO Requirements for Configuration Audits.<br />

1.1.1.2.6 ACMP 6, NATO Configuration Management Terms and Definitions.<br />

1.1.1.2.7 ACMP 7, NATO Configuration Management Guidance on the Application<br />

of ACMPs 1 to 6.<br />

1.1.1.3 SECAN Doctrine and Information Publication (SDIP):<br />

1.1.1.3.1 (NATO RESTRICTED),SDIP-29/1 - Facility Design Criteria and Installation<br />

of Equipment for the Processing of Classified Information; January 2011.<br />

1.1.1.4 Standard NATO Guidance (STANAG):<br />

1.1.1.4.1 STANAG 4107, Mutual Acceptance of Government Quality Assurance and<br />

Usage of the Allied Quality Assurance Publications.<br />

1.1.1.4.2 STANAG 4427, Introduction of Allied Configuration Management<br />

Publications (ACMP), February 2007.<br />

1.1.1.4.3 STANAG 6001, Language Proficiency Levels.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-1 of 532


N A T O U N C L A S S I F I E D<br />

1.1.1.5 Bilateral Strategic Command (Bi-SC) Documents:<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.1.1.5.1 Bi SC Automated Information System (AIS) Minimum Hardware<br />

Procurement Specifications (MHWPS); v5.6, July 2012.<br />

1.1.1.5.2 NATO Training Directive Bi-SC Directive75-7.<br />

1.1.1.5.3 Single-Forest Single-Domain Administration SOP; v2.2, August 2006.<br />

1.1.1.5.4 NCSA Managed Forests Join SOP; v4.8, May 2010.<br />

1.1.1.6 NATO Security Documents:<br />

1.1.1.6.1 Guidelines for Security Risk Assessment (SRA) and Risk Management of<br />

CIS, Ref. AC/35-D/1017-REV2, 26 February 2003.<br />

1.1.1.6.2 (NATO RESTRICTED),Guidelines for the Development of Security<br />

Requirement Statements (SRSs), AC/35-D/1015-REV3, 31 January 2012.<br />

1.1.1.6.3 Guidelines for the Structure and Content of Security Operating Procedures<br />

(SecOPs) for CIS, AC/35-D/1014-REV3, 31 January 2012.<br />

1.1.1.6.4 INFOSEC Technical & Implementation Directive for the Interconnection of<br />

Communication and Information Systems (CIS); AC/322-D/0030-REV5,<br />

February 2011.<br />

1.1.1.6.5 (NATO RESTRICTED),INFOSEC Technical & Implementation Directive for<br />

Computer and Local Area Network (LAN) Security; AC/322-D/0048.<br />

1.1.1.6.6 (NATO RESTRICTED),INFOSEC Technical & Implementation Directive on<br />

Cryptographic Security and Cryptographic Mechanisms; AC/322-D/0047-<br />

REV2, March 2009.<br />

1.1.1.6.7 (NATO RESTRICTED),NATO INFOSEC Technical Centre (NITC) Cisco<br />

Switches Hardening Guide; v.1.2, March 2009.<br />

1.1.1.6.8 Reserved .<br />

1.1.1.6.9 Reserved .<br />

1.1.1.6.10 Information Assurance Technical and Implementation Directive on<br />

Security Management Infrastructure (SMI); Ref.: AC/322-D(2010)0055,<br />

December 2010.<br />

1.1.1.6.11 NATO Public Key Infrastructure (PKI) Certificate Policy; AC/322-<br />

D(2004)0024-REV2-AS1, February 2008<br />

1.1.1.6.12 INFOSEC Technical and Implementation Guidance for Electronic Labelling<br />

of NATO Information; AC/322-D(2004)0021, Mar 2004.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-2 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.1.1.6.13 NATO C3 Board Technical and Implementation Guidance for Consistent<br />

Marking of NATO Information in C3 Systems; AC/322-D(2004)0022,<br />

March 2004.<br />

1.1.1.7 HQPO documents:<br />

1.1.1.7.1 New NATO Headquarters ICT Target Architecture; v2.0, July 2011.<br />

1.1.1.7.2 New NATO HQ Security Accreditation Directive; v2.0, June 2011.<br />

1.1.1.7.3 New NATO HQ Security Accreditation Plan; v1.1, Feb 2011.<br />

1.1.1.7.4 North Atlantic Treaty Organization (NATO) New NATO Headquarters<br />

Security Concept of Operations (CONOPS); v2.0, May 2011.<br />

1.1.1.7.5 New NATO HQ ICT Migration Strategy; v1.1, June 2011.<br />

1.1.1.7.6 Integrated Logistics Support and Operations & Maintenance Directive;<br />

May 2011.<br />

1.1.1.7.7 Green IT Directive; May 2011.<br />

1.1.1.7.8 Testing & Acceptance Directive; May 2011.<br />

1.1.1.7.9 HQPO ICT RCN24 IPTV; v1.0, August 2011<br />

1.1.1.7.10 New NATO Headquarters ICT Target Architecture Directive; v1.1 July<br />

2011.<br />

1.1.1.7.11 HQPO ICT RCN24 IPTV; v1.0 August 2011 spreadsheet with initial<br />

television channels required.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-3 of 532


1.1.1.8 Other NATO documents:<br />

N A T O U N C L A S S I F I E D<br />

1.1.1.8.1 NATO Interoperability Management Plan, Volume 2.<br />

Book II Page IV-4 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.1.1.8.2 NATO C3 Board (NC3B) NATO C3 System Interoperability Directive (NID),<br />

Annex 1; AC/322-D(2004)0001 (INV).<br />

1.1.1.8.3 PNWI Specs Desk Modules, November 2009.<br />

1.1.1.8.4 NCSA Approved Fielded Product List (AFPL).<br />

1.1.1.8.5 (NATO RESTRICTED),NATO HQ ICT Revitalization Network Realignment<br />

& Robustness (NR2) Target Architecture (TA) Security Mechanisms<br />

version 2.2”; Ref.: EM(ICT)(2012)0060; dated 28 Feb 2012.<br />

1.1.1.8.6 NNHQ ANWI Initial Service Catalogue spreadsheet; November 2011.<br />

1.1.1.8.7 NC3A Technical Design Directive NATO C4ISR System Design Principles;<br />

November 2011; October 2011.<br />

1.1.1.8.8 NATO Enterprise Directory Service (NEDS).<br />

1.1.1.8.9 Public Internet Access (PIA) Gateway Services High level design.<br />

1.1.1.8.10 Upgraded informal Email: System Design specification; January 2010.<br />

1.1.1.8.11 Upgraded informal Email: Interface Control Document; January 2010.<br />

1.1.1.8.12 NCSA EMS SCCM Technical Design; v1.1, January 2010.<br />

1.1.1.8.13 (NATO RESTRICTED),NGCS Target Architecture 2011; v4.2, November<br />

2009.<br />

1.1.1.8.14 Reserved<br />

1.1.1.8.15 PMIC Integration Facility HLD; v0.9, August 2010.<br />

1.1.1.8.16 NMS - An Architectural description; v0.99, October 2006.<br />

1.1.1.8.17 PNWI Cabling Design<br />

1.1.1.8.18 NCSA EMS SCOM Technical Design; v1.1, January 2010.<br />

1.1.1.8.19 “NATO Architecture Framework (NAF) Version 3. AC/322(SC/1-<br />

WG/1)N(2007)0004, August 2007).<br />

1.1.1.8.20 PNWI Chahier des charges (English version) dated 1 June 2012.<br />

1.1.1.8.21 Server Room PNWI Design dated 13 January 2009.<br />

1.1.1.8.22 Approved Fieflded Products List (AFPL) NS20120629 dated 29 June<br />

2012.<br />

N A T O U N C L A S S I F I E D


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.1.1.8.23 RD3186 - Collaboration Services Service Interface Profile Proposal<br />

Version 1.2 Final Draft dated March 2012<br />

1.1.1.8.24 RD3186 - Annex A: Core and Advanced Instant Messaging Services<br />

Version 1.2 Final Draft dated March 2012<br />

1.1.1.8.25 NGTS-56 - Standard Specification for VTC Equipment for use in NATO –<br />

Issue 2 dated April 2012<br />

1.1.2 Non-NATO<br />

1.1.2.1.1 ISO 9001:2008, Quality Management Systems: Requirements.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-5 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 2.<br />

INTRODUCTION<br />

2.1 Purpose<br />

2.1-p1 The purpose of this Statement of Work (SOW) is to define the work that<br />

needs to be completed in order to deliver the Information and Communication<br />

Technology (ICT) services of the Active Network Infrastructure (ANWI) for the New<br />

NATO Headquarters (NNHQ).<br />

2.1-p2 The Active Network Infrastructure (ANWI) project shall henceforth be<br />

referred to as ‘ANWI’.<br />

2.1-p3 The ANWI provides the core infrastructure and NNHQ end user devices,<br />

supporting all end user services.<br />

2.1-p4 This SOW defines the required capabilities in terms of services that must<br />

be provided and leaves the details of the implementation to the Contractor to<br />

propose.<br />

2.1-p5 Delivery of the ANWI requires the Contractor to design, procure,<br />

implement, provide and support the services defined in this SOW.<br />

2.1-p6 Acceptance of the ANWI’s capability will be based on the Contractor’s<br />

successful demonstration that all services defined in this SOW are provided per the<br />

described requirements. The ANWI default condition will be NATO Owned Contractor<br />

Operated (NOCO) unless otherwise noted. On a service-by-service basis, NATO may<br />

decide to take ownership and operational control of the delivered services from the<br />

ANWI Contractor. The determination of which services will be operated by the<br />

Contractor will be based largely on the ANWI Contractor’s operational support cost.<br />

2.2 Background<br />

2.2-p1 At the 50th Anniversary Summit in Washington in April 1999, Heads of<br />

State and Government agreed to construct a new NATO Headquarters in Brussels:<br />

"to meet the requirements of the Alliance in the 21st Century".<br />

2.2-p2 After the concept development and the associated financial authorisation,<br />

Host Nation Belgium let the construction contract where ground breaking took place<br />

on 16 December 2010 and the actual construction work began on 18 October 2010,<br />

two months earlier. The building is planned for handover to NATO at the end of 2015<br />

(see Annex A).<br />

2.2-p3 The New NATO Headquarters will reflect the Alliance's core functions and<br />

activities of supporting formal and informal consultation and co-operation between<br />

NATO's member countries, between member countries and partners, other countries,<br />

and other international organisations. To this end, the New NATO Headquarters’<br />

campus will provide:<br />

Up-to-date conference facilities.<br />

Office accommodation for Delegations, Military Representations, International<br />

Staff (IS), International Military Staff (IMS), Agencies and Partner Missions.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-6 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

<br />

<br />

A variety of support service outlets such as restaurants, banks, shops and<br />

leisure and sports facilities.<br />

All of the above will be supported by state of the art information,<br />

communications and technology (ICT) systems.<br />

2.3 Scope<br />

2.3.1 Geographic Scope<br />

2.3.1-p1 The ANWI equipment and service delivery will be to the NNHQ (across<br />

the street from the current NATO HQ building) and other buildings (including<br />

Bâtiment Z) that are on the current NATO campus located in Brussels, Belgium. The<br />

NNHQ and legacy facilities on the current NATO campus will hereafter be called the<br />

NNHQ campus.<br />

2.3.1-p2 The ANWI contract also requires the replacement of existing NATO<br />

equipment and capabilities with ANWI equipment and services installation at five (5)<br />

remote sites.<br />

2.3.1-p3 The Integration and Testing Services (ITS) shall be located in the<br />

basement of Bâtiment Z, which is the current location of NCIA in Brussels.<br />

2.3.1-p4 The ANWI Contractor will be provided with storage and staging space<br />

on location on the NNHQ campus and outside space to establish an on-location<br />

office.<br />

2.3.1-p5 The support Authority for all NATO-wide services is the NATO<br />

Communications Information Agency (NCIA).<br />

2.3.2 Functional Scope<br />

2.3.2-p1 This SOW defines the required NNHQ capabilities in terms of services<br />

that the ANWI Contractor shalldeliver .The SOW leaves the details of the design,<br />

procurement and implementation to the Contractor to propose.<br />

2.3.2-p2 The ANWI Contractor shall deliver four domains (identified in paragraph<br />

2.3.4-p2) on the NNHQ campus which provide selected ANWI services to a wide<br />

range of users located in offices, conference rooms, out buildings and guardhouses<br />

across the NNHQ campus and connected remote locations.<br />

2.3.2-p3 The ANWI Contractor shall deliver all ANWI services, operate the suite<br />

of selected manageable services and offer user consumable services via the NATO<br />

HQ Service Catalogue so an authorised NNHQ user can request (and national<br />

delegations possibly procure) and use.<br />

2.3.3 Service Provisioning Model<br />

2.3.3-p1 The SOW requires that the ANWI Contractor provides the NNHQ<br />

functionality as services and envisages three models for long term service<br />

provisioning: NATO-Owned / NATO-Operated (NONO); NATO-Owned / Contractor<br />

Operated (NOCO); and Contractor-Owned / Contractor-Operated (COCO).<br />

2.3.3-p2 The ANWI services shall be bid as either NOCO or COCO (IPTV, GSM<br />

and Printing/Scanning); where the Purchaser will decide on the final provisioning<br />

model (based on the cost effectiveness of the offer, needed skills/expertise and<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-7 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

security considerations) which may result in a NONO service model replacing a<br />

NOCO offer.<br />

2.3.3-p3 NATO will have on-site ICT staff (either exclusively ANWI Contractor [if<br />

services are NOCO/COCO, and NONO option is not exercised] or, if NONO option is<br />

exercised, a combination of ANWI Contractor [who shall be responsible for all<br />

NOCO/COCO services] and NATO staff [who shall be responsible only for NONO<br />

services]) that shall be able to autonomously serve as the NNHQ’s service<br />

management and control Authority and be called the NNHQ O&M authority.<br />

2.3.3-p4 NCIA staff located in Mons (NATO’s Operations and Maintenance<br />

[O&M] Authority) will serve as: the remote administrators for agreed information<br />

assurance services; enterprise administrators; and the centralised service<br />

management Authority.<br />

2.3.4 Overview of Deliverables<br />

2.3.4-p1 The ANWI Contractor shall design, procure and implement the ANWI<br />

for the NNHQ campus and remote sites (see Annex M), based on the stated<br />

requirements herein.<br />

2.3.4-p2 ANWI Contractor shall deliver:<br />

A. Infrastructure Services (providing network infrastructure, server<br />

processing, storage, and print/scan capabilities) to support four security<br />

domains located in the NNHQ. These domains are named as follows:<br />

1. NATO SECRET (NS)<br />

2. Euro Atlantic Partnership Council (EAPC) SECRET.<br />

3. NATO Business.<br />

4. Public.<br />

B. Local Area Network (LAN) services providing on campus:<br />

1. Wired switching capabilities, supporting the four security domains,<br />

connecting users with network services via the Purchaser provided<br />

cabling infrastructure.<br />

2. Wireless LAN switching and associated Access Points (AP) capabilities<br />

for the NATO Business and Public domains that use the connectivity of<br />

the NNHQ’s Purchaser provided cabling infrastructure.<br />

C. Cross-Domain Gateway (CDGW) Services supporting external network<br />

interconnection and inter-security domain interconnection &<br />

interoperability capabilities supporting the following NNHQ<br />

interconnectivity:<br />

1. CDGW1: NS LAN to NS Wide Area Network (WAN).<br />

2. CDGW2:<br />

a. NATO Business LAN to NR WAN.<br />

b. NATO Business LAN to NU WAN.<br />

c. NATO Business LAN to Internet/Public Networks/Public LAN (via<br />

CDGW3).<br />

3. CDGW3:<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-8 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

a. Public LAN to Internet.<br />

b. Internet/Public Networks/Public LAN to NATO Business LAN (via<br />

CDGW2).<br />

4. CDGW4: EAPC SECRET LAN to NS LAN.<br />

5. CDGW5: NATO Business LAN to NS LAN.<br />

6. CDGW6: Public LAN to NS LAN.<br />

E. Unified Communications & Collaboration Services providing integrated:<br />

1. Voice and voicemail services.<br />

2. Video TeleConferencing services.<br />

3. E-mail services.<br />

4. Unified Messaging services.<br />

5. Instant Messaging services.<br />

6. Presence services.<br />

7. Fax services.<br />

8. Directory services.<br />

9. Collaboration services (white boarding and chat).<br />

10. Mobility services.<br />

F. Desktop Client provisioning (end-user) services (including portables and<br />

small footprint devices)<br />

G. Supplementary services providing:<br />

1. Internet Protocol (IP) Television (IPTV) services<br />

2. Global System for Mobile Communications (GSM) services.<br />

3. Site security communications (radio).<br />

H. ANWI Integration and Testing Services (ITS) offering a reference suite of<br />

ANWI Contractor provided and managed functional baselines that the<br />

ANWI Contractor and all new building Host Nations will use to test their<br />

deliverables prior to deployment in the new building NNHQ.<br />

I. Integration of the ANWI capability with NATO’s extant NATO SECRET<br />

(NS) and NATO RESTRICTED (NR) Automated Information System (AIS)<br />

and network services that are external to ANWI.<br />

J. Migration and support transition of ANWI equivalent services from the<br />

current HQ to the new NATO HQ building NNHQ.<br />

K. Support the NATO Contractor in the migration of applications and data<br />

from the current building HQ to the new building’s NNHQ ANWI<br />

infrastructure.<br />

L. Provision of on-site support of the ANWI services.<br />

M. Provision of Service Management and Control of the ANWI services<br />

2.4 NNHQ Key Programme Planning Factors<br />

2.4-p1 The NATO Headquarters Programme Office (HQPO) is designated as<br />

being overall responsible for the NNHQ integration activities. The overall NNHQ<br />

programme plan coordinates the deliverables for a number of NATO elements and<br />

Host Nations all working together to deliver the totality of the NNHQ.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-9 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-10 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

2.4-p2 The HQPO plan for NNHQ addresses the projects identified below:<br />

A. NATO Projects<br />

1. NATO General (purpose-segment) Communications System (NGCS)<br />

2. NATO Public Key Infrastructure (NPKI)<br />

3. NATO Enterprise Directory Service (NEDS)<br />

4. NATO Computer Incident Response Capability (NCIRC)<br />

5. Public Internet Access (PIA)<br />

6. NATO Video-Teleconferencing service (VTC)<br />

B. Host Nation Belgium<br />

1. Global Construction Contract (GCC)supporting the following capabilities<br />

relevant to ANWI:<br />

a. Server &technical equipment rooms, power and cooling<br />

b. Passive Network Infrastructure (PNWI) [cabling and intelligent<br />

patching system]<br />

c. Building Management System (BMS)<br />

2. Electronic Security System (ESS)<br />

3. Audio/Video Integration (AVI)<br />

C. Host Nation ICTM<br />

1. Business Application and Data Migration (BADM)<br />

2.4-p3 The ANWI Contractor shall adhere to the key milestone dates provided in<br />

Annex A: Schedule of Programme Milestones, to maintain the overall NNHQ<br />

programme schedule with the ANWI dependent elements and projects.<br />

2.5 Statement of Work (SOW) Organisation<br />

2.5-p1 The remainder of this Statement of Work (SOW) defines the requirements<br />

for services and supplies to be provided by the Contractor under this contract.<br />

2.5-p2 The SOW’s main body defines the project scope as well as high level and<br />

common (across all deliverables) requirements as identified below:<br />

High Level ANWI Strategic Requirements.<br />

Project Management.<br />

ANWI Service and System Design.<br />

ANWI Implementation and Transition.<br />

ANWI Service and System Operations.<br />

ANWI Service Improvement.<br />

2.5-p3 The SOW Annexes contain information needed for the planning, design<br />

and implementation of the ANWI.<br />

Annex A: Schedule of Key Program Milestones.<br />

Annex B: Purchaser Furnished Equipment.<br />

Annex C: ANWI Architecture’s “Logical View”.<br />

Annex D: ANWI Architecture “Initial System and Technical View”.<br />

Annex E: Specific Community of Interest.<br />

Annex F: Infrastructure Services.<br />

Annex G: Unified Communications Capability Services.<br />

Annex H: Client Provisioning Services.<br />

Annex I: Supplementary Services.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

<br />

<br />

<br />

<br />

Annex J: Integration Test Service (ITS).<br />

Annex K: Documentation & Reports.<br />

Annex L: Nations & Partners.<br />

Annex M: Remote Sites.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-11 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 3. HIGH LEVEL ANWI STRATEGIC<br />

REQUIREMENTS<br />

3.1 ANWI Business Benefits<br />

3.1-p1 ANWI will deliver a new modern standards based compliant and futureproof<br />

infrastructure providing sustainable business effectiveness for the New NATO<br />

Headquarters.<br />

3.1-p2 ANWI will provide ITIL based services ensuring that the NNHQ deliverables<br />

can align with and adapt to evolving NATO HQ business requirements and new<br />

transformational ways of working,<br />

3.1-p3 The ANWI project will deliver cost effective and flexible service based<br />

solutions providing improved performance while concurrently reducing the overall<br />

operational cost of the headquarters’ ICT; and<br />

3.1-p4 ANWI will help NATO achieve its strategic interoperability goals by having<br />

the NNHQ seamlessly connect to the NATO Command Structure’s Wide Area<br />

Networks and the greater NATO enterprise to easily share both information and<br />

services.<br />

3.2 Overall NNHQ Programme Structure<br />

3.2-p1 To support the delivery of NATO’s business benefits, NATO created a<br />

program structure that has defined and manages the expectations for the NNHQ;<br />

outlined the management structure for the NNHQ project programme; generated<br />

programme guidance and processes; and has delegated decision-rights to specific<br />

areas of NNHQ responsibility.<br />

3.2-p2 The applicable constituent parts relating to the NNHQ Programme structure<br />

are:<br />

A. The Deputy Permanent Representative Committee (DPRC) is the funding<br />

authority for the NNHQ programme structure.<br />

B. The NATO Headquarters Programme Office (HQPO), subordinate to the<br />

DPRC, represents the NNHQ users and is accountablefor ensuring the<br />

delivery of the user requirements and serves as the overall NNHQ<br />

integration Authority.<br />

C. Subordinate to the HQPO are the Purchaser and two Host Nations<br />

(Belgium and ICTM) which have the responsibility to deliver various<br />

elements of the NNHQ project.<br />

D. NCIA serves as the ANWI Implementation Authority with specific<br />

responsibility for the design, procurement and implementation of the ANWI<br />

as well as providing the Integration and Test Service (ITS).<br />

3.2-p3 As such, any changes to the ANWI (architecture, design, concepts or<br />

solution) shall be managed by the Implementation Authority, NCIA .<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-12 of 532


N A T O U N C L A S S I F I E D<br />

3.3 High Level ANWI Strategic Principles<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.3-p1 The NNHQ’s requires a cost effective, modern and innovative ANWI<br />

solution in order to satisfy NATO’s business benefits.<br />

3.3-p2 NATO provides its architectural requirements in Annex C and D which the<br />

ANWI Contractor shall use to support the ANWI design process.<br />

3.3-p3 The ANWI solution shall embrace the following strategic high level<br />

principles (they are fully described in the ANWI architecture, Annex C):<br />

A. Security<br />

B. Scalability<br />

C. Commercial Off The Shelf<br />

E. Reliability, Resilience and Robustness<br />

F. Flexibility<br />

G. Management of Facilities Services<br />

H. Future proof<br />

I. State-of-the-art Technology<br />

J. Interoperability<br />

K. Safety<br />

L. User Experience<br />

3.4 NNHQ Users<br />

3.4-p1 The NNHQ will be a large campus supporting many types of users, with<br />

varying needs, spread across the NNHQ’s security domains and across a number of<br />

buildings on and off campus.<br />

3.4-p2 Understanding and providing for these users’ needs are critical to the<br />

success of the ANWI implementation and realisation of the NATO business benefit.<br />

3.4-p3 There are fourteen (14) main types of users that shall be supported; these<br />

users are identified here and described in the Architecture annex (C):<br />

A. NATO HQ User<br />

B. NATO HQ Nation User<br />

C. NATO HQ Partner User<br />

D. Conference User<br />

E. NATO HQ Conference User<br />

F. NATO HQ Event User (peak)<br />

G. NATO HQ Mobile User<br />

H. NATO HQ Remote User<br />

I. Public User<br />

J. NATO Remote Office User<br />

K. NATO HQ System Administrator User<br />

L. Non-NATO Troop Contributing Nation (NNTCN) User<br />

M. Non-NATO Nation (7NNN) User<br />

N. Non-Personal Entity (NPE) User<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-13 of 532


3.5 Security Domains<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.5-p1 To more easily support the various types of users, NATO has identified four<br />

(4) security domains where these users will operate.<br />

3.5-p2 Currently, NATO HQ has numerous local area networks on its campus and<br />

the HQ is currently undergoing consolidation exercises to reduce the number of<br />

supported LANs into the four (4) security domains identified in paragraph 2.3.3-p7.<br />

3.5-p3 These security domains shall support information services up to the<br />

security classification stipulated in the table below:<br />

Security Domain Name<br />

NS<br />

EAPC<br />

Business<br />

Public<br />

Configured to Support a Security Classification up to<br />

NATO SECRET<br />

EAPC SECRET<br />

NATO RESTRICTED<br />

NATO UNCLASSIFIED Releasable to the Internet<br />

Table 3.1: ANWI security domains and the maximum security classifications of the<br />

data that can be stored on the domain<br />

3.5-p4 The ANWI Project shall design, deliver, integrate and implement the<br />

hardware and software to implement these NNHQ’s four (4) security domains in the<br />

NNHQ.<br />

A. These networks domains shall be provided to those offices, conference<br />

rooms, and out buildings across the NNHQ campus as well as providing<br />

remote access to support the distribution of users based on their security<br />

access needs (see Annex B: PFE for the distribution of users by domain).<br />

B. NATO external communications and IP services will enter the NNHQ via<br />

four communications rooms, two for military communications and two for<br />

commercial communications, where the non-availability of either a military<br />

or commercial communications room shall not render any of the ANWI<br />

military or commercial communication services unavailable.<br />

C. The ANWI Contractor shall provide a domain’s services in a manner, such<br />

that a network service shall be available to users even if either of NNHQ’s<br />

two (2) server rooms is not operational.<br />

3.6 High Availability<br />

3.6-p1 The ANWI design and implementation shall provide a load balanced<br />

infrastructure with automatic failover of a server room to the other server room<br />

without loss of data and minimal delay.<br />

3.6-p2 The ANWI design and implementation shall provide a load balanced<br />

infrastructure with automatic failover of its services from one server room to the other<br />

server room’s services without loss of data and minimal delay.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-14 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.6-p3 The ANWI Contractor shall support the NATO HQ recovery plan if both<br />

NNHQ server rooms fail:<br />

A. The NATO HQ currently uses an alternate facility as its disaster site where<br />

key NATO HQ staff can operate with reduced ICT capabilities.<br />

B. The NNHQ will reuse this capability to host the replication of critical ANWI<br />

services.<br />

3.6-p4 The ANWI Contractor shall provide data routing from the NNHQ to the<br />

alternate site ensuring that the replicated critical business data and services are<br />

available for use in case of disaster.<br />

3.7 Life-Cycle and Innovation<br />

3.7.1 Life-Cycle<br />

3.7.1-p1 The ANWI Contractor shall ensure that all delivered processes follow a<br />

life cycle process where service improvements are fed back into the requirements<br />

and processed through a design adjustment and transition for implementation and<br />

then ultimately supported<br />

ANWI Service<br />

Improvement<br />

ANWI<br />

Requirements<br />

ANWI Service<br />

and System<br />

Design<br />

ANWI<br />

Implementation<br />

and Transition<br />

ANWI Service<br />

and<br />

Operations<br />

.<br />

Figure 3.1 Life cycle process with improvement feedback loop<br />

3.7.1-p2 For the ANWI project, NATO considers the capability’s life-cycle an<br />

important part of delivery and requires that the NNHQ have the most modern COTS<br />

solutions (e.g. the latest version of a product that is proven to be mature from an<br />

engineering and operations and support perspective) at the time of delivery.<br />

A. The ANWI Contractor shall deliver the ANWI infrastructure services to<br />

accommodate the needed capacity and performance requirements without<br />

over providing infrastructure.<br />

B. ANWI hardware shall not be end-of-life or targeted for end-of-life (within 18<br />

months) at acceptance time.<br />

C. Delivered ANWI hardware configurations shall have the components<br />

available to expand the storage capacity, processing and memory<br />

according to the forecasted expansion requirements in Annex F.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-15 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

E. Due to the nature of the data, ANWI storage media (e.g. hard disk drives)<br />

cannot be returned to the OEM maintainer as part of any warranty; the<br />

Purchaser will destroy any bad or inoperable storage media.<br />

F. For those services selected to be NONO, the ANWI Contractor shall<br />

provide training for those services such that NATO trained 1st level<br />

support engineers can properly add cards to switches, memory and CPUs<br />

to servers, and disks to storage devices without invalidating the device’s<br />

hardware warranty.<br />

3.7.2 Innovation<br />

3.7.2-p1 The ANWI Contractor shall, as part of the design process, plan for<br />

innovation and technology updates.<br />

A. Prior to the Initial Operating Capability (IOC), it is highly probable that at<br />

least one major technology life cycle and several technological updates<br />

will occur for the hardware and/or software of ANWI components;<br />

therefore the ANWI Contractor shall suppport technology confirmation<br />

points to delivering antiquated hardware.<br />

B. A technology confirmation point is that point in time where the Purchaser<br />

and ANWI Contractor shall review the hardware configurations and agree<br />

that the Contractor shall update the technical hardware configuration(s)<br />

based on the new technology without increasing the overall cost of the end<br />

item.<br />

C. To provide up-to-date technology as part of this project, the ANWI<br />

Contractor shall address four (4) technology confirmation points defined<br />

below:<br />

1. As part of the design review prior to the ANWI Contractor’s ordering of<br />

the ITS hardware.<br />

2. After the infrastructure design and 30 days prior to switch and first<br />

iteration of server and storage purchase.<br />

3. 60 days prior to wireless Access Point delivery.<br />

4. 90 days prior to the purchase of user client devices.<br />

D. The ANWI Contractor shall propose the technology updates at the<br />

technology confirmation point.<br />

E. If the Purchaser agrees to the Contractor’s proposal, the Contractor shall<br />

adjust the hardware and/or software configuration, update the hardware<br />

and/or software, and update the configuration records.<br />

3.7.2-p2 The ANWI Contractor shall not deliver all ANWI hardware at the start of<br />

implementation<br />

3.7.2-p3 The ANWI Contractor shall support a service capacity paradigm where<br />

the Schedule of Supplies and Services’ hardware quantities identifies the upper limit<br />

which is available to support additional capability while being able to concurrently<br />

provide the new capacity, when needed.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-16 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

TB<br />

or<br />

CPU<br />

Typical<br />

Not yet used<br />

Desired<br />

In use & Provisioned<br />

2014 2015 2016 2020<br />

Enter<br />

Building<br />

IOC FOC FSA<br />

Time<br />

Figure 3.2 Phased delivery of ANWI capacity<br />

3.7.2-p4 Figure 3.2 graphically depicts the provisioning concept described<br />

above. Over the ANWI life cycle, it is believed that the identified (maximum) numbers<br />

of processing and storage should be delivered. The yellow ‘curve’ shows that NATO<br />

wants to deliver capacity based on need vice ‘big bang’ where there is a high<br />

probability that devices amy become obsolete before they are palced into operation.<br />

3.7.3 Capability to Service Evolution<br />

3.7.3-p1 The ANWI Contractor shall scope the ANWI system as a delivery of<br />

integrated services.<br />

3.7.3-p2 An ANWI service shall consist of capabilities and functions installed,<br />

configured by the ANWI Contractor and maintained by either the NATO O&M<br />

Authority staff or the ANWI Contractor.<br />

3.7.3-p3 The ANWI Contractor shall provide and maintain (throughout the<br />

contract’s life) a service catalogue of the ANWI services that NNHQ staff and<br />

delegations can consume or purchase.<br />

3.7.3-p4 The ANWI Contractor shall provide tools to support NATO users and<br />

NATO (Partner) Nation delegation billing/invoicing.<br />

3.7.3-p5 The ANWI Contractor shall deliver services per the SLAs defined in the<br />

ANWI contract.<br />

3.7.4 Service Level Management (SLM)<br />

3.7.4-p1 Services shall be provided in accordance with agreed Service Level<br />

Agreements (SLA).<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-17 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-18 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.7.4-p2 The ANWI Contractor shall define, document and provide tools to<br />

monitor the SLAs for each ANWI provided service.<br />

3.7.4-p3 Within the NNHQ two (2) rooms have been allocated to serve as the<br />

Network Operations Centre (NOC). Either room shall be capable of monitoring,<br />

managing and controlling the statuses of services on any of the security domains.<br />

3.7.4-p4 The NOC shall be equipped with large screen displays (at least 50”)<br />

where the Service Management’s dashboard of ANWI Key Performance Indicators<br />

(KPIs) shall be monitored.<br />

3.7.4-p5 The NATO O&M Authority shall be given access to ANWI Service<br />

Management and Control (SMC) information to support NNHQ services, as needed.<br />

3.7.5 Service Provisioning Models<br />

3.7.5-p1 ANWI shall embrace three service provisioning models: NATO-Owned /<br />

NATO-Operated (NONO); NATO-Owned / Contractor Operated (NOCO); and<br />

Contractor-Owned / Contractor-Operated (COCO).<br />

3.7.5.1 NATO-Owned / NATO-Operated (NONO)<br />

3.7.5.1-p1<br />

maintenance.<br />

NATO will own the service’s hardware and be responsible for its<br />

3.7.5.1-p2 NATO will operate the service and provide 1st, 2nd and 3rd level<br />

support, as defined in Section 7.<br />

3.7.5.1-p3<br />

training.<br />

The ANWI Contractor shall provide NATO with operator/maintainer<br />

3.7.5.2 NATO-Owned / Contractor-Operated (NOCO)<br />

3.7.5.2-p1 NATO will own the hardware and the ANWI Contractor shall be<br />

responsible for its maintenance.<br />

3.7.5.2-p2 The ANWI Contractor shall operate the service and provide 1st, 2nd<br />

and 3rd level support, as defined in Section 7.<br />

3.7.5.2-p3 The ANWI Contractor shall provide the service level manager and<br />

all needed manpower to operate the service within the terms and conditions of the<br />

SLA.<br />

3.7.5.3 Contractor-Owned / Contractor-Operated (COCO)<br />

3.7.5.3-p1 The ANWI Contractor or a sub-Contractor shall own and manage<br />

the hardware and its life cycle (upgrades and technology refreshes).<br />

3.7.5.3-p2 The ANWI Contractor shall operate the service and provide 1st, 2nd<br />

and 3rd level support, as defined in Section 7.<br />

3.7.5.3-p3 The ANWI Contractor shall provide the service level manager and<br />

all needed manpower to operate the service within the terms and conditions of the<br />

SLA.<br />

3.7.5.3-p4 The ANWI GSM service shall be COCO requiring the provider to not<br />

only maintain and operate his commercial back-end network and service provisioning


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

but also the extension of any hardware and software provisioning onto the NNHQ<br />

campus due to weak GSM signal penetration throughout the NNHQ.<br />

3.7.5.3-p5 Any provisioning of equipment to extend the GSM signal on the<br />

NATO campus shall support all locally supported Belgian GSM providers without<br />

NATO users being charged roaming charges by virtue of the user entering the NNHQ<br />

building, as specified in Annex I Appendix 2.<br />

3.7.5.3-p6<br />

personal GSM.<br />

NATO or NATO visitors will own the end user’s SmartPhone/PDA or<br />

3.7.5.3-p7 The ANWI IPTV service, as COCO, shall address the provider’s<br />

back-end network and signal provisioning as well as the extension of any hardware<br />

and software on the NNHQ campus needed to support the distribution and<br />

dissemination of the television signal onto the NNHQ cabling infrastructure.<br />

3.7.5.3-p8<br />

Appendix 6.<br />

NATO will own the user’s IPTV device, as specified in Annex I<br />

3.7.6 Contractor ICT Support Following Acceptance<br />

3.7.6-p1 Implementing proper Service Level Management will facilitate NATO’s<br />

decision whether to in-source or out-source its ICT support.<br />

3.7.6-p2 The ANWI Contractor may serve as the 1 st , 2 nd and 3 rd level support<br />

Authority for the delivered ANWI services(see section 7 for support level<br />

descriptions).<br />

3.7.6-p3 The Purchaser will decide the final provisioning model of ANWI services<br />

(based on needed skills/expertise and security reasons) thus replacing NOCO with<br />

NONO and assuming the 1 st and 2 nd level support role.<br />

3.7.6-p4 External supplied services (IPTV and GSM) shall be made available<br />

and supported by their respective third party service provider while the ANWI<br />

Contractor shall ensure that these services are available throughout the NNHQ<br />

campus.<br />

3.7.6-p5 The ANWI Contractor shall provide the ANWI Printing and Scanning<br />

service in accordance with the COCO model.<br />

3.8 Design<br />

3.8-p1 The ANWI contract requires the implementation of components that are<br />

combined into services where the collective groupings of services provide the overall<br />

system on a single environment.<br />

3.8-p2<br />

below:<br />

A high level diagram of the NNHQ’s domains and connectivity is shown<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-19 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 3.3 High-level diagram of the ANWI<br />

3.8-p3 The ANWI Contractor's design shall describe the provisioning, for each of<br />

the NNHQ’s 4 security domains.<br />

3.8-p4 The ANWI contractor's design shall provide resilience by automating the<br />

failover of each service from one server room to the other with no loss of data and<br />

minimal delay (per RPO and RTO times identified in annex F).<br />

3.8-p5 The ANWI Contractor’s service design shall describe the delivery of<br />

services, including the physical design as well as the processes and that will be used<br />

to achieve the overall service levels in accordance with the defined Service Level<br />

Targets (SLT) stipulated in this SOW.<br />

3.8-p6 The ANWI Contractor shall implement the following services on the<br />

appropriate security domain (for ease of understanding, the Business network has<br />

been decomposed into its constituent parts – NR and NU as some UNCLASSIFIED<br />

services are provided to the Business domain and the Business domain shall provide<br />

extranet applications that connect to the Internet).<br />

No.<br />

Security Domain (Up to Classification)<br />

NS EAPC Business Public<br />

Services NR NU<br />

1 SMC and Information Assurance Services<br />

1.1 Service Management and Control(SMC) Y Y 1 Y Y 1<br />

1.2 Information Assurance (IA) Y Y Y Y<br />

2 Infrastructure Services<br />

2.1 Processing Y Y Y Y 4 Y<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-20 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

No.<br />

Security Domain (Up to Classification)<br />

NS EAPC Business Public<br />

Services NR NU<br />

2.2 Storage Y Y Y Y 4 Y<br />

2.3 Printing & Scanning Y Y Y Y<br />

2.4 Network Infrastructure Y Y Y Y Y<br />

2.5a LAN (Wired) Y Y Y Y Y 2<br />

2.5b LAN (Wireless)<br />

3 UCC (Unified Communications & Collaboration Services<br />

3.1 Voice Y Y 3 Y<br />

3.2 Voicemail Y Y<br />

3.3 Video-Teleconferencing (VTC) Y Y<br />

3.4 E-mail Y Y Y<br />

3.5 Unified Messaging Y<br />

3.6 FAX Y Y<br />

3.7 Instant Messaging (IM)/chat Y Y<br />

3.8 Presence Y Y<br />

3.9 Directory Service Y Y Y<br />

3.10 Collaboration Y Y<br />

3.11 Mobility Y<br />

4 Client Provisioning Services<br />

4.1 Software provisioning Y Y Y Y 2<br />

4.2 Client devices Y Y Y Y<br />

5 Supplementary Services<br />

5.1 GSM n.a.<br />

5.2 GSM Blocking Y 7<br />

5.3 Wireless Blocking Y 7<br />

5.4 Site Security Communications (Radio) n.a.<br />

5.5 IPTV Y 3 Y 5<br />

Key: 1 limited Management capability; 2 Only for Kiosk PC’s; 3 Software Clients; 4 Extranet Applications & DB (DMZ) – Up to NU security domain only exists<br />

in the Data Centre.; 5 Shall cover both IPTV streaming and Browser accessible IPTV services; 6 No specific Business WLAN service – Mobile business<br />

clients shall use the Public WLan to establish secure (VPN) connection with Business security domain.; 7 Static GSM/WLAN Blocking capabilities shall be<br />

managed from the Business network. Mobile GSM/WLAN Blocking capabilities are not networked.<br />

Table 3.2: ANWI Services (security domain) mapping of service<br />

6<br />

Y<br />

3.8-p7 The table provides an overview of the services that shall be made available<br />

for each security domain. This table doesn’t provide details about the classification of<br />

the information handled by the services.<br />

3.8-p8 The ANWI design shall define how the ANWI services (described in the<br />

Annexes of this SOW) are combined to provide a coherent system for the NNHQ.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-21 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.8-p9 The ANWI approved design shall be achieved through a series of events<br />

and deliverables that include:<br />

A. Requirements review.<br />

B. Design briefing.<br />

C. Design document.<br />

E. Design review meeting.<br />

3.8-p10 The ANWI design process is detailed in SECTION 5.<br />

3.9 Interfacing with NATO Provided Services<br />

3.9-p1 An integral part of the ANWI requires interfacing with NATO provided<br />

services which are identified below.<br />

3.9.1.1 Host Nation Projects for NNHQ<br />

3.9.1.1-p1 Global Construction Contractor (GCC) is the New NATO<br />

Headquarters (NNHQ) Contractor responsible for delivering the building. The ANWI<br />

shall use the provided server rooms, communications rooms and technical<br />

equipment rooms while working within the allocated power and cooling constraints for<br />

those rooms (identified in Annex B).<br />

3.9.1.1-p2 Passive Network Infrastructure (PNWI) will be provided by the<br />

GCC and delivers cabling for voice, data and AV, and an active patching system that<br />

shall be used to deliver ANWI services from the server rooms to the user as identified<br />

in Annex B, paragraph 10.2.7.<br />

3.9.1.1-p3 Building Management System (BMS) will be provided by the GCC<br />

to monitor, manage and control the NNHQ’s building environment and facilities. The<br />

ANWI shall provide storage for the BMS data as identified in Annex B, paragraph<br />

10.3.<br />

3.9.1.1-p4 Electronic Security Systems (ESS) will be provided by a separate<br />

ESS contractor to provide capabilities for automated access control, visitor handling,<br />

CCTV and intruder detection systems, as well as Central Security Management and<br />

Control Services (CSMCS). The ANWI shall provide storage for the ESS data as<br />

identified in Annex B, paragraph 10.4.<br />

3.9.1.1-p5 Audio Visual Infrastructure (AVI) will be provided by a separate<br />

AVI contractor to provide the active and passive components that shall be used in the<br />

NNHQ’s conference rooms to deliver AV recording, electronic displays, audio<br />

systems, projectors and video streaming services. The ANWI shall provide storage<br />

for the AVI data as identified in Annex B, paragraph 10.5; and shall also make ANWI<br />

processing services available to support the AVI implementation.<br />

3.9.1.1-p6 Business Applications and Data Migration (BADM) is currently<br />

planned to be provided and migrated by EM/ICTM as identified in Annex B,<br />

paragraph 10.3. The ANWI Contractor shall provide AD, adjustment of security<br />

(settings) roles and software deployment support, based on the ITS results, to this<br />

activity as part of the ANWI 2 nd level implementation support.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-22 of 532


