31.01.2015 Views

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

37/104<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

5.3.1.10. As part of the support services provision, the Contractor shall create and<br />

maintain descriptions of all solutions (Quick solution, Work around, Patch,<br />

Baseline Release) to known issues in a COTS software database (“Known<br />

Error Database”). The Known Error Database shall link issues to solutions and<br />

corresponding documentation and expert POC.<br />

5.3.1.11. Third level maintenance and support of the CCTV HQ ISAF will be provided by<br />

the Contractor under a one (1) year CLS package as described below.<br />

5.3.1.12. Level 4 maintenance tasks shall include, but are not limited to: repair of faulty<br />

LRU(s) of the CCTV HQ ISAF beyond the capability of level 3 (usually under<br />

warranty), provisioning of replacement parts (usually under warranty),<br />

complicated factory adjustments, and provision of maintenance releases at the<br />

Contractor’s, Vendor’s or Manufacturer’s factory.<br />

5.3.1.13. Fourth level maintenance and support of the CCTV HQ ISAF will be provided by<br />

the Contractor, supported by the pertinent OEM-vendors, under a one (1) year<br />

CLS package as described below.<br />

5.3.1.14. The maintenance and support concept applies to both hardware and software.<br />

5.3.1.15. The maintenance and support concept shall be designed, and subsequently<br />

described in the ILSP, in such a way that the reliability, maintainability and<br />

availability (RMA) requirements specified below are achievable.<br />

5.3.2. Reliability, Maintainability and Availability (RMA) requirements<br />

5.3.2.1. Systems and equipment to be supplied under this Contract shall meet specified<br />

criteria for availability, reliability, and maintainability.<br />

5.3.2.2. Reliability, when expressed as Mean Time Between Critical Failures (MTBCF),<br />

shall be greater than four thousand (4,400) hours. In order to guarantee this<br />

reliability, the Contractor shall include sufficient redundancy in the design of the<br />

CCTV system. A critical failure is defined as any event that impairs the total<br />

camera coverage of the ISAF HQ CCTV system as a whole.<br />

5.3.2.3. Maintainability, when expressed as Mean Time To Replace/Repair (MTTR), shall<br />

be less than one (1) hour, with 95% of repairs not exceeding thirty (30) minutes.<br />

5.3.2.4. The Mean Time Between Corrective Maintenance Actions (MTBCMA) shall be<br />

greater than five hundred (500) hours.<br />

5.3.2.5. Operators shall have easy access to any system component in order to facilitate<br />

visual inspection, and so that any LRU replacement can be achieved within the<br />

specified time.<br />

5.3.2.6. Operational Availability (A 0 ), with respect to full camera coverage, shall be<br />

greater than 99.9%. Operational Availability (A 0 ) is defined as MTBF / (MTBF +