Municipal Corporation <strong>of</strong> Jalandhar (MCJ)<br />

51. Negotiations with the Successful Bidder<br />

MCJ reserves the right to further negotiate with the Successful Bidder. While negotiating,<br />

the following aspects may be considered:<br />

1 Further reduction in consultancy charges for undertaking the Work – justifications for<br />

charges may be questioned and negotiated.<br />

2 Advancing the delivery schedule<br />

3 Additional services<br />

4 Phasing <strong>of</strong> the Payment Schedule based on actual work load<br />

52. Outline <strong>of</strong> Tasks to be carried out and Deliverables.<br />

Any work, as and when required for smooth and timely execution <strong>of</strong> the project<br />

may be supported by the SCADA Consultant. MCJ shall make all possible efforts<br />

to provide support and help to the extent possible; however the final<br />

responsibility <strong>of</strong> the same shall rest with the consultants.<br />

1. As is study: Consultant shall carry out a “As is” assessment <strong>of</strong> the tubewells<br />

and waste <strong>water</strong> disposal systems in operation within MCJ area s for preparing<br />

A Detailed Project Report f o r t he SCADA system. The scope <strong>of</strong> “ As is”<br />

study should cover the following:<br />

A. Collection <strong>of</strong> data pertaining to Tubewells & Waste <strong>water</strong> disposal<br />

systems, focusing on Electrical equipment i.e. starters/control<br />

panel/ distribution network and identification <strong>of</strong> adaptation requirements<br />

etc. for the project after field survey <strong>of</strong> the town/city.<br />

B. Identification <strong>of</strong> MCJ requirements based on techno-commercial approach<br />

with the reliability & cost benefit analysis.<br />

C. Study <strong>of</strong> IT system/Telemetry/communication medium being established<br />

for ensuring integration with proposed SCADA.<br />

D. Prepare a roadmap for automation <strong>of</strong> tubewells & waste <strong>water</strong> disposals <strong>of</strong><br />

the project area to utilize the full potential <strong>of</strong> SCADA project after field<br />

survey <strong>of</strong> the tubewells & waste <strong>water</strong> disposals network <strong>of</strong> the town / city<br />

and identification <strong>of</strong> the missing infrastructure.<br />

2. DPR preparation: The Consultant shall assist MCJ in preparation <strong>of</strong> DPR<br />

for the design and implementation <strong>of</strong> the project. The design shall include<br />

remote site connectivity details, existing system details and connectivity to<br />

SCADA, required instrumentation and SCADA and Specifications for electromechanical,<br />

instrumentation & automation works for SCADA.<br />

3. Preparation <strong>of</strong> detailed RFP: Consultant shall be responsible for framing<br />

the model RFP in line with „As-is study & specific project<br />

Section 1: Instructions to Bidders - 27 -