N A T O U N C L A S S I F I E D<br />

3.9.1.2 NCIA & NCIA Projects for NATO<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.9.1.2-p1 NATO General [Purpose Segment] Communication System<br />

(NGCS):<br />

A. NGCS provides Wide Area Networking (WAN) access, interconnecting the<br />

NATO HQ to other NATO or NATO Nation organisations at the NS, NU or<br />

NR level. The ANWI shall connect to the NNHQ NGCS node providing the<br />

needed WAN access and is described in Annex B, paragraph 10.5.3.<br />

B. A small NGCS node will be installed in a second location to support the<br />

ITS and NNHQ back up communications for the NNHQ.<br />

3.9.1.2-p2 Public Internet Access (PIA):<br />

A. PIA provides connectivity to the Internet.<br />

B. The ANWI Contractor shall connect the ANWI’s Public domain to the PIA<br />

providing users managed Internet access. The PIA is described in Annex<br />

B, paragraph 10.6.6.<br />

3.9.1.2-p3 NATO Enterprise Directory Services (NEDS):<br />

A. NEDS provides enterprise level directory synchronisation services and is<br />

described in Annex B, paragraph 10.6.3.<br />

3.9.1.2-p4 NATO Public Key Infrastructure (NPKI):<br />

A. Provides all NPKI certificate services for the ANWI per NATO policy, and<br />

is described in Annex B, paragraph 10.6.5.<br />

3.9.1.2-p5 NATO Cyber Defence Incident Response Centre (NCIRC) Full<br />

Operational Capability (FOC):<br />

A. Provides Tier-3 NCIRC services and is described in Annex B, paragraph<br />

10.6.4.<br />

B. Provides Tier-1 Infrastructure (consisting of a few NR and NS<br />

workstations) and Threat Assessment Cell (2 NU and 2 NS laptops),<br />

considered as a Business Application, centrally managed by NCIRC.<br />

3.9.1.2-p6 NATO Messaging Service:<br />

A. Provides formal military messaging as a NATO enterprise service,<br />

specified in Annex B paragraph 10.6.8.<br />

3.9.1.2-p7 Active Directory AIS Single Forest Single Domain services, as<br />

provided by NATO O&M Authority, specified in Annex B paragraph 10.5.6.<br />

3.9.1.2-p8 Active Directory AIS based MS Exchange Services, specified in<br />

Annex B, paragraph 10.5.7.<br />

3.9.1.2-p9 AIS Enterprise Management Services (EMS), to support AIS<br />

based Configuration Management, Monitoring and Software Distribution Services,<br />

specified in Annex B paragraph 10.5.8.<br />

3.10 Implementation<br />

3.10.1 General<br />

3.10.1-p1<br />

The ANWI implementation shall deliver the active network services.<br />

3.10.1-p2 Implementation is specified in detail in SECTION 6.<br />

3.10.1-p3<br />

A high level discussion on implementation activities is addressed below.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-23 of 532


3.10.2 Site Survey<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.10.2-p1 Prior to the implementation the ANWI Contractor shall conduct a site<br />

survey in all relevant NNHQ locations (server rooms, TERs and communications<br />

rooms) to include the current building’s premises.<br />

3.10.2-p2 The ANWI Contract is based on the requirement for the procurement<br />

and implementation of all new equipment.<br />

3.10.2-p3 The ANWI Contractor shall identify the potential reuse of any existing<br />

NATO HQ equipment during the site survey.<br />

3.10.2-p4 Site survey requirements are provided in paragraph 6.5.2.2.<br />

3.10.3 Installation<br />

3.10.3-p1<br />

6.6.<br />

Delivery of equipment on site shall be in accordance with the paragraph<br />

3.10.3-p2 The ANWI Contractor shall implement the approved design in<br />

accordance to the agreed configurations, specified schedules and security<br />

constraints on each security domain.<br />

3.10.4 Migration and Interoperability<br />

3.10.4-p1 The ANWI Contractor shall migrate the NNHQ ICT environment in<br />

accordance with the HQPO NNHQ ICT migration strategy (ref 1.1.1.7.5).<br />

3.10.4-p2 Detailed requirements for the migration are found in paragraph 6.11.10.<br />

3.10.4-p3 During the migration period, the ANWI Contractor shall maintain and<br />

operate the ANWI environment according to the more detailed requirements in<br />

paragraphs 5.3.4-p4 and 5.6-p4 and ensure it interoperates with the current HQ<br />

environment.<br />

3.10.5 Service Provisioning<br />

3.10.5.1 Infrastructure Services<br />

3.10.5.1-p1 The Infrastructure Services provisioning shall provide network<br />

infrastructure, processing, storage and those capabilities typically supporting network<br />

access, DNS, printing and scanning for each of the security domains as well as the<br />

Local Area Networking component (wired and wireless).<br />

3.10.5.1-p2 This service also addresses cross-domain gateway capabilities that<br />

shall support the movement of data between the various security domains.<br />

3.10.5.1-p3 These sub-services are identified below and described in the<br />

indicated sections of this SOW:<br />

Annex F Appendix 2.<br />

Annex F Appendix 3.<br />

Annex F Appendix 4.<br />

Annex F Appendix 5.<br />

Annex F Appendix 6.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-24 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-25 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.10.5.1-p4 LAN connectivity for fixed desktops and servers will be via fibre<br />

optic cables; see Annex B for PNWI cable information. Cabling design details are<br />

provided as PFE under the Passive Network Infrastructure (PNWI) portion of the<br />

main building construction contract.<br />

3.10.5.1-p5 LAN connectivity supporting the switching infrastructure that<br />

interconnects server rooms and technical equipment rooms (TER, which will host<br />

ANWI switches and patch panels) will be via fibre optic cables as described in Annex<br />

B PNWI cable information.<br />

3.10.5.2 Unified Communications and Collaboration (UCC) Services<br />

3.10.5.2-p1 UCC shall provide the user the opportunity to integrate voice and<br />

email and other functions that support collaboration.<br />

3.10.5.2-p2 These sub-services are identified below and described in the<br />

indicated sections of this SOW:<br />

Annex G Appendix 2.<br />

Annex G Appendix 3.<br />

Annex G Appendix 4.<br />

Annex G Appendix 5.<br />

Annex G Appendix 6.<br />

Annex G Appendix 7.<br />

Annex G Appendix 8.<br />

Annex G Appendix 9.<br />

Annex G Appendix 10.<br />

Annex G Appendix 11.<br />

Annex G Appendix 12.<br />

3.10.5.3 Client Provisioning Services<br />

3.10.5.3-p1 Client Provisioning Services provide end-user devices to the staff in<br />

NNHQ offices, out-site buildings and conference rooms.<br />

3.10.5.3-p2 The ANWI shall provide a variety of end user devices from the<br />

standard desktop to the small footprint mobile device.<br />

3.10.5.3-p3 The Client Provisioning Services are identified below and described<br />

in the appropriate location:<br />

Annex H Appendix 2.<br />

Annex H Appendix 3.<br />

3.10.5.4 Supplementary Services<br />

3.10.5.4-p1 NNHQ supplementary services shall be provided to NATO using all<br />

three of the service models.<br />

3.10.5.4-p2 These services are identified below and described in the indicated<br />

sections of this SOW:<br />

Annex I Appendix 2 GSM as COCO.<br />

Annex I Appendix 3 GSM blocking as NOCO.<br />

Annex I Appendix 4 Wireless blocking as NOCO.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

<br />

<br />

Annex I Appendix 5 TETRA (initially) as NONO.<br />

Annex I Appendix 6 IPTV as COCO.<br />

3.10.5.5 SMC and IA Services<br />

3.10.5.5-p1<br />

services<br />

The SCOI shall provide services that cross and interface with all<br />

3.10.5.5-p2 These services are identified below and described in the indicated<br />

sections of this SOW:<br />

Annex E Appendix 1.<br />

Annex E Appendix 2.<br />

3.10.5.5-p3 Annex E Appendix 2 also addresses cross-domain gateway<br />

capabilities that shall support the movement of data between the various security<br />

domains.<br />

3.10.6 Training<br />

3.10.6-p1 The ANWI Contractor shall provide SysAdmin level training (per<br />

paragraph 6.10.9) for those services selected to be NONO.<br />

3.10.6-p2 The ANWI Contractor shall provide user training for UCC and<br />

Print/Scan services, as addressed in their respective annexes.<br />

3.10.6-p3 The specific training requirements are defined in the respective<br />

service’s area as shown below.<br />

Service Requiring Training<br />

SMC<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-26 of 532<br />

Location<br />

Annex E Appendix 1<br />

Information Assurance Annex E Appendix 2<br />

Infrastructure Services<br />

Storage (Capacity) Service Annex F Appendix 3<br />

Print/Scan Service Annex F Appendix 4<br />

LAN Services Annex F Appendix 6<br />

Unified Communications Capability Services<br />

Voice Service Annex G Appendix 2<br />

Voicemail Service Annex G Appendix 3<br />

Video Tele-Conferencing (VTC) Annex G Appendix 4<br />

E-Mail Service Component Annex G Appendix 5<br />

Unified Messaging Annex G Appendix 6<br />

FAX Service Component Annex G Appendix 7<br />

Instant Messaging/Chat Annex G Appendix 8<br />

Presence Annex G Appendix 9<br />

Directory Service Component Annex G Appendix 10<br />

Collaboration (Whiteboard) Annex G Appendix 11<br />

Client Provisioning Services<br />

Software provisioning Annex H Appendix 2<br />

Client Devices Annex H Appendix 3


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Service Requiring Training<br />

Location<br />

Supplementary Services<br />

GSM Annex I Appendix 2<br />

GSM Blocking Service Annex I Appendix 3<br />

Wireless Blocking Service Annex I Appendix 4<br />

Security Communications (radio) Annex I Appendix 5<br />

IPTV Annex I Appendix 6<br />

Table3.3: Service training<br />

3.10.7 Testing & Acceptance<br />

3.10.7-p1 Testing shall be conducted in accordance with the Test and Acceptance<br />

Plan (TAP) defined in Annex K.<br />

3.10.7-p2 Every component shall be tested based on the approved design<br />

document ensuring that the service meets the Service Level Requirements and<br />

Targets defined in the SOW’s Annexes.<br />

3.10.7-p3 The bundling of the components shall then be tested as a service,<br />

described in the Annexes of this SOW.<br />

3.10.7-p4 Acceptance shall be achieved in three (3) increments:<br />

A. Initial Operating Capability (IOC) requirements are described in paragraph<br />

6.14.<br />

B. Final Operating Capability (FOC) requirements are described in paragraph<br />

6.16.<br />

C. Final System Acceptance (FSA) requirements are described in paragraph<br />

6.17.<br />

3.10.8 Support<br />

3.10.8.1 Migration/Transfer<br />

3.10.8.1-p1 The ANWI contractor shall migrate all ANWI related services and<br />

data (e.g. e-mail, windows shares) from the current to the new building and with<br />

minimum planned disruptions.<br />

3.10.8.1-p2 A NATO Contractor will install the NATO HQ business applications<br />

onto the ANWI infrastructure.<br />

3.10.8.1-p3 The ANWI Contractor shall support the NATO Contractor with any<br />

required NNHQ server and SAN configurations and ITS testing.<br />

3.10.8.1-p4 An adjustment to a server configuration (identified in the ITS) will be<br />

proposed and requested by the NATO Contractor then screened, and/or processed<br />

and approved by NOS, prior to implementation on the ANWI hardware.<br />

3.10.8.1-p5 The ANWI Contractor shall be available during NATO Contractor’s<br />

migration/transfer of the HQs legacy data onto the ANWI provided infrastructure to<br />

support permission/access right configurations.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-27 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

3.10.8.1-p6 The ANWI Contractor shall provide Domain Name System (DNS),<br />

Active Directory (AD) support and capacity allocation as described in Annex F:<br />

Infrastructure Services.<br />

3.10.8.2 Service Desk<br />

3.10.8.2-p1 As soon as IOC is achieved for the first security domain the ANWI<br />

Contractor shall provide the NNHQ Service Desk with technical staff supporting the<br />

implemented capabilities and services.<br />

3.10.8.2-p2<br />

The Service Desk augmentation support shall continue to FSA.<br />

3.10.8.3 Post FOC to FSA support<br />

3.10.8.3-p1 This support shall commence immediately after successfully<br />

achieving FOC and last for 6 months.<br />

3.10.8.3-p2 The ANWI Contractor staff shall support the tuning of the<br />

implemented services based on the SLA’s Key Performance Indicator (KPI) statistics<br />

during this period.<br />

3.10.8.3-p3 The ANWI Contractor shall support the troubleshooting of ANWI<br />

implemented user –service issues and advise the NATO O&M Authority staff on<br />

back-end support issues for NNHQ NONO services.<br />

3.10.9 Total Cost of Ownership (TCO) Assessment<br />

3.10.9-p1 The ANWI Contractor shall recommend for each service the number<br />

and skill set of staff needed to support the service for NATO consideration as part of<br />

the NOCO (outsourcing) service model.<br />

3.11 Integration and Testing Services<br />

3.11-p1 The ANWI shall provide Integration and Testing Services; the requirements<br />

for this are found at Annex J: Integration and Testing Services.<br />

3.11-p2 The infrastructure for Integration and Testing Services shall be installed in<br />

Bâtiment Z.<br />

3.12 Nations and Partners<br />

3.12-p1 National delegations shall be provided an agreed baseline set of client<br />

devices as reflected in Annex L: Nations and Partners.<br />

3.12-p2 Nations and NATO partners located in the NNHQ will be given the<br />

opportunity to use this contract to order user devices and ANWI services.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-28 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 4.<br />

PROJECT MANAGEMENT<br />

4.1 Introduction<br />

4.1-p1 This section outlines the Project Management requirements for the<br />

NNHQ ANWI Contract.<br />

4.1-p2 The NNHQ ANWI is a complex system, and designing, coordinating,<br />

implementing, integrating, and supporting it will be a significant project management<br />

challenge where its success depends upon the implementation and use of a sound<br />

project management approach.<br />

4.2 Organisation<br />

4.2.1 Purchaser Project Organisation and Responsibilities<br />

4.2.1-p1 The Purchaser’s Project Manager serves as the Purchaser’s<br />

representative and will be the primary interface between the ANWI Contractor and<br />

Purchaser after the Effective Date of Contract (EDC).<br />

4.2.1-p2 The Purchaser Project Manager is supported by the NCIA Project team<br />

consisting of specialists in certain areas who may be delegated to act on the Project<br />

Manager’s behalf in their respective area of expertise.<br />

4.2.1-p3 The Purchaser hascreated an ANWI Project Board, in accordance with<br />

the PRINCE2 methodology, consisting of the Purchaser’s Project Manager (Project<br />

Board Executive), HQPO (Senior User),and Purchaser’s Contracting Officer (Senior<br />

Supplier).<br />

4.2.1-p4 After Contract Award, the Purchaser will add the ANWI Contractor<br />

(Senior Supplier)and the ANWI Independent Verification and Validation (IV&V,<br />

Assurance).<br />

4.2.1-p5<br />

The Project Boards will meet monthly at the Purchaser’s facility..<br />

4.2.1-p6 Neither the Purchaser’s Project Manager nor any other NATO<br />

personnel may make changes to the terms and conditions of the Contract; they will<br />

only provide the Purchaser’s interpretation of technical matters. All obligations and<br />

changes to the Contract will only be made through the Purchaser’s contracting office.<br />

4.2.2 ANWI Contractor Project Management Office<br />

4.2.2-p1 Once the implementation starts, the ANWI Contractor shall establish<br />

and maintain a Project Management Office (PMO) in the Brussels, Belgium area to<br />

perform and manage all efforts necessary to discharge the responsibilities under this<br />

Contract.<br />

4.2.2-p2 The ANWI Contractor shall ensure the continuity of personnel assigned<br />

to work on this project.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-29 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-30 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.2.2-p3 The following ANWI Contractor staff shall be identified as key<br />

personnel:<br />

A. ANWI Project Manager (PM).<br />

B. ANWI Technical Lead (TL).<br />

C. ANWI Test Director (TD).<br />

4.2.2-p4 The ANWI Contractor shall ensure the continuity of these key positions<br />

throughout the contract.<br />

4.2.2-p5 The ANWI PM shall be the ANWI Contractor’s primary interface to the<br />

Purchaser’s Project Manager.<br />

4.2.2-p6<br />

The ANWI TL may also serve as the ANWI site installation manager.<br />

4.2.2-p7 The ANWI TD shall be responsible for the ANWI Contractor provided<br />

Integration Test Service (ITS) and responsible for all ANWI testing as well as<br />

reporting oversight of all NNHQ Host Nation related test activities conducted in either<br />

the ITS or NNHQ.<br />

4.2.2-p8<br />

The ANWI TD shall oversee the management and operation of the ITS.<br />

4.2.2-p9 The ANWI Contractor shall provide all necessary manpower and<br />

resources to manage, design, implement and support the ANWI,<br />

4.2.2-p10 The Purchaser shall review and approve appointments of Contractor<br />

key personnel, including allowable substitutions need review and approval from the<br />

Purchaser.<br />

4.2.2-p11 The ANWI Contractor personnel that need to work on-site shall have at<br />

least NATO SECRET clearances by the time their respective duty or assigned task<br />

starts.<br />

4.2.3 ANWI Project Manager (PM)<br />

4.2.3-p1 The ANWI Contractor shall designate an ANWI Project Manager (PM),<br />

who will direct and co-ordinate the activities of the Contractor’s project team.<br />

4.2.3-p2 The ANWI Project Manager shall, as part of his other duties, conduct all<br />

major project design, test, and review meetings.<br />

4.2.3-p3 The ANWI PM shall have a University Degree in Electronic Engineering,<br />

Computer Science, Telecommunications, or related discipline, preferably equivalent<br />

to a Master’s, supported by relevant certificates/ diplomas. Exceptionally, extensive<br />

relevant experience may be considered if the above qualifications are not met.<br />

4.2.3-p4 The ANWI PM shall have a current Project Management (PRINCE2<br />

Practitioner and/or PMI Project Management Professional (PMP 1 )) certification.<br />

4.2.3-p5 The ANWI PM shall have a minimum of ten (10) years’ experience as<br />

an ICT Project Manager as supported by project references, points of contact, and<br />

descriptions/scope of the projects managed.<br />

4.2.3-p6 The ANWI PM shall have a minimum experience of five (5) years<br />

gained within ICT procurement, implementation, migration and management in<br />

projects similar to the ANWI Project, as supported by project references, points of<br />

contact, and description of role/responsibilities/activities executed.


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-31 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.2.3-p7 The ANWI PM shall have a minimum of one (1) years’ experience in<br />

ICT QA activities as well as knowledge and experience with QA standards (either<br />

AQAP or ISO), supported by project references, points of contact, and description of<br />

role/responsibilities/activities executed.<br />

4.2.3-p8 The ANWI PM shall have knowledge and experience with processes for<br />

integration and testing.<br />

4.2.3-p9 The ANWI PM shall have minimum of two (2) years’ experience in<br />

projects where ICT migration/transition was exercised in a managerial role<br />

responsible for the planning, designing and execution of migration/transition<br />

activities, as supported by project references, points of contact, and descriptions of<br />

the role/responsibilities/activities executed.<br />

4.2.3-p10 The ANWI PM shall have a demonstrated spoken and written fluency in<br />

English, at a minimum level of 4343 as defined in STANAG 6001.<br />

4.2.4 ANWI Technical Lead (TL)<br />

4.2.4-p1 The Technical Lead shall lead the analysis, design, development,<br />

integration, migration, and follow-on enhancement efforts of the ANWI Contractor.<br />

4.2.4-p2 The ANWI TL shall have a University Degree in Electronic Engineering,<br />

Computer Science, Telecommunications, or related discipline, preferably equivalent<br />

to a Master’s, supported by relevant certificates/ diplomas. Exceptionally, extensive<br />

relevant experience may be considered if the above qualifications are not met.<br />

4.2.4-p3 The ANWI TL shall have demonstrated practical experience in<br />

Infrastructure (processing, virtualisation, storage, switches), supported by valid<br />

certification of at least the following areas: Microsoft (MCSE), CISCO (CCDP) or valid<br />

comparable (products used in the ANWI design) certification.<br />

4.2.4-p4 The ANWI TL shall have a minimum of two (2) years’ experience<br />

designing and implementing high-availability server rooms as supported by project<br />

references, points of contact, and technical descriptions of the projects implemented.<br />

4.2.4-p5 The ANWI TL shall have a minimum of three (3) years’ experience<br />

designing and implementing local area networks in projects similar to the ANWI<br />

Project demonstrating a strong network infrastructure and network service focus with<br />

good knowledge of Information Assurance and provisioning of core applications, as<br />

supported by project references, points of contact, and description of<br />

role/responsibilities/activities held in these projects.<br />

4.2.4-p6 The ANWI TL shall have a minimum of two (2) years’ experience as a<br />

technical manager responsible for the planning, designing and execution of projects<br />

where an Active Directory and subsequent application and data migration/transition<br />

activities were exercised; as supported by project references, points of contact, and<br />

technical description of the role/responsibilities/activities during this time.<br />

4.2.4-p7 The ANWI TL shall have a minimum of one (1) years’ experience in<br />

undertaking ICT QA activities, supported by supported by project references, point of<br />

contact, and description of role/responsibilities/activities.<br />

4.2.4-p8 The ANWI TL shall have knowledge and experience with QA standards<br />

(either AQAP or ISO), processes for integration and (pre) migration testing.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.2.4-p9 The ANWI TL shall have a minimum of three (3) years’ experience as a<br />

team leader or project manager to ensure the technical management oversight of a:<br />

LAN designer, Server Room designer, UCC designer, communications engineer and<br />

systems integrator; as supported by project references, points of contact, and<br />

technical description of the role/responsibilities/activities.<br />

4.2.4-p10 The ANWI TL shall have an up to date ITIL v3 Intermediate Level<br />

Certification having earned at least 12 points in the Service Capability area.<br />

4.2.4-p11 The ANWI TL shall have a demonstrated spoken and written fluency in<br />

English, at a minimum level of 4343 as defined in STANAG 6001.<br />

4.2.5 ANWI Test Director (TD)<br />

4.2.5-p1 The ANWI TD shall have a University Degree in Electronic Engineering,<br />

Computer Science, Telecommunications, or related discipline, preferably equivalent<br />

to a Master’s and supplemented by relevant postgraduate qualifications, supported<br />

by relevant certificates/ diplomas. Exceptionally extensive relevant experience may<br />

be considered if the above qualifications are not met.<br />

4.2.5-p2 The ANWI TD shall have integration and testing engineering skills with<br />

five (5) years’ experience as part of large ICT projects, supported by project<br />

references, point of contact, and description of role/responsibilities/activities.<br />

4.2.5-p3 The ANWI TD shall have demonstrated practical experience in<br />

planning, conducting and assessing Integration and Testing activities in support of<br />

large ICT projects for at least three (3) years, supported by project references, point<br />

of contact, and description of role/responsibilities/activities.<br />

4.2.5-p4 The ANWI TD shall have demonstrated practical experience in testing<br />

of IT infrastructure, core services where the role of test engineer or integration<br />

engineer was exercised, supported by project references, point of contact, and<br />

description of role/responsibilities/activities.<br />

4.2.5-p5 The ANWI TD shall have demonstrated practical experience in ICT<br />

migrations where the role of test engineer or integration engineer was exercised for<br />

migration of ICT services (Active Directory, business applications and associated<br />

data), supported by project references, point of contact, and description of<br />

role/responsibilities/activities.<br />

4.2.5-p6 The ANWI TD shall have demonstrated practical knowledge and<br />

experience with QA standards (either AQAP or ISO), processes for integration and<br />

(pre) migration testing.<br />

4.2.5-p7 The ANWI TD shall have a demonstrated spoken and written fluency in<br />

English, as defined in STANAG 6001 at a minimum level of 4343.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-32 of 532


4.2.6 Key Supporting Staff<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.2.6-p1 The following support staff are deemed essential to the ANWI project<br />

but shall not be identified as key personnel and thus do not require the Purchaser’s<br />

approval.<br />

A. ANWI Quality Assurance Manager: the ANWI Contractor shall designate<br />

a qualified individual to serve as the Quality Assurance Manager for<br />

activities under this contract. Quality Assurance Manager shall have a<br />

demonstrated spoken and written fluency in English at a level of 4343, as<br />

defined in STANAG 6001<br />

B. Site Implementation and Support Manager: the ANWI Contractor shall<br />

designate a qualified and experienced individual to serve as the lead for<br />

site implementation and operational support of the ANWI Service Desk<br />

throughout the performance of the contract. The Site Implementation and<br />

Support Manager shall have a demonstrated spoken and written fluency in<br />

English at a level of 4343, as defined in STANAG 6001.<br />

C. ANWI Trainers: the ANWI Contractor shall identify qualified individuals<br />

with at least 2 years proven instructor experience to serve as the trainers<br />

supporting the contract. Trainers shall have a demonstrated spoken and<br />

written fluency in English at a level of 4444, as defined in STANAG 6001.<br />

D. ANWI Security Accreditation Manager. The ANWI contractor shall<br />

designate a suitably qualified individual to act as the security accreditation<br />

point of contact, responsible for all elements of production of the ADS<br />

inputs and to act as the central POC with the Authority on security-related<br />

matters in respect of the ANWI solutions, including attendance at NATO<br />

security accreditation meetings, as required<br />

4.3 Project Management Documentation<br />

4.3-p1 The ANWI Project Management documentation and plans are required<br />

to be regularly updated and as such shall be configuration controlled.<br />

4.3-p2 The ANWI Project Management documentation shall define all the<br />

aspects of how the ANWI project shall be managed and executed.<br />

4.3-p3 The ANWI Project Management documentation shall be posted on the<br />

ANWI project website.<br />

4.3-p4 The list of ANWI Project Management documentation is identified here<br />

and fully described in the documentation annex (Annex K):<br />

Project Management Plan (PMP)<br />

Project Implementation Plan (PIP)<br />

Migration Plan (MP)<br />

Risk Management Plan (RMP)<br />

Quality Assurance Plan (QAP)<br />

Test & Acceptance Plan (TAP)<br />

Integrated Logistics Support Plan (ILSP)<br />

Configuration Management Plan (CMP)<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-33 of 532


4.4 Project Controls<br />

4.4.1 Stages and Transition<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.4.1-p1 The ANWI Contractor shall follow the project methodology of the ANWI<br />

PM’s current project management certification (if the PM holds more than one, the<br />

ANWI Contractor is at liberty to choose between the methodologies).<br />

4.4.1-p2 The ANWI Contractor shall identify and describe the ANWI phases of<br />

the project and the stages within a phase, such that the ANWI stages align with both<br />

the ITILv3 life cycle and project methodology (the diagram is meant to only provide a<br />

visual idea of the requirement).<br />

IOC<br />

FOC<br />

FSA<br />

Design<br />

Phase<br />

Transition<br />

Phase<br />

Support<br />

Phase<br />

Improve<br />

Phase<br />

Stage 1 Stage 2 Stage 3 Stage 4<br />

Stage 1 Stage 2 Stage 3 Stage 4<br />

Stage 1 Stage 2 Stage 3 Stage 4<br />

Stage 1 Stage 2 Stage 3 Stage 4<br />

IOC<br />

FOC<br />

FSA<br />

Figure 4.1 Conceptual view of stage and phase relations<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-34 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Design<br />

Phase<br />

Transition<br />

Phase<br />

Support<br />

Phase<br />

Improve<br />

Phase<br />

Preliminary Design Review (PDR)<br />

System Requirements Review (SRR)<br />

Critical Design Review (CDR)<br />

Security Risk Assessment (SRA)<br />

Security Documentation<br />

ITS implementation<br />

Site Survey<br />

Shipping<br />

Testing & ‘accreditation’<br />

Installation & baseline<br />

Training<br />

Migration<br />

IOC, FOC, FSA<br />

Support Desk<br />

Service Management & Control<br />

Monitoring, reporting, auditing<br />

CMDB<br />

Service Catalogue<br />

SLA/SLT reviews<br />

PKI monitoring, reporting,<br />

auditing<br />

1. ITS, CDGW, Switching,<br />

processing, storage<br />

2. Service Management &<br />

Control<br />

3. UCC & Client Provisioning<br />

4. GSM & Secure<br />

Communications<br />

Figure 4.2 Conceptual Stage Activities and Design Decomposition<br />

4.4.1-p3 The ANWI Contractor shall ensure that the stages and phases are<br />

properly reflected in the PIP / Work Breakdown Structure (WBS).<br />

4.4.1-p4 The ANWI Contractor shall identify the triggers that are to be used to<br />

request a move between stage and phases.<br />

4.4.2 Change Management<br />

4.4.2-p1 The ANWI Contractor shall implement a change management approach<br />

and process,based on the requirements defined in paragraph 6.3, to be used<br />

throughout the ANWI project.<br />

4.4.2-p2 The ANWI Contractor is responsible for executing the change<br />

management process for each change request.<br />

4.4.2-p3 The ANWI Contractor’s change management process shall address<br />

submitting, reviewing, vetting, managing, and communicating change requests.<br />

4.4.2-p4 The ANWI Contractor shall log all submitted change requests,<br />

throughout the project’s lifecycle, in a change request register.<br />

4.4.2-p5 The ANWI Contractor’s change management process shall ensure that<br />

ANWI change requests are processed according to the defined process and CAB<br />

decisions reviewed at project meetings.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-35 of 532


4.4.3 Change Requests<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.4.3-p1 The ANWI Contractor shall establish and maintain a process for<br />

identifying, reviewing, approving, and tracking all requests for changes to NNHQ<br />

ANWI baselines.<br />

4.4.3-p2 As described in ACMP-3, Change Requests shall be categorised as<br />

follows:<br />

A. Class 1 Change Requests affect the documentation and baselines<br />

managed by the Purchaser’s NNHQ ANWI Configuration Control Board.<br />

B. Class 2 Change Requests affect the baseline managed by the ANWI<br />

Contractor’s Configuration Control Board and can be approved without<br />

Purchaser review.<br />

4.4.4 Off-Specifications<br />

4.4.4-p1 The ANWI Contractor shall establish and maintain a process for<br />

reporting, tracking, and resolving Off-specifications on all baselines through Offspecification<br />

Reports (OSR).<br />

4.4.4-p2 Off-specification Reports (OSR), which document problems/issues with<br />

the design, configuration, implementation, or operation of NNHQ ANWI, shall be<br />

included in the ANWI Contractor’s Issue Management Plan and are distinguished<br />

from Change Requests, which identify proposed changes to the Functional,<br />

Developmental, or Product Baselines.<br />

4.4.4-p3 OSR shall be closed when the identified problem/issue is resolved<br />

through procedure or other action that does not affect the system baselines, or when<br />

a corresponding Change Request is opened to correct the Off-specification through a<br />

change to a baseline.<br />

4.4.4-p4 All OSR shall be assembled in an Off-specifications Documentand<br />

tracked in the Issue Management Plan’s issue register.<br />

4.5 Project-Level Communications<br />

4.5.1 General<br />

4.5.1-p1<br />

4.5.1-p2<br />

The Purchaser or his designated representative will chair all meetings.<br />

The ANWI Contractor shall schedule project meetings in the PIP.<br />

4.5.1-p3 The ANWI Contractor shall produce a draft agenda for the Purchaser’s<br />

approval at least one week before the meeting.<br />

4.5.2 Formal Meetings<br />

4.5.2.1 General<br />

4.5.2.1-p1 The ANWI PM shall participate in all formal ANWI project meetings<br />

(kick-off meeting, Project Progress Review Meetings and Design Review meetings,).<br />

4.5.2.1-p2<br />

Reserved<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-36 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.2.1-p3 The following provisions shall apply to all formal meetings to be held<br />

under the contract.<br />

A. The ANWI Contractor shall take meeting notes (capturing main points,<br />

decisions and action items)and submit them in draft version to the<br />

Purchaser for approval within 3 working days after the meeting.<br />

B. The final version of the meeting notes shall be posted on the Project<br />

Website within 3 working days of receipt of Purchaser approval.<br />

C. The participants shall not regard these minutes as a mechanism to change<br />

the terms, conditions or specifications of the Contract or as a vehicle to<br />

alter the design or configuration of equipment or systems. Any such<br />

changes shall only be made by agreement, amendment or by authorised<br />

mechanisms as set forth in the Contract.<br />

D. Any documentation, even in draft format, that may be useful to the<br />

Purchaser in preparing for Design or Project Progress Review Meetings<br />

and ensuring efficient discussions during the meetings shall be provided to<br />

the Purchaser no later than five (5) working days before the meeting.<br />

4.5.2.2 Kick Off Meeting (1 st PPRM)<br />

4.5.2.2-p1<br />

facility.<br />

The ANW Contractor shall host the project Kick Off meeting at his<br />

4.5.2.2-p2 The ANWI Contractor shall hold the Kick Off Meeting not later than<br />

3 weeks after EDC.<br />

4.5.2.2-p3 The ANWI Contractor shall address the following items:<br />

A. Project description<br />

B. Project plan (PMP and PIP)<br />

C. Project goals & objectives of the ANWI deliverables<br />

D. Project assumptions and dependencies<br />

E. Project Management process overview<br />

F. Introduction of the teams and roles<br />

G. Communications plan and meetings<br />

H. Risks<br />

4.5.2.3 Project Progress Review Meetings (PPRMs)<br />

4.5.2.3-p1 PPRMs shall be held quarterly in turn at the Purchaser’s and at the<br />

Contractor’s facilities until the start of the NNHQ server rooms’ installation.<br />

4.5.2.3-p2 From the start of the server room installation, PPRMs shall be held<br />

monthly on the NNHQ campus.<br />

4.5.2.3-p3<br />

4.5.2.4 Other Meetings<br />

The PPRMs shall follow the requirements specified in Annex K<br />

4.5.2.4-p1 The Purchaser or ANWI Contractor will alternate hosting allother<br />

meetings as agreed by both parties unless there is a specifically agreed need to<br />

review material, witness technical demonstrations, or perform any other activity<br />

outside of the Purchaser’s premises as part of the meeting.<br />

4.5.2.4-p2 Upon approval by the Purchaser’s PM, the ANWI Contractor shall<br />

schedule, organise, and conduct such meetings.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-37 of 532


4.5.3 Informal Meetings<br />

N A T O U N C L A S S I F I E D<br />

4.5.3-p1 The ANWI Contractor shall carry out ad-hoc project-level<br />

communication activities as needed to clarify project issues.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-38 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

4.5.3-p2 The Purchaser and ANWI PM shall hold fortnightly contact from the<br />

Kick off meeting through the remaining contractual period.<br />

4.5.3-p3 The parties will agree on a day (e.g. Tuesday) and time for the regular<br />

conference calls.<br />

4.5.3-p4 The Purchaser and ANWI Contractor shall exchange contact telephone<br />

numbers and agree on conference call requirements (day and time) during the<br />

project kick-off meeting.<br />

4.5.3-p5 Action Items from the conference calls shall be drafted by the ANWI<br />

Contractor and added to the ANWI Action Item List by the ANWI Contractor within 2<br />

days of the conference call.<br />

4.5.3-p6 The ANWI Contractor and Purchaser shall have weekly on-site status<br />

meetings once Implementation and Transition starts in order to quickly remedy any<br />

issues dealing with Implementation and Transition.<br />

4.5.4 Project Status Reports<br />

4.5.4-p1 The ANWI Contractor shall provide monthly Project Status Reports until<br />

the start of the NNHQ server rooms’ installation; thereafter shall be replaced by the<br />

monthly PPRM. The PPRMs shall follow the requirements specified in Annex K.<br />

4.5.5 Project Web Space<br />

4.5.5-p1 The ANWI Contractor shall use the Internet based project workspace<br />

provided and defined by the Purchaser as the project’s website.<br />

A. The Purchaser will serve as the website’s System Administrator.<br />

B. The ANWI Contractor shall serve as the content manager for the project’s<br />

workspaces. The ANWI IV&V Contractor shall have access to all part of<br />

the project’s web site.<br />

C. The ANWI Contractor shall be issued permissions to post all relevant<br />

NATO UNCLASSIFIED ANWI project documentation and datasets.<br />

D. Handling NATO Restricted Information<br />

1. The ANWI Contractor shall provide any NATO RESTRCTED (NR) to<br />

the Purchaser for posting on the Purchaser’s internal NR portal.<br />

2. The project website’s workspace shall identify (but not store) all relevant<br />

NR documents with a ‘dummy document’ reflecting the date of issue<br />

and title unless the title is classified.<br />

E. The project website shall use email alerts to notify the Purchaser, IV&V<br />

Contractor and ANWI Contractor of site changes/uploads.<br />

F. The project website’s workspace will use version control with major and<br />

minor versions.<br />

G. The project website’s workspace will provide audit logs for tracking and<br />

auditing.<br />

H. Each document shall clearly indicate whether it is part of a baseline or not.<br />

I. The project website’s workspace shall contain:


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

1. Purchaser provided documentation:<br />

a. Background and guidance documents referred to in the SOW.<br />

b. Entire contract.<br />

c. Information on other NATO Projects and NNHQ activities.<br />

2. ANWI Contractor provided and maintained documentation:<br />

a. All NATO UNCLASSIFIED ANWI project documentation, be it<br />

management products or specialists products, as soon as it is<br />

submitted in first draft version to the Purchaser.<br />

b. ANWI plans.<br />

c. Issue and Risk Register.<br />

d. Change Requests regardless of their status.<br />

e. All design documentation and vendor-provided technical documentation<br />

pertaining to the COTS.<br />

f. All test documentation.<br />

g. Project Schedule design specifications, documentation, and source<br />

code (installers and executables shall be provided to the Purchaser<br />

and maintained elsewhere in the Purchaser’s organisation).<br />

h. Project Status Reports.<br />

i. All presentation material from all Design Review and other meetings.<br />

j. Project Progress Review Meeting Minutes and notes of meetings.<br />

k. Site Survey Report.<br />

l. Site Installation Specifications.<br />

m. Network Design and Implementation Plan.<br />

n. Operator and PTC Network Reference Manuals.<br />

o. Maintenance Manuals.<br />

p. Request for Customs Form.<br />

q. Notice of Shipment.<br />

r. Inventory of provided Supplies.<br />

s. Training Material.<br />

t. Recommended Spare Parts List.<br />

u. Recommend Tools and Test-equipment list.<br />

v. Sub-Contracts and/or Purchase orders.<br />

w. All Baselines.<br />

x. Initial Operating Capability (IOC) Documentation.<br />

y. Final Operating Capability (FOC) Documentation.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-39 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 5.<br />

ANWI SERVICE AND SYSTEM DESIGN<br />

5.1 General<br />

5.1-p1 The ANWI Contractor shall develop the design of the NNHQ ANWI<br />

(including all interfaces to other systems) to meet the ANWI’s architectural, service<br />

and system requirementsas described in this Statement of Work.<br />

5.1-p2 The ANWI Contractor shall initiate the ANWI design process starting with a<br />

Preliminary Design Review (PDR) Meeting and then provide the ANWI service<br />

design in 4 stages:<br />

1) Integrated Test Service, Cross Domain Gateways, switching, infrastructure,<br />

processing and storage;<br />

2) Service Management & Control;<br />

3) UCC Services, client provisioning; and<br />

4) GSM & secure communications) where each design stage will conclude with<br />

a Critical Design Review<br />

5.1-p3 The ANWI Contractor shall establish and maintain the NNHQ ANWI Design<br />

Documentation Package, consisting of: the ANWI Design Document, ANWI Service<br />

Interface Profile Documents (specifying all ANWI internal and external service<br />

interfaces), the security design, the Change Request log (tracing appropriate<br />

changes in the design document), an Off-specifications Document, and the ANWI<br />

Requirements Traceability Matrix.<br />

5.1-p4 Maintainability: All ANWI services shall ensure a minimal Operations and<br />

Maintenance 'tail' in terms of cost and resources where special attention is given to<br />

the manpower and skill profiles required to support the services.<br />

5.1-p5 Quality: The ANWI shall ensure that the Contractor's delivered solutions<br />

are 'fit for purpose' and adhere to the quality standards agreed in the Quality<br />

Management Plan, the Target Architecture, etc.<br />

5.1-p6 Life-Cycle Approach: The ANWI shall provide an estimation of all relevant<br />

life-cycle parameters relating to the delivered service (e.g. reliability [MTBF, MTTR],<br />

life-cycle costs, equipment life, etc.) and include Total Cost of Ownership.<br />

5.2 Preliminary Design Review (PDR) Meeting<br />

5.2-p1 The ANWI Contractor shall hold a Preliminary Design Review (PDR)<br />

Meeting at the Purchaser’s facility.<br />

5.2-p2 The Preliminary Design Review Meeting shall last not more than four (4)<br />

days.<br />

5.2-p3 The Preliminary Design Review Meeting shall be based upon the ANWI<br />

Contractor’s initial design proposal and include a detailed review and discussion of<br />

how the ANWI Contractor shall meet all the requirements of the contract.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-40 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.2-p4 The Preliminary Design Review Meeting shall outline the decomposition of<br />

the ANWI design into the four (4) CDRs to facilitate delivery, testing and acceptance<br />

of the ANWI.<br />

5.2-p5 The output of the Preliminary Design Review Meeting shall deepen the<br />

understanding of the ANWI requirements and guide the evolution of the ANWI<br />

Design Document into a comprehensive document that shall be used to implement<br />

the ANWI.<br />

5.3 Design Document Package<br />

5.3.1 General<br />

5.3.1-p1 The ANWI Contractor’s Design Document package shall define the<br />

NNHQ ANWI deliverables detailing how:<br />

A. The ANWI services shall be designed and configured.<br />

B. The requirements processes in the ANWI SOW shall be implemented.<br />

C. The ANWI security requirements shall be implemented.<br />

D. The NNHQ ANWI Interoperability Services shall be implemented for the<br />

duration of the ANWI migration and migration support to Business<br />

Applications.<br />

5.3.2 Design Document<br />

5.3.2-p1 The ANWI Contractor shall deliver the ANWI Design Document in<br />

accordance with Annex K Appendix 2.<br />

5.3.2-p2 The ANWI Design Document’s quality shall be reviewed in accordance<br />

with the ANWI Contractor’s QA process defined in the QAP (Annex K) and released<br />

by the ANWI Contractor’s PM.<br />

5.3.2.1 ANWI Design Objectives<br />

5.3.2.1-p1 The ANWI Contractor’s services’ design shall comply with the ANWI<br />

service requirements detailed in Annex C and D (logical, system and technical<br />

architecture requirements), Annexes E through I (ANWI services) and reference<br />

1.1.1.7.1. (NNHQ ICT Target Architecture).<br />

5.3.2.1-p2 The ANWI Contractor shall architecturally align all ANWI service<br />

designs with one another fully supporting integration (i.e. provide services, data,<br />

information & functionality to interface with other solutions) in accordance with the<br />

NNHQ Target Architecture.<br />

5.3.2.1-p3 The ANWI Contractor’s architecture shall adopt the basic principles<br />

of modularity and interface design.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-41 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.3.2.1-p4 The ANWI design shall ensure that the following principles are built<br />

into the ANWI design and implementation:<br />

A. Performance: providing the processing, memory, storage, and quality of<br />

services, as defined by the service parameters found in the SOW’s<br />

annexes.<br />

B. Reliability: identifying and implementing quality reliable COTS products to<br />

reduce the length of time between service or component failure and to<br />

reduce the exposure to software of small user communities. Reliability<br />

shall be calculated using:<br />

1. Reliability = (available time hrs. – total downtime hrs.)/number of breaks<br />

C. Availability: to ensure the availability of NATO information, supporting<br />

system services and resources, and to provide a robust system that<br />

minimises downtime versus uptime through the provisioning of highly<br />

available services and capabilities. Availability shall be calculated using:<br />

