N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

system is designed as a stand alone network, it shall possess the capability within<br />

the technical control centre to interface with a standard IPv6 network to further<br />

centralize surveillance capability for future evolution of the CCTV network such<br />

as interconnection to archive data to an alternate location.<br />

4.6.2. During the Design Review, the Contractor shall cover the following topics:<br />

4.6.2.1. System Design, as presented in the System Design Documentation (SDD)<br />

package, including any change request or off-specification;<br />

4.6.2.2. Breakdown of the design into lowest-level CI;<br />

4.6.2.3. Recommended spare parts list (RSPL) and justification, provided as an availability<br />

analysis and assess the design in relation to RMA design as stated in section 5.3.2;<br />

4.6.2.4. List of off-the-shelf products to be used in the system: the Contractor shall identify<br />

the intended product and version, and note if any modifications, adaptations, or<br />

additional elements are required to meet the requirements set forth by the SRS. For<br />

any elements that require development, the Contractor shall describe the design,<br />

development, unit testing, and integration approach;<br />

4.6.2.5. Steps to mitigate any risks identified in the Risk Log;<br />

4.6.2.6. Draft Test Plan for FAT, PSA and Operational Test & Evaluation (OT&E).<br />

4.6.3. The duration of the review period of the CCTV HQ ISAF Design Documentation<br />

Package by the Purchaser shall be one (1) week, i.e. shall be finished within five<br />

(5) weeks of the EDC.<br />

4.6.4. A Critical Design Review (CDR) shall be conducted, if the changes requested after<br />

the first meeting require the Contractor to re-engineer the solution in any way at<br />

EDC +8 weeks.<br />

4.6.5. Purchaser review and acceptance of the SDD package shall not imply Purchaser<br />

acceptance of the CCTV HQ ISAF design. In particular:<br />

4.6.6. It remains the sole responsibility of the Contractor to prove the design through the<br />

regime of testing set forth in the Contract.<br />

4.6.7. It will be the sole responsibility of the Contractor in the event that the system<br />

proves deficient in meeting the Contractual requirements.<br />

4.6.8. As part of the Configuration Management (CM) activities, and like any other<br />

management product or specialist product, the Contractor shall update the SDD, in<br />

order to reflect changes, if any, at least at each of the following major milestones:<br />

4.6.8.1. Second Design Review, if required;<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

31/104