31.01.2015 Views

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

3.5.2. Project Meetings<br />

3.5.2.1. General<br />

3.5.2.1.1. Except as otherwise stated in the Contract, the following provisions shall apply to<br />

all meetings to be held under the Contract.<br />

3.5.2.1.2. The Contractor shall take meeting minutes, submit them in draft version to the<br />

Purchaser for approval within three (3) working days of the meeting, post the final<br />

version of them on the Project portal within three (3) working days of receipt of<br />

Purchaser approval, and notify the Purchaser by email.<br />

3.5.2.1.3. The participants shall not regard these minutes as a mechanism to change the<br />

terms, conditions or specifications of the Contract, or as a vehicle to alter the<br />

design or configuration of equipment or systems. Any such changes shall only be<br />

made by agreement, amendment or by authorised mechanisms, as set forth in the<br />

Contract.<br />

3.5.2.1.4. Any documentation, even in draft format, that may be useful to the Purchaser in<br />

preparing for meetings and ensuring efficient discussions during the meetings shall<br />

be provided to the Purchaser no later than ten (10) working days before the<br />

meeting.<br />

3.5.2.2. Design Review Meetings<br />

3.5.2.2.1. The Contractor shall host the Design Reviews.<br />

3.5.2.2.2. In addition to the scope and requirements for Design Reviews as described in<br />

SECTION 4: related to contract line number (CLIN) 1.4 of the schedule of<br />

supplies and services the Contractor shall provide the following, if applicable, at<br />

all Design Reviews:<br />

3.5.2.2.2.1 Changes to the PMS;<br />

3.5.2.2.2.2 Risk assessment of proposed changes, and an update of the Risk Log and Issue<br />

Logs.<br />

3.5.2.3. Project Review Meetings<br />

3.5.2.3.1. The Contractor shall coordinate and hold Project Review Meetings (PRM) with<br />

the Purchaser.<br />

3.5.2.3.2. The PRM shall be held at least once a month, throughout the Contract period of<br />

performance.<br />

3.5.2.3.3. One (1) week before each PRM, the Contractor shall provide a Project Status<br />

Report (PSR), in accordance with paragraph 3.5.1.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

21/104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!