1. Availability = 100 x (agreed service time-downtime)/agreed service time<br />

D. High availability: the effect of minimising or masking the effect of<br />

component failure to data, capabilities, services or users.<br />

E. Scalability: accommodating the growth of processing, memory usage and<br />

storage capacity and network connectivity as defined in the service<br />

parameters found in the SOW’s annexes.<br />

F. Flexibility: supporting the dynamic increase and release of<br />

server/storage/networking services on demand.<br />

G. Confidentiality: to ensure the confidentiality of information by controlling<br />

the disclosure of, and access to, NATO information, supporting system<br />

services and resources.<br />

H. Integrity: to ensure the integrity of NATO information, supporting system<br />

services and resources.<br />

i. Continuity: ensuring that the average time to restore a service is per<br />

recovery targets.<br />

J. Interoperability: Ensure that during the migration phase, the old HQ ICT<br />

environment and the NNHQ ANWI ICT environment shall be able to exist<br />

next to each other.As well as ensure that NNHQ ANWI ICT environment<br />

shall be able to operate in harmony with other NATO and Commercial<br />

systems and services.<br />

K. Maintainability: delivering an overall system that minimises the average<br />

time to repair a service, capability or component. Maintainability shall be<br />

calculated using:<br />

1. Maintainability = downtime/number of breaks.<br />

L. Serviceability: monitoring delivered capabilities to demonstrate that the<br />

provided services and capabilities are meeting the terms of the service<br />

contract and agreed with the Purchaser.<br />

M. Monitoring services shall collect and store all necessary data to compile<br />

metrics, benchmarks, statistics and all base data needed for billing<br />

processes.<br />

5.3.2.1-p5 The ANWI Contractor’s design shall incorporate the design drivers<br />

as provided in Annex D section 12.2 as key themes in the design.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-42 of 532


5.3.2.2 Standardisation<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.3.2.2-p1 The ANWI design shall minimize the variation of components and<br />

products in the ICT infrastructure through the use of a set of well-defined set of<br />

products that are standardized to the extent possible across the four networks.<br />

5.3.2.2-p2 The ANWI design shall ensure that components performing the<br />

same function across different locations and/or domains within ANWI shall be of<br />

same brand, model, capacity and feature.<br />

5.3.2.2-p3 The ANWI Contractor shall clearly document the justification and<br />

the results of exceptional cases where use of same equipment is not possible.<br />

5.3.2.2-p4<br />

5.3.2.2-p5<br />

protocols.<br />

All physical interfaces shall be based on industry standards.<br />

All logical interfaces shall be based on industry standards and<br />

5.3.2.2-p6 Configuration parameters shall be controlled, standardized and<br />

documented in the design.<br />

5.3.2.3 Innovation<br />

5.3.2.3-p1 The ANWI shall be on contract well before its implementation; as<br />

such, at least two technology life cycles are expected to occur during the ANWI’s<br />

implementation and the ANWI shall not implement old technology in the NNHQ but is<br />

expected to deploy proven and up to date modern technologies.<br />

5.3.2.3-p2 The ANWI Contractor shall incorporate innovation planning and<br />

assessment into the ANWI design process to overcome the risk of not delivering the<br />

most modern COTS solutions.<br />

5.3.2.3-p3 The ANWI Contractor shall make an assessment of state-of-art or<br />

announced technologies on service and technical maturity from an engineering and<br />

operations and support standpoint and justify the technology of choice for ANWI at<br />

the time of deployment and indicate promising technologies to keep track of since<br />

they may be a candidate for the CSI process.<br />

5.3.2.3-p4 The ANWI Contractor shall provide a design plan as part of the PIP<br />

reflecting the ANWI design being delivered in phases so that the design process,<br />

Purchaser decision and approval cycle are adequately supported in time prior to<br />

delivery and implementation.<br />

5.3.2.4 System Integration<br />

5.3.2.4-p1 The ANWI Contractor shall be responsible for integration of NNHQ<br />

ANWI components, capabilities, services and systems.<br />

5.3.2.4-p2 This implies both the integration of all ANWI HW and SW<br />

components and the integration of NNHQ ANWI with the existing NATO systems<br />

specified in Annex C and D.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-43 of 532


5.3.2.5 Environmental Considerations<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.3.2.5-p1 The ANWI design shall include estimates of peak and average<br />

power consumption, UPS/backup power and cooling as well as the overall data<br />

centre Power Utilisation Efficiency.<br />

5.3.2.5-p2 The ANWI Contractor shall optimise the design in order to minimise<br />

the total cost of ownership, including energy consumption as one parameter.<br />

5.3.2.5-p3 The ANWI design shall account for the NNHQ environmental<br />

constraints provided in Annex B: Purchaser Furnished Equipment (PFE).<br />

5.3.2.5-p4 The ANWI Contractor shall comply with all appropriate Green IT<br />

regulations including, but not limited to, the use of local regulation compliant<br />

equipment.<br />

5.3.2.5-p5 The ANWI Contractor shall provide an efficient solution in terms of<br />

energy-consumption, use of materials and environmental friendly materials.<br />

5.3.2.5-p6 The ANWI design shall comply with all relevant local electromagnetic<br />

compatibility requirements.<br />

5.3.2.5-p7 The ANWI design shall pay particular attention to compliance with<br />

any restrictions resulting from low-level over-flight by Zaventem airport traffic.<br />

5.3.2.6 Capabilities<br />

5.3.2.6-p1 The ANWI Contractor’s design shall identify COTS hardware and<br />

software capabilities for use in each ANWI service.<br />

5.3.2.6-p2 The ANWI Contractor shall identify the intended product and<br />

version, and note if any modifications, adaptations, or additional elements (such as<br />

macros or plug-ins) are required.<br />

5.3.2.6-p3 In the ANWI design document, the ANWI Contractor shall describe<br />

the design, development, testing, and integration approach for any elements that<br />

require development.<br />

5.3.2.7 Capability Extension into ANWI Services<br />

5.3.2.7-p1 The ANWI Contractor shall use and integrate the ANWI capabilities<br />

to design and deliver a coherent and integrated set of services that comply with the<br />

Service Level Targets (SLT) and Requirements (SLR) specified in the Annexes to<br />

this SOW.<br />

5.3.2.7-p2 ANWI designed services shall:<br />

A. Incorporate resilient and secure infrastructure.<br />

B. Maintain the ANWI’s architecture principles.<br />

C. Identify the skills necessary to maintain and sustain the service.<br />

D. Easily scale to support life-cycle changes.<br />

E. Integrate with PFE services and applications (Annex B).<br />

5.3.2.7-p3<br />

Minimise the total cost of ownership, over a five-year life-cycle.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-44 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-45 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.3.2.7-p4 ANWI services shall be designed to leverage the following ITIL<br />

processes:<br />

A. Availability management<br />

B. Catalogue management<br />

C. Service level management<br />

D. Capacity & Performance management<br />

E. Continuity management<br />

F. Information Security management<br />

G. Supplier management.<br />

5.3.2.7-p5 The ANWI design shall ensure that the Service Catalogue’s Service<br />

Level Agreements are met.<br />

5.3.2.7-p6<br />

The ANWI contractor shall document all processes.<br />

5.3.3 Service Interface Profiles (SIPs)<br />

5.3.3-p1 Each interface between NNHQ ANWI servicies (ANWI internal<br />

interfaces) or an interface between a NNHQ ANWI service (ANWI external interface)<br />

and other capabilities or systems shall be documented in a SIP. Interface<br />

requirements are identified in each annex of this SOW and the SIPformat is provided<br />

in Annex K Appendix 17.<br />

5.3.4 Security Design & Accreditation<br />

5.3.4-p1 The Design Document package shall include the ANWI Contractor’s<br />

Security Risk Assessment (SRA) and security configurations (outline is provided in<br />

Annex K) of the proposed design.<br />

5.3.4-p2 The design shall identify how Information Assurance (IA) services shall<br />

be provided in the ANWI per Annex E Appendix 2 and per the IA requirements<br />

specified for each individual ANWI service (Annexes E through I).<br />

5.3.4-p3 The ANWI design’s IA section shall provide the security configuration<br />

settings and features implemented to provide a secure system, based upon the<br />

agreed SRA.<br />

5.3.4-p4 The ANWI Contractor shall provide security documentation in<br />

accordance with Annex K Appendices 11, 12 and 13 to support the security<br />

accreditation process.<br />

5.3.4-p5 The Purchaser is responsible for submitting the ANWI’s security<br />

documentation to the Security Accreditation Authority (SAA).<br />

5.3.4-p6 The ANWI Contractor shall provide support to the accreditation process,<br />

as detailed in Reference 1.1.1.7.2.<br />

5.3.5 Change Request Log<br />

5.3.5-p1 The ANWI Contractor shall maintain a Change Request Log that tracks<br />

all requests for change to the ANWI design (paragraph 6.4).<br />

5.3.5-p2 The ANWI Contractor’s Change Request Log shall trace requirement,<br />

specification or technical changes made to the ANWI design as a result of a design<br />

review or test result.


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-46 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.3.5-p3 The ANWI Contractor’s Change Request Log shall adhere to the ANWI<br />

Contractor’s approved change process (paragraph 6.4)<br />

5.3.6 Off-Specification Document<br />

5.3.6-p1 The ANWI Contractor shall maintain an Off-Specification Document that<br />

correlates test results and finding that differ from the approved design to design<br />

Change Request Log.<br />

5.3.6-p2 The ANWI Contractor’s Off-Specification Document shall serve as the<br />

log of service features and/or components that did not meet the expected service’s<br />

design outcome<br />

5.3.7 Requirements Traceability and Changes<br />

5.3.7-p1 The ANWI Contractor shall provide a Requirements Traceability Matrix<br />

with the design document that establishes a complete cross-reference mapping of<br />

the ANWI SOW’s requirements to the paragraph numbers of the ANWI Contractor’s<br />

ANWI Design Document which provides details to the lowest-level Configuration<br />

Items (CIs).<br />

5.3.7-p2 The ANWI Contractor shall maintain a design document change log that<br />

traces approved ANWI requirement changes to the Requirements Traceability Matrix<br />

and ANWI Design Document.<br />

5.3.7-p3 The ANWI Contractor shall maintain an Off-specifications Document<br />

that traces the service or system specification to the Requirements Traceability<br />

Matrix.<br />

5.4 Service Management Design<br />

5.4-p1 The ANWI Contractor shall design and implement an integrated Service<br />

Management console in accordance with the requirements identified in Annex E<br />

Appendix 1<br />

5.5 Integrated Test Service (ITS) Design<br />

5.5-p1 The ANWI Contractor shall design and implement an Integrated Test<br />

Service in accordance with Annex J.<br />

5.5-p2 The ITS shall be used to test all ANWI services, dependent project<br />

interfaces and other Host Nation deliverables (ESS, BMS, AVI and business<br />

applications with associated migration tools) that are to use ANWI<br />

services/components.<br />

5.6 Critical Design Review (CDR)<br />

5.6-p1 The ANWI Contractor shall create and present the ANWI Design Brief to<br />

the Purchaser’s staff.<br />

5.6-p2<br />

5.6-p3<br />

The ANWI Design Briefing shall be held at the Purchaser’s facility.<br />

The ANWI Design Briefing shall be planned to cover five (5) days.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.6-p4 The ANWI Contractor shall include the following areas in Design Briefing:<br />

A. ITS Design and confirmation of equipment and software to be ordered for<br />

security domains, server rooms, site wide infrastructure equipment, client<br />

devices and software confirmation for ordering.<br />

B. NNHQ ANWI overall system, subsystems and interactions.<br />

C. Subsystem functionality, modularity and interfaces, breakdown into lowestlevel<br />

Configuration Items.<br />

D. Off-the-shelf products to be used in the system: the ANWI Contractor shall<br />

identify the intended product and version, and note if any modifications,<br />

adaptations, or additional elements (such as macros or plug-ins) are<br />

required. For any elements that require development, the ANWI<br />

Contractor shall describe the design, development, testing, and integration<br />

approach.<br />

E. Interfaces with other relevant systems, both NATO and non-NATO.<br />

F. System security design: Presentation of the Security Risk Assessment that<br />

the ANWI contractor used in creating the ANWI design: Results of the Risk<br />

Analysis, Definition and implementation of the Security measures to<br />

counter the risks identified in the Risk Assessment and relate those to the<br />

security mechanisms as required in section 11.8.2.2. This presentation<br />

shall be done as a separate item. This presentation shall also address the<br />

changes to be brought by the ANWI Contractor to any INFOSEC<br />

documentation which NATO may have provided the ANWI Contractor with.<br />

G. System migration and interoperability: Migration planning and order,<br />

migration risks, possible issues during migration, complications expected<br />

during the interoperability period.<br />

H. Sequence and scope of system tests of the initial and updated<br />

Developmental Baseline and any requirements for Purchaser support and<br />

participation.<br />

i. Innovation plan to guarantee the most modern COTS technology solutions<br />

are provided.<br />

J. Any change request or off-specification.<br />

K. Requirements traceability matrix.<br />

L. Any changes to the Project Implementation Plan.<br />

M. Risk assessment of proposed changes and an update of the Risk log and<br />

Issue Log.<br />

5.6-p5 The ANWI Contractor shall deliver the ANWI Design Document to the<br />

Purchaser at the end of the Design Briefing.<br />

5.6-p6 The duration of the Purchaser review cycle for the NNHQ ANWI Design<br />

Documentation Package will not exceed 3 (three) weeks.<br />

5.6-p7 Three weeks after the ANWI PDR Briefing, a follow-on Critical Design<br />

Review Meeting shall be held with the Purchaser and ANWI Contractor attending.<br />

5.7 Critical Design Review (CDR) Feedback Meeting<br />

5.7-p1<br />

facility.<br />

5.7-p2<br />

The Critical Design Review (CDR) meeting shall be held at the Purchaser’s<br />

The CDR feedback meeting shall be planned to cover two (2) days.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-47 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

5.7-p3 The Purchaser will brief the ANWI Contractor on their comments on the<br />

design document.<br />

5.7-p4 At the conclusion of the CDR feedback meeting the Purchaser will issue his<br />

comments on the design document to the ANWI Contractor.<br />

5.7-p5 The ANWI Contractor shall have two weeks to make the required changes<br />

where he shall then submit the design document package for acceptance.<br />

5.8 Acceptance of the Design Document<br />

5.8-p1 Purchaser review and acceptance of the ANWI Design Documentation<br />

package shall imply Purchaser acceptance of the NNHQ ANWI design permitting a<br />

move to the next stage of the project. It remains the sole responsibility of the ANWI<br />

Contractor to prove the design through the regime of testing set forth in the Contract<br />

and it will be the sole responsibility of the ANWI Contractor in the event that the<br />

system proves deficient in meeting the contractual requirement.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-48 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 6.<br />

ANWI IMPLEMENTATION AND TRANSITION<br />

6.1 General<br />

6.1-p1 This Section provides the requirements for managing service transitions<br />

according to agreed service design requirements, with the final aim to meet business<br />

requirements and user expectations, minimizing risks and maximizing the services'<br />

effectiveness.<br />

6.1-p2 This section addresses the requirements related to:<br />

A. The delivery of equipment and the implementation of services, and<br />

B. The transitioning to new and modified services that shall meet the user’s<br />

expectation as defined in the High Level Requirements and the Service<br />

Design supporting an overall service lifecycle.<br />

6.1-p3 The project Implementation and Transition phase covers all ANWI activities<br />

from first access to the site for site surveys through to the fully functional ANWI<br />

services and handover of the ANWI.<br />

6.1-p4 The high level implementation and transition timeline shall refer to the<br />

diagram in Figure 6.1.<br />

Figure 6.1a ANWI high level implementation and transition timeline<br />

6.1-p5 The ANWI Contractor shall initiate the Project’s Implementation and<br />

Transition phase once:<br />

A. The Service Design Package has being confirmed,<br />

B. The Configuration Management System has been implemented with all<br />

Configuration Item baselines, and<br />

C. The delivery schedule of equipment to site has been agreed with the<br />

Purchaser.<br />

6.1-p6 The ANWI Implementation and Transition is underpinned by the following<br />

six major processes:<br />

1) Transition Planning and Support,<br />

2) Change Management,<br />

3) Service Asset and Configuration Management,<br />

4) Release and Deployment Management,<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-49 of 532


N A T O U N C L A S S I F I E D<br />

5) Release and Deployment Planning Phase<br />

6) Knowledge Management.<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.1-p7 The requirements for each of the six processes are documented in the<br />

following paragraphs.<br />

6.2 Transition Planning and Support Process<br />

6.2-p1 The ANWI Contractor shall support the Transition Planning by:<br />

A. Leading the Transition Planning and Support Process in cooperation with<br />

the Purchaser for providing and coordinating the overall plan;<br />

B. Ensuring that the Implementation and Transition phase is coordinated with<br />

the Purchaser Project Management office and staff;<br />

C. Planing and coordinating the resources with the aim to warrant that High<br />

Level requirements and Service Design requirements are thoroughly<br />

implemented in Service Operation;<br />

D. Deploying new and changed services within the established, estimated<br />

and agreed cost, quality and timeline;<br />

E. Sustaining multiple transitions at the same time.<br />

6.2-p2 The ANWI Contractor shall support the transition by:<br />

A. Ensuring that all the required policies / standards / models for both<br />

transition activities and processes are respected;<br />

B. Reviewing and briefing ANWI Contractor staff on NNHQ campus access<br />

policies;<br />

C. Reviewing safety procedures for working on the NNHQ campus;<br />

D. Ensuring that the ANWI Contractor implementation staff are issued access<br />

badges to the NNHQ campus;<br />

E. Surveying the Purchaser provided storage and staging areas on the<br />

NNHQ campus;<br />

F. Periodically reviewing the plans to improve the transition’s efficiency.<br />

6.2-p3 The ANWI Contractor Transition/Migration Plan shall include the Security<br />

Test and Evaluation Plan per Annex K.<br />

6.3 Change Management<br />

6.3.1 General<br />

6.3.1-p1 The ANWI Contractor shall have a fully functioning change<br />

management process (with defined roles and responsibilities), as required in the<br />

project management section of this SOW, established to support all changes to the<br />

configuration items in a configuration management system, change/modify user<br />

business requirements, and the implementation process.<br />

6.3.1-p2 The ANWI Contractor shall provide for all service changes (which are<br />

any changes) to Configuration Items (CIs) (addition, modification, removal) that have<br />

or could have an operational impact on the operation of ICT services.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-50 of 532


6.3.2 Types of Service Change<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.3.2-p1 Standard Change: low-risk pre-authorized change with a known<br />

procedure to implement it<br />

6.3.2-p2 Emergency Change: change that needs to be implemented as soon as<br />

possible to resolve an issue (i.e. security incident, major incident, etc.)<br />

6.3.2-p3<br />

categories.<br />

6.3.3 Change Requests<br />

Normal Change: change belonging to neither of the two previous<br />

6.3.3-p1 The ANWI Contractor shall submit change requests, as needed, to<br />

adjust and support the integrity of service assets and configurations as needed to<br />

deliver the ANWI design.<br />

6.3.3-p2 The ANWI Contractor shall submit change requests, as needed, to<br />

rectify issues and mitigate risks.<br />

6.3.3-p3 The ANWI Contractor shall submit change requests, as needed, to<br />

support the coordination and installation of the ANWI.<br />

6.3.4 Change Process<br />

6.3.4-p1 The ANWI Contractor shall implement a Change Process following the<br />

ITIL best practice.<br />

6.3.5 Change Advisory Board (CAB)<br />

6.3.5-p1 The ANWI Contractor, HQPO and the Purchaser shall be members of<br />

the ANWI Change Advisory Board to review and process change requests and<br />

provide assistance to process, evaluate, assess, prioritize and evaluate changes.<br />

6.3.5-p2<br />

6.3.6 Change Models<br />

The ANWI IV&V will observe and monitor the activities of the CAB.<br />

6.3.6-p1 The ANWI Contractor and the Purchaser will agree on a definite set of<br />

changes that need to be pre-defined through agreed change models.<br />

6.3.6-p2 The ANWI Contractor’s change model shall include the steps to be<br />

taken, their chronological order, the roles and responsibilities during the change<br />

management processes, the thresholds to assess the completion and performances,<br />

the escalation procedures.<br />

6.3.7 Change Remediation<br />

6.3.7-p1 The ANWI Contractor shall propose a change remediation process<br />

which includes those pre-defined actions to be taken after a change failed.<br />

6.3.7-p2 For CAB to grant the change authorization, the ANWI Contractor shall<br />

propose the Change Remediation options as part of the change documentation.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-51 of 532


N A T O U N C L A S S I F I E D<br />

6.4 Service Asset and Configuration Management<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.4-p1 The purpose of this process is to ensure that the required assets to deliver<br />

the services are systematically controlled and that all the information about those<br />

assets is updated, reliable, and available when and where requested.<br />

6.4-p2 The Configuration Management process shall support the lifecycle of any<br />

service asset, ensuring that baselines are updated, all CIs identified, and that any<br />

change is documented.<br />

6.4-p3 The Configuration Management process shall also serve as the interface<br />

between services and the complete map of the CIs relationships.<br />

6.4-p4 The ANWI Contractor shall implement this process for the Implementation<br />

and Transition, and to hand – over to the Support Authority at the end of the phase.<br />

6.4-p5 The ANWI Contractor shall document the baseline of ANWI configuration<br />

items (CIs) to include:<br />

A. ICT Services,<br />

B. Software,<br />

C. Hardware,<br />

D. Facilities,<br />

F. People,<br />

G. Formal documents (SLAs, OLAs, Service Catalogue, etc.).<br />

6.4-p6 The ANWI Contractor shall implement, as part of the configuration<br />

management process, a set of tools and database(s) [configuration management<br />

database (CMDB)] to manage all the ICT Services configuration data that is<br />

interfaced with other ANWI support processes:<br />

A. Incident,<br />

B. Problems,<br />

C. Known errors,<br />

D. Changes,<br />

E. Releases.<br />

6.4-p7 The ANWI Contractor shall implement a Definitive Media Library (DML) in<br />

accordance with the ITIL definition.<br />

6.5 Release and Deployment Management Process<br />

6.5.1 Release and Deployment Management Process<br />

6.5.1-p1 The ANWI Contractor shall implement a Release and Deployment<br />

Management process to plan, schedule and control the build, test and deployment of<br />

the new services, while protecting the integrity of any existing infrastructure.<br />

6.5.1-p2 The ANWI Contractor shall:<br />

A. Define and agree a service’s release and deployment plan with the<br />

Purchaser;<br />

B. Create test release packages and agree with the Support Authority to<br />

verify that utility and warranty of services are satisfied and granted;<br />

C. Deploy Release Package following the agreed plans and schedules;<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-52 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-53 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

D. Record and manage deviations, risks, issues related with the<br />

implementation of Release Packages and take corrective actions when<br />

necessary;<br />

E. Ensure that knowledge transfer is ensured to users, and support Authority<br />

staff.<br />

F. The Release and Deployment Management process formally manages<br />

processes, systems, and functions to package, build, test, deploy, release,<br />

hand-over any CIs required to implement a release: Physical and Virtual<br />

assets, Applications and software, Training, Services.<br />

G. This process has also as objective of eventually handing the services to<br />

the support Authority.<br />

6.5.1-p3 The Release and Deployment plan shall ensure that the following four<br />

principal phases will be satisfied:<br />

A. Release and Deployment Planning Phase,<br />

B. Release Build and Test,<br />

C. Deployment,<br />

D. Review and Close.<br />

6.5.2 Release and Deployment Planning Phase<br />

6.5.2.1 General<br />

6.5.2.1-p1 At this phase, all the plans for creating and deploying services shall<br />

be composed and agreed with the Purchaser. The trigger for initiating the phase is<br />

the change management authorization to compose the plan, and ends with the<br />

change management authorization to create the Release Package.<br />

6.5.2.1-p2<br />

This phase shall be re-iterated for each single Release Package.<br />

6.5.2.1-p3 The ANWI Contractor shall initiate the implementation and transition<br />

phase of the project once the design confirmation of capabilities (configuration item<br />

baselines) and services has been achieved, and the delivery schedule of equipment<br />

to site has been agreed with the Purchaser.<br />

6.5.2.1-p4<br />

The ANWI Contractor shall then proceed to testing the capabilities.<br />

6.5.2.1-p5 The ANWI Contractor shall, upon successful testing of the<br />

capability, be permitted to install the capability.<br />

6.5.2.1-p6 The ANWI Contractor shall, with all required capabilities in place,<br />

proceed to test and then implement the ANWI infrastructure services (note: this may<br />

be tested, as practical, in parallel with capability testing).<br />

6.5.2.1-p7 Upon implementation and acceptance of all capabilities and<br />

infrastructure services, the ANWI Contractor shall request Initial Operating Capability<br />

(IOC) per paragraph 6.8.<br />

6.5.2.1-p8 The ANWI Contractor shall then complete the test and implement<br />

the remaining elements of ANWI client services.<br />

6.5.2.1-p9 The ANWI Contractor shall, upon successful installation of all client<br />

devices and services and support of ICTM application and data migration, request<br />

Final Operating Capability (FOC) per paragraph 6.10.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.5.2.1-p10 The ANWI Contractor shall provide 6 months of service<br />

improvement and technical support between FOC to Final System Acceptance.<br />

6.5.2.2 Site Survey<br />

6.5.2.2-p1 The Release and Deployment plan shall envisage a site survey<br />

consisting of:<br />

A. General<br />

1. The ANWI Contractor shall conduct site survey preparatory work, visit<br />

the old NATO Headquarter Site, the NNHQ ANWI site, Bâtiment Z and<br />

the NNHQ remote sites (see Annex M), provide an Introductory Briefing<br />

to the site, survey relevant facilities, interview site personnel, and collect<br />

data to support site preparation and implementation.<br />

2. The ANWI Contractor shall identify his intent to conduct a site survey<br />

and request permission to access the facility at least one (1) month<br />

before the targeted survey date.<br />

3. The ANWI Contractor shall identify all required support facilities,<br />

including modifications or additions required, within one week of a site<br />

survey.<br />

B. Site Survey Workbook<br />

1. The ANWI Contractor shall prepare a site survey workbook of<br />

checklists, fill-in forms, installation sketches, contact information,<br />

installation specifications, site data to be collected by the ANWI<br />

Contractor during the site survey, and any other documentation<br />

required to perform site surveys.<br />

2. This workbook shall be available for Purchaser review and comment<br />

before the first site survey, and shall be maintained and updated as<br />

necessary during the site survey process.<br />

3. Upon acceptance of the Site Survey Workbook by the Purchaser, the<br />

ANWI Contractor shall distribute the Site Survey Workbook to the sites<br />

for preparation of the Site Surveys.<br />

4. The ANWI Contractor shall provide the Purchaser with the ANWI<br />

Contractor’s proposed site survey agenda, the presentation material<br />

that the ANWI Contractor intends to use, the ANWI Contractor’s<br />

attendance list. Based on agreement from the Purchaser, the ANWI<br />

Contractor shall organise and conduct the Site Survey.<br />

C. Introductory Briefing<br />

1. The Introductory Briefing shall not assume other than basic knowledge<br />

of the project by the site personnel.<br />

2. The Introductory Briefing shall be an introduction to NNHQ ANWI<br />

outlining the ANWI services, describing the system functionalities, the<br />

site to be implemented, the project timelines, the goals and objectives<br />

of the Site Survey process, and the notional implementation identified<br />

for the surveyed site and to be refined through the Site Surveys<br />

activities.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-54 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

D. Survey of the Site Facilities<br />

1. During the Site Survey the ANWI Contractor shall determine the<br />

necessary installation preparation and support arrangements and<br />

collect all project implementation-relevant information. This shall<br />

include:<br />

a. Validation of the numbers of users and administration staff for NNHQ<br />

ANWI for the NNHQ site.<br />

b. Validation of the number, location, and network connectivity of any<br />

remote users.<br />

c. Analysis of the training needs.<br />

d. Estimate of the on-site training requirements, based on the numbers<br />

of First- and Second-Level Support staff and NNHQ ANWI Users<br />

identified by the Site POC.<br />

e. Identification of any input (equipment, documentation and<br />

information) or work required from the Purchaser with indication of<br />

suspense date.<br />

f. As per site-provided information, identification of the facilities where<br />

NNHQ ANWI equipment will have to be installed.<br />

g. Identification of any piece of equipment available in the NATO HQ<br />

Site (e.g. servers, racks), that meets the contractual requirements of<br />

this contract and that the ANWI Contractor deems reusable for the<br />

purpose of this Contract. Note the ANWI Contract is based on the<br />

requirement for procurement and deployment of all new equipment.<br />

However, having knowledge of current HQ existing equipment that<br />

potentially can be reused, may help with the implementation,<br />

including the possibility of providing further migration options. Some<br />

speciality or very new hardware/software suites may have to be<br />

relocated when the user relocates; the ANWI Contractor shall<br />

accommodate for this space or connectivity (e.g. graphics lab Apple<br />

computers) List of all system CIs (nature and quantities) to be<br />

installed in the site.<br />

h. All site data relevant to the future site installation (current systems<br />

configuration data as required).<br />

i. List of systems and services that are candidates for reuse.<br />

j. List of interfaces to Specific CoI Services (e.g. Business<br />

Applications) which will continue to be supported in the new building.<br />

E. Out Briefing<br />

1. The ANWI Contractor shall conduct an out briefing of the site survey’s<br />

findings and recommendations to the Purchaser.<br />

F. Post Site Survey Report and Action Items<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-55 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-56 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

1. The ANWI Contractor shall present his site engineering and installation<br />

drawing(s) 2 weeks after the Site Survey to the Purchaser for review.<br />

2. The ANWI Contractor shall update the Project Management<br />

Documentation immediately after the Site Survey and no later than two<br />

(2) weeks before the Site installation.<br />

3. The ANWI Contractor shall update and re-issue the Project<br />

Management Documentation to the Purchaser.<br />

6.6 Accreditation Documentation<br />

6.6.1 Security Risk Assessment<br />

6.6.1-p1 The ANWI Contractor shall provide a Security Risk Assessment (SRA)<br />

in accordance with Annex K Appendix 11.<br />

6.6.1-p2 The ANWI Contractor shall maintain the ANWI System Security<br />

Configuration based on the SRA.<br />

6.6.1-p3 The ANWI Contractor shall review and, as necessary update the SRA<br />

as changes are made to either the design or a CI’s baseline documentation.<br />

6.6.2 Security Documentation<br />

6.6.2-p1 The ANWI Contractor shall provide security documentation in<br />

accordance with Annex K Appendices 5, 11, 12 and 13.<br />

6.6.3 Server Security Roles<br />

6.6.3-p1 ANWI servers, wherever feasible, shall use NATO standard security<br />

roles (e.g. Domain Controller, DNS) of which the latest guidance documentation will<br />

be provided at Contract Award.<br />

6.6.3-p2 The ANWI Contractor shall assess the provided security roles as they<br />

relate to server performance.<br />

6.6.3-p3 The ANWI Contractor shall recommend changes to the security roles'<br />

configuration settings to the Purchaser for approval so long as the recommended<br />

changes improve performance without compromising security.<br />

6.6.3-p4 The ANWI Contractor shall ensure that the security roles are addressed<br />

in the System-specific Security Requirements Statement (SSRS) input.<br />

6.6.3-p5 The ANWI Contractor shall ensure that the protocols addressed in the<br />

security roles are reflected in the System Interconnection Security Requirements<br />

Statement (SISRS) input.<br />

6.7 Release Build and Test Phase<br />

6.7-p1 The change management authorization to create the Release Package<br />

triggers this phase that ends with the change management authorization to baseline<br />

the Release package into the DML by the Service Asset and Configuration<br />

Management Process.<br />

6.7-p2<br />

This phase shall be re-iterated for each single Release Package.


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-57 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.7-p3 The ANWI Contractor shall conduct testing activities to verify a capability or<br />

service for compliance with the contractual requirements by demonstrating its<br />

operational suitability, to evaluate its performance and to establish benchmarks for<br />

future enhancements.<br />

6.7-p4 Throughout any test session the ANWI Contractor shall organise and<br />

conduct Test Status Meetings with the Purchaser on a weekly basis to discuss:<br />

The results of the tests run to date.<br />

Any new Off-specifications raised.<br />

Any adjustments to the schedule of test activities within the test session.<br />

Any other issues.<br />

6.7-p5 Waivers<br />

The ANWI Contractor may choose for some specific requirements, rather than<br />

perform actual tests to provide documentary evidence to show that the stated<br />

requirements are fulfilled.<br />

This documentary evidence may either be a rationale based on existing<br />

design or specification documentation, or rely on previously successfully<br />

completed qualification testing to national or international standards for<br />

assemblies, subassemblies, components or parts.<br />

If the ANWI Contractor intends to rely on previously successfully completed<br />

qualification testing to national or international standards for assemblies,<br />

subassemblies, components or parts, the ANWI Contractor shall produce the<br />

following documentation:<br />

o The equipment specifications and true manufacturing number to<br />

demonstrate that the NNHQ ANWI CI for which a test waiver is requested is<br />

identical to the equipment previously tested.<br />

o The ANWI Capability Services Requirements, SSRS, SISRS, and CPS<br />

(Certificate Practice Statement) if the system includes a PKI requirement(s)<br />

covered by the test waiver.<br />

o The test standards, procedures and methods employed on the testing.<br />

o The nationally or internationally certified test results.<br />

6.7-p6 A Statement in which the ANWI Contractor shall certify that the<br />

equipment to be implemented is identical to that which was originally tested and<br />

certified or advice the Purchaser of design/construction changes which affect form, fit<br />

or function. In the latter case, the Purchaser, after review of such changes and their<br />

impact, shall have the right to require test and certification of the modified equipment,<br />

at no cost to the Purchaser.<br />

6.7-p7<br />

The Purchaser reserves the right to reject any test waiver request.<br />

6.7-p8 The ANWI Contractor shall record and log all test waiver requests along<br />

with their resolution and shall hand-over the records and logs at the FST.<br />

6.8 Testing<br />

6.8.1 General<br />

6.8.1-p1 The ANWI Contractor shall provide a suite of comprehensive tests to<br />

test service components, proof of concept, service certification, service activation and<br />

final site testing.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.8.1-p2 The ANWI Contractor testing shall be conducted in either the<br />

Integration Test Service (ITS) or NNHQ server rooms.<br />

6.8.1-p3 All testing activities in the ITS will be monitored by both the Purchaser<br />

and ANWI IV&V.<br />

6.8.1-p4 The following figure depicts the relationship between the tests required<br />

to field the ANWI services.<br />

Figure 6.1b ANWI test flow<br />

6.8.2 Capability Acceptance Testing (CAT)<br />

6.8.2-p1 The ANWI Contractor shall commence this phase of the project with<br />

Capability Acceptance Tests (CATs).<br />

6.8.2-p2 Testing shall be in accordance with the approved Test and Acceptance<br />

Plan (Annex K).<br />

6.8.2-p3 The ANWI Contractor shall schedule the CAT in either the ITS or other<br />

Purchaser approved NNHQ campus location that is physically interconnected to the<br />

ITS to demonstrate that the specific capability, as defined in the SOW, meets the<br />

operational, functional and technical requirements.<br />

6.8.2-p4 The ANWI Contractor shall deliver all test documentation required for<br />

the test (Section 4, Project Management - System Test Documentation Package) for<br />

the Purchaser’s review (and IV&V validation) at least two weeks prior to the test.<br />

6.8.2-p5 Before each test session the ANWI Contractor shall confirm to the<br />

Purchaser that all required hardware, software, test equipment, instrumentation,<br />

supplies, facilities, and personnel are available, in place and ANWI baseline<br />

configured to conduct the test session.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-58 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.8.2-p6 The Purchaser and IV&V will monitor and inspect the ANWI<br />

Contractor’s test activities to ensure compliance.<br />

6.8.2-p7 Reserved .<br />

6.8.2-p8 The Purchaser will review the ANWI Contractor’s test report for<br />

correctness, completeness, and acceptance.<br />

6.8.3 Proof of Concept Testing (PCT)<br />

6.8.3-p1 The ANWI Contractor shall focus on the SMC, UCC, CDM and Client<br />

Provisioning services with the aim to validate and confirm technical and user-related<br />

useability features prior to finalising the design of these services.<br />

6.8.3-p2 The ANWI Contractor shall use the ITS, or other designated facility on<br />

the NNHQ campus, for all PCT.<br />

6.8.3-p3 The ANWI Contractor shall undertake PCT for the following ANWI<br />

services:<br />

A. CDGW (Annex E Appendix 2).<br />

B. UCC (Annex G).<br />

C. SMC (Annex E Appendix 1)<br />

D. Client Provisioning (Annex H Appendix 2)<br />

6.8.3-p4 The PCT will be concluded with user- and technical-level testing,<br />

demonstration and validation.<br />

6.8.4 Service Certification Tests (SCT)<br />

6.8.4-p1 The ANWI Contractor shall test the system engineering, integration, and<br />

monitoring of the services as delivered and monitored in the NNHQ Network<br />

Operations Centre.<br />

6.8.4-p2 The ANWI Contractor shall use the SCT to activate an ANWI service for<br />

use in the NNHQ.<br />

6.8.4-p3 The ANWI Contractor shall use the SCT to validate that a service is “fit<br />

for purpose” and assures that it is also “fit for use”.<br />

6.8.4-p4 The ANWI Contractor shall use the SCT to confirm the ANWI Service<br />

Catalogue.<br />

A. Service definition includes the service description and components.<br />

B. Service utilities, requirements and warranties for correct functioning.<br />

C. Service’s context, function from utilisation perspective – scenario of use.<br />

D. Service operation.<br />

E. Process (repeatable, audit/traceability to requirement) maps, workflow<br />

diagrams, activity patterns & combination of service assets, context,<br />

approach, boundaries.<br />

F. Acceptance criteria & margin of error – to meet Reliability, Maintainability,<br />

and Availability (RMA) – test activities, specialist tools, people.<br />

G. Metrics and test measurements are managed, monitored and controlled.<br />

H. Service’s standards.<br />

I. Scope, organisation.<br />

J. Process: management, control, recording, monitoring reporting; planning;<br />

test preparation, install, perform document.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-59 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

K. Identification of the items to test: service package, service level package,<br />

service model.<br />

L. Operations and support plan.<br />

M. Risk assessment for testing and use.<br />

N. Interfaces.<br />

O. Approach: test level, regressing, simulation, reuse pieces ID up front.<br />

P. Criteria – pass/fail, entry, exit, stop/start.<br />

Q. Deliverables: documentation, plan, spec – design, test case, procedure –<br />

results/reports, validation, summary.<br />

R. Functional and operational management.<br />

S. Technology.<br />

T. Service’s documentation.<br />

6.8.4-p5 The ANWI Contractor shall conclude all SCT with the finalisation of the<br />

specific (whether it is a user [business] or support [technical]) ANWI Service<br />

Catalogue entry.<br />

6.8.4-p6 The ANWI Contractor shall request to hold the Initial Operating<br />

Capability meeting upon completion of SCT.<br />

6.8.5 System Activation Testing (SAT)<br />

6.8.5-p1 The ANWI Contractor shall use the SAT to provide the overall<br />

operational testing of all ANWI integrated services offered on the NNHQ site.<br />

6.8.5-p2 The ANWI Contractor shall confirm, via this test, that the integrated<br />

back-end, specific CoI and supplemental services are “fit for purpose”.<br />

6.8.5-p3 The ANWI Contractor shall request to hold the Final Operating<br />

Capability meeting upon completion of SAT.<br />

6.8.6 Final Site Testing (FST)<br />

6.8.6-p1 The ANWI Contractor shall achieve FST after the installation of all user<br />

devices and activation of the user’s requested service catalogue choices to the user’s<br />

device.<br />

6.8.6-p2 The ANWI Contractor shall support the ICTM staff with infrastructure<br />

and Active Directory assistance as the ICTM staff installs NATO’s business<br />

applications and migrates the application’s data onto ANWI storage.<br />

6.8.6-p3 The ANWI Contractor shall request to hold the Final System<br />

Acceptance meeting upon completion of FST.<br />

6.8.7 Security Implementation Verification Procedures (SIVP)<br />

6.8.7-p1 The ANWI Contractor shall provide and maintain a Security<br />

Implementation Verification Procedures (SIVP) as part of the testing.<br />

6.8.7-p2 The SIVP shall consist of a set of software scripts that shall allow a Site<br />

System Security Officer to verify that the installed system at a site complies with the<br />

CPS, SSRS and SISRS.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-60 of 532


6.8.8 Requirements Traceability Matrix<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.8.8-p1 The ANWI Contractor shall extend the Requirements Traceability Matrix<br />

to the Product Baseline to maintain full traceability between the functional, the<br />

developmental, and the product baseline, so as to ensure the Purchaser can verify<br />

compliance throughout the project.<br />

A. Sequencing of activities for a Test session.<br />

B. Test Failures.<br />

C. Classification of Test Failures.<br />

6.8.9 Test Failures<br />

6.8.9-p1<br />

Should a failure occur during testing, a failure report shall be<br />

raised by the ANWI Contractor and a preliminary investigation shall be immediately<br />

carried out in order to classify the failure as one of the following:<br />

A. Class “A”: there is evidence that the cause was an external or transient<br />

condition.<br />

B. Class “B”: there is mutual agreement that the cause was an inherent<br />

design or manufacturing deficiency in the unit under test.<br />

C. Class “C”: When the specific nature of the cause cannot be immediately<br />

determined and a more detailed investigation is required before a<br />

conclusion can be drawn.<br />

6.8.9.1 Class "A" Failures<br />

6.8.9.1-p1 In the event that a preliminary investigation results in the<br />

classification of a failure as is described above, the test shall be repeated at least<br />

three successive times.<br />

6.8.9.1-p2 If the re-test is successful, the Purchaser will close the observation<br />

and testing shall be resumed from the point immediately after that where the failure<br />

occurred.<br />

6.8.9.1-p3 If a failure is encountered prior to the successful completion of the<br />

re-test, the failure category shall be changed to class "B" or "C", as described below.<br />

6.8.9.2 Class "B" Failures<br />

6.8.9.2-p1 In the event that a failure is classified as a Class "B" from above, the<br />

equipment shall be rejected and all testing related to that particular series of tests<br />

shall be suspended until such a time as the ANWI Contractor determines the specific<br />

cause of the failure and proposes appropriate remedial action acceptable to the<br />

Purchaser.<br />

6.8.9.2-p2 Should the cause of the failure or the effect of the proposed<br />

remedial action be deemed by the ANWI Contractor to have no influence whatsoever<br />

on other areas of scheduled testing, the ANWI Contractor may propose to the<br />

Purchaser to continue testing in the other areas prior to the rectification of the cause<br />

of the failure.<br />

6.8.9.2-p3 If such proposals are accepted by the Purchaser, the Purchaser<br />

shall have the right to require repetition of any or all tests performed in these<br />

circumstances after the rectification of the cause of the failure and the subsequent retests,<br />

to prove they have been successfully completed.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-61 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.8.9.2-p4 The ANWI Contractor shall be responsible for all costs related to the<br />

rectification of deficiencies or failures and subsequent re-testing caused by the<br />

design or production of the deliverables identified during the verification and/or<br />

testing cycles. The ANWI Contractor shall be responsible for any travel, subsistence<br />

and other incidental expenses incurred by the Purchaser as a result of the<br />

requirement for the re-performance of tests necessitated by test failures.<br />

6.8.9.2-p5 After remedial action has been taken by the ANWI Contractor, the<br />

test may be resumed at the step during which the deficiency or failure was identified,<br />

however, the Purchaser shall have the right to require that re-testing includes all of<br />

the tests related to the verification of that particular specification requirement.<br />

