Municipal Corporation <strong>of</strong> Jalandhar (MCJ)<br />

an obvious misplacement <strong>of</strong> the decimal point in the unit rate,<br />

in which case the total price as quoted will govern and the unit<br />

rate will be corrected. If there is a discrepancy between the<br />

total bid amount and the sum <strong>of</strong> total costs per item, the sum <strong>of</strong><br />

the total costs per item shall prevail and the total bid amount<br />

will be corrected. If the bidder has <strong>of</strong>fered a discount<br />

expressed as a percentage <strong>of</strong> the quoted price, such discount<br />

will be applied to the corrected bid price.<br />

34.2 The amount stated in the Form <strong>of</strong> Bid for Price Proposal will<br />

be adjusted by the Employer in accordance with the above<br />

procedure for the correction <strong>of</strong> errors and shall be considered<br />

as binding upon bidder. If the bidder does not accept the<br />

corrected amount <strong>of</strong> bid, its bid will be rejected, and the bid<br />

security may be forfeited in accordance with sub-Clause<br />

17.6(b).<br />

35. Conversion to a Single<br />

Currency<br />

36. Evaluation and<br />

Comparison <strong>of</strong> Proposals<br />

35.1 Not Applicable – All the Bid Price shall be in Indian Rupees<br />

only.<br />

36.1 The Employer will evaluate and compare only the bids<br />

determined to be substantially responsive in accordance with<br />

Clause 33. The Financial Bids <strong>of</strong> the technically qualified<br />

bidders will be evaluated as per mentioned below.<br />

a. The Total Value <strong>of</strong> the Financial bid shall be arrived by the<br />

following method<br />

Total Value = Fixed Fee + maximum value <strong>of</strong> Out <strong>of</strong> Pocket<br />

expenses as given by bidder + any applicable taxes<br />

c. The list <strong>of</strong> Bidder will be ranked in ascending order (i.e.) Bidder<br />

quoting the lowest price in terms <strong>of</strong> Total value (L1) will be<br />

ranked first and so on.<br />

d. The L1 bidder will be awarded the contract.<br />

e. However, the MCJ does not bind itself to award the contract to<br />

the bidder(s) <strong>of</strong>fering the lowest price.<br />

36.2 The Employer reserves the right to accept or reject any<br />

variation, deviation and other factors which are in excess <strong>of</strong><br />

the requirements <strong>of</strong> the bidding documents or otherwise result<br />

in the accrual <strong>of</strong> unsolicited benefits to the Employer shall not<br />

be taken into account in bid evaluation.<br />

36.3 If the bid <strong>of</strong> the successful bidder is seriously unbalanced in<br />

relation to or substantially above the Engineer’s estimate <strong>of</strong><br />

the cost <strong>of</strong> work to be performed under the Contract, the<br />

Employer may require the bidder to produce detailed price<br />

analyses for any or all items <strong>of</strong> the Schedule <strong>of</strong> Prices, to<br />

demonstrate the internal consistency <strong>of</strong> those prices with the<br />

construction methods and schedule proposed.<br />

Section 1: Instructions to Bidders - 21 -