31.01.2015 Views

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.3.3.2.2. a limited on-site spares holding, based on the outcome of the provisioning<br />

conference;<br />

5.3.3.3. As an Option to this Contract, the contractor may be obligated to enter into a<br />

Contractor Logistics Support agreement with the Purchaser or his representative<br />

after the 1-year warranty period. The following considerations apply:<br />

5.3.3.3.1. The CLS contract may be renewed inline with the options detailed in the<br />

Schedule of Supplies and Services (SSS).<br />

5.3.3.3.2. This support agreement is a full Contractor Logistics Support (CLS) Contract<br />

provided under a Firm Fixed Price.<br />

5.3.3.3.3. Prices shall remain valid during the period of validity.<br />

5.3.3.3.4. The price revisions are to be limited to the amounts reflected for each period in<br />

a governmentally approved inflationary index of the producing country.<br />

5.3.3.3.5. If the Option of CLS is exercised, the Contractor shall be responsible for the<br />

CLS for all deliverables furnished under this Contract and shall guarantee the<br />

provisions of such equipment replacement/repair services including Technical<br />

Assistance.<br />

5.3.3.4. CLS hardware support<br />

5.3.3.4.1. During the CLS-period (and any subsequent period of CLS, if exercised), the<br />

Contractor shall establish a Logistics Support Programme and be responsible<br />

for ensuring adequate provision of direct exchange Line Replacement Units<br />

(LRUs), in terms of both range and quantity, to maintain the reliability and<br />

availability requirements specified in this SOW.<br />

5.3.3.4.2. To this end the Contractor shall provide sufficient spares at the site and shall<br />

ensure a comprehensive range is available to replace any defective LRUs<br />

returned from the site.<br />

5.3.3.4.3. The Contractor shall be responsible for the provision of any alternative or<br />

superseding items should the original part be no longer available ensuring<br />

form, fit, and functional requirements.<br />

5.3.3.4.4. The Contractor shall be responsible to provide upon request the necessary<br />

failure and price data to permit Purchaser selection and separate procurement<br />

of spare parts to cover any requirements arising during tension, crisis, or other<br />

emergency.<br />

5.3.3.4.5. The Contractor shall repair or replace any item returned as unserviceable in<br />

accordance with current approved specifications and QA requirements.<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

39/104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!