6.8.9.2-p6 The ANWI Contractor shall seek the Purchaser's agreement of a<br />

mutually suitable time when testing shall be resumed, subsequent to the Purchaser<br />

having accepted the contents of a formal submission by the ANWI Contractor<br />

providing full details describing the cause of the failure and the recommended<br />

remedial actions to be taken.<br />

6.8.9.3 Class "C" Failures<br />

6.8.9.3-p1 In the event that a failure is classified as a Class "C" from above, all<br />

testing shall be immediately suspended until such a time as the ANWI Contractor<br />

completes a detailed investigation and subsequently recommends to the Purchaser,<br />

that the failure should be re-classified as either a Class "A' or "B", as appropriate.<br />

The actions previously described relating to these classifications shall then be<br />

commenced.<br />

6.8.9.3-p2 In this context, should it be determined that the test failure was due<br />

to a component failure and not attributable to a deficiency in equipment design, or a<br />

defective process during manufacture of the equipment, then the defective<br />

component may be replaced and the failure re-classified as a Class "A" failure.<br />

6.8.10 System Off-Specifications<br />

6.8.10-p1 Throughout any test session Off-specifications will be identified, either<br />

as a result of test failures, or noted while running tests regardless of whether the<br />

tests eventually pass or fail.<br />

6.8.10-p2 Throughout any test session the ANWI Contractor shall maintain Offspecifications<br />

Reports and the Off-specifications Document describing all noted Offspecifications.<br />

6.8.10-p3 The contents of the required Off-specification Reports are outlined<br />

below:<br />

A. Off-specification identification.<br />

B. Description of the Off-specification.<br />

C. Related test (if the Off-specification was raised further to a test failure).<br />

D. Severity (Major if to be corrected before deployment, otherwise Minor).<br />

E. CIs affected.<br />

F. Action taken.<br />

G. Fault Resolution status:<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-62 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

1. Open=the Off-specification is identified.<br />

2. Resolved= remedial action has been taken by the ANWI Contractor and<br />

demonstrated through tests conducted by the ANWI Contractor without<br />

official witnessing by the Purchaser.<br />

3. Closed= the resolution was officially demonstrated to the Purchaser.<br />

H. Comments<br />

6.8.10-p4 The ANWI Contractor shall provide a list of all Off-specification Reports<br />

processed since the start of the project, in tabular form, indicating for each of them<br />

the date is was created and the current status.<br />

6.8.10-p5 The System Version Definition Document shall include the following:<br />

A. List of differences between this and the previous System version.<br />

B. List of capabilities of this System version.<br />

C. Guidelines on how to install this System version.<br />

D. Breakdown of the system into CIs and provision of accurate identification<br />

information for every CI.<br />

6.8.10-p6 The ANWI Contractor shall record the results of a test in test results<br />

sheets incorporated in the relevant test procedure and shall be called the Test<br />

Report.<br />

A. The ANWI Contractor shall declare a test as ‘passed’ if the entirety of the<br />

expected results were obtained when running the test.<br />

B. The ANWI Contractor shall ensure that the test report’s cover sheet clearly<br />

shows whether the test passed, failed, or was not run and for what<br />

reasons.<br />

C. Where the Purchaser or the Purchaser’s IV&V Contractor has witnessed<br />

the testing, appropriate annotations shall be made on each page of the<br />

test results to ensure that the test report is a true record of test activities<br />

and results as witnessed by the Purchaser.<br />

D. The ANWI Contractor’s representative and the Purchaser’s representative<br />

shall sign after completing the testing.<br />

E. Each original test report shall be provided to the Purchaser and a PDF-A<br />

version of the report shall be posted (with an alert for the Purchaser) on<br />

the ANWI project’s web site for acceptance within 15 (fifteen) working<br />

days after the completion of the test.<br />

6.9 Integration and Testing Service (ITS)<br />

6.9-p1 The ANWI Contractor shall design, install, configure, and support the ITS in<br />

accordance with Annex J.<br />

6.9-p2 The ANWI Contractor shall create, manage and maintain the ITS baseline<br />

configuration to be consistent (in line) with the expected deployed ANWI environment<br />

and production baseline.<br />

6.9-p3 The ANWI Contractor shall support the use of the ITS by other Host<br />

Nations and/or their contractors by restoring the ITS baseline, providing configuration<br />

points during testing and support in adjusting the ITS’ hardware configuration.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-63 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-64 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.9-p4 The ANWI Contractor shall test all ANWI services through service<br />

certification testing in the ITS prior to installing the service in the NNHQ server<br />

room(s), validating the service installation and conducting the remaining ANWI tests.<br />

6.9-p5 The ANWI IV&V will observe and monitor all ITS activities as the NATO<br />

Quality Assurance representative.<br />

6.10 Deployment<br />

6.10.1 General<br />

6.10.1-p1 This phase starts with the change management authorization to deploy<br />

and ends with the hand-over to the support Authority of each release package.<br />

6.10.1-p2<br />

This phase shall be re-iterated for each single release package.<br />

6.10.1-p3 The ANWI Contractor shall consider the following requirements when<br />

deploying any Release Package.<br />

6.10.2 Delivery of Equipment<br />

6.10.2.1 Delivery to site process<br />

6.10.2.1-p1 The ANWI Contractor shall deliver NNHQ ANWI hardware and<br />

software as specified in this Contract. This section defines the general requirements<br />

that shall apply to all NNHQ ANWI equipment delivery.<br />

6.10.2.1-p2 The ANWI Contractor shall provide the labour involved in the<br />

packing, unpacking, installation, configuration, and activation of ANWI equipment.<br />

6.10.2.2 Inventory<br />

6.10.2.2-p1 The ANWI Contractor shall ensure the provision of an inventory<br />

down to the Lowest Replaceable Unit (LRU) level of all the equipment, software,<br />

training and other documentation supplied, not later than ten (10) working days prior<br />

to the first shipment of the equipment to the Purchaser.<br />

6.10.2.2-p2 The ANWI Contractor shall use the NATO Material Data Sheet<br />

(MDS) document as provided in Annex K.<br />

6.10.2.2-p3 The ANWI Contractor shall post a softcopy of the inventory on the<br />

portal, in Microsoft Excel or Access database format.<br />

6.10.2.2-p4 The inventory information shall, as a minimum, include the following<br />

data elements:<br />

(1) Contract Line Item Identification Number (CLIN).<br />

(2) NATO Stock Number (NSN, if known).<br />

(3) Item Name.<br />

(4) Expendable or Non-Expendable Code.<br />

(5) True Manufacturer Part Identification.<br />

(6) True Manufacturer code or complete name and address.<br />

(7) Vendor/Contractor Code or complete name and address.<br />

(8) Vendor/Contractor part number.<br />

(9) Quantity ordered.<br />

(10) Serialized item tag.


N A T O U N C L A S S I F I E D<br />

(11) Serial Number.<br />

(12) Software Revision Level.<br />

(13) Hardware Revision Level.<br />

(14) Serial Number Attributes.<br />

(15) Accountable Item Flag.<br />

(16) Currency.<br />

(17) Price.<br />

(18) Warranty Expiration Date.<br />

(19) Extended Line Item Description (if applicable).<br />

(20) Part Number of Next Higher Assembly.<br />

(21) Quantity in Next Higher Assembly.<br />

(22) Location Code.<br />

6.10.2.3 Transportation<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.2.3-p1 The ANWI Contractor shall ship all supplies to the destinations as<br />

identified in the Schedule of Supplies.<br />

6.10.2.3-p2 The ANWI Contractor shall transport all ANWI warranty supplies<br />

from and to all NNHQ destinations at his expense through FSA.<br />

6.10.2.3-p3 The Purchaser is not liable for any storage, damage, accessories or<br />

any other charges involved in such transporting of supplies prior to the actual<br />

acceptance of such supplies at the sites.<br />

6.10.2.4 Preservation and Packaging<br />

6.10.2.4-p1 The ANWI Contractor shall ensure that the various supplies will be<br />

transported, packaged, crated, or otherwise prepared in accordance with the best<br />

commercial practices for the types of supplies involved, giving due consideration to<br />

shipping and other hazards associated with the transportation of consignments to<br />

overseas.<br />

6.10.2.4-p2 The ANWI Contractor shall ensure that packing lists are provided in<br />

such a way as to permit easy identification of the items to be delivered to<br />

destinations.<br />

6.10.2.4-p3<br />

These packing lists shall accompany the shipment.<br />

6.10.2.4-p4 Each individual box from a consignment shall have one packing list<br />

in weatherproof envelope affixed to the outside of each box that indicates exactly<br />

what is contained inside. One copy shall also be put inside each box.<br />

6.10.2.4-p5 The packing lists shall contain all necessary information for easy<br />

identification of the content by the Consignee and shall also indicate the Contract<br />

Number, Prime Contractor/Sender and the Purchaser’s names and addresses.<br />

6.10.2.5 Customs Form 302<br />

6.10.2.5-p1<br />

This form is not required for movements within the European Union.<br />

6.10.2.5-p2 The ANWI Contractor shall ensure the timely request of Customs<br />

Forms 302 which is required for duty free import/export of supplies.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-65 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.2.5-p3 Following receipt of the request by the Purchaser, normally a<br />

maximum of three working days is required for the issue of the form.<br />

6.10.2.5-p4 These forms MUST be originals and cannot therefore be faxed but<br />

have to be mailed or sent by mail/express courier. In case that an express courier<br />

has to be used to ensure that the form is available in time before shipment, all<br />

associated costs shall be the responsibility of the ANWI Contractor.<br />

6.10.2.5-p5 The written request for a 302 form, (provided in Annex K) shall<br />

contain the following information:<br />

A. Purchaser Contract Number.<br />

B. CLIN, Designation and Quantities.<br />

C. Destination.<br />

D. Number and Gross Weight.<br />

E. Consignors and Consignee’s Name and Address.<br />

F. Method of Shipment, i.e. road, rail, sea, air, etc.<br />

6.10.2.5-p6 If a country refuses to accept the Form 302 and requires the<br />

payment of customs duties, the ANWI Contractor shall immediately inform the<br />

Purchaser by the fastest means available and obtain from the Customs Officer a<br />

written statement establishing that his country refuses to accept the Form 302. Only<br />

after having received Purchaser’s approval the ANWI Contractor shall pay these<br />

customs duties and the Purchaser shall reimburse the ANWI Contractor at actual<br />

cost against presentation of pertaining documents.<br />

6.10.2.5-p7 The ANWI Contractor shall inform forwarding agents of the<br />

availability of Form 302 and how this form is utilised to avoid the payment of customs<br />

duties. This Form 302 shall be added to the shipping documents to be provided to<br />

the carrier.<br />

6.10.2.6 Notice of Shipment<br />

6.10.2.6-p1 The ANWI Contractor shall, before each shipment of supplies,<br />

provide the Purchaser with a notice of shipment comprising the following details:<br />

A. Shipment Date.<br />

B. Contract Line Item.<br />

C. Consignor and Consignee.<br />

D. Number of Packages/Containers.<br />

E. Final/Partial Shipment.<br />

F. Mode of Shipment.<br />

G. Number of 302 Forms used.<br />

6.10.2.7 Shipment<br />

6.10.2.7-p1 The ANWI Contractor shall ship all required hardware, software,<br />

and installation or testing tools to the locations designated by the Purchaser. The<br />

ANWI Contractor shall be responsible for resolving any loss incurred in shipping.<br />

6.10.2.8 Delivery to Site<br />

6.10.2.8-p1 The ANWI Contractor shall be responsible to ensure that the<br />

deliveries are received, processed and delivered to the installation location.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-66 of 532


6.10.2.9 Security Scanning<br />

N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-67 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.2.9-p1 The ANWI Contractor shall ensure that all contractor<br />

hardware/software deliverables are provided to the Purchaser for screening for bugs<br />

and viruses.<br />

6.10.2.9-p2 The ANWI Contractor shall ensure that at least 1 week is provided<br />

for the Purchaser to execute the electronic screening process.<br />

6.10.2.9-p3 The ANWI Contractor’s on-site staff shall execute the unpacking<br />

and repacking of the items for electronic screening.<br />

6.10.3 Preparations for Installation<br />

6.10.3-p1 The ANWI Contractor shall identify all required support facilities,<br />

including modifications or additions required, within one week of each site survey.<br />

This notification shall be in the form of a letter to the site POC, with a copy to the<br />

Purchaser’s Project Manager, accompanied by engineering drawings, checklists, or<br />

any other supporting information. Facilities support issues that represent Medium or<br />

High risk items shall be reflected in the Risk Log.<br />

6.10.3-p2 The ANWI Contractor shall provide the NNHQ site POC and a list of<br />

ANWI Contractor personnel who will be involved in site installation and activation,<br />

with a copy of both to the Purchaser Project Manager.<br />

6.10.3-p3 The ANWI Contractor shall monitor the progress of any required Site<br />

facilities preparations, and the progress of any required provision of input by the<br />

Purchaser and the Site, to ensure timeliness and quality of the preparatory work<br />

required from the Purchaser. The ANWI Contractor shall ensure that anything that<br />

may delay installation is brought to the attention of the Purchaser’s Project Manager<br />

promptly.<br />

6.10.3-p4 The ANWI Contractor shall prepare and conduct a Site Verification<br />

Survey no later than 30 (thirty) days prior to installation activities at the site. The<br />

purpose of the site survey is to verify that the information provided for the site is still<br />

valid. This is to confirm that the new building construction is in accordance with the<br />

site plans and drawing in the locations of interest for the ANWI Project.<br />

6.10.3-p5 The ANWI Contractor shall update and issue the Project Management<br />

Handbook to reflect provision of input by the Purchaser and the Sites.<br />

6.10.4 Capability and Service Implementation<br />

6.10.4-p1 The ANWI Contractor shall hold a daily meeting with the Purchaser’s<br />

site POC to agree on the work to be conducted during the day.<br />

6.10.4-p2 The ANWI Contractor shall ensure that the equipment to be installed in<br />

any of the relevant site facilities (as identified in the SOW, and agreed changes) has<br />

been tested.<br />

6.10.4-p3 The ANWI Contractor shall provide relevant acceptance evidence to the<br />

Purchaser’s site POC before installing any ANWI piece of equipment.<br />

6.10.4-p4 The ANWI Contractor shall unpack all NNHQ ANWI equipment at the<br />

installation location and dispose of packing materials as directed by the Purchaser's<br />

Site POC.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.4-p5 The ANWI Contractor shall install the ANWI equipment supporting the<br />

ANWI services (as defined in Table 3.2) in the following locations:<br />

No. Services Installation Location<br />

1<br />

1.1 Service Management<br />

and Control(SMC)<br />

1.2 Information Assurance<br />

(IA)<br />

2<br />

SMC and IA Services<br />

Software installed on servers in both server rooms (SRs).<br />

Software installed on servers in both SRs.<br />

Infrastructure Services<br />

2.1 Processing Processing servers to be installed in both Server Rooms (SR). Full redundancy between<br />

the 2 SRs.<br />

2.2 Storage Storage devices to be installed in both SRs. Full redundancy between the 2 SRs.<br />

2.3 Printing & Scanning Servers to be installed in both SRs. The locations of the user printing and scanning<br />

devices are detailed in Annex F, Appendix 4.<br />

2.4 Network Infrastructure The Network Infrastructure Services will be installed or is (physically) integrated on/to<br />

all ANWI platforms.<br />

2.5 LAN LAN services shall be installed in a redundant manner in the two SRs, interconnected<br />

in a redundant way to the two TCFs and provide redundant services to the network end<br />

point through the Technical Equipment Rooms (TERs), National TERs(NTERs), and<br />

the Partner TERs (PTERs) Further details are in Annex F, Appendix 6.<br />

* The Wireless access points shall be installed across the whole NNHQ main building<br />

and staff centre to provide full coverage across the campus.<br />

3<br />

UCC (Unified Communications & Collaboration Services<br />

3.1 Voice Software installed on servers in both server rooms. Servers to be installed in both SRs<br />

and redundantly connected to TCF.<br />

3.2 Voicemail Software installed on servers in both server rooms. Servers to be installed in both SRs.<br />

3.3 VTC Software installed on servers in both server rooms. The service shall be available on<br />

the end user device. This may be a desktop device or a mobile device.<br />

3.4 E-mail Servers to be installed in both SRs<br />

3.5 Unified Messaging Software installed on servers in both server rooms. Servers to be installed in both SRs.<br />

3.6 Fax Software installed on servers in both server rooms. Servers to be installed in both SRs.<br />

3.7 Instant Messaging (IM) Software installed on servers in both server rooms. The service shall be available on<br />

the end user device. This may be a desktop device or a mobile device<br />

3.8 Presence Software installed on servers in both server rooms. The service shall be available on<br />

the end user device. This may be a desktop device or a mobile device<br />

3.9 Directory Software installed on servers in both server rooms. Servers to be installed in both SRs.<br />

3.10 Collaboration Software installed on servers in both server rooms. The service shall be available on<br />

the end user device. This may be a desktop device or a mobile device<br />

3.11 Mobility Software installed on servers in both server rooms.<br />

4<br />

Client-Provisioning Services<br />

4.1 Software deployment Software installed on servers in both SRs.<br />

4.2 Client devices Client devices will be prepared and deployed to the designated user locations (desks or<br />

remote locations).<br />

5<br />

Supplementary Services<br />

5.1 GSM GSM coverage shall be provided across the NNHQ campus, both within the building<br />

and externally within the campus.<br />

5.2 GSM Blocking The GSM blocking capability shall be available at the NAC and EAPC Conference<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-68 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

No. Services Installation Location<br />

rooms, and there shall be two mobile units which shall be transportable across the site.<br />

5.3 Wireless Blocking The Wireless blocking capability shall be available at the NAC and EAPC Conference<br />

rooms, and there shall be two mobile units which shall be transportable across the site.<br />

5.4 Site Security<br />

Communications<br />

(Radio)<br />

The mast(s) and associated antennas shall be installed on the campus. The exact<br />

location will depend on the location which provides full coverage of the campus.<br />

The security communications management servers shall be located in the two SRs.<br />

5.5 IPTV Servers to be installed in both SRs. The on-site IPTV service access point will be in<br />

both SRs. Any IPTV device shall be installed in the identified 425 end user locations.<br />

Table 6.1: Locations for ANWI services<br />

6.10.4-p6 The ANWI Contractor shall install all equipment in accordance with the<br />

applicable SDIP documents (References 1.1.1.3.1 – 1.1.1.3.3).<br />

6.10.4-p7 The ANWI Contractor shall connect all equipment to electrical power<br />

and communications interfaces.<br />

6.10.4-p8 The ANWI Contractor shall turn on all equipment and configure<br />

hardware and software settings to match the Product Baseline and site infrastructure<br />

configuration.<br />

6.10.4-p9 The ANWI Contractor shall ensure that all identified interfaces to<br />

systems and services as identified in the detailed design are operational.<br />

6.10.4-p10 The ANWI Contractor shall provide the approved SIVP to the<br />

Purchaser Site POC.<br />

6.10.4-p11 The ANWI Contractor shall execute the SIVPs for the NNHQ ANWI<br />

equipment installed in the site in order to demonstrate to the local Security<br />

Accreditation Authority (SAA) that the equipment complies with the CPS, SSRS and<br />

SISRS.<br />

6.10.4-p12 The ANWI Contractor shall upon completing an installation:<br />

A. Provide the Purchaser Site POC with a copy of the site installation and<br />

activation checklist and resolve any discrepancies identified.<br />

B. Obtain a System Statement of Conformance from the local Security<br />

Accreditation Authority and provide it to the Purchaser Site POC.<br />

6.10.4-p13 The ANWI Contractor shall respond within 24 hours to any problems<br />

reported by the Purchaser with installed but not yet activated NNHQ ANWI site.<br />

6.10.5 Installation Back Out<br />

6.10.5-p1 The ANWI Contractor shall uninstall any ANWI component found to be<br />

interfering with IOC services (table 6.1).<br />

6.10.5-p2 The ANWI Contractor shall ensure that after uninstalling a capability<br />

that restoration of the pre-existing services is again operational.<br />

6.10.5-p3 The ANWI Contractor shall analyse the problematic component and<br />

after correcting the error retest the component in the ITS before reinstalling it on the<br />

network.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-69 of 532


6.10.6 ANWI Service Activation<br />

6.10.6-p1<br />

Activation.<br />

N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Upon Purchaser approval the ANWI Contractor shall conduct Service<br />

6.10.6-p2 Service Activation shall comprise:<br />

A. The establishment of live connections and activation of the NNHQ ANWI<br />

site.<br />

B. The performance of Service Certification Tests.<br />

C. The testing of service levels as specified in the SLA.<br />

6.10.6-p3 The ANWI Contractor shall provide specific service requests to the<br />

Purchaser to provide the facilities, operational links, and interfaces required for<br />

System Activation Tests.<br />

6.10.6-p4 The ANWI Contractor shall conduct Service Certification Tests as<br />

defined below and in compliance with the overall System Tests Process as identified<br />

in paragraphs 6.13-16.<br />

6.10.6-p5 During the Service Certification Testing the ANWI Contractor shall<br />

demonstrate that the equipment installed at all affected sites complies with the<br />

operational readiness and performance requirements and complies with the security<br />

requirements as specified in the of the NNHQ ANWI Capability Service requirements,<br />

SSRS and SISRS.<br />

6.10.6-p6 The Service Certification Testing shall include the exchange of test<br />

traffic between the activated NNHQ ANWI sites and the monitoring of operational<br />

performance to confirm the operational readiness and reliability of the NNHQ ANWI<br />

services at affected sites.<br />

6.10.6-p7 Service Certification Testing shall be conducted for a minimum of two<br />

weeks, based on the individual test criteria.<br />

6.10.6-p8 The completion of Service Certification Testing shall be subject to the<br />

Purchaser's confirmation that all Service Certification Tests have been completed<br />

successfully for requesting IOC.<br />

6.10.7 ANWI System Activation Testing<br />

6.10.7-p1 Upon Purchaser authorisation the ANWI Contractor shall conduct<br />

service interoperational testing as defined below and in compliance with the overall<br />

Release Build and Test Phase process as defined in paragraph 6.7.<br />

6.10.7-p2 The ANWI Contractor shall develop and carry out System Activation<br />

Tests of NNHQ ANWI services to establish benchmarks for service performance and<br />

service reliability, maintainability, and availability.<br />

6.10.7-p3 The ANWI Contractor shall develop and carry out System Activation<br />

Tests (demonstrating service interoperability) of NNHQ ANWI to prove end-to-end<br />

services provision to end-users to support FOC.<br />

6.10.7-p4 The ANWI Contractor shall develop and carry out ANWI System<br />

Activation Tests to prove that ANWI trained NATO personnel can provide the ANWI<br />

capability services for NONO services as specified in the SLA.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-70 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.7-p5 The Purchaser shall observe the tests and have the ANWI Contractor<br />

perform additional selected testing tasks to confirm compliance with ANWI<br />

requirements.<br />

6.10.7-p6 The completion of System Activation Tests shall be subject to the<br />

Purchaser's confirmation that all tests have been completed successfully.<br />

6.10.8 Physical Configuration Audits<br />

6.10.8-p1 The ANWI Contractor shall schedule and chair the Physical<br />

Configuration Audit (PCA) for each site (Main ANWI campus, Bâtiment Z and remote<br />

sites) following Site Activation. The objective of the PCA is to verify that the delivered<br />

CIs correspond with the NNHQ ANWI Product Baseline documentation.<br />

6.10.8-p2 The PCA shall include visual inspection of all hardware and<br />

documentation CIs, and visual verification of the presence and correct configuration<br />

of all service and software CIs.<br />

6.10.8-p3<br />

Site POC.<br />

6.10.8-p4<br />

6.10.9 On-Site Training<br />

6.10.9.1 User Training<br />

The ANWI Contractor shall co-ordinate the PCA with the Purchaser's<br />

Successful completion of PCA establishes the site baseline.<br />

6.10.9.1-p1 The ANWI Contractor shall provide all users with an appropriate<br />

clientenvironment training session (as noted below).<br />

6.10.9.1-p2 The ANWI Contractor’s client environment training session shall not<br />

exceed 2 hours in length<br />

6.10.9.1-p3<br />

The ANWI Contractor shall conduct the training.<br />

6.10.9.1-p4 The ANWI Contractor’s client environment training session shall be<br />

tailored to include:<br />

A. Use and access of the print/scan service<br />

B. Use of the UCC service (as applicable to the type of user and security<br />

domain)<br />

C. Use and access of the mobile client (applicable to mobile Business users)<br />

6.10.9.1-p5 The ANWI Contractor shall post the client environment training<br />

material on the ANWI Self-service portal as well as link the material to the<br />

appropriate service listed in the ANWI service catalogue.<br />

6.10.9.2 Training Needs Analysis<br />

6.10.9.2-p1 The ANWI Contractor shall perform a training needs analysis of the<br />

on-site support staff.<br />

6.10.9.2-p2 The ANWI Contractor shall use the ANWI capabilities and services<br />

(Annexes and Appendices) to determine what tasks the NATstaff is able to<br />

satisfactorily perform.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-71 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.9.2-p3<br />

report.<br />

The ANWI Contractor shall report the findings in the site survey’s<br />

6.10.9.3 NONO Services<br />

6.10.9.3-p1 The ANWI Contractor shall provide on-site training to System<br />

Administration personnel designated by the Purchaser’s Site POC on all tasks<br />

required to operate the system, perform daily maintenance and administration,<br />

disaster recovery, and first-level problem isolation.<br />

6.10.9.3-p2 The on-site training shall be structured according to the First- and<br />

Second-Level support concept.<br />

6.10.9.3-p3 The on-site training for System Administration personnel shall not<br />

exceed 3 days per session for First-Level personnel and 5 days per session for<br />

Second-Level personnel.<br />

6.10.9.3-p4 The ANWI Contractor shall also provide on-site training for 50<br />

designated users on the ANWI capabilities.<br />

6.10.9.3-p5<br />

The user on-site training shall not exceed 1 day per session.<br />

6.10.9.3-p6 The Purchaser will provide the following basic facilities to support<br />

training: Equipment room, power supply, tables, chairs.<br />

6.10.9.3-p7 The ANWI Contractor shall provide all other facilities, equipment<br />

and services necessary, to include any necessary servers, workstations etc…, to<br />

carry out the on-site Training activities.<br />

6.10.10 Migration to the ANWI Environment<br />

6.10.10-p1 The ICT migration to the NNHQ is a complex process with a lot of<br />

interdependencies between the NNQH Programme projects (PNWI, GCC, ESS, AVI,<br />

BMS), ICTM business applications migration and the ANWI. The migration of the<br />

ICTM Business Applications and related ESS and AVI services from the old building<br />

will be dependent on the availability of the ANWI. Also the migration is dependent on<br />

the installed capabilities services that have been successfully tested. See Figure 6.2.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-72 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 6.2: Migration overview.<br />

6.10.10-p2 The overall New NATO HQ ICT migration strategy and planning<br />

requirements, to which the ANWI project is an integrated part, issued by HQPO and<br />

governed by the DPRC, are provided in reference 1.1.1.7.5.<br />

6.10.10-p3 The migration of services, applications, configuration settings, and<br />

data is split into:<br />

A. ANWI related core and infrastructure services, applications, configuration<br />

settings, and data. These are within the scope of the ANWI Contractor’s<br />

direct responsibility.<br />

B. AVI, BMS and ESS related data and applications are the responsibility of<br />

HN Belgium. However, the ANWI Contractor shall provide support and<br />

advice on their migration and integration with ANWI capability services, to<br />

ensure that the overall migration processing and storage support is<br />

seamless and successful.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-73 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

C. Business Applications, configuration settings and data are the<br />

responsibility of Host Nation ICTM. However, the ANWI Contractor shall<br />

provide support and advice on their migration and integration with the<br />

ANWI capability services, to ensure that the overall migration is seamless<br />

and successful.<br />

D. Migration and transition of user communities and business processes will<br />

be undertaken on a progressive basis, with users being trained “just in<br />

time” for their migration from their current to their new location. These are<br />

within the scope of the NNHQ HQPO transition team. The ANWI<br />

Contractor shall provide support to this process, directly via the ANWI<br />

related core and infrastructure services provisioning, and indirectly via the<br />

ANWI Contractor support to business application migration.<br />

6.10.11 ICT Migration Key Milestones<br />

6.10.11-p1 The ANWI contractor shall create and implement a migration plan<br />

that satisfies the key migration milestones as shown in Annex A.<br />

6.10.12 ANWI Contractor Task<br />

6.10.12-p1 The ANWI Contractor shall execute the migration in close<br />

coordination with the Purchaser.<br />

6.10.12-p2 The ANWI Contractor shall use automated tools for migration and<br />

migration roll-back. Manual interventions for migration activities will only be allowed<br />

as an exception that the ANWI Contractor shall offer for approval to the Purchaser.<br />

6.10.12-p3 The ANWI Contractor shall migrate the Current Systems and<br />

Services as related to the ANWI Capability Services as specified in table 6.3. The<br />

current ICT environment that shall be used as the basis for the migration planning is<br />

specified in Annex B.<br />

6.10.12-p4<br />

more detail.<br />

Table 6.3 Describes the ANWI Capability Services Migration task in<br />

No. Migration Category Acronym Migration Responsibility<br />

1 Migration of Core Services. Mig-CS ANWI Contractor Task.<br />

2 Migration of other services. Mig-O Migration of current capability at the NHQ site to the<br />

NNHQ site.<br />

3 New service / capability at NNHQ. NoMig-NS No migration requirement.<br />

4 Current service / capability that will<br />

not be migrated.<br />

NoMig<br />

Legend for Table 6.3 (below)<br />

To be clearly identified as a part of the migration<br />

planning. No migration requirements.<br />

No. Services Migration Requirement<br />

1<br />

1.1 Service Management and<br />

Control(SMC)<br />

SMC and IA Services<br />

Mig-O. The extent of the SMC migration requirement will depend on the SMC<br />

capability and the how much of it will be the same as the current site capability.<br />

Where the tools are the same they will have the relevant setting migrated, where<br />

the capability is new the current knowledge base will be migrated.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-74 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

1.2 Information Assurance (IA) NoMig-NS. The IAM configuration will have to be developed.<br />

2<br />

Infrastructure Services<br />

2.1 Processing NoMig of physical hardware. Detailed service configurations shall be developed<br />

and implemented by the ANWI Contractor. The NATO setting and configurations<br />

will be provided by the Purchaser as PFI.<br />

2.2 Storage NoMig of physical hardware. Detailed setting (including security) setting will be<br />

provided by the Purchaser as PFI, which the ANWI Contractor shall implement.<br />

2.3 Printing & Scanning NoMig of physical hardware. This will be a new service. New printer<br />

configurations will be developed for the new site, as a part of the follow me print<br />

concept.<br />

2.4 Network Infrastructure 1.3.1.1 NoMig of physical hardware.<br />

A new network level connectivity and routing design will need to be provided as a<br />

part of the overall ANWI design.<br />

2.5 LAN NoMig of physical hardware. Detailed setting (including security) setting will be<br />

provided by the Purchaser as PFI, which the ANWI Contractor shall implement.<br />

3<br />

UCC (Unified Communications & Collaboration Services<br />

3.1 Voice Mig-CS. Migration of address lists and current user telephone numbers.<br />

This applies for NU voice oice as both UCC and as a separate service.<br />

3.2 Voicemail Goes with voice.<br />

3.3 VTC Video Desktop - NoMig-NS. New configurations will be developed.<br />

Video VTC/VMR – existing address books and VTC number shall be migrated.<br />

3.4 E-mail Mig-CS. E-mail configurations, and constraints (e.g. user maximum size, address<br />

lists) shall be migrated. If possible individual user configuration and user profiles<br />

to be migrated.<br />

3.5 Unified Messaging NoMig-NS. New configurations will be developed.<br />

3.6 Fax Mig-CS. New configurations will be developed but the current directory need to<br />

be migrated<br />

3.7 Instant Messaging (IM) NoMig-NS. New configurations will be developed.<br />

3.8 Presence NoMig-NS. New configurations will be developed<br />

3.9 Directory<br />

3.10 Collaboration NoMig-NS. New configurations will be developed<br />

3.11 Mobility NoMig-NS. New configurations will be developed<br />

4 Client-Provisioning Services<br />

4.2 Software deployment NoMig. New configurations will be developed<br />

4.1 Client devices NoMig. New configurations will be developed<br />

5<br />

Supplementary Services<br />

5.1 GSM NoMig-NS. New configurations will be developed<br />

5.2 GSM Blocking NoMig-NS. New configurations will be developed.<br />

5.3 WiFi Blocking NoMig-NS. New configurations will be developed.<br />

5.4 Site Security Communications<br />

(Radio)<br />

Mig-O. Migration of the current radio device address-list and users numbers.<br />

Migration of management application settings.<br />

5.5 IPTV NoMig-NS. IPTV will need configuration to provide the required channels to the<br />

end users.<br />

6 Common User Services<br />

6.1 File services Mig-CS. The file structure, file naming convention shall be migrated. Note that<br />

ICTM may wish to consolidate file structures before migration. Normally this<br />

should make the migration process simpler.<br />

6.2 Web browsing Mig-CS. Browsing configuration for application and user profiles to be migrated.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-75 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Table 6.3: ANWI Capability Services Migration task overview (should be table 2)<br />

6.10.12-p5 The ANWI Contractor shall provide migration support to each<br />

application that belongs to the categories of HN BEL related ESS/AVI application or<br />

HN ICTM business applications as specified in table 6.4.<br />

6.10.12-p6 The ANWI Contractor shall, for each of the identified applications as<br />

required in 6.14.4.5, perform the following tasks:<br />

A. Determine the application migration support requirements with the<br />

Purchaser and in close cooperation with HN ICTM:<br />

1. Determine and agree the detailed schedule.<br />

2. Determine all the ANWI services and interfaces that are affected.<br />

3. Determine ANWI Contractor integration and customisation efforts for<br />

each of the affected services/interfaces.<br />

4. Determine the ANWI Contractor support requirements for CAT, ITS and<br />

Operational testing.<br />

5. Determine the ANWI Contractor operations and support requirements<br />

for the duration of the application migration.<br />

B. Determine the Migration risk and develop an ANWI roll-back procedure<br />

derived from the Application Migration roll-back procedure.<br />

C. Execute the required ANWI Contractor Application migration support<br />

activities according to the plan.<br />

6.10.12-p7 Table 6.4 shows the categories of applications for which the ANWI<br />

Contractor shall provide migration support.<br />

No Security Domain Descriptions<br />

Services<br />

1 ICTM business application Services<br />

NS EAPC Business Public<br />

1.1 Specialist Applications Y Y Y Y HQ applications with specific functionality in<br />

support of specific business processes. A list of<br />

applications in this category is provided in<br />

Annex B.<br />

1.2 EIM applications Y Y Y Y Suite of applications related to Enterprise<br />

Information Management (EIM). A list of<br />

applications in this category is provided in<br />

Annex B.<br />

1.3 ERP applications Y Y Y Y Suite of applications related to Enterprise<br />

Resource Planning. A list of applications in this<br />

category is provided in Annex B.<br />

2 HN BEL Applications<br />

2.1 ESS related apps/data - - Y - ESS Access Card ID information migration as<br />

specified in Annex B as a specialist<br />

application.<br />

2.2 AVI related applications /data<br />

migration<br />

- - Y Y AV data storage migration as specified in<br />

Annex B as a specialist application.<br />

Table 6.4: Application Services Categories that require ANWI support<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-76 of 532


N A T O U N C L A S S I F I E D<br />

6.10.13 Migration Concept and Business Principles<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.10.13-p1 The ANWI Contractor shall implement the ICT migration concept to<br />

transfer the existing Headquarters business infrastructure into the NNHQ without<br />

adverse effect upon NATO’s on-going operational capability.<br />

6.10.13-p2 The ANWI Contractor shall apply the following business principles<br />

to both the migration of ANWI related services as well as for the support to Business<br />

and AVI/ESS related applications:<br />

6.10.13-p3 There shall be a full continuity of service provision, with no loss of<br />

service to users.<br />

6.10.13-p4 There shall be a minimal disruption to the users and migration<br />

activities will be transparent to all involved stakeholders.<br />

6.10.13-p5 The migration activities shall preserve the NATO security posture<br />

and will not adversely compromise NATO classified information pre-, during or after<br />

migration.<br />

6.10.13-p6 Each migration activity shall include an input and support to a<br />

communication campaign.<br />

6.10.13-p7 Each migration activity will include instructions for the pre- and postmigration<br />

user involvement.<br />

6.11 Review and Close<br />

6.11-p1 This phase aims to collect experience and feedbacks, performance targets<br />

and achievements. Most commonly this phase happens once, and overlaps with the<br />

Project Closure phase.<br />

6.11-p2 The ANWI Contractor shall organize this phase accordingly with the ITIL<br />

best practice and hand-over all the documentation to the Purchaser.<br />

6.12 Knowledge Management<br />

6.12-p1 The purpose of this process is to share ideas, perspective, experience and<br />

information, ensuring that all of them are available to Contractor’s and Purchaser’s<br />

decision makers to take at the right time informed decision.<br />

6.12-p2 The ANWI Contractor shall create a Service Knowledge Management<br />

database (per Annex E Appendix 1) for the NNHQ O&M Authority that will be used to<br />

identify risk areas for the various capabilities and services.<br />

6.12-p3 The ANWI Contractor shall use the Knowledge Management database to<br />

hold capability and service performance baselines.<br />

6.12-p4 The ANWI Contractor shall use the Knowledge Management database to<br />

estimate a service’s cost and the NNHQ O&M Authority’s cost of a service<br />

(ownership)<br />

6.12-p5 The ANWI Contractor shall use the Knowledge Management database<br />

identify service catalogue delivery constraints.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-77 of 532


N A T O U N C L A S S I F I E D<br />

6.13 Initial Operating Capability (IOC milestone)<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.13-p1 IOC is the act by which the Purchaser has evaluated the ANWI services<br />

being provided at the all NNHQ sites and remote sites and has determined that they<br />

meet the requirements to request IOC.<br />

6.13-p2 The ANWI Contractor shall have completed the following actions prior to<br />

requesting IOC:<br />

A. Successful completion of Site installation and Service Activation, including<br />

Purchaser approval of the test reports.<br />

B. Completion of SCT (paragraph 6.8.4).<br />

C. Completion of the on-site training of NATO personnel involved in<br />

operations and maintenance of NNHQ ANWI for NONO services (only if<br />

NONO option is exercised).<br />

D. Delivery of all required documentation.<br />

E. Inventory of delivered items.<br />

6.13-p3 The ANWI contractor shall follow the required steps and responsibilities for<br />

providing Service Level Targets (SLTs) as specified in their appendices.<br />

6.13-p4 The ANWI Contractor shall notify the Purchaser in writing that the NNHQ<br />

ANWI site is offered for IOC and it shall have the installation activation checklist<br />

attached.<br />

6.13-p5 After satisfactory completion of the IOC review and the issuing of the<br />

System Statement of Conformance, the Purchaser will accept delivery of the NNHQ<br />

IOC ANWI site.<br />

6.13-p6 Responsibility for system operation and performance shall remain with the<br />

ANWI Contractor for the duration of the initial and any follow-on Operational Support<br />

tasks through FSA.<br />

6.13.1 ANWI System Activation Testing<br />

6.13.1-p1 The ANWI Contractor shall conduct System Activation Testing as<br />

defined below and in compliance with the overall ANWI Testing Process.<br />

6.13.1-p2 The System Activation tests shall verify NNHQ ANWI services<br />

functionality at the site, demonstrate interfaces with local and external systems as<br />

required, and evaluate the overall readiness of the site for System activation.<br />

6.13.1-p3 The Purchaser will provide the facilities, operational links, and<br />

interfaces required for System Activation Tests.<br />

6.13.1-p4 The Purchaser will observe the tests and have the ANWI Contractor<br />

perform additional selected testing tasks to confirm compliance.<br />

6.13.1-p5 Except for any specialised test equipment such as traffic generators,<br />

etc., the ANWI Contractor shall only use the site NNHQ ANWI equipment for System<br />

Activation Testing and no operational traffic shall be authorised.<br />

6.13.1-p6<br />

The ANWI Contractor shall check that all services are migrated.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-78 of 532


6.13.2 ANWI Site Activation<br />

N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-79 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.13.2-p1 After completion of site installation activities and upon authorisation by<br />

the Purchaser, the ANWI Contractor shall conduct Final Site Testing .<br />

6.13.2-p2 The site activation will be achieved in two steps:<br />

A. Provisional Site Activation (PSA): the ANWI Contractor shall provide the<br />

ANWI IOC services as specified in table 6.2<br />

B. Site Activation (SA): The ANWI Contractor shall achieve all ANWI services<br />

to be operational and where ANWI NONO capabilities and services are<br />

handed-over to the Purchaser.<br />

6.13.2-p3 PSA shall consist of:<br />

A. The establishment of connections between the NNHQ ANWI<br />

implementation in the site, the NATO operational systems at the old NATO<br />

Headquarters site, remote NNHQ locations and other NATO locations via<br />

the NGCS network.<br />

B. The performance of provisional Final Site Tests.<br />

6.13.2-p4 SA shall consist of:<br />

A. The confirmation of connections between the NNHQ ANWI<br />

implementation in the site, the NATO operational systems at the old NATO<br />

Headquarters site, remote NNHQ locations and other NATO locations via<br />

the NGCS network.<br />

B. The performance of Final Site Tests.<br />

6.13.2-p5 The ANWI Contractor shall be responsible for integration of NNHQ<br />

ANWI. This means both the integration of the various HW products and SW products<br />

that constitute NNHQ ANWI and the integration of NNHQ ANWI with the existing<br />

NATO systems specified in the Annexes and Appendices.<br />

6.13.3 “As Built” Drawings and Documentation<br />

6.13.3-p1 The ANWI Contractor shall provide an “as built” drawing of the installed<br />

capability at IOC.<br />

6.13.3-p2 The ANWI Contractor shall document the “as built” physical<br />

configuration making appropriate changes to the installation and configuration<br />

document detailing the configuration settings and loaded parameters.<br />

6.13.3-p3 The ANWI Contractor “as built” drawing and document shall be under<br />

the Contractor’s configuration control.<br />

6.14 Initial Operating Capability (IOC) Acceptance<br />

6.14-p1 The ANWI Contractor shall have successfully completed and/or delivered<br />

the following to have IOC accepted:<br />

A. Provision of all supplies and services required for IOC as specified<br />

(above).<br />

B. Completion of the Service Certification Tests including approval of the<br />

operational test reports by the Purchaser.<br />

C. Successful completion of Site and Service Certification Testing, including<br />

Purchaser approval of the test reports.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

D. Completion of the on-site training of NATO System Administration<br />

personnel involved in operations and maintenance of ANWI for NONO<br />

services (only if NONO option is exercised).<br />

E. Delivery of all required documentation (including ILS documentation and<br />

Operational Support Plan).<br />

F. Inventory of delivered items.<br />

G. The Product Baseline (a link to the current version on the Project Website<br />

is sufficient).<br />

H. Report of all outstanding Off-specification Reports related to the site.<br />

i. Documentation relevant to the IOC (e.g. as-built drawings, handbooks,<br />

quality assurance reports, manuals).<br />

J. Integration of all back-end services be they ANWI or NATO PFE provided<br />

K. Initial or updates to ANWI service & maintenance manuals and SOPs.<br />

L. A copy of the System Statement of Conformance signed by the local SAA<br />

for the NNHQ ANWI Site.<br />

6.14-p2 After satisfactory completion of the IOC review and the issuing of the<br />

