07.02.2015 Views

municipal corporation of jalandhar (mcj) water supply division ...

municipal corporation of jalandhar (mcj) water supply division ...

municipal corporation of jalandhar (mcj) water supply division ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Municipal Corporation <strong>of</strong> Jalandhar (MCJ)<br />

Section III:<br />

TERMS OF REFERENCE FOR CONSULTANTS<br />

PURPOSE<br />

The prime objective <strong>of</strong> this Consulting Services is to design and manage implementation <strong>of</strong> a<br />

techno-economical feasible solution for Integration <strong>of</strong> tube wells and waste <strong>water</strong> disposal in<br />

Jalandhar city using SCADA /Telemetry.<br />

Specific Scope <strong>of</strong> Consulting Services includes but not limited to:<br />

(a) Prepare master plan for linking tube wells within Jalandhar city to a centralized<br />

SCADA monitoring station to be set up at <strong>corporation</strong> premises<br />

(b) Prepare master plan for linking <strong>water</strong>, waste <strong>water</strong> treatment facilities within<br />

Jalandhar city to the centralized SCADA monitoring station<br />

(c) Detailed out the systems proposed under (a) and (b) along with alternate cost<br />

models, and finalize them (in consultation with MCJ) using efficient operational<br />

system requirements, cost effectiveness and budget limitations <strong>of</strong> MCJ<br />

(d) Prepare tender/RFP documents for Vendor Selection; assist the MCJ in the<br />

evaluation <strong>of</strong> bids and award <strong>of</strong> contract.<br />

(e) Monitor and Supervise implementation <strong>of</strong> the contract.<br />

(f) Prepare an institution development program focusing on business process<br />

reengineering, restructuring/realignment and assist in delivering <strong>of</strong> required<br />

trainings etc. so as to smooth take-over <strong>of</strong> the systems by MCJ<br />

DETAILED SCOPE OF CONSULTING SERVICES<br />

1) Prepare a Detailed Inception Report<br />

Prior to undertaking any engineering work the Consultants shall prepare an inception report<br />

for the project. This inception report shall be prepared upon review (“AS IS” Study) <strong>of</strong><br />

existing <strong>water</strong> <strong>supply</strong>/ tube wells within the MCJ area, Consultant’s approach and<br />

methodology in completing the project along with project delivery schedule.<br />

2) Selection <strong>of</strong> Telemetry/communication medium<br />

In consultation with the MCJ staff, the Consultant shall assess availability <strong>of</strong> sites within MCJ<br />

area for the selection <strong>of</strong> site for Central SCADA location as well as telemetry/communication<br />

medium for data transfer from remote sites to the central location. The primary focus in<br />

selecting the telemetry medium shall include but not limited to: techno-economical feasibility,<br />

life time cost analysis, availability <strong>of</strong> telecommunication infrastructure, budgetary constraints<br />

<strong>of</strong> MCJ etc.<br />

Section 1: Instructions to Bidders - 29 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!