4.3 Lafourche Delta Barrier Isl<strong>and</strong>s (Timbalier Isl<strong>and</strong> to Gr<strong>and</strong> Isle)<br />

The Lafourche Delta Barrier Isl<strong>and</strong>s have benefitted from a number of <strong>barrier</strong> <strong>isl<strong>and</strong></strong> restoration<br />

projects, most recently the East Gr<strong>and</strong> Terre Isl<strong>and</strong> <strong>Restoration</strong> project (BA-30) that was<br />

completed through CIAP (Figure 27 <strong>and</strong> Table 4). In total, five projects have been constructed<br />

in this region <strong>and</strong> several others are planned.<br />

Figure 27. Location of <strong>barrier</strong> <strong>isl<strong>and</strong></strong> restoration projects in Lafourche Delta Barrier System<br />

(CEC, 2012).<br />

Table 4. List of projects constructed, funded for construction, <strong>and</strong> for future implementation in<br />

the Lafourche Delta Barrier System.<br />

Funding<br />

Program<br />

Construction<br />

Date<br />

Barrier Shoreline <strong>Restoration</strong> Projects<br />

Lafourche Barrier System<br />

Constructed Projects<br />

Timbalier Isl<strong>and</strong> Planting Demonstration (TE-18) CWPPRA 1996<br />

Timbalier Isl<strong>and</strong> Dune <strong>and</strong> Marsh Creation (TE-40) CWPPRA 2004<br />

East Timbalier Isl<strong>and</strong> Sediment <strong>Restoration</strong>, Phase 1 (TE-25) CWPPRA 2000<br />

East Timbalier Isl<strong>and</strong> Sediment <strong>Restoration</strong>, Phase 2 (TE-30) CWPPRA 2000<br />

West Belle Pass Barrier Headl<strong>and</strong> <strong>Restoration</strong> (TE-52) CWPPRA 2012<br />

Bayside Segmented Breakwaters at Gr<strong>and</strong> Isle (BA-50) CIAP 2012<br />

Funded for Construction<br />

Caminada Headl<strong>and</strong> Beach <strong>and</strong> Dune <strong>Restoration</strong> (BA-45) (under construction)<br />

Future Projects<br />

Barataria Basin Barrier Shoreline (BBBS) <strong>Restoration</strong> (BA-10)<br />

Eastern portion of Caminada<br />

NRDA (proposed) Caminada Headl<strong>and</strong> Beach <strong>and</strong> Dune <strong>Restoration</strong>, increment 2<br />

(BA-143) (under design)<br />

CIAP/<br />

Surplus 2014<br />

LCA<br />