System Statement of Conformance, the Purchaser will accept IOC for the NNHQ<br />

ANWI back-end capabilities and services.<br />

6.14-p3 The ANWI Contractor shall be responsible for system operation and<br />

performance through FOC.<br />

6.15 Final Operating Capability (FOC milestone)<br />

6.15-p1 The ANWI Contractor shall request a FOC meeting where the ANWI<br />

Contractor shall demonstrate that all ANWI services are conformant to the agreed<br />

SLAs.<br />

6.15-p2 The ANWI Contractor’s notification shall include the following information:<br />

A. The Product Baseline (a link to the current version on the Project Website<br />

is sufficient).<br />

B. Report of all outstanding Off-specification Reports related to the site.<br />

C. Documentation relevant to the Partial System Acceptance (e.g. as-built<br />

drawings, handbooks, quality assurance reports, manuals).<br />

D. Initial or updates to User training and Custom NNHQ ANWI manuals.<br />

E. A copy of the System Statement of Conformance signed by the local SAA<br />

for the NNHQ ANWI Site.<br />

F. Site Implementation checklist.<br />

G. Successful completion of System Acceptance Testing including approval<br />

of the operational test reports by the Purchaser.<br />

6.16 Final Operating Capability (FOC) Acceptance<br />

6.16-p1 FOC is the act by which the Purchaser has evaluated the operational ANWI<br />

NNHQ site and remote sites and has determined that it meets the requirements of<br />

the Contract.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-80 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-81 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

6.16-p2 The ANWI Contractor shall have completed the following actions to achieve<br />

FOC:<br />

A. Completion of the Client-device installation and testing including approval<br />

of the Operational Tests report by the Purchaser.<br />

B. Successful acceptance of the end-to-end user testing of all client services.<br />

C. Provision of all supplies and services required for FOC.<br />

D. Completion of the on-site training of NATO staff<br />

E. Delivery of all client device required documentation<br />

F. Inventory of delivered items.<br />

G. The Product Baseline (a link to the current version on the Project Website<br />

is sufficient).<br />

H. Report of all outstanding Off-specification Reports related to the site.<br />

I. Documentation relevant to the Partial System Acceptance (e.g. as-built<br />

drawings, handbooks, quality assurance reports, manuals).<br />

J. Initial or updates to User and Custom NNHQ ANWI training manuals.<br />

K. A copy of the System Statement of Conformance signed by the local SAA<br />

for the NNHQ ANWI Site.<br />

L. All actions closed.<br />

M. No outstanding issues with System Activation Testing.<br />

N. All risks closed.<br />

6.16-p3 After satisfactory completion of the FOC review and the issuing of the<br />

System Statement of Conformance, the Purchaser will accept FOC for the NNHQ<br />

ANWI site.<br />

6.16-p4 Responsibility for system operation and performance shall remain with the<br />

ANWI Contractor for the duration of the initial and any follow-on Operational Support<br />

tasks.<br />

6.16-p5 The ANWI Contractor shall maintain a status report of document delivery<br />

based on the Contract Data Requirements List (CDRL) as part of the Project<br />

Progress Report. The CDRL shall contain the status of all documentation to be<br />

provided under the Contract: Title, reference, quantity and status (i.e. draft,<br />

approved, revision level). A final version of the CDRL shall be delivered to the<br />

Purchaser prior to Final Operating Capability.<br />

6.17 Final System Acceptance (FSA milestone)<br />

6.17-p1 The ANWI Contractor shall request a FSA meeting after he hasdelivered<br />

and handed-over everything which is part of 6.15 Final Operating Capability (FOC)<br />

Acceptance:<br />

A. All contract activities fully executed.<br />

B. All deliverables acceptedand handed over to the Purchaser.<br />

C. Provided six (6) months of service support to the NNHQ O&M Authority.<br />

D. Produced acceptable SLA reports per Section 7.<br />

E. Validation that warranty was transferred to Purchaser.<br />

F. Trained NNHQ O&M Authority service staff how to create the SLA reports.<br />

G. Trained NNHQ O&M Authority how to perform the data capture and trend<br />

analysis to produce the reports.<br />

H. No outstanding issues with Final Site Testing.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 7.<br />

ANWI SERVICE AND SYSTEM OPERATIONS<br />

7.1 ITIL Service Operation<br />

7.1-p1 The Processes that are part of Service Operations are;<br />

A. Incident Management<br />

B. Problem management<br />

C. Request fulfilment<br />

D. Access Management<br />

E. Event Management<br />

7.1-p2 The purpose of Service Operation is the coordination and the conduct of all<br />

the activities and processes that are necessary for delivering and managing all the<br />

services at the agreed levels to business users and customers.<br />

7.2 ANWI Service Operation Functions<br />

7.2.1 Support Overview<br />

7.2.1-p1 The ANWI Contractor shall implement three (3) levels of operational<br />

support following the NATO Support Authority best practice which are identified as:<br />

First Level, Second Level and Third Level of Support.<br />

7.2.2 First Level Support<br />

7.2.2-p1 First Level support shall constitute the routine system operation, system<br />

administration, and system maintenance tasks required to maintain NNHQ ANWI<br />

services at a site. These tasks include providing local user support, account<br />

management, system monitoring, backups, and disaster recovery.<br />

7.2.2-p2 The NNHQ ANWI First Level Support function shall use the incident<br />

management and trouble-ticketing system for modifying, tracking, and closing trouble<br />

tickets in this system.<br />

7.2.2-p3 The NNHQ First Level Support interfaces with and engages the user to<br />

resolve user ICT work-orders / trouble tickets.<br />

7.2.3 Second Level Support<br />

7.2.3-p1 Second Level Support shall constitute the centralised system operation,<br />

administration, and management tasks performed at the Primary and Alternate sites<br />

to maintain NNHQ ANWI services across the Product baseline.<br />

7.2.3-p2 Second Level Support supports fault isolation, system-wide<br />

performance monitoring and reporting, and in-depth technical assistance to First-<br />

Level support staff.<br />

7.2.3-p3 The NNHQ ANWI Second Level Support function shall be available to<br />

NNHQ ANWI users and Administration staff by telephone, unclassified facsimile, and<br />

email (NATO SECRET, NATO RESTRICTED, NATO UNCLASSIFIED, EAPC<br />

CONFIDENTIAL or Internet mail).<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-82 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.2.3-p4 The NNHQ ANWI Second Level Support function shall use the incident<br />

management and trouble-ticketing system for opening, modifying, tracking, and<br />

closing trouble tickets, and log all requests in this system. The ANWI Contractor shall<br />

summarise trouble ticket statistics, assess trends, and recommend changes to<br />

improve system performance as part of the System Status Report.<br />

7.2.3-p5 The NNHQ ANWI Service Desk and Second Level Support function<br />

shall be manned by the ANWI Contractor on NNHQ business days from 0800 to<br />

1830 CET Monday-Thursday and from 0800 to 1700 Friday.<br />

7.2.3-p6 The NNHQ ANWI Service Desk shall be available to NNHQ ANWI<br />

users and Administration staff by telephone, unclassified facsimile, and email (NATO<br />

SECRET, NATO RESTRICTED, NATO UNCLASSIFIED, EAPC CONFIDENTIAL or<br />

Internet mail).<br />

7.2.3-p7 The ANWI Contractor shall provide 24-hour support when requested by<br />

the Purchaser to support operational needs or events. A request for 24-hour support<br />

will be requested by the Purchaser to the ANWI Contractor not less than a week<br />

before the needed effort. Note, the ANWI Contractor may need to be flexible in<br />

supporting an urgent 24-hour support request if an emergency situation occurs.<br />

7.2.3-p8 Unless otherwise specified agreed, support outside NNHQ business<br />

days shall not exceed a total of 180 hours in a one-year period.<br />

7.2.4 Third Level Support<br />

7.2.4-p1 Third Level Support shall maintain the core expertise for all NNHQ<br />

ANWI components and services, including configuration management of NNHQ<br />

ANWI components, administration of the NNHQ ANWI, performance assessment,<br />

Off-specification reporting, and maintenance engineering.<br />

7.2.4-p2 Third Level Support includes the maintenance and administration of the<br />

NNHQ ANWI ITS and its use in analysing operational problems and validating<br />

changes to the Product Baseline as well as the link between the operational Second<br />

Level Support and factory ANWI corporate technical support staff. Third Level<br />

Support is provided by the ANWI Contractor’s corporate technical experts and/or<br />

manufacturer support.<br />

7.2.5 ITIL Mapping<br />

7.2.5-p1 The ANWI Contractor shall map the relations between the NATO three<br />

(3) levels of support and the ITIL V3 framework in the ILSP todetermine the<br />

manpower needs to support the ANWI contractor based service design where the<br />

following paragraphs help define the ITIL Service Operation functions:<br />

A. Service Desk<br />

B. Technical management<br />

C. Application Management<br />

D. IT Operations Management<br />

7.2.6 Service Desk<br />

7.2.6-p1 The NNHQ ANWI Service Desk shall be manned by the NNHQ O&M<br />

Authority as defined in 2.3.3-p3 and represents the single point of contact for users<br />

for the day-by-day operations.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-83 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-84 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.2.6-p2 The ANWI Contractor shall recommend one of the ITIL standard<br />

Service Desk models for implementation at NNHQ (Local Service Desk Structure,<br />

Centralized Service Desk Structure, or Virtual Service Desk Structure) for Purchaser<br />

approval.<br />

7.2.7 Technical Management<br />

7.2.7-p1 The ANWI Contractor shall provide technical management (referred to<br />

the groups / departments / teams that provide the technical expertise) for the for the<br />

ANWI services.<br />

7.2.7-p2 The ANWI Contractor’s Technical Management shall provide support<br />

for maintaining a stable and resilient ICT infrastructure, with the final aim to support<br />

the business value to users through plans / decisions / actions support.<br />

7.2.8 IT Operation Management<br />

7.2.8-p1 The NNHQ O&M authority as defined in 2.3.3-p3 shall be responsible<br />

for the ANWI’s IT Operation Management of both ITIL defined Operations and<br />

Facilities.<br />

7.3 ANWI Service Operations Processes<br />

7.3.1 Incident Management<br />

7.3.1-p1 The purpose of Incident Management is to restore as soon as possible<br />

the normal service operation, minimizing the operational impact on NNHQ business.<br />

7.3.1-p2 The ANWI Contractor Incident Management process shall identify all<br />

those events that disrupt or could disrupt an ANWI service, and can be<br />

communicated by the users through the service desk or directly through an ANWI<br />

provided automated tool.<br />

7.3.1-p3 The ANWI Contractor shall provide a tool for the Service Desk if the<br />

current HQ’s Service Desk PFE tool is determined to be insufficient. The tool shall<br />

manage incidents, via trouble tickets, which cause an unplanned interruption to a<br />

service or reduction in the quality of the service. The technical requirements for the<br />

service desk tool are provided by the Service Management and Control Specific CoI<br />

Services, Section 13.1.<br />

7.3.1-p4 The ANWI Contractor shall configure the Service Desk tool to support<br />

the Service Desk service and address failures, technical/operational questions or<br />

user queries.<br />

7.3.1-p5 The ANWI Contractor shall configure the tool to allow the Service Desk<br />

to log new incidents, their resolution and adjust timescales for<br />

resolution/escalation/workarounds.<br />

7.3.1-p6 Each trouble ticket incident shall:<br />

A. Be uniquely identified (by a ticketing number system).<br />

B. Have symptoms described.<br />

C. Be categorised.<br />

D. Be prioritised (major incidents, minor, etc.).<br />

E. Be (optionally) linked to a problem record.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

F. Be (optionally) linked to a change.<br />

G. Have a related CI.<br />

H. Have a resolution.<br />

I. Have a date of occurrence.<br />

J. Add a user with contact information.<br />

K. Have the status tracked (Open, In Progress, Resolved, closed).<br />

7.3.1-p7 The ANWI Contractor shall configure the Service Desk tool to be linked<br />

to the ANWI’s configuration management database and the management’s<br />

monitoring tool.<br />

7.3.1-p8 The ANWI Contractor shall configure the tool to track the incident<br />

response and resolution performance against the target per the agreed SLA.<br />

7.3.1-p9 The ANWI Contractor shall configure the tool to interconnect, leverage<br />

and update the Service Knowledge Management System.<br />

7.3.1-p10 The ANWI Contractor shall configure the tool to provide a visual (stepby-step)<br />

troubleshooting model on how to handle incidents; time thresholds for<br />

completion and escalation; and what experts to engage for follow-on actions/queries.<br />

7.3.1-p11 The ANWI Contractor shall configure the tool to provide and support a<br />

knowledgebase of previously resolved incidents.<br />

7.3.1-p12 The ANWI Contractor shall leverage and agreed (with the Purchaser)<br />

Incident Management Process, with definite steps like: Identification, Logging,<br />

Categorization, Prioritization, Initial Diagnosis, Escalation, Resolution, and Recovery.<br />

7.3.1-p13 Any incident that exceeds the targeted timescale shall be automatically<br />

escalated to higher management for action and prioritisation.<br />

7.3.2 Problem Management<br />

7.3.2-p1 The Problem Management tool shall manage the Problems’ lifecycle<br />

from the first identification, further down to the identification, counter-measures and<br />

eventual resolution.<br />

7.3.2-p2 The Problem Management process shall support the ANWI lifecycle by<br />

preventing problems and their subsequent incidents; minimizing the impact of<br />

incidents; and elimination of recurring incidents.<br />

7.3.2-p3 The incident management tool’s records shall be used to provide trend<br />

analysis of similar problems in order to diagnose the root cause of incidents for the<br />

resolution of the problem be it reactive or proactive.<br />

7.3.2-p4 Problem resolutions or workarounds shall be released after being<br />

successfully tested, approved for release and documented in the change and<br />

configuration management systems.<br />

7.3.2-p5 The problem’s resolution shall be assessed against the SLA’s<br />

availability, capacity and continuity targets.<br />

7.3.2-p6 The ANWI Contractor shall reflect the resolution of all problems in the<br />

CI’s documentation, settings and baseline.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-85 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.3.2-p7 The Problem Management process shall manage all the type-ofproblem<br />

related entities: Problem, Workaround, Known Error, and Known Error<br />

Record so that:<br />

A. The ANWI Contractor shall setup a Known Error Database (KEB) and a<br />

Problem Management Process, there are identified all the problem<br />

lifecycle stages: Detection, Logging, Categorization, Prioritization,<br />

Investigation, and Diagnosis; the process must also identify when and if is<br />

possible to use a work around, or when a change is needed, or when a<br />

resolution is found.<br />

B. The information from the Problem Managementprocess shallfeed the CSI<br />

process.<br />

7.3.3 Request Fulfilment<br />

7.3.3-p1 The purpose of Request Fulfilment is to manage the lifecycle of all<br />

users’ requests that belong to standard predefined and approved services.<br />

7.3.3-p2 This process provides a channel to discuss also general information,<br />

complaints and general queries.<br />

7.3.3-p3 The ANWI Contractor shall configure the Request Fulfilment tool for the<br />

Service Desk to process user requests to receive Service Catalogue advertised<br />

services.<br />

7.3.3-p4 The Service Desk will need to be able to provide users with information<br />

about a service’s availability; the procedure to obtain them; to request software;<br />

provide general service information; address user complaints and user comments on<br />

offered services.<br />

7.3.3-p5 The ANWI Contractor shall configure the tool to publish and manage<br />

the appropriate ANWI security domain’s Service Catalogue on that security domain’s<br />

network for user consumption.<br />

7.3.3-p6 The ANWI Contractor shall configure the tool to create a service<br />

request template, that is accompanied with a simple workflow which requires<br />

financial and management approval before the request for a service can be<br />

submitted to ICTM for deployment.<br />

7.3.3-p7 The approved request shall add the request to the configuration<br />

management database, note delivery date; add to the SLA reporting and<br />

management tool.<br />

7.3.4 Access Management<br />

7.3.4-p1 The purpose of access management is to manage the rights of users to<br />

use a service (resource) or groups of services (resources).<br />

7.3.4-p2 This process shall offers also the functionalities to execute the Active<br />

Directory policies and granular (file level) security settings defined in the security<br />

documentation.<br />

7.3.4-p3 ANWI access management shall be focused on availability (authorised<br />

times per the SLA), and information security (confidentiality, availability and integrity).<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-86 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-87 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.3.4-p4 The ANWI Contractor shall use the Active Directory (AD) or any other<br />

federated service directory as the primary means of providing confidentiality and<br />

access to ANWI data.<br />

7.3.4-p5 Use of means other than that mentioned under 7.1.5.2 to achieve ANWI<br />

data confidentiality and access shall be authorised by the Purchaser and its<br />

justification be provided in the Contractor provided ANWI Design, reflected in the<br />

SSRS, and SRA.<br />

7.3.4-p6 The ANWI Contractor shall interface with and use the NATO Enterprise<br />

Directory Service (NEDS), LDAP and NPKI enabled federated Identity and Access<br />

Management services to grant users outside the NATO Single Forest Single Domain<br />

access to NATO HQ data.<br />

7.3.4-p7 The ANWI Contractor shall provide a capability for an authorised NATO<br />

user to view the names of users/groups having access to the targeted information.<br />

7.3.4-p8 The ANWI Contractor shall configure the tools to audit and log failed<br />

logon attempts and access not granted events in the ANWI.<br />

7.3.5 Event Management<br />

7.3.5-p1 The purpose of event management is to manage the events in all their<br />

lifecycle stages, from the detection, identification, and the determination of the<br />

appropriate control action.<br />

7.3.5-p2 The scope of Event Management is very large, and shall include:<br />

A. Software licensing<br />

B. Software monitoring<br />

C. Security status<br />

D. Intrusion detection<br />

E. Environmental conditions<br />

F. Any CIs status<br />

7.3.5-p3 The ANWI Contractor shall ensure that the Service Desk and the<br />

designated Operations and Support positions inside the NNHQ and at remote<br />

locations, have access to the ANWI’s configuration items for the purpose of<br />

generating and detected occurrences that have a negative impact on either the<br />

infrastructure or other ANWI provided service.<br />

7.3.5-p4 The ANWI Contractor shall provide a common monitoring capability that<br />

polls the configuration items (CIs) on every ANWI security domain and determines<br />

their status and availability.<br />

7.3.5-p5 The ANWI Contractor shall configure the monitoring tool(s), whether<br />

PFE or ANWI Contractor provided, to provide the operational alerts of any CI that is<br />

not operating according to its normal operating (e.g. performance, availability,<br />

capacity, etc.) parameters to the Network Operating Centre and Service Desk.<br />

7.3.5-p6 The ANWI Contractor shall use the monitoring tool(s) to detect and<br />

correlate the operational alerts to support ‘downstream’ troubleshooting and<br />

assessment of dependent services as defined in the Appendices.<br />

7.3.5-p7 Following the ITIL definition, an alert is a warning that a threshold has<br />

been reached, something has been modified, or a failure has occurred.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.3.5-p8 The events can be categorized in: Informational (“green”), Warning<br />

(“yellow") or Exception (“red”).<br />

7.3.5-p9 The ANWI Contractor shall provide a visualisation of the ANWI system’s<br />

monitoring output showing the status of the reported CIs on the NS security domain<br />

segment, providing options for zoom-in/zoom-out and based on a colour scheme that<br />

links to SLT/SLA agreed thresholds(note: the NS domain is where the main SMC is<br />

located and shows the aggregation of data from the other security domains).<br />

7.3.5-p10 The monitoring tool(s) shall allow the configuration of the event to be<br />

identified as being either information notifications (i.e. do not set off alerts) or<br />

occurrences (i.e. that do set off alerts).<br />

7.3.5-p11 The ANWI Contractor shall configure warning notifications to report a<br />

service or capability SLT is approaching a threshold.<br />

7.3.5-p12 The ANWI Contractor shall configure exception notifications to report a<br />

service or capability that is not operating properly due to a breach of the SLA or SLT.<br />

7.3.5-p13 The ANWI Contractor shall configure the monitoring tool(s) to track<br />

software version, licensing and usage.<br />

7.3.5-p14 The ANWI Contractor shall configure the monitoring tool(s) to audit<br />

system, management and security events per the ANWI design, to support data<br />

collection for SLA monitoring.<br />

7.3.5-p15 The ANWI Contractor shall configure the monitoring tool to permit the<br />

Service Desk and designated Operations and Support personnel to filter the<br />

monitored and reported events.<br />

7.3.5-p16 The ANWI Contractor shall configure the monitoring tool to collect, track<br />

and correlate the operational information to the service/capability performance<br />

standards and metrics for use in assessing the targets and requirements for use in<br />

the reporting and monitoring of the Service Level Agreements (SLAs).<br />

7.3.5-p17 The technical requirements for event management support are provided<br />

in Annex E Appendix 1: Service Management and Control.<br />

7.3.5-p18 Monitoring<br />

A. The operations monitoring process shall track, document and record:<br />

1. All changes made to the service.<br />

2. Adjustments to a service’s configuration setting(s).<br />

3. Capacity metrics.<br />

4. Availability metrics.<br />

5. Performance metrics<br />

6. Usage metrics.<br />

7. Reliability metrics.<br />

B. The operations monitoring process shall monitor the system baseline<br />

configuration and replication status of data to support continuity of<br />

operations.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-88 of 532


7.4 ANWI Operational Support<br />

7.4.1 Operational Support<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-89 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.4.1-p1 The ANWI Contractor shall produce an Operational Support Plan in<br />

accordance with ITIL v3 guidelines.<br />

7.4.1-p2 The Operational Support Plan shall be based on the analysis of the<br />

operations and maintenance requirements for the ANWI services as derived from:<br />

A. The ANWI Services Requirements<br />

B. Service Level Targets and proposed Service Level Agreements<br />

C. Specific support needs (e.g., maintenance equipment, personnel, repair<br />

parts, technical orders, manuals and other documentation, training,<br />

transportation and handling, etc.).<br />

7.4.1-p3 The ANWI Contractor’s Operational Support Plan (OSP) shall provide<br />

the organisation, operational support staff job/skill descriptions and operational<br />

procedures to be used to manage the entire set of ANWI (SMC, Infrastructure, UCC<br />

and supplemental) services.<br />

7.4.1-p4 The OSP shall describe how the ANWI Contractor shall perform: day-2-<br />

day operational management and capacity, availability and performance monitoring<br />

and management.<br />

7.4.1-p5 The ANWI Contractor’s OSP shall provide: level 1-2-3 support; system<br />

maintenance; service level management; SLA reporting and serice billing.<br />

7.4.1-p5a<br />

countries.<br />

The ANWI Contractor’s support staff shall be citizens of NATO<br />

7.4.1-p5b The ANWI Contractor’s support staff shall hold at least a valid NATO<br />

Secret Clearance.<br />

7.4.1-p5c The ANWI Contractor’s System Administrators shall have a<br />

demonstrated spoken and written fluency in English, at a minimum level of 4343 as<br />

defined in STANAG 6001.<br />

7.4.1-p5d The ANWI Contractor’s Service Desk staff shall have a demonstrated<br />

spoken and written fluency in English and Fench, at a minimum level of 4343 as<br />

defined in STANAG 6001.<br />

7.4.1-p6 The ANWI Contractor provided maintenance support shall include<br />

replacement of any faulty ANWI hardware or software item for the ITS, Training<br />

System, and operational sites.<br />

7.4.1-p7 The ANWI Contractor shall provide an on-site support staff to support<br />

hardware/software maintenance and trouble calls per paragraphs 7.2.2 and 7.2.3.<br />

7.4.1-p8 The ANWI Contractor shall provide after-hours telephonic assistance for<br />

urgent maintenance and trouble calls.<br />

7.4.1-p9 The ANWI Contractor shall be responsible for shipment of faulty items<br />

for repair or replacement, and of the repaired or replaced item to the affected site.<br />

7.4.1-p10 In order to achieve TCO there is a need to establish level 1 support<br />

costs; therefore the ANWI Contractor shall provide the cost for the provisioning of<br />

level 1 support costs.<br />

N A T O U N C L A S S I F I E D


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-90 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.4.1-p11 The ANWI Contractor shall:<br />

A. Consider Annex B which provides the As-Is ICT current ICTM identified<br />

roles and skills sets information, as input to the ANWI Contractor’s<br />

estimation of costs.<br />

B. Provide the level 1-2-3 support needs (based on the additional new<br />

capabilities or the increase in scale of existing capabilities) to provide the<br />

support service via the ANWI Contract.<br />

C. Review the total ANWI operational support requirement (skill sets and<br />

tasks needed to be undertaken), and determine the manning levels<br />

needed to provide a complete level 1-2-3 support.<br />

7.4.1-p12 The below table identifies the ANWI services and the preferred<br />

Purchaser management approach concept for each service.<br />

No. Services Centrally managed at another<br />

NATO or non-NATO location<br />

1 SMC and IA Services<br />

1.1 Service Management and<br />

Control(SMC)<br />

Managed by The<br />

NNHQ Site<br />

Posssibly via escalation Y Y<br />

1.2 Information Assurance (IA) Y – NCIRC FOC, FW interfaced to<br />

NATO wide networks<br />

2 Infrastructure Services<br />

Y – Other FWs and IDS,<br />

IDP.<br />

2.1 Processing Y<br />

2.2 Storage Y<br />

2.3 Printing & Scanning Y<br />

2.4 Network Infrastructure Y (partial for Active Directory) Y<br />

2.5 LAN Y<br />

3 UCC (Unified Communications & Collaboration Services<br />

3.1 Voice Y (partial NATO wide VOICE) Y<br />

3.2 VoiceMail Y<br />

3.3 VTC Y (partial NATO VTC) Y<br />

3.4 E-mail Y<br />

3.5 Unified Messaging Y<br />

3.6 FAX Y<br />

3.7 Instant Messaging (IM) Y<br />

3.8 Presence Y<br />

3.9 Directory Y (AD related) Y Y<br />

3.10 Collaboration Y<br />

3.11 Mobility Y<br />

4 Client-Provisioning Services<br />

4.1 OS deployment Y<br />

4.2 Client devices Y<br />

5 Supplementary Services<br />

5.1 GSM Y (partial for Access) Y<br />

5.2 GSM Blocking Y<br />

Contractor<br />

Managed


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

No. Services Centrally managed at another<br />

NATO or non-NATO location<br />

Managed by The<br />

NNHQ Site<br />

5.3 Wireless Blocking Y<br />

5.4 Site Security Communications<br />

(Radio)<br />

5.5 IPTV Y<br />

Table 7.1: Management approach for ANWI services<br />

Y<br />

Contractor<br />

Managed<br />

7.4.1-p13 The ANWI Contractor shall establish and maintain a support<br />

environment to ensure ANWI services meet, at a minimum, the service level targets<br />

for Reliability, Maintainability, and Availability (RMA) while at the same time<br />

minimising manpower and support costs.<br />

7.4.1-p14 The ANWI Contractor shall seek, identify and implement opportunities<br />

to reduce Operations & Maintenance (O&M) costs through automating or<br />

streamlining O&M tasks, centralising administration and management, and reducing<br />

Mean Time to Restore (MTTR).Operational Support during migration<br />

7.4.1-p15 The ANWI Contractor shall be responsible for the maintenance support<br />

of NNHQ ANWI services in full cooperation with the NNHQ O&M Authority (for NATO<br />

projects, Active Directory and Enterprise Administrators) from the moment the<br />

migration of ANWI services commence.<br />

7.4.1-p16 The ANWI Contractor shall provide all necessary level 1-2-3 the First,<br />

Second and Third Level support from the moment the ANWI migration commences<br />

through till achievement of ANWI FOC.Operational Support and Service<br />

Management Capability (SMC)<br />

7.4.1-p17 The relationship between the SMC (based on ITIL v3 based service<br />

operations) and the proposed ANWI levels of support and is detailed below.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-91 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 7.1: ITILv3 and NATO ILS levels relationship<br />

7.4.1-p18 The ANWI Contractor shall provide the Service Desk tool set to support<br />

the Service Desk functionality described in paragraph 7.1.<br />

7.4.1-p19 The Service Desk shall be the function where all NNHQ service, ANWI<br />

and others, will use to report any ICT incidents and will be manned by the First Level<br />

NNHQ O&M Authority staff.<br />

7.4.1-p20 The Technical Management function shall be provided by the ANWI<br />

Contractor and covers all of the ANWI services provided.<br />

7.4.1-p21 The ANWI Contractor shall manage the ANWI provided core<br />

applications and services while the Business Applications’ support will be provided by<br />

the NNHQ O&M Authority.<br />

7.4.1-p22 The ANWI Contractor shall provide the centralized NNHQ monitoring<br />

and control tools for the ANWI services while the IT Operations and control will be<br />

undertaken by NNHQ O&M Authority staff.<br />

7.4.1-p23 The service management capability for each ANWI identified service<br />

element is detailed in the appendices.<br />

7.4.1-p24 The ANWI Contractor shall draft a SLA, in accordance with Annex K<br />

Appendix 18 (SLA), for every ANWI Contractor managed service.<br />

7.4.1-p25<br />

The Purchaser will agree the SLAs prior to activation.<br />

7.4.2 Operational Procedures/Operating Instructions<br />

7.4.2-p1 The Purchaser has a transition team whose purpose is to develop<br />

processes/ procedures describing the users’ new ways of working in the<br />

NNHQ.7.4.4-p2 The ANWI Contractor shall work with the Purchaser’s transition<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-92 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

team to ensure that the ANWI capability shall support the NNHQ processes and<br />

procedures being developed.<br />

7.4.2-p2 The ANWI Contractor shall advise the Purchaser and the transition<br />

team how the ANWI capability shall function so that the transition team can adjust<br />

processes as/if required.<br />

7.4.2-p3 The ANWI Contractor shall develop processes and procedures for the<br />

ANWI UCC, SMC, and CDM capabilities.<br />

7.4.2-p4 The ANWI Contractor shall hold a three (3) days workshop to capture<br />

the needs and provide demonstration mock-ups to demonstrate how the processes<br />

will work with the ANWI functionality.<br />

7.4.3 Monitor and Control<br />

7.4.3-p1<br />

the service.<br />

After accepting an ANWI service, the Purchaser will have oversight of<br />

7.4.3-p2 The failure of a server room, service or capability shall direct an alert to<br />

the Event Management system and directly to the Event Management’s console.<br />

7.4.3-p3 The ANWI design shall ensure that service Key Performance Indicator<br />

metrics are directed to the Network Operations Centre where the service’s current<br />

status and its service target are clearly visualised in support of any of the NNHQ<br />

O&M Authority operations and support, as well as those having service management<br />

responsibilities.<br />

7.4.3-p4 All ANWI services shall be monitored and managed from the NNHQ<br />

LAN, Bâtiment Z or any other authorised remote location.<br />

7.4.4 Life-Cycle Support<br />

7.4.4-p1 The ANWI Contractor shall provide the ANWI Second and Third Level<br />

Support for the warranty period, and costed options for the support elements<br />

provided by NNHQ Staff, as detailed in the Support section.<br />

7.4.4-p2 The costed support elements options shall cover a full cycle support<br />

period of 5 years from Final Operating Capability (FOC) .<br />

7.4.4-p3 The ANWI Contractor shall provide First, Second and Third Level<br />

Support (as defined in section 7.2) for the period starting at ANWI Initial Operational<br />

Capability (IOC) through FOC<br />

7.4.4-p4 The ANWI Contractor shall provide First, Second and Third Level<br />

Support for the ITS.<br />

7.4.4-p5 The ANWI Contractor shall deliver the services as defined in this SOW<br />

for a period sufficient to ensure that all Service Requirements and SLTs are met, all<br />

SLAs defined are achieved, and full acceptance can be realised.<br />

7.4.4-p6 The ANWI Contractor shall continue to provide contractor operated<br />

services, until transition of the services that are designated NATO operated are<br />

transitioned to NATO staff.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-93 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

7.4.4-p7 Contractor owned and operated services (e.g. GSM, IPTV,<br />

Printing/Scanning) shall continue to be provided by the ANWI Contractor following<br />

ANWI service acceptance.<br />

7.4.4-p8 The ANWI Contractor may be asked to continue providing contractor<br />

operated services throughout the 5-year life cycle should this be determined to be<br />

cost effective or otherwise deemed to be advantageous to NATO.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-94 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 8.<br />

ANWI SERVICE IMPROVEMENT<br />

8.1 ANWI Service Improvement Purpose<br />

8.1-p1 According to the ITIL definitions, the Continual Service Improvement (CSI)<br />

lifecycle stage provides guidance on creating and maintaining value for users through<br />

better strategy, design, transition and operation of services, following changing<br />

business needs.<br />

8.1-p2 The CSI phase of the ANWI project shall begin (see figure 4.1) prior to the<br />

milestone that the ANWI capability reaches IOC thus establishing the initial baseline,<br />

and starts service tuning once users are added. The next baseline is at FOC (all<br />

users on line), ensuring that the delivered services and capabilities are continually<br />

realigned to the users’ needs through the identification and implementation of ways<br />

to improve process effectiveness, efficiency and lower costs. After FOC the CSI<br />

phase will continue until FSA after which the CSI will become an embedded part of<br />

the ANWI life-cycle and Service Management process.<br />

8.1-p3 CSI can apply to organizations, resources, technology, partners, training,<br />

communications, and skills.<br />

8.1-p4 The ANWI Contractor shall support ANWI CSI by:<br />

A. Developing the Service Catalogue reports that are delivered to the users<br />

in accordance with the Service Level Agreement identifying the how the<br />

terms of the SLA and its targets were or were not met.<br />

B. Collecting the necessary data for use in generating the Service Catalogue<br />

reports.<br />

C. Analysing the data’s trend and comparing the result with the SLA<br />

baselines, targets and benchmarks.<br />

D. Recommending service level target adjustments to improve efficiency in<br />

quality and resource use over the service’s lifecycle.<br />

E. Reviewing security requirements and suggest ways to improve a<br />

capability’s performance.<br />

F. Reviewing the service billing and invoice process.<br />

G. Reviewing the ANWI installation baselines and procedures and<br />

recommend changes.<br />

H. Proposing a plan to the Purchaser on how to implement the ANWI<br />

Contractor’s suggestions to improve efficiency and availability of ANWI<br />

capabilities and services.<br />

8.2 ANWI CSI Assumptions<br />

8.2-p1 The ANWI Contractor, the Purchaser, NATO Contractors and the other<br />

NATO National Contractors work together to ensure their mutual success in<br />

managing and continuously improving all implemented services.<br />

8.2-p2 The underpinning Contracts shall support the business and provide<br />

appropriate embedded incentives.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-95 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

8.3 CSI Register<br />

8.3-p1 The ANWI Contractor shall identify all the improvement opportunities in a<br />

CSI Register that shall be part of the Service Knowledge Management System.<br />

8.3-p2 The ANWI Contractor shall establish and maintain a CSI register which<br />

serves as the historical log of each improvement initiative, where it was tried with<br />

explicit mention to: categories of the improvement, justification benefits to be<br />

achieved, and evaluation of the benefits achieved.<br />

8.4 CSI Board<br />

8.4-p1 A CSI Board shall be established consisting of: User Representative, CSI<br />

Manager, Service Owner, Reporting Analyst, Purchaser, ANWI PM; and CIS<br />

Manager.<br />

8.4-p2 The CSI Board shall review and approve changes to services and/or SLAs.<br />

CSI Baselines<br />

8.4-p3 The ANWI Contractor shall establish service baselines for comparing<br />

service levels of performance.<br />

8.5 CSI Metrics<br />

8.5-p1 The ANWI Contractor shall address the following Service Design areas:<br />

Technology, Processes, and Service when assessing service improvement.<br />

8.5-p2 The ANWI Contractor shall review the ANWI Critical Success Factors and<br />

recommend Key Performance Indicators (from Annex E Appendix 1) to better<br />

measure and assess the ANWI services.<br />

A. Critical Success Factors (CSF)<br />

1. The ANWI Contractor shall review the ANWI Service Catalogue’s<br />

entries and their Service Level Agreements then suggest improvements<br />

to the CSI Board.<br />

2. The ANWI Contractor shall base the ANWI Critical Success Factors on<br />

the ANWI’s vision and high level objectives.<br />

3. The ANWI Contractor shall identify the Critical Success Factors for<br />

each ANWI offered service’s SLA.<br />

B. Key Performance Indicators (KPI)<br />

1. The ANWI Contractor shall assess the output of the ANWI provided<br />

element monitoring and reporting tools and provide interpretations of<br />

their outputs to the Critical Success Factors.<br />

2. The ANWI Contractor shall identify necessary KPIs to display and<br />

monitor for each CSF to ensure the SLA can be satisfactorily assessed.<br />

3. The ANWI Contractor shall recommend other KPIs for measuring future<br />

service management maturity.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-96 of 532


N A T O U N C L A S S I F I E D<br />

8.6 Seven-Steps Improvement Process<br />

8.6.1 General<br />

IFB-CO-13300-ANWI-AMD-2<br />

8.6.1-p1 The single process of ITIL CSI is focused on identify, define, gather,<br />

process, analyse, present and implement improvements:<br />

8.6.2 Step-1: Define What Should Be Measured<br />

8.6.2-p1 The ANWI Contractor shall produce a list of the possible KPIs that can<br />

be used to measure each of the ANWI services<br />

8.6.3 Step-2: Define What CanBe Measured<br />

8.6.3-p1 The ANWI Contractor shall assess the list of ANWI service KPIs and<br />

recommend those KPIs that will provide the best information on the respective<br />

service to determine if the service is performing properly.<br />

8.6.4 Step-3: Gather the Data<br />

8.6.4.1.1 Monitoring<br />

8.6.4.1.1-p1 Once a capability is implemented the ANWI Contractor shall monitor<br />

the services to identify weak areas in need of remedial action to improve the service.<br />

8.6.4.1.1-p2 The ANWI Contractor shall review the trouble tickets and issues to<br />

identify weaknesses in process training and/or areas for culture change to improve<br />

user working efficiency.<br />

8.6.4.1.1-p3<br />

service.<br />

The ANWI Contractor shall monitor the quality of the end-to-end<br />

8.6.4.1.1-p4 The ANWI Contractor shall monitor the performance (throughput,<br />

cycle times, etc.).<br />

8.6.4.1.1-p5 The ANWI Contractor shall monitor the perceived value of the<br />

service and associated processes.<br />

8.6.4.1.1-p6<br />

8.6.4.1.2 Data Collection<br />

The ANWI Contractor shall monitor service availability and capacity.<br />

8.6.4.1.2-p1 The ANWI Contractor shall continuously collect Service Level<br />

Target data for analysis and reporting every two weeks after FOC for the first two<br />

months so the Service Level Agreement reporting process can be quality assessed<br />

and the ANWI tuned.<br />

8.6.4.1.2-p2 The ANWI Contractor shall focus on the need to measure and<br />

evaluate the effectiveness of the service when collecting a service’s data.<br />

8.6.4.1.2-p3 The ANWI Contractor shall identify the linkage between:<br />

A. Critical Success Factors.<br />

B. Service Level Targets.<br />

C. IT duty positions.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-97 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

8.6.4.1.2-p4 The ANWI Contractor shall identify what tool, process flow,<br />

procedure and other source will provide the appropriate data to produce the Service<br />

Level Agreement reports.<br />

8.6.4.1.2-p5 The ANWI Contractor shall collect data from the monitoring and<br />

reporting tools to assess the effectiveness of the:<br />

A. Technology solution – this metric considers performance, availability,<br />

reliability, manageability, etc.<br />

B. Service – concentrates on assessing the end-to-end service where<br />

component and technology metrics are used.<br />

C. Organisation – the data reflects the system administration exercises,<br />

routines and processes impacting availability, continuity, serviceability and<br />

manageability.<br />

D. Process – focuses on Key Performance Indicators, Critical Success<br />

Factors and service desk.<br />

8.6.4.1.2-p6 The ANWI Contractor shall determine the service’s network path<br />

and collects data from several points along the path to assess areas that reduce the<br />

service’s performance.<br />

8.6.4.1.2-p7 The ANWI Contractor shall identify when and how often data<br />

measurements are taken and used for analysisand offer it to the Purchaser for<br />

approval.<br />

8.6.4.1.2-p8 The ANWI Contractor shall ensure that collected data samples are<br />

from the same timeframe.<br />

8.6.5 Step-4: Process the Data<br />

8.6.5-p1 The ANWI Contractor shall collect the data from the service element<br />

managers and format the data so that the SMC analysis tool(s) can ingest the data<br />

8.6.6 Step-5: Analyse the Information and Data<br />

8.6.6-p1 The ANWI Contractor’s data analysis shall concentrate on the Service<br />

Level Targets for availability, capacityand other agreed metrics/KPIs.<br />

8.6.6-p2 The ANWI Contractor shall review the collected data ensuring it is<br />

consistent and gaps identified.<br />

8.6.6-p3 The ANWI Contractor shall assess the data to determine if the service<br />

metrics, Key Performance Indicators (KPIs) and supporting Critical Success Factors<br />

are correct to evaluate the service.<br />

8.6.6-p4 The ANWI Contractor shall perform statistical analysis on the metric’s<br />

data and determine if the metric’s trend supports and shall continue to support the<br />

Service Level Targets for the periods of 3/6/9/12 months and 1/2/3 years.<br />

8.6.6-p5 The ANWI Contractor shall look for weak areas in the delivery of the<br />

capability or service.<br />

8.6.6-p6 The ANWI Contractor shall use the data to determine the cause of<br />

issues/problems.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-98 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

8.6.6-p7 The ANWI Contractor shall suggest adjusting the SLT if a parameter is<br />

consistently met or exceeded.<br />

8.6.6-p8 The ANWI Contractor shall compare the collected data to service and<br />

capability issues to determine what system actions are causing service faults.<br />

8.6.6-p9 The ANWI Contractor shall present the data analysis to the Purchaser<br />

and make recommendations for ANWI service tuning.<br />

8.6.7 Step-6: Present and Use the Information<br />

8.6.7.1 Reporting<br />

8.6.7.1-p1 The ANWI Contractor shall provide the Purchaser ANWI Service<br />

Level Agreement Reports, as required per the Service Level Agreements,<br />

regardingthe performance of the ANWI’s Service Catalogue entries.<br />

8.6.7.1-p2 The ANWI Contractor shall create reports on the analysed data to<br />

relate meaningful and relevant information on the services’ SLA and SLTs.<br />

8.6.7.1-p3 ANWI SLAReports shall as a minimum include:<br />

A. Performance against the Service Level Target benchmarks.<br />

B. Trend analysis and SLT performance prediction.<br />

C. Non-compliance with SLA.<br />

D. Issues and problems reported.<br />

E. Security issues.<br />

F. Resource use against target.<br />

G. Service target trend information.<br />

8.6.7.2 Correction Recommendations<br />

8.6.7.2-p1 The ANWI Contractor shall make recommendations to the<br />

Purchaser based on the collected data as reflected in the SLAreport.<br />

8.6.7.2-p2 The ANWI Contractor shall recommend process and capability<br />

changes to tune the ANWI Service.<br />

8.6.7.2-p3 The ANWI Contractor shall recommend Change Proposals to adjust<br />

the product baseline.<br />

8.6.8 Step-7: Implement the Improvements<br />

8.6.8-p1<br />

The ANWI Contractor shall document the recommended improvements.<br />

8.6.8-p2 The ANWI Contractor shall submit the recommendation to the CSI<br />

Board for consideration and approval.<br />

8.6.8-p3<br />

CSI register<br />

The ANWI Contractor shall document the approved improvement in the<br />

8.6.8-p4 The ANWI Contractor shall create a new baseline for the service and<br />

document the baseline in the configuration management database<br />

8.6.8-p5<br />

The ANWI Contractor shall implement the approved change<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-99 of 532


N A T O U N C L A S S I F I E D<br />

8.7 CSI Interactions with Other Processes<br />

Book II Page IV-100 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

8.7-p1 The ANWI Contractor shall consider the following processes when<br />

considering CSI:<br />

8.7-p2 The ANWI Contractor shall address the following points relating to security:<br />

A. Define security monitoring and data collection procedures<br />

B. Monitor the level of security changes<br />

C. Analyse responses to the security issues<br />

D. Generate trend analysis on security breaches<br />

E. Validate risk mitigation strategies<br />

F. Analyse data for evaluating the SLA<br />

8.7-p3 The ANWI Contractor shall address the following points relating to<br />

availability:<br />

A. Review components failure impact analysis<br />

B. Provide fault tree analysis<br />

C. Manage the IT services demand<br />

8.7-p4 The ANWI Contractor shall address the following points relating to<br />

capacity:<br />

A. Analyse business, service, component against the capacity plan<br />

B. Gather information about application sizing<br />

C. Gather SIPs information and provide reports<br />

D. Manage demand<br />

8.7-p5 The ANWI Contractor shall address the following points relating to change<br />

and release:<br />

A. Manage Requests for Change<br />

B. Perform post-implementation review<br />

C. Participate to the CAB<br />

D. Seek for implementation improvements<br />

8.7-p6 The ANWI Contractor shall address the following points relating to<br />

financial:<br />

A. Monitor and collect data about expenditures vs. budget<br />

B. Provide input to define whether cost and business targets are met<br />

C. Monitor the cost per service<br />

D. Provide support in evaluation the ROI for improvements<br />

8.7-p7 The ANWI Contractor shall address the following points relating to Service<br />

Desk and Incident Management:<br />

A. Document and review incidents trends, services requests,<br />

B. Compare all results with agreed Service Level and previous months,<br />

C. Suggest improvement opportunities,<br />

D. Analysis processed data for accuracy<br />

8.7-p8 The ANWI Contractor shall address the following points relating to Service<br />

Level Management:<br />

A. Interact with executives to determine / validate Service Level<br />

Requirements<br />

B. Negotiate terms and responsibilities of Operational Level Agreements<br />

(OLAs)<br />

N A T O U N C L A S S I F I E D


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

C. Verify that needed contracts are updated and meet the revised business<br />

requirements<br />

D. Use service catalogue to negotiate SLAs with executives<br />

E. Review services achievements and verify where improvements are<br />

required<br />

8.7-p9 The ANWI Contractor shall address the following points relating to<br />

Knowledge:<br />

A. Analyse Data, Information, knowledge and use results in the CSI<br />

B. Share CSI knowledge<br />

C. Include the CSI register in the Service Knowledge management database<br />

D. Analyse the statistics of user access and permanence per sites/tools of<br />

the Information Management tools and provide the necessary information<br />

to improve the knowledge management process<br />

8.8 Win-Win Relationship and Management<br />

8.8-p1 The Purchaser encourages the optimization of service delivery, as well as<br />

the identification of any opportunities for enhanced technical performance due to<br />

evolution of technology and the optimization of performance including, inter alia,<br />

utilizing green technologies and business best practises, that offer value both in<br />

terms of performance and reduction in price for the Purchaser whilst maintaining and<br />

improving users’ satisfactionthrough hardware, software and process efficiencies as<br />

agreed with the Purchaser.<br />

8.8-p2 The ANWI Contractor and Purchaser will develop a process, within the<br />

scope of the SOW, where the optimization and cost reductions (to the Contractor)<br />

and consequent price reductions to the Purchaser can be examined and agreed. This<br />

will be part of the process of development of the agreed SLAss.<br />

8.8-p3 Bidders shall provide a SLAs for the ANWI services, as part of the<br />

Operational Support Plan, describing their optimization concept with reference to<br />

best industry practise and past experience).<br />

8.8-p4 Any adjustments to the price or SLA will be in accordance with the<br />

Contract.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-101 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 9. ANNEX A: SCHEDULE OF KEY PROGRAM<br />

MILESTONES<br />

9.1 ANWI Schedule<br />

9.1-p1 The following table shows the NNHQ dependent project timelines showing<br />

when ANWI must have capabilities available for other HN use<br />

Milestone Milestone Description Milestone Date<br />

PNWI HN Belgium starts PNWI cabling September 2012<br />

VTC IOC NATO -wide VTC Initial Operating Capability (IOC) June 2013<br />

VTC FOC NATO-wide VTC Final Operating Capability (FOC) December 2013<br />

ITS ITS available for use by AVI, ESS and BMS February 2014<br />

PNWI PNWI cabling works completed September 2014<br />

ITS ITS available for Business Application and Data Migration testing October 2014<br />

ANWI-1 ANWI installation in basement part of building (month 49) starts November 2014<br />

SvrRm Server Rooms available for installation February 2015<br />

BADM-1<br />

Business Applications and Data Management ready for migration to<br />

ANWI<br />

April 2015<br />

BADM-2<br />

ANWI available for ICTM business application migration Core AIS<br />

ready for AVI, ESS andBMS installation<br />

July 2015<br />

ESS/BMS AVI and ESS production tests start in new building September 2015<br />

IOC<br />

Server Room installation completed and Provisional Site<br />

Acceptance Testing completed<br />

(caveat this is for all ANWI services and readiness of HN BEL 31<br />

October 2015<br />

March and ICTM Apps 1 January)<br />

AVI/ESS New Building handover to building management & HQPO December 2015<br />

End User<br />

NNHQ building end user area available for ANWI Contractor<br />

installation work to start<br />

January 2016<br />

Migration ANWI Migration Support to BADM August 2015 –April 2016<br />

FOC ANWI end user area installation completed April 2016<br />

Improvement Post Migration and ANWI improvement support May 2016 – October 2016<br />

FSA Final Acceptance for Handover October 2016<br />

Table 9.1 NNHQ project timelines<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-102 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

9.2 Integration Test Service<br />

9.2-p1<br />

The following is the timeline for the ITS’ deliverables and readiness<br />

Milestone Milestone Description Milestone Date<br />

EDC Effective Date of Contract D<br />

ITS designed ITS design approval D+2months<br />

ITS installed ITS hardware installed D+4 months<br />

ITS Available ITS initial security domain configuration and processes agreed D+5 months<br />

ANWI infrastructure services baselined<br />

ANWI ready for AVI, ESS and BMS contractor February 2014<br />

AVI, ESS & BMS testing completed<br />

ITS available for Business Application and data migration<br />

contractor (BADM)<br />

ITS decommissioned ITS effort completed<br />

October 2014<br />

D+26 months<br />

Table 9.2 timeline for the ITS’ deliverables and readiness<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-103 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 10. ANNEX B: PURCHASER FURNISHED<br />

INFRASTRUCTURE & SERVICES (hereafter known<br />

as PFE)<br />

10.1 INTRODUCTION<br />

10.1-p1 The totality of the New NATO Headquarters is provided through a number<br />

of projects and/or contracts. Each contract provides deliverables that will support<br />

interface (which varies from electronic interfaces between ICT systems to physical<br />

interfaces such as physical installation location) with the ANWI Capability.<br />

10.1-p2 Below is a description of the various projects and/or contracts deliverables,<br />

to be provided by various stakeholders that the ANWI Contractor shall integrate into<br />

the ANWI capability.<br />

10.1-p3 Each paragraph relates to one specific project and/or contract. It specifies<br />

particular requirements for the ANWI Contractor with regards to the related PFE and<br />

provides references, as appropriate, to Section 12.<br />

10.2 Global Construction Contract (GCC) Project (HN: Belgium)<br />

10.2.1 General<br />

10.2.1-p1 HN Belgium manages the Global Construction Contract (GCC)<br />

providing the New NATO Headquarters campus facilities.<br />

10.2.1-p2 The following site drawings are provided at Appendix 1:<br />

A. NU-09-I-HQ-A-5-208-XX-00-SW section, Issue: 10 Aug 2009.<br />

B. NU-09-I-L2-I-2-034-00-02-LW-Level 0, Issue: 7 May 2012.<br />

C. NU-09-I-L2-I-2-035-01-03-LW-Level 1, Issue: 7 May 2012.<br />

D. NU-09-I-L2-I-2-036-02-02-LW-Level 2, Issue: 10 Aug 2009.<br />

E. NU-09-I-L2-I-2-037-03-02-LW-Level 3, Issue: 10 Aug 2009.<br />

F. NU-09-I-L8-I-2-088-04-01-LW-Level 4, Issue: 17 Feb 2012.<br />

G. NU-09-I-L2-I-2-039-05-01-LW-Level 5, Issue: 13Jun 2012.<br />

H. NU-09-I-L2-I-2-040-06-00-LW-Level 6, Issue: 10 Aug 2009.<br />

I. NU-09-I-S2-I-2-100-02-01-typical floor SW, Issue: 08 Dec 2011.<br />

J. NU-9-I-CC-J-2-140-00-01, Issue 4 Apr 2012.<br />

K. NU-9-I-CI-J-2-301-00-01, Issue 4 Apr 2012.<br />

L. NU-11-B-AG-A5-525-XX-00, Issue 30 Mar 2007.<br />

M. NU-11-B-AG-A5-528-XX-00, Issue 30 Mar 2007.<br />

N. NU-09-I-S2-N-2-100-02-00, Issue 10 Aug 2009.<br />

O. NU-09-I-L2-N-2-036-02-00, Issue: 10 Aug2009.<br />

10.2.2 Server Rooms<br />

10.2.2-p1 Two server rooms where each provides:<br />

A. 375 m2 (ICT1) + 462m2 (ICT2) floor space per server room.<br />

B. Each server room will be provided an elevated floor.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-104 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

C. 112 (ICT1) + 126 (ICT2) Rack Positions (not completely filled with empty<br />

racks).<br />

D. 5 dual rows of Purchaser provided 800x1000 racks (each dual row<br />

covered to form a corridor, 12-18 racks per dual row).<br />

10.2.3 Technical Control Facility (TCF) Rooms (Communications Rooms)<br />

10.2.3-p1 NATO external communications and IP services will enter the NNHQ<br />

via four communications rooms. There are two types of TCFs:<br />

A. Two commercial communications TCFs.<br />

B. Two military communications TCFs.<br />

10.2.3-p2 TCFs will include Point of Presence (POP) equipment where external<br />

communication services are delivered.<br />

10.2.3-p3 A subset of such POP equipment will be provided by other<br />

projects/stakeholders (such as NGCS) as PFE.<br />

10.2.4 Technical Equipment Room (TER)<br />

10.2.4-p1 There are two types of TERs:<br />

A. NATO (basement) TERs (TERs).<br />

B. NATO Nations (Nations’ floor space) TERs (NTERs).<br />

10.2.4-p2 National TERs will be the responsibility of the particular nations,<br />

therefore to gain access to these TERs shall require coordination with the national<br />

POC.<br />

10.2.4-p3 The repartition of the TERs is described below:<br />

A. Long wings: 1 x 1 TER + 3 x 2 combined TERs;<br />

B. Short wings: 1 x 1 TER + 1 x 2 combined TERs (except SW2: 3 x 1 TER);<br />

C. Basement functions: 2 x 1 TERs;<br />

D. Conference Centre: 4 x 1 TERs + 4 x 2 combined TERs;<br />

E. Common Infrastructure: 4 x 1 TER + 2 x 3 combined TERs.<br />

10.2.4-p4 Technical Equipment Rooms (TER) where each provides:<br />

A. 20 m 2 (4m x 5m) of floor space for a single TER;<br />

B. 40 m 2 (8m x 5m) of floor space for a double TER ;<br />

C. 4 (800x800) Racks (8 in Merged TERs);<br />

D. 10 kVA UPS and 4 kW cooling capacity.<br />

10.2.4-p5 The ANWI Contractor shall be responsible for the management and<br />

control of the Technical Equipment Rooms.<br />

10.2.4-p6 The ANWI Contractor shall install ANWI switches in the Technical<br />

Equipment Rooms.<br />

10.2.5 Power and Cooling<br />

10.2.5-p1 Power and Cooling will be provided as indicated in Paragraphs 14.2.3.2<br />

and within the limits indicated in Para 14.1.4.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-105 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.2.6 Passive Network Infrastructure (PNWI)<br />

10.2.6-p1 The PNWI project provides fibre and copper cabling within NNHQ<br />

campus, details are provided in the PNWI Cabling Design (ref 1.1.1.8.17) and in the<br />

PNWI technical specifications (ref 1.1.1.8.20). The PNWI uses flood cabling<br />

throughout the building; fibre will be used for secure networks and copper for the<br />

public network.<br />

10.2.6-p2 Each end-user point will be supported with a desk module that supports<br />

the following cabling as outlined in table 10.1.<br />

Type of Outlet<br />

HQ, IS/IMS, Conference Center (CC),<br />

Nations<br />

Staff Centre (SC), Industrial Infrastructure<br />

(II), Common Infra<br />

Number of<br />

Ports<br />

Number of fibre<br />

ports. multimode<br />

Number of<br />

Copper RJ-45<br />

Spare<br />

6 4 1 1<br />

4 2 1 1<br />

Guard House (GH) 4 2 1 1<br />

Table 10.2: PNWI Desk outlets<br />

10.2.6-p3 More details about the desk module and connector types can be found<br />

in reference 1.1.1.8.3.<br />

10.2.6-p4 The drawing below provides an overview of the TER cabling concept<br />

delivered by the PNWI.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-106 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 10.1 Overview of TER cabling concept<br />

10.2.6-p5 The ANWI Contractor shall deliver and install any ANWI POP<br />

equipment (if needed) into the TCF (Technical Control Facility) Rooms.<br />

10.2.6-p6 The ANWI Contractor shall connect and configure equipment in Server<br />

Rooms and TCFs to establish the required integration, in coordination with other<br />

stakeholders where necessary.<br />

10.3 Building Management Services (BMS) Project (HN: Belgium)<br />

10.3-p1 The Building Management Services (BMS) are running on the Business<br />

network and have a facility management scope. They will interface with the ANWI on<br />

the infrastructure layer where they will use networking and storage resources of the<br />

ANWI as well as some specific infrastructure networking services like NTP and<br />

DHCP.<br />

10.3-p2 BMS capabilities will be provided by the Purchaser for Integration Testing<br />

on the ITS and for installation, Integration, Testing and Acceptance on the ANWI<br />

infrastructure in the New NATO HQ.<br />

10.3-p3 The ANWI Capability Contractor shall provide 10TB of usable storage per<br />

server room supporting the BMS storage requirement.<br />

10.3-p4 The ANWI Business network shall also provide the physical network<br />

connections for the BMS devices. There will be approximately 170 fibre optic network<br />

connections required.<br />

10.3-p5 The BMS shall run on the Business network.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-107 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-108 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.4 Electronic Security Services (ESS) PROJECT (HN: Belgium)<br />

10.4-p1 The Electronic Security Services (ESS) are running on the Business<br />

network and have a physical security scope. They will interface with the ANWI on the<br />

infrastructure layer where the ESS will use networking and storage resources of the<br />

ANWI as well as some specific infrastructure networking services like NTP and<br />

DHCP.<br />

10.4-p2 ESS capabilities will be provided by the Purchaser for integration testing on<br />

the ITS and for installation, integration, testing and acceptance on the ANWI<br />

infrastructure in the NNHQ.<br />

10.4-p3 The ANWI Contractor shall support the Purchaser by providing switched<br />

connectivity from the ESS device to the server room.<br />

10.4-p4 The ANWI Capability Contractor shall provide and configure 150 TB<br />

(online) and 900 TB (offline – archive) usable storage per server room, supporting<br />

the ESS storage.<br />

10.4-p5 The ANWI Business network shall provide the physical network<br />

connections for the ESS devices. There will be approximately 2000 fibre optic<br />

network connections required for ESS devices.<br />

10.5 Audio Visual Infrastructure (AVI) PROJECT (HN: Belgium)<br />

10.5-p1 The AVI capability will be available on all 4 domains. Therefore, the<br />

interfacing with ANWI shall be on all domains (NATO SECRET, EAPC SECRET,<br />

BUSINESS and PUBLIC).<br />

10.5-p2 The Purchaser will provide the NNHQ with AVI capabilities that<br />

interconnect with the NATO Wide VTC; the interconnection via ANWI assets shall be<br />

supported by the ANWI Contractor.<br />

10.5-p3 AVI capabilities will be provided by the Purchaser for integration testing on<br />

the ITS and for installation, integration, testing and acceptance on the ANWI<br />

infrastructure in the New NATO HQ.<br />

10.5-p4 The ANWI Contractor shall provide 20TB online usable storage and 20TB<br />

offline usable storage per server room and per network supporting the AVI storage<br />

requirement.<br />

10.5-p5 The ANWI networks shall provide the physical network connections for the<br />

AVI devices.<br />

10.5-p6 The ANWI Contractor shall support the Purchaser with ANWI networking<br />

connectivity and storage support.<br />

10.6 NNHQ Office Furniture Project (HN: HQPO)<br />

10.6-p1 This project will deliver furniture throughout the NNHQ, including specialist<br />

ICT and AV (conference centre) furniture.<br />

10.6-p2 The office furniture will be installed and made available for the installation<br />

of the ANWI client equipment by the Purchaser.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.6-p3 Early access to the planned office layout and furniture will be made<br />

available to the ANWI Contractor, as an input to the selection of the client device<br />

form factor.<br />

10.7 NATO General Purpose Segment Communication System<br />

(NGCS) Project (HN: NCIA)<br />

10.7-p1 NCIA is NATO’s current Communications and Information System<br />

Operations and Support authority for the management of NATO wide services. NCIA<br />

is responsible for the NGCS which is the Circuit Emulation Subsystem providing<br />

Legacy Circuit Services. NGCS provides access to the NATO WAN Environment.<br />

This currently includes NATO SECRET and NATO UNCLASSIFIED. A NATO<br />

RESTRICTED WAN is being implemented.<br />

10.7-p2 The main NGCS interfaces are the edge routers of the different networks.<br />

Traffic is predominately IP based with the exception of some legacy systems (ex.<br />

TDM Voice communication). The general architecture is presented in the figure<br />

below.<br />

Figure 10.2 Graphical overview of NGCS architecture<br />

10.7-p3 For each new (or changed) connection for the NATO-wide network an<br />

official Service Request (SR), that will be managed via the Service Request Tracking<br />

System (SRTS), shall be prepared by the ANWI Contractor. Handling an SRTS can<br />

take from 30 to 60 days, this time is needed as part of the security accreditation<br />

procedure. The Purchaser will provide guidance and support to the ANWI Contractor<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-109 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

in order for the ANWI Contractor to prepare all necessary information in time for a<br />

successful SR.<br />

10.7-p4 The NGCS network services are centrally managed using a network<br />

management system located in Mons.<br />

10.7-p5 Access to NGCS will be provided for ITS and the NNHQ.<br />

10.7-p6 The ANWI Contractor shall request the IP address space needed to<br />

implement the ANWI design for the NNHQ from the Purchaser. This is applicable for<br />

all the domains that shall be implemented. This does not include the ESS, BMS and<br />

AVI equipment.<br />

10.7-p7 The ANWI Contractor shall prepare all necessary information in time for a<br />

successful SR.<br />

10.7-p8 The ANWI shall interface with the NGCS data IP networks at various<br />

classifications.<br />

10.7-p9 The ANWI shall interface with the NGCS unclassified voice capability.<br />

10.7-p10<br />

The ANWI shall interface with NGCS VTC services.<br />

10.8 Domain Name System(DNS) Project (HN: NCIA)<br />

10.8-p1 NCIA is the Naming and Addressing Authority that controls the NATO DNS<br />

namespaces. Any ANWI DNS changes shall be prepared by the ANWI Contractor as<br />

part of the SR procedure.<br />

10.8-p2 DNS will be provided by the Purchaser for the new NATO HQ.<br />

10.8-p3 The ANWI Contractor shall coordinate all ANWI DNS changes needed to<br />

support the implementation of their design with the Purchaser.<br />

10.9 Firewalls Project (HN: NCIA)<br />

10.9-p1 NCIA centrally manages Firewalls and Guards devices that interconnect to<br />

the NATO-wide networks. This is specified in Annex E Appendix 2. Firewalls, just as<br />

any other border protection device, are centrally managed in NATO. The current<br />

NATO Firewall products in use are Palo Alto branded firewalls.<br />

10.10 Active Directory AIS Single Forest Single Domain (AD AIS<br />

SFSD) Project (HN: NCIA)<br />

10.10-p1 NCIA Enterprise Administers manage the NATO Windows Active<br />

Directory (AD) Single Forest Single Domain (SFSD) network on the NS and the<br />

Public Access Network (PAN, operating at NU level). There are plans for NR support<br />

(for the NR network).<br />

10.10-p2 More information on the AIS SFSD and joining instructions can be<br />

found in references 1.1.1.5.3. and 1.1.1.5.4.<br />

10.10-p3 The ANWI Contractor shall create the NNHQ Active Directory for<br />

Purchaser approval for the NNHQ.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-110 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.10-p4 The ANWI Contractor shall coordinate with the Purchaser to join the<br />

SFSD, for the NU (Public) and for the NR (Business) should it exist at the time of<br />

implementation.<br />

10.11 AIS Microsoft Exchange Services Project (HN: NCIA)<br />

10.11-p1 NCIA is supporting an AIS wide Microsoft Exchange 2007 environment<br />

on both the NS and PAN.<br />

10.11-p2 The details can be found in references 1.1.1.8.10 and 1.1.1.8.11.<br />

10.11-p3 The ANWI Contractor shall coordinate with the Purchaser to join the<br />

AIS MS Exchange organisations.<br />

10.12 Automated Information System Enterprise Management<br />

System (AIS EMS) Project (HN: NCIA)<br />

10.12-p1 NCIA manages the AIS AD enabled EMS services using Microsoft’s<br />

System Centre Configuration Manager (SCCM), WSUS, and System Centre<br />

Operations Manager (SCOM) for AIS wide configuration, software update, and<br />

monitoring purposes on the NS and the PAN. This central enterprise management<br />

system is currently based on Microsoft System Centre Enterprise.<br />

10.12-p2 The EMS details can be found in reference 1.1.1.8.12.<br />

10.12-p3 The ANWI Contractor shall coordinate with the Purchaser to join and<br />

integrate the EMS Services.<br />

10.12-p4 The ANWI SMC shall interface with the NCIA EMS system in order to<br />

exchange asset and event data.<br />

10.13 Current HQ Baseline (HN: HQ ICTM)<br />

10.13-p1 HN ICTM is responsible for the NR-2 capability which will provide ICT<br />

services at the current NATO HQ. The NR-2 capability is currently under<br />

development and implementation and will evolve.<br />

10.13-p2 The planned NR-2 capability is described in the NR-2 Target<br />

Architecture Document (reference 1.1.1.8.5).<br />

10.13-p3 HN ICTM is responsible for managing and evolving the current<br />

application portfolio. In addition to the ANWI related core and infrastructure services<br />

based applications the following three other categories of applications are identified:<br />

A. Enterprise Information Management (EIM) based applications primarily<br />

support the HQ Information and Knowledge Management processes.<br />

B. Enterprise Resource Management (ERP) based applications primarily<br />

supporting the resource planning processes related to for example<br />

financial processes.<br />

C. Specialist Applications which are related to support specific specialist<br />

function of Headquarters organisation elements or in support of specific<br />

Communities of Interest.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-111 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.13-p4 The following table gives a global overview of the number of<br />

applications currently used in the HQ.<br />

Type of application<br />

Number of applications<br />

ERP 81<br />

EIM 121<br />

Table 10.3: Number of current applications<br />

10.13-p5 The Business Applications and Data Migration (BDAM) Project will<br />

install the NATO Headquarters’ business applications on the ANWI provided<br />

hardware and base software.<br />

10.13-p6 The BDAM Contractor will migrate the NATO Headquarters user and<br />

business applications’ data onto ANWI servers and client devices.<br />

10.13-p7 The ANWI Contractor shall support the BADM Contractor by assisting<br />

with the adjustment of approved windows security role configuration of the ANWI<br />

delivered software baseline configuration.<br />

10.13-p8 The ANWI Contractor shall provide access and advice/assistance to the<br />

BADM Project with respect to performance tuning of network services.<br />

10.14 Video Tele Conference(VTC) Project (HN: NCIA)<br />

10.14-p1 NCIA is the Host Nation for the VTC project that will operate on both NS<br />

and NU networks.<br />

10.14-p2 The operational objectives of this project are to:<br />

A. Provide a centrally managed VTC system through the installed VTC<br />

Network Operational Centre (VNOC). It will allow the VNOC operators in<br />

their Headquarter to achieve control of all related systems. This will<br />

include but not be limited to configuration management, operational<br />

management and troubleshooting activities as required,<br />

B. Provide a VTC system scheduling service which allows users to directly<br />

perform scheduling activities with Outlook and a web-based application,<br />

C. Upgrade the existing VTC system to the latest industry standards by<br />

adding state-of-the-art facilities. As a minimum, the system will provide<br />

Point-to-Point and Multipoint VTC services to static NGCS locations and<br />

giving the NATO user community a reliable, secure, manageable and<br />

scalable VTC service,<br />

D. Provide distributed services through the installed VTC Access Node (VAN)<br />

managing the VTC services, enabling session recording services and<br />

videoconferencing with other stakeholders and ISDN VTC terminals,<br />

E. Provide a reference facility system located at NATO Communications and<br />

Information Agency (NCIA Belgium). This reference facility will be<br />

operated by NCIA primarily to perform fault analysis, configuration<br />

management, upgrades, reporting and migration scenario testing,<br />

F. Provide a training facility at the NATO CIS School (NCISS, location to be<br />

confirmed) with the appropriate tools to train technicians and VTC<br />

facilitators,<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-112 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

G. Integrate existing VTC equipment into the new and enhanced NATO VTC<br />

system,<br />

H. Provide new VTC equipment NATO Wide including High resolution VTC<br />

terminal equipment,<br />

I. Support the integration process between various implementation projects.<br />

10.14-p3<br />

HQ.<br />

VTC Capabilities will be provided by the Purchaser for the new NATO<br />

10.14-p4 The ANWI Contractor shall support the Purchaser with NNHQ<br />

connectivity issues.<br />

10.14-p5 The ANWI Contractor shall support the Purchaser by providing<br />

technical support and storage access.<br />

10.15 NATO Enterprise Directory Services(NEDS) Project (HN: NCIA)<br />

10.15-p1 NCIA is the Host Nation for the NEDS project. This project will provide<br />

Directory synchronisation between different sources as illustrated in the figure below.<br />

Figure 10.3: NEDS Project Scope<br />

10.15-p2 The NEDS will be deployed on the NS and Business domains by the<br />

NEDS Contractor. The NEDS capability supports NPKI needs.<br />

10.15-p3 The NEDS will act as an information broker between the various NATO<br />

directory/data repositories, called the “NEDS Affiliates”. Through a ‘Repository’<br />

function as well as a filtering and synchronisation function NEDS allows “NEDS<br />

Affiliates” to make information available for sharing with other directories/data<br />

repositories, and allows them to subscribe to NEDS information published by other<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-113 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

directories/data repositories. Each piece of information contained in the NEDS is<br />

derived from an authoritative NATO source.<br />

10.15-p4<br />

Brunssum.<br />

Two NEDS central admin workstations will be installed at SHAPE and<br />

10.15-p5 NEDS capabilities will be provided by the Purchaser for the new NATO<br />

HQ and the NEDS implementation on the ANWI shall be supported by the ANWI<br />

Contractor.<br />

10.15-p6 The ANWI shall interface with the NEDS capability on the NS and<br />

Business domains, acting as a “NEDS affiliate”. The ANWI Contractor shall work with<br />

the NEDS Contractor to synchronise ANWI directory information within the affiliate<br />

role.<br />

10.15-p7 The ANWI Contractor shall interface the ANWI with the NEDS through<br />

Lightweight Directory Access Protocol (LDAP).<br />

10.15-p8 The ANWI shall be compatible with the Enterprise Directory Services<br />

Service Interface Profile (SIP) (reference 1.1.1.8.8).<br />

10.15-p9 The ANWI shall include the necessary administration tool(s), provided<br />

by the NEDS, to manage the interface with the NEDS if required by the NEDS<br />

Agreement.<br />

10.15-p10<br />

The ANWI shall be able to use the NEDS Directory as its own Directory.<br />

10.15-p11 In case the ANWI cannot use the NEDS Directory as its own Directory:<br />

A. The NEDS Contractor shall establish its own directory or data repository<br />

on the ANWI with ANWI Contractor supervision;<br />

B. The ANWI directory or data repository shall interface with the NEDS either<br />

through the NEDS Meta-tool, or directly by reading/writing into the NEDS<br />

Directory through LDAP and as required by the agreement.<br />

10.16 NATO Cyber Defence Incident Response Centre (NCIRC) FOC<br />

Project (HN:NCIA)<br />

10.16-p1 The NATO Computer Incident Response Capability (NCIRC) is that part<br />

of NATO’s Information Assurance effort that provides the capability to respond to<br />

computer and network security threats and vulnerabilities rapidly and effectively due<br />

to its preparedness to respond to Information Assurance-related incidents as they<br />

occur.<br />

10.16-p2 NCIA is responsible for the NATO Cyber Defence Incident Response<br />

Centre (NCIRC) Full Operational Capability (FOC) project which will provide the<br />

central agent for maintaining the end-to-end security of NATO networks by:<br />

A. Providing NATO-wide protection, detection and response mechanisms to<br />

cyber-attacks wherever NATO CIS systems are located (static or<br />

deployed);<br />

B. Providing “Rapid Reaction Team” (RRT) capability;<br />

C. Enabling NATO to collaborate with Nations on cyber defence.<br />

10.16-p3<br />

The NCIRC functional organization is described in the figure below.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-114 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 10.5: NCIRC Functional Organization<br />

10.16-p4 This project will prepare the NCIRC services to which the NNHQ ANWI<br />

will integrate at the tier-3 level. More information can be found in Annex E Appendix<br />

2.<br />

10.16-p5 As part of the NCIRC FOC project, N-CIRC Tier-3 sensors including N-<br />

IDS/IPS, Online computer Forensics, full packet capturing devices, online<br />

vulnerability assessment tools and log aggregation will be implemented in the new<br />

NATO HQ by the NCIRC Contractor.<br />

10.16-p6 The ANWI Contractor shall support the NCIRC FOC Contractor in the<br />

implementation of the above mentioned hardware and software on the different<br />

security domains of ANWI where NCIRC will be installed.<br />

10.17 NATO Public Key Infrastructure(NPKI) Project (HN: NCIA)<br />

10.17-p1 The NPKI project will achieve a PKI environment for NATO that fully<br />

complies with reference 1.1.1.6.11 .<br />

10.17-p2 The purpose of a NPKI is to generate, distribute and manage<br />

cryptographic keys, electronic certificates and electronic Certificate Revocation Lists<br />

(CRL), which in turn allows for securing the electronic IT environment.<br />

10.17-p3 As a part of this NPKI architecture the NNHQ will have its own<br />

Registration Authority (RA) provided by the NPKI project.<br />

10.17-p4 Reserved .<br />

10.17-p5 NPKI will ultimately be fully integrated and interoperable with virtually<br />

every other NATO CIS system. Interoperability with NATO systems will be achieved<br />

through implementation of common data structures based on international standards<br />

(X.509 certificates and Certificate Revocation Lists (CRLs)) and common protocols.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-115 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Final interoperability will be achieved through tight cryptographic integration at the<br />

operating system level to ensure full compatibility.<br />

10.17-p6<br />

HQ.<br />

NPKI Capabilities will be provided by the Purchaser for the new NATO<br />

10.17-p7 The ANWI Contractor shall interface the ANWI network services with<br />

the RA to provide digital signature capability on the ANWI.<br />

10.17-p8 The ANWI Contractor shall provide support to the NPKI Contractor to<br />

establish the RA and use the NPKI services to implement NPKI enabled ANWI<br />

services.<br />

10.17-p9 The ANWI Contractor shall integrate NPKI issued certificates and<br />

services in the different ANWI provided services.<br />

10.17-p10 Public/Private Certificates and CRL need to be integrated with different<br />

ANWI provided components like:<br />

A. Active Directory for the Client Authentication with smart cards;<br />

B. Secure VPN components;<br />

C. SSL services (Web Services)<br />

D. Networking services.<br />

10.17-p11<br />

NPKI certificates and CRL information is stored in NEDS.<br />

10.18 Public Internet Access (PIA) Project (HN: NCIA)<br />

10.18-p1 The PIA Project provides a reliable, secure, resilient and managed<br />

Internet Services Gateway (ISG) from a commercial service provider to access Public<br />

Information Services. The ISG includes relay, protect, and filter internet access<br />

(browsing, web publishing, extranet), and internet e-mail traffic to and from<br />

Connected commands. The ISG enables remote users to access the network<br />

services and internal resources provided by the ANWI Business Network. It also<br />

provides access to the Internet.<br />

10.18-p2 The scope of the PIA Project is to provide centrally managed Internet<br />

access for all Bi-SC AIS Commands and other entities that are part of the NUWAN,<br />

to provide Remote Access for roaming users to their Commands and to provide<br />

NATO Unclassified / NATO Restricted (NU/NR) WAN Enterprise Services to allow<br />

NU/NR email exchange and functional services to/from the Internet.<br />

10.18-p3 The PIA’s Internet Services Gateway will be installed on NATO<br />

premises and support outsourced to the PIA Contractor. The infrastructure to provide<br />

the PIA services will be delivered installed and owned by the PIA Contractor. The PIA<br />

Contractor will be responsible for the provision of the services as well as operation<br />

and maintenance of the equipment, i.e. the PIA Contractor will be responsible for the<br />

overall lifecycle of the PIA infrastructure during the period of performance of this PIA<br />

contract.<br />

10.18-p4 The PIA Gateway will connect into the NGCS layer and interface with<br />

the ANWI (Business and Public) domains through the NGCS interfaces.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-116 of 532


N A T O U N C L A S S I F I E D<br />

10.18-p5 The following services will be provided:<br />

A. Public Internet Access<br />

B. Remote user Access<br />

C. Site-to-Site VPN<br />

D. External DNS<br />

E. Proxy Service<br />

F. Reverse Proxy Service<br />

G. Email Proxy Service<br />

H. Web Hosting and Publishing Service<br />

I. Information Assurance Services<br />

J. Virtual machine Hosting Service<br />

K. Mobile Messaging and Web Proxy Service.<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.18-p6 The initial classification of the PIA will be NATO UNCLASSIFIED but<br />

may be upgraded to NR.<br />

10.18-p7 More details on the PIA can be found in reference 1.1.1.8.9.<br />

10.18-p8 The NNHQ Site will be provided with a PIA node that needs to be fully<br />

integrated into the ANWI capability.<br />

10.18-p9 The ANWI will be connected to the NGCS (NU), which will then be<br />

connected to the PIA capability. The configuration of the Public and Business<br />

domains of the ANWI will be influenced by the PIA services.<br />

10.18-p10 The PIA configuration details shall be discussed in detail, and agreed<br />

by the Purchaser and the ANWI Contractor.<br />

10.18-p11 The ANWI Contractor shall integrate the PIA node capabilities into the<br />

ANWI capability.<br />

10.19 Programme Management and Integration Capability(PMIC)<br />

Project (HN:NCIA)<br />

10.19-p1 The PMIC laboratory provides integration test services for NATO wide<br />

networks, IA and AIS services<br />

10.19-p2 PMIC details can be found in reference 1.1.1.8.15.<br />

10.19-p3<br />

Access to the PMIC will be given by the Purchaser.<br />

10.19-p4 The ANWI Contractor shall interface the ITS with the PMIC laboratory to<br />

support end-to-end services testing where integration or interoperability with NATO<br />

wide network, IA or AIS services is/are required.<br />

10.20 NATO Messaging Services(NMS) Project (HN: NCIA)<br />

10.20-p1 The NMS project provides (hardware and software) the NATO Secret<br />

Bi-SC AIS with formal a messaging infrastructure. The messaging client upgrade is<br />

not part of the NMS project scope.<br />

10.20-p2 The NMS will be provided as a NATO wide service that is currently<br />

available in the NATO HQ<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-117 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

10.20-p3 The NMS is to be seen as a specific application with multiple interfaces<br />

into ANWI (Client, Infrastructure) or via ANWI (such as NEDS, NPKI, and NGCS).<br />

10.20-p4 More details on the NMS can be found in reference 1.1.1.8.16.<br />

10.20-p5 The Interface requirements are described in Paragraph 12.5.2.<br />

10.20-p6 The ANWI Contractor shall support the Purchaser to interface the ANWI<br />

capabilities with the NMS application configuration.<br />

10.21 Bâtiment Z Space to Support Integration and Testing Services<br />

(ITS) (HN: NCIA)<br />

10.21-p1 The Integration and Testing Services (ITS) facility will be installed and<br />

operated within the NCIA premises inside Bâtiment Z located in the current NATO<br />

HQ Campus.<br />

10.21-p2 The Purchaser will provide Power & Cooling, floor space for ITS racks<br />

and office space for the ITS.<br />

10.22 Current NATO HQ Security Communications (TETRA)<br />

10.22-p1 A TETRA Security Communications is currently in operational use on<br />

the NATO HQ campus.<br />

10.22-p2 In the case a decision is taken to reuse the current system for the new<br />

NATO HQ, this system will be PFE to the ANWI Contractor.<br />

10.22-p3<br />

5.<br />

The ANWI Contractor requirements are described in Annex I Appendix<br />

10.23 Enterprise Agreement Software (HN: NCIA)<br />

10.23-p1 Microsoft products are subject to a NATO Enterprise Agreement (EA)<br />

between NATO and Microsoft.<br />

10.23-p2 All Microsoft products, with the exception of client OEM Operating<br />

Systems on COTS computers, necessary to support the implementation of the ITS<br />

and the implementation of the ANWI in the new NATO HQ may be provided by the<br />

Purchaser under this EA as PFE to the Contractor unless the ANWI Contractor’s cost<br />

of the software with assurance is able to be provided at a lower cost.<br />

10.23-p3 The ANWI Contractor shall provide the most current client device<br />

Windows OEM Professional Operating System at time of delivery. The OS shall be<br />

pre-installed on all new windows based client devices.<br />

10.23-p4 The ANWI Contractor shall integrate the NATO provided software<br />

baseline into the ANWI capabilities.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-118 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SECTION 11. Annex C: ANWI Architecture ”Logical View”<br />

11.1 Introduction<br />

11.1.1 Purpose<br />

11.1.1-p1 The purpose of this technical annex is to provide background<br />

information about the NNHQ architecture and architecture governance, introduce the<br />

ANWI services and introduce the architecture logical view by means of certain<br />

architecture operational views.<br />

11.1.2 Annex Structure<br />

11.1.2-p1 This Annex contains the following sections:<br />

A. Section 11.2 describes the NNHQ architecture governance and introduces<br />

the architecture principles.<br />

B. Section 11.3introducesanoverarching services framework based on the C3<br />

services classification taxonomy.<br />

C. Section 11.4 introduces the ANWI services and maps those to the<br />

services framework.<br />

D. Section 11.5 introduces the key operational information domains and<br />

NNHQ user types.<br />

E. Section 11.6 is providing the operational node connectivity showing the<br />

high-level connectivity of internal and external operational entities to the<br />

ANWI capability and domains.<br />

F. Section 11.7 is providing the high-level ANWI driven Information Exchange<br />

Requirements for each of the domains, and in more detail which user<br />

types will have access to what ANWI services.<br />

G. Section 11.8 is providing the overarching Information Assurance<br />

Architecture concept and requirements<br />

11.2 Architecture Governance and Principles<br />

11.2.1 NNHQ Architecture Governance<br />

11.2.1-p1 NATO HQ CIS architecture governance for this project is covered by:<br />

A. Various target architectures that detail the technology and solution<br />

architecture for a specific architecture target. Two main categories of<br />

target architectures are being governed which are of importance for the<br />

ANWI project:<br />

1. Old building<br />

a. NR-2 TA governing the ICT capabilities that will be implemented under<br />

the NR-2 project, delivery in the old building.<br />

2. New Building<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-119 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

b. NNHQ ICT TA governing what ICT capabilities need to be established<br />

for the NNHQ [1.1.1.7.1]. The TA includes a comprehensive list of<br />

ICT services, among which are ANWI and Business Application<br />

services.<br />

B. Requirements governance. High level NNHQ programme level<br />

requirements, called needs and features, are mapped to the TA as well as<br />

assigned/mapped to the various projects. The requirements statements in<br />

this SoW (all “shall statements”) map to the overarching needs and<br />

features as assigned to the ANWI project.<br />

11.2.1-p2 The various architectures are periodically updated as part of the<br />

architecture governance scheme. For the NNHQ TA update there is a directive<br />

(1.1.1.7.10) that requires the inclusion of results from NNHQ projects into the NNHQ<br />

ICT TA to ensure that the TA remains consistent and coherent with evolving design<br />

solutions as shown in figure 11.1. Figure 11.1 identifies the interrelationships of the<br />

various architectures and project design/architecture artefacts.<br />

Figure 11.1 NATO HQ architecture governance<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-120 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.2.1-p3 The NNHQ ICT projects, and henceforth the ANWI design as specified<br />

in Sections 2 and 5, shall provide technical information, through the various design<br />

level products, that include the following information that will help the ANWI Target<br />

Architecture Authority (HQPO) to compose the following architecture „views‟ (as<br />

further specified in the NATO Architecture Framework version 3.0 reference<br />

1.1.1.8.19).<br />

11.2.1.1 NSV-1 System Interface Description<br />

11.2.1.1-p1 The purpose of the System Interface Description is to illustrate<br />

which systems collaborate in which way to support the information exchange needs.<br />

The following are documented in an NSV-1:<br />

A. systems and their interfaces<br />

B. system use dependencies between interfaces<br />

C. system collaborations (systems interacting with each other through their<br />

interfaces)<br />

D. distributions of software systems to hardware systems<br />

E. connections between hardware systems<br />

11.2.1.1-p2 NSV-1 is best described as a graphical diagram depicting how<br />

systems are collaborating through their interfaces to realize the information<br />

exchanges between different domains. The diagram must be accompanied by a<br />

textual specification of all the graphical elements included in the diagram. The<br />

descriptions of systems and system interfaces should also include details concerning<br />

the functionality provided by each system; the procedures governing system<br />

implementation; the infrastructure supporting the systems; the quality with which the<br />

system offers its system services; and the means by which the system processes,<br />

manipulates, stores, and exchanges data.<br />

11.2.1.2 NSV-2, Systems Communication Description<br />

11.2.1.2-p1 The purpose of Systems Communication Description is to provide a<br />

comprehensive specification of how systems are connected at a detailed<br />

infrastructural level, what interfaces each system exposes (ports), the hardware<br />

interfaces used, and the protocols that govern transmission of data across the<br />

interface. NSV-2 enables acquisition specialists and system engineers to quickly plan<br />

and visualize how communications between systems are to be implemented.<br />

11.2.1.2-p2 The NSV-2 view can be split into three sub-views which define the<br />

communication links between systems. The sub-views are:<br />

A. NSV-2a System Port Specification: it defines the ports on each system,<br />

and the protocol / hardware stack that is specified or implemented for each<br />

of those ports.<br />

B. NSV-2b System to System Port Connectivity: it defines the connections<br />

between individual ports and shows the protocols and hardware<br />

specification used for each connection.<br />

C. NSV-2c System Connectivity Clusters - defines the bundles of system to<br />

system connections that go to make up an inter-nodal connection (see<br />

NSV-1).<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-121 of 532


N A T O U N C L A S S I F I E D<br />

11.2.1.3 NSV-4 System functionality description<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.2.1.3-p1 The primary purpose of the System Functionality Description is to:<br />

A. Describe systems that are outlined in NSV-1 in more detail, both in terms<br />

of structure (functional decomposition of systems) and behaviour (data<br />

flows between system components that realize certain system functions).<br />

B. Develop a clear description of the necessary system data flows.<br />

C. Clearly describe the allocation of system functions to specific systems,<br />

system components and/or nodes and thus clearly delineate lines of<br />

responsibility.<br />

D. Analyse the construction of NSV-1 systems to provide a basis for the<br />

determination of the quality requirements for systems and making<br />

decisions about streamlining, combining or omitting system functionality.<br />

11.2.1.3-p2 The complementary technical views originated by Contractors as<br />

part of the design phases will become part of future TA releases. For this reason text<br />

shall be provided as Microsoft word documents and figures in Visio, EA (Enterprise<br />

Architect) or scalable JPEG format.<br />

11.2.1.3-p3 The schedule for the Contractor’s inputs to the ICT TA isdriven by<br />

the schedule of ANWI design and testing products as reflected below:<br />

ANWI Product<br />

Initial ANWI Design<br />

Final ANWI Design<br />

Initial ANWI Design<br />

Final ANWI Design<br />

Final ANWI Design<br />

Post solution Design<br />

Pre-Integration Testing<br />

Post-Integration Testing<br />

Type of Input<br />

Develop High-level Design document, identifying elements<br />

within the solution having „relevance‟ for the ICT TA.<br />

Produce & Develop solution Design document, including initial<br />

version of NSV1.<br />

Produce & Develop solution Design document, including initial<br />

version of NSV1, NSV2 and NSV4 views.<br />

Update/Develop further NSV1, NSV2 and NSV4 views.<br />

Produce final NSV1, NSV2 and NSV4 views in line with new<br />

releases of the ICT TA.<br />

Refine as required NSV1, NSV2and NSV4 views according to<br />

integration testing results.<br />

Table 11.1 Provisional schedule Contractor input ICT TA<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-122 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.2.1.3-p4 The ANWI Contractor shall incorporate the following key<br />

architecture principles for the ANWI design and identify any limitations of his design<br />

from these perspectives:<br />

A. Security: All solutions and foreseen services are subject to security<br />

accreditation by the NATO HQ Security Accreditation Authority. Solutions<br />

shallbe in accordance with NATO security policies, directives and<br />

guidelines (references in section 1.1.1.6).<br />

B. Scalability: All solutions shall be scalable. A change to the number of<br />

NATO member Nations, number of partnership Nations, number of<br />

Agencies or a relocation of any of these within the building must be<br />

facilitated and absorbed by the solution facilities scale up capability as<br />

provided: The base capacity of the solutions provided shall support at<br />

least 25% extra capacity expansion in<br />

numbers/performance/storage/functionality etc. given the estimated<br />

service capacity requirements for the next 5 years starting to count from<br />

day-1 operation (FOC), without having to upgrade the components<br />

provided. Scalability scenario’s beyond the 25% level shall be supported<br />

preferably through scale up scenario’s but may require scale out level<br />

upgrade of major components in the infrastructure.<br />

C. Commercial Off The Shelf (COTS) Products: To ensure satisfactory<br />

maintainability of the solutions provided, 'Commercial Off The Shelf'<br />

(COTS) products shall be used as much as possible. Custommade/proprietary<br />

solutions should be avoided, wherever possible and<br />

justified whenever proposed.<br />

D. Reliability, resilience and robustness: The ANWI contractor shall consider<br />

reliability of components and solutions, resilience and robustness as key<br />

principles of their solutions in order to guarantee continuity of service<br />

(even in the case of a major incident).<br />

E. Flexibility: All provided solutions, services, etc. shall be adaptable with<br />

minimal effort to change. Changes in technology, technology standards or<br />

usage of the solutions must be possible without undue adverse effect<br />

upon the overall design or minimal downtime.<br />

F. Convergence: In the design and delivery of ANWI services, solutions,<br />

functions, or networks, etc. consolidation and rationalisation shall be taken<br />

into account to the maximum extent possible, in order to realize efficiency<br />

and synergistic savings providing flexibility in utilisation and the<br />

management of the NNHQ’s services.<br />

G. Management of Services: All solutions shall include a maximum level of<br />

automation of Service Management and Control functions providing<br />

remote management capabilities, to allow full flexibility in the way NATO<br />

decides to organize the management of the solution (i.e. centrally,<br />

integrated, stove-piped, etc.) in order to reduce the need for human<br />

intervention.<br />

H. Future proofing: To maximise the return on investment, proposed solutions<br />

shall aim to 'future-proof' the installation by providing easy and sustainable<br />

'upgrade paths' in terms of:<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-123 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-124 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

1. Adherence to standards (i.e. Non-proprietary solutions).<br />

2. Capability to exploit technology advances.<br />

3. Implementation of future improvements supporting performance &<br />

quality.<br />

i. State-of-the-art Technology: The ANWI contractor shall exploit the latest<br />

'state-of-the-art' technology (NB. 'Experimental' or 'Unproven' solutions<br />

shall NOT be implemented, since they are unlikely to be 'accreditable' in<br />

the required timescale).<br />

J. Interoperability: Delivered solutions shall demonstrate an appropriate<br />

degree of 'interoperability' with both 'local' (on-campus) and 'remote' (offcampus)<br />

NATO facilities and systems, as indicated within the project<br />

specifications.<br />

K. Safety: Safety is a key principle that shall be taken into account when<br />

designing and delivering solutions. Health and safety risks are to be<br />

minimized by providing safe and healthful work environments, preventing<br />

unsafe acts and controlling exposures to health and safety hazards in the<br />

workplace.<br />

L. User Experience: All solutions shall be user-friendly and suitably<br />

'performant' in order to maximize user experience, automation and<br />

minimize training and change management needs.<br />

11.3 Services Framework<br />

11.3.1 Applied Service Framework References<br />

11.3.1-p1 The NNHQ ANWI services concept is derived from NNHQ ICT target<br />

architecture (see reference 1.1.1.7.1) and has adopted the NATO C3 services<br />

taxonomy framework (which is based on the NATO Network Enabled Capability<br />

NNEC paradigm as high-level template to model and classify ANWI services, show<br />

their interrelationships, and show the linkage to business applications and business<br />

processes.<br />

11.3.2 C3 Taxonomy Services Framework<br />

11.3.2-p1 Figure 11.2 shows the C3 services taxonomy framework that is used to<br />

model and classify the ANWI services that will be described and specified in Annexes<br />

E to I. In the remainder of this section a short introduction into the main concepts and<br />

principles of the frameworkis provided.<br />

11.3.3 Services Framework Main Concepts<br />

11.3.3-p1 The model is based on a producer consumer model of services. The<br />

main philosophy of the taxonomy framework is to be able to visualise which<br />

applications or user clients use services as provided by the ICT (technical) Services.<br />

The model should not be perceived as a strict layered model: applications, clients or<br />

services can have direct access to any service in the model.<br />

11.3.3-p2 One of the main objectives of the model is to visualise and analyse the<br />

(re)use of services by applications to promote capabilities not to develop their own<br />

solutions for certain common available ICT services.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.3.3-p3 A key part of the C3 taxonomy framework is composed of the ICT<br />

technical services, as produced by Information and Communication systems<br />

equipment, subdivided into three groups:<br />

A. Communications services, subdivided into:<br />

1. Transmission Services<br />

2. Transport Services<br />

3. Communications Access Services<br />

B. Core Enterprise Services, subdivided into:<br />

1. Infrastructure Services<br />

2. SOA foundation services<br />

3. Enterprise Support Services<br />

C. Community of Interest (CoI) services<br />

11.3.3-p4 The C3 framework identifies Applications and User Appliances (clients).<br />

These are the user facing capabilities that are using services to get a capability<br />

function delivered to the end users in support of the business processes.<br />

11.3.3-p5 Common to these three groups of services are two overarching services<br />

groupings:<br />

A. Service Management and Control (SMC) services.<br />

B. Information Assurance Services.<br />

11.3.3-p6 Due to the special nature of the SMC and IA services, they should not<br />

be seen as unique self-contained services, but as services that integrate with all<br />

other services:<br />

A. As a part of horizontal integration:<br />

1. Each of the ICT services will have embedded IA and SMC features. The<br />

SMC service features are better known as “Element Management<br />

Services”.<br />

B. As part of the vertical integration:<br />

1. All SMC and IA (embedded) features contribute to the NATO ICT<br />

(SMC) and IA business processes:<br />

C. ICT related business processes are driven by the ITIL framework.<br />

1. IA related business processes are driven by the NNHQ Security<br />

CONOPS and are linked with the NCIRC capability.<br />

D. Vertical integration of consolidated IA and SMC information will be part of<br />

SMC and IA Services which are described in Annex E.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-125 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 11.2: C3 Services Framework<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-126 of 532


11.4 ANWI services<br />

N A T O U N C L A S S I F I E D<br />

11.4.1 ANWI ICT Technical Services Groupings<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-127 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.4.1-p1 To facilitate a coherent approach for services implementation and<br />

provision the ANWI services have been bundled into the following groups fuly in-line<br />

with the C3 services taxonomy and will be further specified in Annex E to I:<br />

A. Annex E: IA and SMC Services: The ANWI IA and SMC Services. This<br />

grouping is about the specialist CoI IA and SMC services and IA and SMC<br />

(user) applications to allow ICT and IA capability management and<br />

planning. Generic services features provided in this area are monitoring,<br />

reporting, configuration and change management, capacity and<br />

performance management, analysis, etc.<br />

B. Annex F: Infrastructure Services: The ANWI infrastructure services are the<br />

foundation services for all NNHQ ICT services and include processing,<br />

storage, LAN services and the means to integrate to these foundation<br />

services. A special element of the infrastructure services are the cross<br />

domain modules which will enable ICT services from inside the HQ<br />

perimeter (local) to the external NATO ICT services as well as enabling<br />

cross security domain services both for internal and external HQ<br />

purposes.<br />

C. Annex G: Unified Communications and Collaboration (UCC) Services: The<br />

ANWI UCC services shall enable a unified and converged capability for all<br />

users to effectively and efficiently communicate and collaborate via a<br />

consistent ICT capability.<br />

D. Annex H: Client Provisioning Service: The ANWI client provisioning<br />

service shall enable the provisioning of client based services to the end<br />

user. The client provisioning service shall provide generic services and<br />

support for many different client device form factors in support of the<br />

various user profiles.<br />

E. Annex I: Supplementary services: A bundling of mainly communications<br />

focused services that enhance the functionality of the ANWI foundation<br />

services as specified in Annex to H: Wireless and GSM blocking, GSM<br />

services, IPTV and Secure Site Communications.<br />

11.4.2 ANWI Services Listing<br />

11.4.2-p1 Given the groupings as introduced in the precious section the following<br />

ANWI (technical) services are identified in table 11.2.<br />

Services<br />

Short Description<br />

1 SMC and IA Services See Annex E<br />

1.1 Service Management and Control(SMC) All management services to ensure monitoring and provisioning<br />

of ANWI services.<br />

1.2 Information Assurance (IA) All IA services related to (centralised) security management and<br />

monitoring of the ANWI related IA element services<br />

2 Infrastructure Services See Annex F<br />

2.1 Processing Processing/computing services in support of any other service.<br />

2.2 Storage Storage services in support of any other service.


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Services<br />

Short Description<br />

2.3 Printing & Scanning Network enabled printing and scanning services.<br />

2.4 Network Infrastructure Infrastructure network services that resolve network wide<br />

infrastructures services (such as naming).<br />

2.5a LAN (Wired) Network services for LAN and computer room environments<br />

(wired)<br />

2.5b LAN (Wireless) in-building Wireless LAN services.<br />

3 Unified Communications and Collaboration<br />

Services<br />

See Annex G<br />

3.1 Voice Telephony voice services<br />

3.2 Voicemail Telephony voice mail service<br />

3.3 Video-Teleconferencing (VTC) Video teleconferencing engaging VTC, VMR and desktop level<br />

VTC elements.<br />

3.4 E-mail Email service (with attachments and labelling)<br />

3.5 Unified Messaging Unified messaging integrating/routing all UCC messaging<br />

oriented services (IM, chat, mail, voice(mail)).<br />

3.6 FAX FAX services<br />

3.7 Instant Messaging (IM)/chat Instant messaging and chat service.<br />

3.8 Presence On-line presence information of users logged-on (or off) to the<br />

network.<br />

3.9 Directory Service Directory services that can help resolve any user entry to a UCC<br />

supported address on the network.<br />

3.10 Collaboration Basic collaborations services linked<br />

3.11 Mobility Service that allows users to access the available services based<br />

on where they are.<br />

4 Client Provisioning Annex H<br />

4.1 Software provisioning Provision of the required application software to become<br />

available for the applicable user client device.<br />

4.2 Client devices Various client form factor devices that would allow users to<br />

consume NNHQ ICT services (to include ANWI services)<br />

5 Supplementary Services Annex I<br />

5.1 GSM Provision and extension of public GSM telephony services<br />

inside the NATO HQ building at authorised locations.<br />

5.2 GSM Blocking Blocking of GSM signals to prevent GSM access in nonauthorised<br />

locations at designated time periods (such as<br />

conference rooms).<br />

5.3 Wireless Blocking Blocking of any kind of Wireless (LAN) protocols to avoid<br />

access to Wireless ICT capabilities at non-authorised locations at<br />

designated time periods (such as conference rooms)<br />

5.4 Site Security Communications Site security communication services in support of (radio)<br />

communications for the site security staff covering the NNHQ<br />

premise.<br />

5.5 IPTV Provisioning and (re)distribution of TV services (public and<br />

NATO channels) using IP network services.<br />

Table 11.2: ANWI Services Overview<br />

11.4.3 Identification of ANWI related End-to-End Services<br />

11.4.3-p1 The ANWI services are predominantly services that will be provided to<br />

other services (business applications) in order to provide an end-to-end user or<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-128 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

application service. However table 11.3 shows the services where the ANWI project<br />

is responsible to provide end-to-end user services. Annex D will go in more detail<br />

showing end-to-end information flows as related to end-to-end services provisioning.<br />

Service<br />

SMC and IA Services<br />

SMC services<br />

IA services<br />

Infrastructure Services<br />

Web browsing<br />

File services<br />

Print services<br />

UCC services<br />

Email<br />

Instant Messaging<br />

Voice and Voice Mail<br />

FAX<br />

VTC<br />

Collaboration<br />

Unified Messaging<br />

Presence<br />

Client-Provisioning<br />

(no direct end-user service}<br />

Supplementary Services<br />

GSM<br />

Site Security Comms<br />

IPTV<br />

End-to-End Functionality<br />

Provision of SMC services and information to ICT managers and administrators in support<br />

of local and enterprise ICT services planning, management and O&M. Provision of SMC<br />

information interfaces to Business Applications.<br />

Provision of IA management services to IA managers and administrators in support of the<br />

local and enterprise IA management functions.<br />

User web browser based access to web based information services and sources. Provision<br />

of application based access to web portal or web services through the HTTP protocol.<br />

User access to file shares (home drive, specialist drives).<br />

User access to printing via ANWI based MF printer-scanner devices.<br />

User based email access services via the user email applicationclient (outlook or other<br />

mail client). Application based SMTP based messaging interface to information transfer.<br />

User based instant messaging services via user IM application client (today LYNC for the<br />

desktop). IM application services interface.<br />

End user voice services available through user client devices that support voice services.<br />

Automated FAX services interface to send and receive FAX to/from external<br />

organisations. No physical FAX end devices.<br />

End user VTC in conference room down to desktop VTC format.<br />

Calendar, user document or desktop sharing.<br />

Integration of different electronic messages and media (e-mail, SMS, Fax, Voicemail,<br />

video messaging) into a single user interface accessible from a variety of different devices.<br />

User based presence information shared through user collaboration services application<br />

client (today LYNC for the desktop).<br />

N/A as clients are provided under the service, other than that the native local client<br />

services are available through each different client form factor.<br />

ANWI will assure GSM services are accessible and relayed at authorised locations at the<br />

NNHQ building premise.<br />

Site Security Communication Services for NOS. Dedicated service.<br />

IP television services where users can watch (NATO) television channels<br />

Table 11.3: ANWI end-to-end services<br />

11.5 ANWI Information Infrastructures, Domains, Zoning and User<br />

Types<br />

11.5.1 Introduction<br />

11.5.1-p1 The ANWI architecture need to be flexible and expandable to support<br />

many different Communities of Interest (CoI) and related user types. Following a<br />

“traditional” approach where each CoI would be hosted on complete separate<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-129 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

infrastructure (e.g. networks) would create a plethora of numerous segregated<br />

networks with poor interoperability options, high management complexity and high<br />

security risk profile. To prevent this from happening NATO has issued a policy for the<br />

rationalisation of information infrastructures based on their classification levels . The<br />

policy is providing guidance for NATO to adopt two major Information Infrastructures<br />

that will be able to support handling information at all required classification levels:<br />

A. An Infrastructure that can support Secret classification levels.<br />

B. An Infrastructure that can support NATO Restricted, NATO Unclassified<br />

and Unclassified (Public) classification levels.<br />

11.5.1-p2 For the current NR-2 network this approach is followed as is reflected in<br />

NR-2 Target Architecture Document (Ref. 1.1.1.8.5). The ANWI architecture is taking<br />

the NR-2 architecture forward in enhancing the capabilities for the two major<br />

infrastructure and its internal and external interfaces. Once cost effective security<br />

technologies and mechanisms become available, compliant with the extant NATO<br />

security policies and guidance, further rationalisation of infrastructures may be an<br />

option and the ANWI Contractor shall include these in the ANWI design. Initial results<br />

in sharing LAN, storage and processing infrastructure have been achieved and will<br />

be addressed in the Infrastructure Services Annex F.<br />

11.5.1-p3 The concept of Zoning is used to logically or physically segregate and<br />

protect Communities of Interest or information services. The segregation in Security<br />

Zones (e.g. Public Security Zone, NATO UNCLASSIFIED Security Zone, etc.)<br />

enhances security as whole. Dividing the ICT infrastructure into separate logical<br />

security zones is lessen the burden of security controls in areas with open access<br />

requirements and high tolerance for downtime and strengthens security for those<br />

areas that need additional protection and high availability.<br />

11.5.1-p4 Zoningcan be achieved at one or more network layers (mainly at Layer<br />

2 and 3 according to the OSI RM), and using one or a combination of different types<br />

of technology as follows, but not limited to:<br />

A. Virtual Local Area Network (VLAN)<br />

B. Private Virtual Local Area Network (PVLAN)<br />

C. Access Control List (ACL)<br />

D. VLAN Access Control List (VACL)<br />

E. Multiprotocol Label Switching (MPLS)<br />

F. Virtual Private Network (VPN)<br />

G. Virtual Private LAN Service (VPLS)<br />

H. Virtual Device Context (VDC)<br />

i. Firewall and IDS/IPS capabilities distinct at each layer<br />

j. Distinct Firewall leg and port<br />

k. Distinct Virtual Switch (vSwitch)<br />

11.5.1-p5 The concept of User Types is used to diversify different types of users<br />

that would be involved in NATO HQ business and can be identified as users that<br />

reside either internal or external to the NATO HQ building.<br />

11.5.1-p6 A security domain is a special case of a zone where the physical and<br />

logical zoning is delimiting a specific (NATO HQ) Community (subset of user types)<br />

for which a set of well-defined security rules and behaviours is defined.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-130 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.5.1-p7 In addition to the perspective of security domains it is worth introducing<br />

the concept of Cross Domain: given the fact that CoI’s may reside in one or multiple<br />

domains, they may have Information Exchange Requirements (IERs), that cause that<br />

information need to be provided across domains and zones supported by cross<br />

domain solutions such as firewalls, gateways and proxies.<br />

11.5.2 ANWI Security Domains<br />

11.5.2-p1 Figure 11.3 shows the ANWI security domains in the perspective of the<br />

two major infrastructures as introduced in the previous section and introducing the<br />

perspective of cross domain to either internal or external domains of the NATO HQ.<br />

Figure 11.3 ANWI Security Domains.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-131 of 532


N A T O U N C L A S S I F I E D<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-132 of 532<br />

IFB-CO-13300-ANWI-AMD-2<br />

11.5.2-p2 There is a need for four different security domains:<br />

A. NATO SECRET (NS): The NS domain shall provide a local area network<br />

for use at up to and including the NATO SECRET classification level. It<br />

also provides interconnectivity to the NS wide area network, used<br />

throughout NATO for Command and Control. The security classification is<br />

NATO SECRET.The current NS domain (called Minerva) is the primary<br />

HQ user domain. Based on the future plans for NATO HQ the NS domain<br />

shall reduce in size and complexity, many of its functions being transferred<br />

to the Business domain. However, the authoritative repository for official<br />

documents, their handling and distribution, shall remain on the NS domain,<br />

and shall be supported with the appropriate information management<br />

mechanisms.<br />

B. EAPC: The EAPC domain shall provide an information sharing capability<br />

or use at up to and including the EAPC SECRET classification level,<br />

provided for non-NATO delegation staff to access NATO documents,<br />

which are releasable to the EAPC. The security classification is EAPC<br />

SECRET. The EAPC network is a local-only domain for the NATO HQ, the<br />

authoritative repository for all official documentation of non-NATO EAPC<br />

Delegation users.<br />

C. Business (NU/NR): The Business domain shall serve as the primary<br />

domain for business operations in the NATO HQ Building, providing<br />

information sharing capability for use up to and including the NATO<br />

RESTRICTED classification level. This shall also provide connectivity to<br />

NR networks in NATO and to the Internet, through Public Information<br />

Access (PIA) Gateways. The Business domain shall service the highest<br />

number of users of all networks. It shall provide access to the Internet for<br />

its users.<br />

D. Public: The Public domain shall have a relatively simple architecture for<br />

local HQ use only, providing user services coverage of only a part of the<br />

HQ premise, offering only a limited range of end-user services, including<br />

web access, services. This domain will primarily support visitors to the<br />

Headquarters (such as journalists). In addition to its (limited) end-user<br />

services it provides wireless, IPTV and voice UNCLASSIFIED access<br />

services throughout the building.<br />

No.<br />

Security Domain (Up to Classification)<br />

NS EAPC Business Public<br />

Services NR NU<br />

1 SMC and IA Services<br />

1.1 Service Management and Control(SMC) Y Y 1 Y Y 1<br />

1.2 Information Assurance (IA) Y Y Y Y<br />

2 Infrastructure Services<br />

2.1 Processing Y Y Y Y 4 Y<br />

2.2 Storage Y Y Y Y 4 Y<br />

2.3 Printing & Scanning Y Y Y Y<br />

2.4 Network Infrastructure Y Y Y Y Y<br />

2.5a LAN (Wired) Y Y Y Y Y 2


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

No.<br />

Security Domain (Up to Classification)<br />

NS EAPC Business Public<br />

Services NR NU<br />

2.5b LAN (Wireless)<br />

3 UCC (Unified Communications & Collaboration Services<br />

3.1 Voice Y Y 3 Y<br />

3.2 Voicemail Y Y<br />

3.3 Video-Teleconferencing (VTC) Y Y<br />

3.4 E-mail Y Y Y<br />

3.5 Unified Messaging Y<br />

3.6 FAX Y Y<br />

3.7 Instant Messaging (IM)/chat Y Y<br />

3.8 Presence Y Y<br />

3.9 Directory Service Y Y Y<br />

3.10 Collaboration Y Y<br />

3.11 Mobility Y<br />

4 Client Provisioning Services<br />

4.1 Software provisioning Y Y Y Y 2<br />

4.2 Client devices Y Y Y Y<br />

5 Supplementary Services<br />

5.1 GSM n.a.<br />

5.2 GSM Blocking Y 7<br />

5.3 Wireless Blocking Y 7<br />

5.4 Site Security Communications (Radio) N/A<br />

5.5 IPTV Y 3 Y 5<br />

Key: 1 limited Management capability; 2 Only for Kiosk PC’s; 3 Software Clients; 4 Extranet<br />

Applications & DB (DMZ) – Up to NU security domain only exists in the Data Centre. 5 Shall cover<br />

both IPTV streaming and Browser accessible IPTV services; 6 No specific Business WLAN service –<br />

Mobile business clients shall use the Public WLan to establish secure (VPN) connection with Business<br />

security domain; 7 Static GSM/WLAN Blocking capabilities shall be managed from the Business<br />

network. Mobile GSM/WLAN Blocking capabilities are not networked.<br />

Table 11.4: Overview Services per security domain<br />

6<br />

Y<br />

11.5.2-p3 The table provides an overview of the services that shall be made<br />

available each security domain. This table doesn’t provide details about the<br />

classification of the information handled by the services.<br />

11.5.3 User Types<br />

11.5.3-p1 Table 11.5 shows the different types of users identified for access to the<br />

New NATO HQ ICT and a short description. More elaborate descriptions can be<br />

found in the NNHQ ICT Target Architecture.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-133 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

User Type<br />

U1 - NATO HQ User<br />

U2 - NATO HQ Nation User<br />

U3 - NATO HQ Partner User<br />

U4 - Conference User<br />

U5 - NATO HQ Conference User<br />

U6 - NATO HQ Event User (peak)<br />

U7 - NATO HQ Mobile User<br />

U7a NATO HQ Mobile User (NRoI)<br />

U7b NATO HQ Mobile User (NS)<br />

U8 - NATO HQ Remote User (RU)<br />

U8a - NATO WAN Remote User<br />

U8b - Non-NATO Remote User<br />

Short description<br />

individuals who are permanent, temporary or<br />

contracted employees of NATO, its Agencies and<br />

Commands<br />

a User working in a NATO Nation Permanent<br />

Representation to NATO HQ (a.k.a Delegation)<br />

or a NATO Nation Military Representation to<br />

NATO HQ (a.k.a. MilRep).<br />

an individual associated with Euro-Atlantic<br />

Partnership Council Nations<br />

a user who is visiting NATO HQ to participate or<br />

brief in a meeting or conference and is not<br />

working at the HQ or has no NATO security<br />

clearance. Affiliated to NATO member nation.<br />

a user who is to participate or brief in a meeting<br />

or conference and is working at the HQ<br />

present at the NATO HQ site during a Special<br />

Event e.g. a Summit, Ministerial or exhibition.<br />

User that is away from the NATO HQ site but<br />

needs connectivity to certain ICT services.<br />

User that is away from the NATO HQ site but<br />

needs connectivity to certain ICT services.<br />

delivered at the NATO HQ site up to NR<br />

(common business service)<br />

User that is away from the NATO HQ site but<br />

needs connectivity to certain ICT services.<br />

delivered at the NATO HQ site up to NS<br />

(authorised under exceptional circumstances)<br />

a User that is located away from the NATO HQ<br />

Campus.<br />

a type of user in a NATO location that connects<br />

to a Network that provides access to the NATO<br />

WAN in a certain way, at the NS level or at the<br />

NR level<br />

A Non-NATO Remote User (U8b) is a type of<br />

user associated with:<br />

• NATO Nations (located in Capitals and<br />

elsewhere),<br />

• NATO Partners,<br />

• National Delegations,<br />

• Military Representatives,<br />

• Other International Organisations (e.g. EU),<br />

• NGO and other organisation extranet users<br />

U8c - Home Worker<br />

type of NATO HQ Users (U1) accessing<br />

remotely certain NATO HQ ICT Services from<br />

the HQ information domain using a non-NATO<br />

owned device.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-134 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

User Type<br />

U8d - Internet Café User<br />

U9 - Public User<br />

U9a - Public User (the Public/Open Source)<br />

U9b Registered Public User<br />

U10 - NATO Remote Office User<br />

U11 - NATO HQ System Administrator User<br />

U11a NATO HQ Application Administrator<br />

User<br />

U12 - Non-NATO Troop Contributing Nation<br />

(NNTCN)<br />

U13 - Non-NATO Nation (7NNN) User<br />

U14 - Non-Personal Entity (NPE) User<br />

Short description<br />

type of NATO HQ Users (U1) accessing certain<br />

services away from the HQ using a non-NATO<br />

owned device from an Internet Café.<br />

A public user that connect to the NATO<br />

(extranet/web publishing services) using a<br />

public network.<br />

A public User that<br />

• accesses publicly available information e.g. the<br />

NATO public website or<br />

• exchanges non classified or unclassified e-mail,<br />

releasable for Internet Transmission, with a HQ<br />

User.<br />

A public user that is registered with NATO<br />

HQ but does not have to proof (NATO)<br />

identity.<br />

accesses services at NR or NS classification level<br />

from a protected environment, defined as a<br />

Remote Office.<br />

is usually a permanent employee of NATO. This<br />

type of user has access to Privileged Accounts<br />

a permanent NATO employee, who has<br />

privileged access to a specific Application<br />

is an individual in possession of a valid Personal<br />

Security Clearance based on a clearance<br />

procedure no less rigorous than that required for a<br />

NATO national in accordance with NATO<br />

security policy and supporting directives, who<br />

has access to NATO CIS and NATO/X CIS<br />

systems for the effectiveness of the Operation,<br />

Training, and Exercise activities and who has<br />

access to NATO/X CIS for the effectiveness of<br />

Transformation or Cooperation activities.<br />

See above: 7NNN Users are from Australia,<br />

Austria, Finland, Ireland, New Zealand, Sweden<br />

and Switzerland.<br />

is an authorized Communication Information<br />

System (CIS)‟ component (non-humankind) like<br />

but not limited to an ICT System, Network<br />

Device, Application process allow to authenticate<br />

its identity within a security domain, for various<br />

purposes, and ensure interoperability across<br />

security domains through NATO WAN or over<br />

the Internet with other international organizations<br />

and partners.<br />

NPE is most of the time a known CIS component<br />

authorized to perform automated tasks without<br />

human intervention on behalf of human<br />

individuals.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-135 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Security<br />

Domains<br />

\<br />

Users<br />

(access)<br />

Types<br />

NATO<br />

Secret<br />

EAPC<br />

Secret<br />

NATO<br />

Restricte<br />

d<br />

NATO<br />

Unclassif<br />

ied<br />

U01 - NATO HQ User<br />

U02 - NATO HQ Nation User<br />

U03 - NATO HQ Partner User<br />

U04 - Conference User<br />

U05 - NATO HQ Conference User<br />

U06 - NATO HQ Event User<br />

U07a - NATO HQ Mobile User (NRoI)<br />

U07b - NATO HQ Mobile User (NS)<br />

U08a - NATO WAN Remote User<br />

U08b - Non-NATO Remote User<br />

Y O N N Y N N Y Y N N N N N Y Y Y N N Y<br />

O N Y N O N N N N N N N N N N Y Y Y Y Y<br />

Y O N N Y N Y N Y<br />

U08c - Home Worker<br />

U08d - Internet Café User<br />

U09a - Public User<br />

U09a - Registered Public User<br />

U10 - NATO Remote Office User (U10)<br />

U11 - NATO HQ System Administrator User<br />

U11a - NATO HQ Application Administrator User<br />

U12 - Non-NATO Troop Contributing Nation (NNTCN)<br />

U13 - 7 Non-NATO Nation (7NNN) User<br />

U14 - Non-Personal Entity (NPE) User<br />

O 1 N N N N Y Y Y N N Y<br />

O O N N O N O N O Y O O N N O Y Y N N Y<br />

Public 2 Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y<br />

Table 11.5 Different types of user<br />

Legend<br />

(Y) Access to the security domain is allowed<br />

(O) Access to the security domain is allowed for limited users<br />

(N) Access to the security domain is NOT allowed<br />

1) under condition of usage of NATO (owned) NR approved access mechanisms<br />

2) used for Wireless and Telephony Access, except for U04 who use it for Public<br />

Domain User Services (e.g. Internet, Printing,..)<br />

11.6 Node Connectivity Diagrams<br />

11.6-p1 The Operational Node Connectivity is modelled from the perspective of the<br />

bundling’s of two major information infrastructures as explained in section 11.5:<br />

A. Secret infrastructure which is modelled through<br />

1. Security Domains:<br />

i) NS domain<br />

ii) EAPC domain<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-136 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

2. Cross Domain Services allowing NS infrastructure Operational Nodes to<br />

share and exchange information with both internal as well as external<br />

entities.<br />

B. Business Infrastructure which is modelled through:<br />

1. Security Domains:<br />

i) NR<br />

ii) Public<br />

2. Cross Domain Services allowing Business infrastructure Operational<br />

Nodes to share and exchange information with both internal as well as<br />

external entities.<br />

11.6.1 NS Infrastructure Node Connectivity<br />

Figure 11.4 NATO SECRET node connectivity<br />

11.6.1-p2 Figure 11.4 subdivides into the following ways of node connectivity:<br />

A. NATO or NATO Nation users which are authorised ANWI services users<br />

and have direct LAN access (on premise) to the ANWI NS security domain<br />

using NATO ANWI provided clients.<br />

B. Conference users who are authorised to logon (dedicated guest accounts)<br />

to dedicate ANWI provided workstations in the Conference rooms in order<br />

to support a conference at the NS or EAPC classification level.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-137 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

C. NATO HQ staff users who have ANWI user accounts can logon on the<br />

conference room client to support and participate in the conference using<br />

the NATO HQ services authorised to be operated from those user<br />

locations. In addition, as and when the conference classification and<br />

arrangement allows, ANWI users can utilise their NS Mobile Client.<br />

D. NATO HQ Mobile user that is provided with a Mobile NS capable device<br />

with NS level VPN and uses a controlled public network access<br />

mechanism where NATO security staffs are convinced the end-to-end<br />

connectivity is secured.<br />

E. An ANWI user can logon to ANWI services through the NATO WAN or a<br />

dedicated NS link (exception) as and when this is facilitated in the remote<br />

user location. The ANWI user can either use a ANWI provided client or a<br />

NATO client provided in the remote location that allows the ANWI user to<br />

logon with his/her ANWI credentials.<br />

F. Dedicated and specific authorised access for administrators and or<br />

devices used for system administration or SMC purposes. Support through<br />

either dedicated logon from designated machines or using mobile devices<br />

that are be logically or physically connected to the ANWI infrastructure.<br />

G. Partner Nation users provided with ANWI clients can achieve (on premise)<br />

LAN based access to the EAPC security domain.<br />

H. Cross domain interconnection to the Business Infrastructure that support<br />

controlled information exchange/flows to and from the Business<br />

infrastructure (NR and Public security domains).<br />

I. Cross domain interconnection to other NS security domains<br />

interconnected via the NS WAN.<br />

J. Cross domain interconnection to other NATO Nation security domains<br />

interconnected via the NS WAN and the NATO IEG A and B services.<br />

K. Cross domain interconnection to other Mission Secret security domains<br />

interconnected via the NS WAN and the NATO IEG C services<br />

L. NNTC user who uses a ANWI provided client and user account can get<br />

access to certain designated services on the NS domain that are either<br />

logically or physically segmented using a cross domain solution.<br />

M. 7NNN user who uses a ANWI provided client and user account can get<br />

access to certain designated services on the NS domain that are either<br />

logically or physically segmented using a cross domain solution.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-138 of 532


N A T O U N C L A S S I F I E D<br />

11.6.2 Business Infrastructure Node Connectivity<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 11.5 Business Infrastructurenode connectivity<br />

11.6.2-p1 Figure 11.5 subdivides into the following ways of node connectivity:<br />

A. NATO or NATO Nation users which as authorised ANWI services users<br />

and have direct LAN access (on premise) to the ANWI NR security domain<br />

using NATO ANWI provided clients.<br />

B. Conference users who are authorised to logon (dedicated guest accounts)<br />

to dedicated ANWI provided workstations in the Conference rooms in<br />

order to support a conference at the NR or Public classification level.<br />

C. NATO HQ staff users who have ANWI user accounts can logon on the<br />

conference room client to support and participate in the conference using<br />

the NATO HQ services authorised to be operated from those user<br />

locations. In addition, as and when the conference classification and<br />

arrangement allows, ANWI users can utilise their NR Mobile Client.<br />

D. A NATO HQ mobile user, possessing aNRoI mobile client (including NR<br />

VPN), can get access via the ANWI public WLAN service to the NR<br />

domain.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-139 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

E. An ANWI user can logon to ANWI services through the NATO WAN or a<br />

dedicated NR VPN over a public network (as an exception) as and when<br />

this is facilitated in the remote user location. The ANWI user can either<br />

use a ANWI provided client or a NATO client provided in the remote<br />

location that allows the ANWI user to logon with his/her ANWI credentials.<br />

F. Dedicated and specific authorised access for administrators and or<br />

devices used for system administration or SMC purposes. Support through<br />

either dedicated logon from designated machines or using mobile devices<br />

that can be logically or physically connected to the ANWI infrastructure.<br />

G. Event users, using their own devices, will be granted controlled Internet<br />

Access using the Public WLAN capability.<br />

H. Cross domain interconnection to the NS Infrastructure that support<br />

controlled information exchange/flows to and from the NS infrastructure<br />

primarily the NS security domain.<br />

I. Cross domain interconnection to other NR security domains<br />

interconnected via the NR WAN or using an approved peer-to-peer NR<br />

VPN connection over a Public Network.<br />

J. Cross domain interconnection to Public (Internet) Interconnected domains<br />

representing business, NGO, etc. for.<br />

K. NATO or non-NATO user, using either its own or Internet café device<br />

getting access to a extranet portal reachable from the Internet using a<br />

NATO provided user account. Dependent on the type of usage access to<br />

various extranet information may be limited.<br />

L. Internet external user that will use the web browser to get access to the<br />

NATO external/web publish website: www.nato.int. Based on his/her<br />

credentials may have access to certain other web based services.<br />

M. NNTCN user who uses a ANWI provided client and user account can get<br />

access to certain designated services on the NR domain that are either<br />

logically or physically segmented using a cross domain solution.<br />

N. 7NNN user who uses a ANWI provided client and user account can get<br />

access to certain designated services on the NR domain that are either<br />

logically or physically segmented using a cross domain solution.<br />

11.7 Information Exchange Requirements (IERs)<br />

11.7-p1 The Information Exchange Requirements are modelled per key<br />

infrastructure for each of the operational nodes as identified and is compliant with the<br />

NATO Architectural Framework.<br />

11.7.1 ANWI NS Infrastructure IERs<br />

11.7.1-p1 In this section the operational information requirements for the NS<br />

infrastructure are summarized through Table 11.6. This table identifies the nature of<br />

the information exchange requirement (function), the involved nodes and the required<br />

information exchange attributes. The table includes only the IER’s of which the endto-end<br />

user level is within the responsibility of ANWI.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-140 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Supported<br />

Operational<br />

Task<br />

Specific<br />

Missions,<br />

Functions<br />

or<br />

Activities<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Operational Elements<br />

Involved<br />

Information<br />

Consuming<br />

Node<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

10 Partner<br />

Nations<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

15-16<br />

NNTCN and<br />

7NNN<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

14 Mission,<br />

domains<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

Information<br />

Producing<br />

Node<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

10 Partner<br />

Nations<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

15-16<br />

NNTCN and<br />

7NNN<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

14 Mission,<br />

domains<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

13 NATO<br />

Nation,<br />

domains<br />

Description of<br />

Information<br />

Required Information Exchange Attributes<br />

Element<br />

Information Media Quality Type<br />

Data provided to ANWI Well<br />

entities to be access connected<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in NATO<br />

SECRET downto<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

CONFIDENTIAL<br />

down to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Cross<br />

Domain<br />

Cross<br />

Domain<br />

Cross<br />

domain<br />

full ANWI<br />

access<br />

Cross<br />

domain<br />

contained<br />

ANWI<br />

access<br />

Cross<br />

domain<br />

(IEG C)<br />

Cross<br />

domain<br />

(IEG C)<br />

Cross<br />

domain<br />

(IEG B)<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

All UCC<br />

message,<br />

portal, file,<br />

voice, video,<br />

collaborations<br />

, directory<br />

message, file,<br />

labeled,<br />

directory<br />

Portal access,<br />

message, file,<br />

database<br />

access,<br />

directory<br />

All UCC<br />

message,<br />

portal, file,<br />

voice, video,<br />

collaborations<br />

, directory<br />

All UCC<br />

message,<br />

portal, file,<br />

voice, video,<br />

collaborations<br />

, directory<br />

message,<br />

portal, file,<br />

collaboration<br />

(chat),<br />

directory<br />

message,<br />

portal,<br />

collaborations<br />

(chat),<br />

directory<br />

message,<br />

portal,<br />

collaborations<br />

(chat),<br />

directory<br />

Capabilitie<br />

s<br />

UCC, web<br />

browsing,<br />

web access,<br />

storage-file<br />

share,<br />

directory<br />

Email,<br />

directory<br />

email,<br />

portal, file,<br />

database<br />

queries,<br />

directory<br />

UCC, web<br />

browsing,<br />

web access,<br />

storage-file<br />

share,<br />

directory<br />

UCC, web<br />

browsing,<br />

web access,<br />

storage-file<br />

share,<br />

directory<br />

email, chat,<br />

web<br />

browsing,<br />

web access,<br />

storage-file<br />

share,<br />

directory<br />

Email, chat,<br />

web<br />

browsing,<br />

web access,<br />

directory<br />

email, web<br />

browsing,<br />

web access,<br />

directory<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-141 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Supported<br />

Operational<br />

Task<br />

Specific<br />

Missions,<br />

Functions<br />

or<br />

Activities<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation,<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Operational Elements<br />

Involved<br />

Information<br />

Consuming<br />

Node<br />

13 NATO<br />

nation<br />

domains<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

12 other<br />

NATO<br />

domains<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

11 Business<br />

Infra<br />

Domains<br />

SMC 8-9<br />

Administrator<br />

, NPE<br />

Information<br />

Producing<br />

Node<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

12 other<br />

NATO<br />

domains<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

11 Business<br />

Infra<br />

Domains<br />

1-8 All ANWI<br />

NS<br />

connected<br />

users<br />

11 Business<br />

Infra domain<br />

Description of<br />

Information<br />

Required Information Exchange Attributes<br />

Element<br />

Information Media Quality Type<br />

Data provided to Cross Well<br />

entities to be domain connected<br />

handled/integrate (IEG B)<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in NATO<br />

RESTRICTED<br />

down to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrate<br />

d in<br />

SECRETdown to<br />

(NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data generated by<br />

SMC/element<br />

managers on the<br />

Business Infra<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

Well<br />

connected<br />

message,<br />

portal,<br />

collaborations<br />

(chat),<br />

directory<br />

All UCC<br />

services,<br />

portal,<br />

directory<br />

All UCC<br />

services,<br />

portal,<br />

directory<br />

email, portal,<br />

directory, TV<br />

email, portal,<br />

directory<br />

Xml file,<br />

email, SNMP,<br />

portal<br />

Capabilitie<br />

s<br />

Email, web<br />

browsing,<br />

web access,<br />

directory<br />

UCC, web<br />

browsing,<br />

web access,<br />

directory<br />

Email, chat,<br />

web<br />

browsing,<br />

web access,<br />

directory<br />

email, web<br />

browsing,<br />

web access,<br />

directory.<br />

Email, web<br />

browsing,<br />

web access,<br />

directory<br />

File, email,<br />

web<br />

browsing,<br />

web access<br />

SMC<br />

11 Business<br />

Infra domain<br />

8-9<br />

Administrator<br />

, NPE<br />

SMC info reported<br />

back to Business<br />

Domains<br />

Cross<br />

domain<br />

Well<br />

connected<br />

Email, xml file<br />

email<br />

Table 11.6: NS Infrastructure IER table<br />

11.7.2 ANWI Business Infrastructure IERs<br />

11.7.2-p1 In this section the operational information requirements for the Business<br />

Infrastructure is summarized in Table 11.7. This table identifies the nature of the<br />

information exchange requirement (function), the involved nodes and the required<br />

information exchange attributes. The table includes only the IER’s of which the endto-end<br />

user level is within the responsibility of ANWI.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-142 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Supported<br />

Operational<br />

Task<br />

Specific<br />

Missions,<br />

Functions<br />

or<br />

Activities<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation<br />

Day-to-Day<br />

Business,<br />

consultation,<br />

Operational Elements<br />

Involved<br />

Information<br />

Consuming<br />

Node<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

19-20<br />

NNTCN and<br />

7NNN<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

12 Public<br />

Connected<br />

Domains<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

12 other<br />

NATO WAN<br />

NR domains<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

Information<br />

Producing<br />

Node<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

19-20<br />

NNTCN and<br />

7NNN<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

13 Public<br />

Connected<br />

domains<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

12 other<br />

NATO WAN<br />

NR domains<br />

1-8 All ANWI<br />

NRconnected<br />

users<br />

11 NS infra<br />

domain<br />

Description of<br />

Information<br />

Required Information Exchange Attributes<br />

Element<br />

Information Media Quality Type Capabilities<br />

Data provided to ANWI Well All UCC UCC, web<br />

entities to be access Connected services, browsing,<br />

handled/integrated<br />

portal, file, web access,<br />

in NATO<br />

voice, video, storage-file<br />

RESTRICTED down<br />

collaborations, share,<br />

to (NATO)<br />

directory directory<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

in NATO<br />

RESTRICTED down<br />

to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

in NATO<br />

RESTRICTED down<br />

to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

atUNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

atUNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

in NATO<br />

RESTRICTEDdown<br />

to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

in NATO<br />

RESTRICTED down<br />

to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data provided to<br />

entities to be<br />

handled/integrated<br />

in NATO<br />

RESTRICTED down<br />

to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Cross<br />

domain<br />

full<br />

ANWI<br />

access<br />

Cross<br />

domain<br />

full<br />

ANWI<br />

access<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Well<br />

Connected<br />

Well<br />

Connected<br />

Well<br />

Connected<br />

Well<br />

Connected<br />

Well<br />

Connected<br />

Well<br />

Connected<br />

Well<br />

Connected<br />

All UCC<br />

services ,<br />

portal, file,<br />

voice, video,<br />

collaborations,<br />

directory<br />

All UCC<br />

services,<br />

portal, file,<br />

voice, video,<br />

collaborations,<br />

directory<br />

UCC voice<br />

services<br />

,message,<br />

portal,<br />

collaborations<br />

(chat),<br />

directory, TV<br />

UCC voice<br />

services,<br />

message,<br />

portal,<br />

collaborations<br />

(chat),<br />

directory<br />

All UCC<br />

services,<br />

portal,<br />

directory<br />

All UCC<br />

services,<br />

portal,<br />

directory<br />

email, portal,<br />

directory,<br />

UCC, web<br />

browsing,<br />

web access,<br />

storage-file<br />

share,<br />

directory<br />

UCC, web<br />

browsing,<br />

web access,<br />

storage-file<br />

share,<br />

directory<br />

UCC voice<br />

services,<br />

email, web<br />

browsing,<br />

web access,<br />

directory,<br />

IPTV<br />

Email, web<br />

browsing,<br />

web access,<br />

directory,<br />

UCC, web<br />

browsing,<br />

web access,<br />

directory<br />

UCCweb<br />

browsing,<br />

web access,<br />

directory<br />

email, web<br />

browsing,<br />

web access,<br />

directory<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-143 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Supported<br />

Operational<br />

Task<br />

Specific<br />

Missions,<br />

Functions<br />

or<br />

Activities<br />

Day-to-Day<br />

Business,<br />

consultation<br />

SMC<br />

Operational Elements<br />

Involved<br />

Information<br />

Consuming<br />

Node<br />

11 NS Infra<br />

Domain<br />

11 NS infra<br />

domain<br />

SMC 8-9<br />

Administrator,<br />

NPE<br />

Information<br />

Producing<br />

Node<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

8-9<br />

Administrator,<br />

NPE<br />

11 NS infra<br />

domain<br />

Description of<br />

Information<br />

Required Information Exchange Attributes<br />

Element<br />

Information Media Quality Type Capabilities<br />

Data provided to Cross Well email, portal, Email, web<br />

entities to be domain Connected directory browsing,<br />

handled/integrated<br />

web access,<br />

in NATO<br />

directory<br />

RESTRICTED down<br />

to (NATO)<br />

UNCLASSIFIED<br />

processing<br />

Data generated by<br />

SMC/element<br />

managers on the<br />

Business Infra<br />

(maximum NR level)<br />

SMC info reported<br />

back to Business<br />

Domains (maximum<br />

NR level)<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Well<br />

Connected<br />

Well<br />

connected<br />

Xml file,<br />

email, SNMP,<br />

portal<br />

Email, xml file<br />

File, email,<br />

web<br />

browsing,<br />

web access<br />

email<br />

Provision of<br />

info to public<br />

sources<br />

10, 14, 17<br />

Public users<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

Extranet Portal,<br />

Public Portal, Email<br />

at Unclassified level<br />

Cross<br />

domain<br />

Well<br />

Connected<br />

email, portal<br />

email, web<br />

browsing,<br />

web access<br />

Reachback<br />

with non<br />

NATO<br />

owned<br />

devices<br />

Exchange of<br />

information<br />

with<br />

registered<br />

users (ERP)<br />

15, 16 Home<br />

worker and<br />

Internet café<br />

user<br />

18 registered<br />

public user<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

1-8 All ANWI<br />

NR<br />

connected<br />

users<br />

Extranet Portal,<br />

Email at NATO<br />

Unclassified level<br />

Extranet Portal,<br />

email at<br />

Unclassified level<br />

Cross<br />

domain<br />

Cross<br />

domain<br />

Well<br />

connected<br />

Well<br />

connected<br />

Table 11.7: ANWI Business Infrastructure IER table<br />

Email, portal<br />

Email, portal<br />

Email, web<br />

browsing,<br />

web access<br />

Email, web<br />

browsing,<br />

web access<br />

11.8 Overarching Information Assurance Architecture Concept and<br />

Requirements<br />

11.8.1 ANWI IA Services Architecture<br />

11.8.1-p1 As mentioned in section 11.3.3.5, IA services integrate with all other C3<br />

services:<br />

A. Each C3 service has embedded some IA features (as part of the<br />

horizontal integration). These IA features provided by each ANWI service<br />

are addressed in the SOW and appropriate Annexes (F to I);<br />

B. IA services needed to integrate/manage/support the horizontal IA services<br />

and, if required, integrate into NATO wide IA services and IA services<br />

management (vertical integration). The (vertical) specific CoI IA services<br />

and applications are specified in Annex E appendix 2.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-144 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 11.6 IA services architecture<br />

11.8.2 Information Assurance Architecture Compliance Approach<br />

11.8.2.1 NNHQ Security Architecture Concept<br />

11.8.2.1-p1 The HQPO Security CONOPS (Ref. 1.1.1.7.4) states the “Need for<br />

INFOSEC Control and Management” (N.IA.05) - need to support security<br />

management mechanisms and procedures that will deter, prevent, detect, and<br />

recover from the impacts of incidents that affect the NNHQ’s security posture (i.e.<br />

confidentiality, integrity and availability of NATO classified information and supporting<br />

system services and resources). The identified business need is to manage the<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-145 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

implemented security mechanisms in a holistic and fully integrated manner (as far as<br />

is practical, given the state of the art).<br />

11.8.2.1-p2 As stated in the HQPO Security CONOPS (Ref. 1.1.1.7.4), the<br />

solutions shall employ coherent and interoperable technical approaches to ensure<br />

that all security mechanisms are fully operational, yet are still „trusted‟.<br />

11.8.2.1-p3 This approach forms the basis for achieving a dynamically<br />

integrated Security Management Infrastructure (SMI) (Ref. 1.1.1.6.10).<br />

11.8.2.1-p4 Initially SMI will be based on currently deployed services and will<br />

comprise of NATO Computer Incident Response Capability (NCIRC), the existing<br />

NATO IP, ISDN and other NATO cryptographic system management consoles, the<br />

enterprise systems management consoles operated by NCIA and other system<br />

management controls operated either directly by NATO or under NATO supervision.<br />

The Contractor should built/integrate ANWI management infrastructure into existing<br />

(at the implementation time) SMI.<br />

11.8.2.1-p5 Given the fact that the SMI concept is not worked out to the full level<br />

of detail an approach has been selected for the (N)NHQ (see figure 11.7) that<br />

ensures full traceability of high level security requirements (IER/approved<br />

countermeasures) down to the implementation level. For this approach 49 Security<br />

Mechanisms (SM) have been identified for implementation. These Security<br />

Mechanisms are a bundling of the NSRAG security countermeasures that were<br />

resulting from an initial Security Risk Assessment.<br />

11.8.2.1-p6 The ANWI contractor shall execute his own SRA and<br />

validate/enhance the Security Mechanisms as needed for ANWI.<br />

11.8.2.1-p7 The list of Current Developed Security Mechanisms is provided in<br />

section 11.8.2.2. The ANWI contractor shall those as a reference for creating the<br />

ANWI design and security accreditation work and as and when needed indicate<br />

where changes are needed given the SRA as to be undertaken by the ANWI<br />

contractor.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-146 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

Figure 11.7 Security flow<br />

11.8.2.2 NATO HQ ICT Security Mechanisms<br />

11.8.2.2-p1<br />

[1.1.1.8.5].<br />

The NATO HQ ICT security mechanisms are provided in reference<br />

11.8.2.2-p2 The purpose of this section is to identify potential security<br />

mechanisms of NR2 or capabilities provided by the other projects/systems (like<br />

NCIRC FOC and PIA GW) which can be either re-used by ANWI or ANWI shall<br />

integrate with them.<br />

11.8.2.2-p3 The Contractor shall develop a design of ANWI security<br />

mechanisms on basis of requirements listed in the SOW. These mechanisms may<br />

correlate with NR2 security mechanisms, but most likely will be richer due to fact that<br />

ANWI is bringing new services (like UCC) and new services interfaces.<br />

11.8.2.2-p4 For the current HQ NR2 project, part of a comprehensive IA<br />

management approach, implementation of 49 security mechanisms are considered of<br />

which various of those mechanisms will be implemented during the NR2 timeframe.<br />

Table11.6, lists those security mechanisms, marks whether there is linkage to ANWI<br />

IA service and indicates the transition/migration requirements.<br />

11.8.2.2-p5 Column “Transition/migration/future management” indicated<br />

potential possibility for transition pending earlier assessment or integration with the<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-147 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

other systems or central management capabilities managed by NCIA or NCIRC.<br />

Criteria for security mechanism migration shall include, but won’t be limited to:<br />

A. Software is under warranty,<br />

B. Software is still supported but near end-of-life ( -> no migration),<br />

C. Cost of migration,<br />

D. Easy integration in new environment;<br />

E. Fading/ emerging technology.<br />

Note: according to migration requirements listed in section 6.14, no hardware will be<br />

migrated.<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-148 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

01<br />

SM<br />

02<br />

SM<br />

03<br />

Security<br />

Mechanisms<br />

Malware<br />

Protection for<br />

Server (File,<br />

Application,<br />

Print,<br />

Database)<br />

Malware<br />

Protection for<br />

Client<br />

(Desktop,<br />

Laptop)<br />

Malware<br />

Protection for<br />

Personal<br />

Digital<br />

Assistant<br />

(PDA). E.g.<br />

Blackberry<br />

Mapping to<br />

ANWI<br />

service<br />

Processing<br />

Services;<br />

Crossdomain<br />

services<br />

Client<br />

Provisioning<br />

Service<br />

Client<br />

Provisioning<br />

Services<br />

Current<br />

product<br />

NS, NR:<br />

McAfee Total<br />

Protection<br />

NR: McAfee<br />

for MOSS<br />

(SharePoint<br />

only)<br />

NS, NR:<br />

McAfee Total<br />

Protection<br />

NR: Message<br />

Labs; McAfee<br />

Mobile<br />

Security<br />

Current<br />

situation<br />

NS: Partially<br />

Implemented<br />

since not<br />

100%<br />

coverage, not<br />

redundant<br />

NR: partially<br />

implemented<br />

(databases<br />

not covered)<br />

NS, NR: fully<br />

implemented<br />

NS: N/A<br />

NR: partially<br />

done<br />

Current<br />

management<br />

NS, NR: Local<br />

management<br />

from ePO –<br />

no integration<br />

with<br />

NIATC/NCIRC<br />

NS, NR: As<br />

above<br />

NS: N/A<br />

NR: local<br />

management<br />

Security<br />

Risk level<br />

NS, NR:<br />

Medium<br />

(NR: print<br />

server –<br />

low, DB –<br />

high)<br />

NS:<br />

Medium<br />

NR: High<br />

NS: Low<br />

NR:<br />

Medium<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR: Fully<br />

implemented<br />

NS, NR: Fully<br />

implemented<br />

NS: N/A<br />

NR: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Migration possible<br />

– local<br />

management (from<br />

ePO) integrated<br />

with NIATC (i.a. to<br />

download<br />

updates);<br />

See SM01<br />

Potential reuse/integration<br />

with ANWI – local<br />

management<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-149 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

04<br />

SM<br />

05<br />

SM<br />

06<br />

Security<br />

Mechanisms<br />

Malware<br />

Protection for<br />

Email server<br />

-<br />

SMTP/AV/Spa<br />

m<br />

Malware<br />

Protection for<br />

Web server<br />

Messaging<br />

Content<br />

Filtering<br />

(MCF)<br />

- SMTP Relay<br />

Mapping to<br />

ANWI<br />

service<br />

Processing<br />

Services;<br />

Crossdomain<br />

services;<br />

UCC<br />

Services<br />

Crossdomain<br />

module<br />

Crossdomain<br />

services<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Current<br />

product<br />

NS: Trend<br />

Micro on MS<br />

Exchange<br />

NR: Message<br />

Labs,<br />

Trendmicro<br />

NS, NR:<br />

McAfee Total<br />

Protection<br />

NS:<br />

Trendmicro<br />

(offline<br />

scanning)<br />

NR:<br />

Mimesweepe<br />

r<br />

+Trendmicro(<br />

offline only)<br />

on NR;<br />

Current<br />

situation<br />

Fully<br />

implemented<br />

Note:<br />

MessageLabs<br />

do not provide<br />

adequate<br />

logging<br />

Fully<br />

implemented<br />

NS: Partially<br />

Implemented<br />

because of<br />

7NNN<br />

improvement<br />

is required,<br />

especially to<br />

avoid human<br />

errors<br />

NR: partially<br />

implemented<br />

(not<br />

redundant)<br />

Current<br />

management<br />

NS: local<br />

management;<br />

separated<br />

from ePO<br />

See SM 01<br />

Local<br />

management<br />

Security<br />

Risk level<br />

NS: Low<br />

NR: High<br />

NS: Low<br />

NR:<br />

medium<br />

NS: High<br />

NR:<br />

Medium<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR: Fully<br />

implemented<br />

NS, NR: Fully<br />

implemented<br />

NS: partially<br />

implemented<br />

NR: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Migration possible<br />

– similar as SM01<br />

See SM 01<br />

NR: can be<br />

covered by PIA<br />

GW<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-150 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

07<br />

SM<br />

08<br />

SM<br />

09<br />

Security<br />

Mechanisms<br />

Web Content<br />

Filtering<br />

(WCF)<br />

HTTP AV<br />

Proxy<br />

FTP AV Proxy<br />

Mapping to<br />

ANWI<br />

service<br />

Crossdomain<br />

services<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Crossdomain<br />

services<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Crossdomain<br />

services<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Current<br />

product<br />

NR: Bluecoat<br />

proxy<br />

(reverse<br />

proxy – see<br />

SM 20)<br />

NS: N/A<br />

NR:<br />

Symantec,<br />

MessageLab<br />

s security<br />

cloud;<br />

Kaspersky on<br />

BlueCoat<br />

proxy<br />

NS: N/A<br />

NR: Bluecoat<br />

proxy<br />

Current<br />

situation<br />

NS: not yet<br />

implemented,<br />

only Reverse<br />

Proxy needed<br />

NR:<br />

implemented<br />

(not all<br />

features<br />

enabled)<br />

NS: N/A<br />

NR:<br />

implemented<br />

NS: N/A<br />

NR: partially<br />

implemented<br />

(reverse proxy<br />

not covered)<br />

Current<br />

management<br />

NR: Local<br />

management<br />

NS: N/A<br />

NR: local<br />

NS: N/A<br />

NR: local<br />

Security<br />

Risk level<br />

Medium<br />

NS: Low<br />

NR:<br />

Medium<br />

NS: Low<br />

NR:<br />

Medium<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR:<br />

Partially<br />

implemented<br />

(NS: reverse<br />

proxy only)<br />

NS: N/A<br />

NR: fully<br />

implemented<br />

NS: not<br />

implemented<br />

NR: partially<br />

covered<br />

Transition/<br />

migration / future<br />

management<br />

NR: can be<br />

covered by PIA<br />

GW<br />

NS: N/A<br />

NR: can be<br />

covered by PIA<br />

GW<br />

NR: can be<br />

covered by PIA<br />

GW<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-151 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

10<br />

SM<br />

11<br />

SM<br />

12<br />

Security<br />

Mechanisms<br />

Integrity<br />

Checker<br />

SSL VPN or<br />

SSL/TLS VPN<br />

Strong<br />

Authentication<br />

also called<br />

One Time<br />

Password<br />

(OTP or<br />

Medium<br />

Authentication<br />

) or Two<br />

Factors<br />

Authentication<br />

(T-FA)<br />

Mapping to<br />

ANWI<br />

service<br />

Network<br />

infrastructure<br />

services<br />

(Endpoint<br />

compliance)<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Crossdomain<br />

services;<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Client<br />

provisioning<br />

(two factor<br />

authenticatio<br />

n using NPKI)<br />

Current<br />

product<br />

NS, NR:<br />

Tripwire from<br />

Red Hat<br />

(WCM)<br />

NR:<br />

Symantec<br />

Altiris (on<br />

clients only)<br />

NS: N/A<br />

NR: Juniper<br />

SA4520,<br />

Cisco ASA<br />

5520<br />

NS: RSA for<br />

WCM<br />

solution<br />

administratio<br />

n<br />

NR: RSA<br />

SecureID (for<br />

WCM and<br />

NITV<br />

administratio<br />

n)<br />

NU: OTP<br />

Current<br />

situation<br />

Not yet<br />

implemented,<br />

essential for<br />

servers<br />

accessible for<br />

public<br />

NS: N/A”<br />

NR:<br />

implemented<br />

NS: Not yet<br />

implemented<br />

NR:<br />

implemented<br />

for privileged<br />

users only<br />

Current<br />

management<br />

NS, NR: N/A<br />

NS: N/A<br />

NR: local<br />

NS: N/A<br />

NR: local<br />

Security<br />

Risk level<br />

NS, NR:<br />

Medium<br />

NS: Low<br />

NR: High<br />

NS, NR:<br />

High<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR:<br />

partially<br />

implemented<br />

NS: N/A<br />

NR:fully<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

(implemented<br />

at least for<br />

privileged<br />

accounts)<br />

Transition/<br />

migration / future<br />

management<br />

NS: N/A<br />

NR: can be<br />

provided by PIA<br />

GW<br />

NS, NR: no<br />

transition (ANWI<br />

will provide T-FA<br />

based on smart<br />

cards and NPKI<br />

certificates)<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-152 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

13<br />

SM<br />

14<br />

Security<br />

Mechanisms<br />

Enterprise<br />

Single Sign-<br />

On (ESSO)<br />

Firewall (FW)<br />

for Outer<br />

Perimeter/<br />

Border<br />

Protection<br />

Mapping to<br />

ANWI<br />

service<br />

Partially<br />

covered by<br />

Network<br />

Infrastructure<br />

Services<br />

(Directory<br />

services)<br />

Crossdomain<br />

services;<br />

GW3 –<br />

Integration<br />

with PIA GW<br />

(10.6.6.2) or<br />

re-using PIA<br />

GW services<br />

Current<br />

product<br />

NS, NR:<br />

CheckPoint<br />

Current<br />

situation<br />

NS: Partially<br />

implemented<br />

(e.g. Active<br />

Directory)<br />

NR: as above<br />

NS: Fully<br />

Implemented<br />

but HW<br />

replacement<br />

required<br />

NR: fully<br />

implemented<br />

Current<br />

management<br />

NS: local<br />

NR: as above<br />

NS, NR: local<br />

management<br />

Security<br />

Risk level<br />

NS: low<br />

NR:<br />

medium<br />

NS, NR:<br />

medium<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR: fully<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Integration with<br />

SF/SD to be<br />

discussed (impact<br />

on business<br />

application to be<br />

analysed –<br />

currently all apart<br />

from FINS (for<br />

AMS only) are<br />

locally managed)<br />

NS: Checkpoint –<br />

can be centrally<br />

managed by NCIA<br />

NR: can be<br />

provided by PIA<br />

GW<br />

FW log monitoring<br />

to be integrated<br />

with NCIRC (note:<br />

FW management<br />

by NCIA -SMD is<br />

integrated with<br />

NCIRC – see<br />

Annex E, section<br />

“13.2.1.3.1 Firewall<br />

management” for<br />

details)<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-153 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

15<br />

Security<br />

Mechanisms<br />

Firewall (FW)<br />

for Inner<br />

Perimeter<br />

Mapping to<br />

ANWI<br />

service<br />

Crossdomain<br />

services;<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Current<br />

product<br />

NS: N/A<br />

NR: Juniper<br />

Current<br />

situation<br />

NS: N/A<br />

NR: fully<br />

implemented<br />

Current<br />

management<br />

NS: N/A<br />

Security<br />

Risk level<br />

NS: Low<br />

NR: High<br />

Expected<br />

NR2 end<br />

state<br />

NS: N/A<br />

NR: fully<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

NS: N/A<br />

NR: Can have<br />

interface with PIA,<br />

potentially centrally<br />

managed<br />

FW log monitoring<br />

to be integrated<br />

with NCIRC (note:<br />

FW management<br />

by NCIA -SMD is<br />

integrated with<br />

NCIRC – see<br />

Annex E, section<br />

“13.2.1.3.1 Firewall<br />

management” for<br />

details)<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-154 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

16<br />

SM<br />

17<br />

Security<br />

Mechanisms<br />

Intrusion<br />

Detection and<br />

Prevention<br />

System<br />

(IDS/IPS)<br />

Network<br />

Access<br />

Control (NAC)<br />

/ Network<br />

Access<br />

Protection<br />

(NAP) and<br />

Network<br />

Access<br />

Quarantine<br />

(NAQ)<br />

Mapping to<br />

ANWI<br />

service<br />

Processing<br />

Services<br />

(PR060-061)<br />

– host-based<br />

IDS;<br />

Crossdomain<br />

services;<br />

Integration<br />

with PIA GW<br />

(10.6.6.2);<br />

Client<br />

Provisioning<br />

Service (H-<br />

IDS)<br />

Network<br />

Infrastructure<br />

Services –<br />

Network<br />

Access<br />

Control<br />

(14.5.3.8)<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Current<br />

product<br />

NS: Internet<br />

Security<br />

Systems<br />

(ISS);<br />

McAfee<br />

NR: ISS,<br />

McAfee,<br />

Juniper<br />

N/A<br />

Current<br />

situation<br />

NS: Partially<br />

implemented<br />

NR: fully<br />

implemented<br />

NS, NR: not<br />

yet<br />

implemented<br />

Current<br />

management<br />

NS, NR: local<br />

management<br />

N/A<br />

N A T O U N C L A S S I F I E D<br />

Security<br />

Risk level<br />

NS: Low<br />

NR:<br />

Medium<br />

NS, NR:<br />

high<br />

Expected<br />

NR2 end<br />

state<br />

NS: partially<br />

implemented<br />

NR: fully<br />

implemented<br />

NS: partially<br />

implemented<br />

NR: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

N-ID/PS<br />

management can<br />

be centralized;<br />

H-IDS – local<br />

management due<br />

to server specific<br />

policies;<br />

Integration with<br />

NCIRC necessary<br />

Note: certain<br />

sensors may be<br />

provided by<br />

NCIRC FOC<br />

Assertion<br />

(13.2.2.6) – IDS (at<br />

least N-ID/PS) are<br />

managed by<br />

NCIRC<br />

NR: certain<br />

mechanisms can<br />

be covered by PIA<br />

(e.g. NAQ)<br />

Book II Page IV-155 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

18<br />

SM<br />

19<br />

SM<br />

20<br />

Security<br />

Mechanisms<br />

IP Filtering<br />

Network<br />

Address<br />

Translation<br />

(NAT)<br />

Application<br />

Firewall<br />

Mapping to<br />

ANWI<br />

service<br />

Crossdomain<br />

services -<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Crossdomain<br />

Services -<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Crossdomain<br />

Services<br />

Integration<br />

with PIA GW<br />

(10.6.6)<br />

Current<br />

product<br />

NS: N/A<br />

NR: Juniper,<br />

CheckPoint<br />

NS: N/A<br />

NR: Juniper,<br />

Checkpoint<br />

NS: N/A<br />

NR:<br />

Barracuda<br />

Current<br />

situation<br />

NS: N/A<br />

NR: fully<br />

implemented<br />

(on routers<br />

and FWs)<br />

NS: N/A<br />

NR: Fully<br />

implemented<br />

(in mixed<br />

mode - on<br />

router and<br />

balancer –<br />

FWs)<br />

NS: N/A<br />

NR: partially<br />

implemented<br />

(further<br />

configuration<br />

required)<br />

Current<br />

management<br />

NS: N/A<br />

NR: local<br />

management<br />

NR: local<br />

management<br />

NR: local<br />

Security<br />

Risk level<br />

NS: Low<br />

NR:<br />

medium<br />

NS: Low<br />

NR:<br />

Medium<br />

NS: Low<br />

NR: High<br />

Expected<br />

NR2 end<br />

state<br />

NS: N/A<br />

NR: fully<br />

implemented<br />

NS: N/A<br />

NR: Fully<br />

implemented<br />

NS: N/A<br />

NR: full<br />

implementati<br />

on<br />

Transition/<br />

migration / future<br />

management<br />

NS: N/A<br />

NR: can be<br />

covered by PIA<br />

GW<br />

Assertion: firewalls<br />

(apart from PIA)<br />

will be managed<br />

by NCIA (13.2.2.6)<br />

NS: N/A<br />

NR: can be<br />

covered by PIA<br />

GW<br />

NR: can be<br />

provided by PIA<br />

GW<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-156 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

21<br />

SM<br />

22<br />

SM<br />

23<br />

Security<br />

Mechanisms<br />

System and<br />

Security<br />

Logging &<br />

Auditing<br />

Router and<br />

Switch<br />

Voice over<br />

Internet<br />

Protocol<br />

(VoIP)<br />

protection<br />

Mapping to<br />

ANWI<br />

service<br />

SMC; Crossdomain<br />

services;<br />

integration<br />

with NCIRC<br />

Network<br />

infrastructure<br />

services<br />

UCC<br />

Services –<br />

Voice Service<br />

Component;<br />

Client<br />

Provisioning<br />

Current<br />

product<br />

Current<br />

situation<br />

Arcsight NS, NR :<br />

Partially<br />

Implemented<br />

as not all logs<br />

are captured<br />

No event<br />

correlation<br />

implemented;<br />

NS and NR –<br />

events<br />

(subset) send<br />

to NCIRC for<br />

correlation<br />

NS, NR:<br />

Juniper,<br />

Cisco<br />

NS: N/A<br />

NR:<br />

CheckPoint<br />

(built-in VoIP<br />

Application<br />

Intelligence)<br />

NS, NR : Fully<br />

implemented<br />

NS: N/A<br />

NR: limited to<br />

public security<br />

zone<br />

Current<br />

management<br />

NS, NR: Local<br />

management<br />

NS: N/A<br />

NR: local<br />

management<br />

Security<br />

Risk level<br />

NS, NR:<br />

High<br />

NS: Low<br />

NR:<br />

Medium<br />

NS: Low<br />

NR: High<br />

Expected<br />

NR2 end<br />

state<br />

NS: Partially<br />

implemented<br />

NS, NR: fully<br />

implemented<br />

NS: N/A<br />

Transition/<br />

migration / future<br />

management<br />

Can be migrated;<br />

integration with<br />

NCIRC to be<br />

improved.<br />

Note: NCRIC FOC<br />

project will deploy<br />

log aggregation at<br />

NATO HQ and is<br />

part of ANWI PFE,<br />

see Annex B<br />

NS: N/A<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-157 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

24<br />

SM<br />

25<br />

SM<br />

26<br />

Security<br />

Mechanisms<br />

Wireless<br />

Network<br />

Protection<br />

Storage<br />

Compartment<br />

ed Security<br />

Mode (SCSM)<br />

Data Backup,<br />

Replication<br />

and Recovery<br />

(DBRR)<br />

Mapping to<br />

ANWI<br />

service<br />

Part of LAN<br />

services<br />

(14.6.5)<br />

Storage<br />

Services<br />

Partially<br />

covered by:<br />

- SMC<br />

(13.1.6.2)<br />

- Infrastruct<br />

ure<br />

services<br />

Current<br />

product<br />

NS, NR: N/A<br />

Public: Cisco<br />

5508<br />

Wireless LAN<br />

Controller;<br />

Access<br />

Points 3502E<br />

NS: N/A<br />

Current<br />

situation<br />

NS, NR: N/A<br />

Public –<br />

limited to<br />

public security<br />

zone; planned<br />

REACH<br />

deployment in<br />

3 blocks of<br />

main building<br />

(NR2<br />

infrastructure<br />

will be used)<br />

NS: N/A (not<br />

required)<br />

NR: the same<br />

SAN used for<br />

NR and NU<br />

NS, NR:<br />

partially<br />

implemented<br />

(upgrade/<br />

replacement<br />

needed)<br />

Current<br />

management<br />

Local<br />

management<br />

NS: N/A<br />

NR: local<br />

management<br />

NS, NR: local<br />

management<br />

Security<br />

Risk level<br />

NS: Low<br />

NR: high<br />

NS: Low<br />

NR: high<br />

NS: low<br />

NR:<br />

medium<br />

Expected<br />

NR2 end<br />

state<br />

NS: N/A<br />

NR: partially<br />

implemented<br />

NS: N/A<br />

NR: fully<br />

implemented<br />

NS: fully<br />

implemented<br />

NR: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-158 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

27<br />

SM<br />

28<br />

SM<br />

29<br />

Security<br />

Mechanisms<br />

Network<br />

Management<br />

System<br />

(NMS) /<br />

Systems<br />

Management<br />

System (SMS)<br />

IT Forensic<br />

Encryption-<br />

Decryption<br />

/Cryptography<br />

Mapping to<br />

ANWI<br />

service<br />

Service<br />

Management<br />

and Control –<br />

partial<br />

coverage<br />

(SM#<br />

requirements)<br />

Integration<br />

with NCIRC<br />

Client<br />

Provisioning<br />

Service (Hard<br />

disk<br />

encryption)<br />

Current<br />

product<br />

NS, NR: N/A<br />

Current<br />

situation<br />

NS, NR: not<br />

yet<br />

implemented<br />

Encase NS, NR :<br />

partially<br />

implemented<br />

(access<br />

limited to<br />

NOS)<br />

NS:<br />

Flagstones<br />

hard-drive<br />

NR: N/A<br />

NS: fully<br />

implemented<br />

USB<br />

encryption –<br />

to be<br />

addressed<br />

NR: not<br />

implemented<br />

Current<br />

management<br />

NS, NR : N/A<br />

NS: Local<br />

management<br />

by COM<br />

branch<br />

Security<br />

Risk level<br />

NS:<br />

Medium<br />

NR: High<br />

NS: Low<br />

NR:<br />

medium<br />

NS, NR:<br />

High<br />

Expected<br />

NR2 end<br />

state<br />

Implemented:<br />

(NS - work<br />

package<br />

planned for<br />

2012)<br />

NS, NR:<br />

partially<br />

implemented<br />

NS: Fully<br />

implemented<br />

NR: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Migration to be<br />

considered;<br />

Tools will be<br />

provided by<br />

NCIRC FOC<br />

Assertion<br />

(13.2.2.6) – online<br />

computer forensic<br />

and full packet<br />

capture (FPC) to<br />

be managed by<br />

NCIRC<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-159 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

30<br />

SM<br />

31<br />

SM<br />

32<br />

Security<br />

Mechanisms<br />

Public Key<br />

Infrastructure<br />

(PKI)<br />

Security<br />

Zones<br />

Policies,<br />

directives and<br />

procedures<br />

(PDP)<br />

Mapping to<br />

ANWI<br />

service<br />

Support to<br />

establish RA;<br />

Client<br />

provisioning<br />

(PKI client,<br />

token and<br />

token reader)<br />

All networks<br />

provided by<br />

ANWI<br />

N/A – out of<br />

scope<br />

ANWI will<br />

provide<br />

solutions<br />

compliant<br />

with NATO<br />

policies<br />

Current<br />

product<br />

NS, NR:<br />

SafeNet<br />

Aladdin<br />

N/A<br />

Current<br />

situation<br />

NS, NR:<br />

Partially<br />

implemented<br />

(Registration<br />

Authority on<br />

NS and NR)<br />

NS: Partially<br />

implemented<br />

NR: fully<br />

implemented<br />

NS, NR:<br />

Partially<br />

implemented<br />

– update<br />

needed<br />

Current<br />

management<br />

RA locally<br />

managed;<br />

most of the<br />

network<br />

devices<br />

managed with<br />

NATO<br />

certificate<br />

Security<br />

Risk level<br />

NS:<br />

Medium<br />

NR: High<br />

NS: High<br />

NR:<br />

Medium<br />

NR:<br />

medium<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR:<br />

partially<br />

implemented<br />

NS: partially<br />

implemented<br />

NR: fully<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

N/A<br />

ANWI<br />

implementation<br />

shall be compliant<br />

with security<br />

policies valid at the<br />

time of ANWI<br />

implementation;<br />

certain procedures<br />

may require<br />

update – out of<br />

scope of ANWI<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-160 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

33<br />

SM<br />

34<br />

SM<br />

35<br />

SM<br />

36<br />

Security<br />

Mechanisms<br />

Load<br />

Balancing /<br />

Failover<br />

(LB/FO)<br />

Classification<br />

Level / Data<br />

Labelling<br />

Data<br />

Loss/Leak<br />

Prevention<br />

(DLP)<br />

Vulnerability<br />

Scanning<br />

Mapping to<br />

ANWI<br />

service<br />

Processing<br />

Services<br />

(LB/FO<br />

between<br />

server<br />

rooms);<br />

Integration<br />

with PIA GW<br />

(10.6.6.2)<br />

Out of scope<br />

(label<br />

checking<br />

CDM)<br />

Client<br />

Provisioning<br />

Service<br />

(Removable<br />

Storage<br />

Management<br />

System)<br />

Integration<br />

only (tools to<br />

be provided<br />

by NCIRC)<br />

Current<br />

product<br />

NS, NR:<br />

McAfee Total<br />

Protection for<br />

Data<br />

Current<br />

situation<br />

NS: fully<br />

implemented<br />

(dual NS<br />

connectivity –<br />

fail-over only;<br />

no load<br />

balancing)<br />

NR: fully<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR:<br />

Partially<br />

implemented<br />

for USB<br />

control<br />

Partially<br />

implemented -<br />

periodical<br />

tests<br />

performed by<br />

other entities<br />

(e.g. SECAN,<br />

NIATC)<br />

Current<br />

management<br />

Local<br />

management<br />

Local<br />

management<br />

N/A<br />

Security<br />

Risk level<br />

NS: Low<br />

NR: high<br />

NS, NR:<br />

High<br />

NS, NR:<br />

High<br />

NS, NR:<br />

High<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR: fully<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Connection to<br />

Internet – can be<br />

covered by PIA<br />

GW<br />

On-line VA will be<br />

deployedby<br />

NCRIC FOC<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-161 of 532


SM<br />

ID<br />

SM<br />

37<br />

SM<br />

38<br />

SM<br />

39<br />

SM<br />

40<br />

SM<br />

41<br />

Security<br />

Mechanisms<br />

Group Policy<br />

Object (GPO)<br />

Quality of<br />

Service (QoS)<br />

Preproduction<br />

Environment<br />

/Test<br />

Environment<br />

Configuration<br />

Management<br />

Database<br />

(CMDB)<br />

Mapping to<br />

ANWI<br />

service<br />

Possible<br />

integration<br />

with AD AIS<br />

SF/SD<br />

(10.5.6)<br />

Partially<br />

covered by<br />

LAN services<br />

Integration<br />

and test<br />

services<br />

SMC –<br />

Configuration<br />

Management<br />

Database<br />

Current<br />

product<br />

NS, NR: MS<br />

AD<br />

NS, NR: Infra<br />

Helpdesk<br />

(EMC); Altiris<br />

(Symantec)<br />

N A T O U N C L A S S I F I E D<br />

Current<br />

situation<br />

Partially<br />

Implemented<br />

because not<br />

100%<br />

coverage such<br />

as Mac, UNIX,<br />

etc<br />

NS, NR:<br />

partially<br />

implemented<br />

NS : not<br />

implemented<br />

NR: partially<br />

implemented<br />

(redesign in<br />

accordance<br />

with NR2 TA<br />

needed)<br />

Partiallyimple<br />

mented<br />

CAPTCHA Out of scope NS: N/A (not<br />

required)<br />

NR: partially<br />

implemented<br />

Current<br />

management<br />

Local<br />

management<br />

Local<br />

Security<br />

Risk level<br />

NS, NR:<br />

High<br />

NS, NR:<br />

Medium<br />

NS :<br />

Medium<br />

NR : high<br />

Local NS, NR :<br />

High<br />

NS: N/A<br />

NS, NR:<br />

low<br />

IFB-CO-13300-ANWI-AMD-2<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR :<br />

fullyimplemen<br />

ted<br />

NS, NR :<br />

fullyimplemen<br />

ted<br />

NS: N/A<br />

NR: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Possible<br />

integration with<br />

SF/SD – see SM<br />

13<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-162 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

42<br />

SM<br />

43<br />

SM<br />

44<br />

Security<br />

Mechanisms<br />

Identity &<br />

Access<br />

Management<br />

(IAM)<br />

Management<br />

of the Security<br />

Mechanisms<br />

Network Time<br />

Protocol<br />

(NTP)<br />

Mapping to<br />

ANWI<br />

service<br />

Part of SMC<br />

(SM017-22) –<br />

partially<br />

covered;<br />

Where<br />

possible<br />

centralized<br />

capabilities at<br />

NCIA and<br />

NCIRC to be<br />

reused<br />

NTP –<br />

integration,<br />

time server<br />

for NR and<br />

EAPC<br />

Current<br />

product<br />

Current<br />

situation<br />

NS: partially<br />

implemented<br />

NR: partially<br />

implemented<br />

(redesign<br />

needed)<br />

NS: Not yet<br />

implemented<br />

NR: partially<br />

implemented<br />

(needs to be<br />

redesigned)<br />

NS, NR: Fully<br />

implemented;<br />

NATO-wide<br />

provided<br />

Current<br />

management<br />

Local<br />

management<br />

N/A<br />

Local<br />

management<br />

–<br />

synchronizatio<br />

n with time<br />

source at<br />

NCIA<br />

Security<br />

Risk level<br />

NR: high<br />

NS, NR:<br />

High<br />

Ns, NR:<br />

High<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR:<br />

partially<br />

implemented<br />

NS, NR: Fully<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

Application<br />

authentication –<br />

out of scope of<br />

ANWI, re-used<br />

from NR2<br />

synchronization<br />

with time source at<br />

NCIA<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-163 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

45<br />

SM<br />

46<br />

SM<br />

47<br />

Security<br />

Mechanisms<br />

Logical Unit<br />

Number<br />

(LUN)<br />

Management<br />

for Storage<br />

Area Network<br />

(SAN)<br />

Data Activity<br />

Monitoring<br />

(DAM) using<br />

the Data<br />

Scramble<br />

mechanism<br />

Data Activity<br />

Monitoring<br />

(DAM) and<br />

File Server<br />

Activity<br />

Monitoring<br />

(FSAM) using<br />

the Data<br />

Safeguarding<br />

mechanism<br />

Mapping to<br />

ANWI<br />

service<br />

Out of scope<br />

Out of scope<br />

Out of scope<br />

Current<br />

product<br />

NS, NR: HP<br />

EVA 8100<br />

family<br />

Current<br />

situation<br />

NS: Partially<br />

Implemented<br />

because<br />

configuration<br />

of LUNs may<br />

need some<br />

changes<br />

NR: fully<br />

implemented<br />

NS, NR: Not<br />

yet<br />

implemented<br />

NS, NR: Not<br />

yet<br />

implemented<br />

Current<br />

management<br />

Local<br />

management<br />

Security<br />

Risk level<br />

NS, NR:<br />

High<br />

NS, NR:<br />

Low<br />

NS, NR:<br />

High<br />

Expected<br />

NR2 end<br />

state<br />

NS, NR: fully<br />

implemented<br />

NR: will be<br />

implemented<br />

if required by<br />

business<br />

NS: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-164 of 532


N A T O U N C L A S S I F I E D<br />

IFB-CO-13300-ANWI-AMD-2<br />

SM<br />

ID<br />

SM<br />

48<br />

SM<br />

49<br />

Security<br />

Mechanisms<br />

Password<br />

Management<br />

Identity &<br />

Authentication<br />

, Access<br />

Control<br />

(IAAC)<br />

Mapping to<br />

ANWI<br />

service<br />

Tools<br />

implemented<br />

in OS – no<br />

extra tools<br />

will be<br />

provided by<br />

ANWI<br />

Partially<br />

covered:<br />

Infrastructure<br />

Services<br />

(based on<br />

MS Active<br />

Directory/NP<br />

KI).<br />

Current<br />

product<br />

NS, NR:<br />

Password<br />

Policy<br />

Enforcer<br />

(PPE);<br />

NS: Thycotic<br />

SECRET<br />

Server (for<br />

password<br />

protection)<br />

Current<br />

situation<br />

NS: Partially<br />

Implemented -<br />

covers only<br />

Active<br />

Directory<br />

NS, NR: Not<br />

yet<br />

implemented<br />

Current<br />

management<br />

NS: Local<br />

management<br />

Security<br />

Risk level<br />

NS, NR:<br />

High<br />

NS: High<br />

NR:<br />

medium<br />

Expected<br />

NR2 end<br />

state<br />

NS: partially<br />

implemented<br />

NS: partially<br />

implemented<br />

Transition/<br />

migration / future<br />

management<br />

N A T O U N C L A S S I F I E D<br />

Book II Page IV-165 of 532