linear feet of berm on Shell Isl<strong>and</strong> started on October 9, 2010 <strong>and</strong> was completed by<br />

November 23, 2010. Approximately 777,000 cubic yards of s<strong>and</strong> was placed along the<br />

<strong>isl<strong>and</strong></strong>.<br />

b. Berm Reach W9 (Pelican Isl<strong>and</strong>): Construction of berm reach W9 along Pelican Isl<strong>and</strong><br />

started on July 18, 2010 <strong>and</strong> was completed by October 2, 2010. S<strong>and</strong> was placed within<br />

the construction template, which was identical to the template used for the other berm<br />

reaches. The template was superimposed on the existing <strong>isl<strong>and</strong></strong> <strong>and</strong> within the footprint of<br />

the proposed <strong>Coastal</strong> Wetl<strong>and</strong>s Planning, <strong>Protection</strong>, <strong>and</strong> <strong>Restoration</strong> Act (CWPPRA)<br />

Pelican Isl<strong>and</strong> <strong>Restoration</strong> Project (BA-38-1). A total length of 12,700 feet of berm was<br />

constructed <strong>and</strong> approximately 1,294,000 cubic yards of s<strong>and</strong> was emplaced within the<br />

berm along Pelican Isl<strong>and</strong>.<br />

c. Berm Reach W10 (Scofield Isl<strong>and</strong>): Construction of berm reach W10 on Scofield Isl<strong>and</strong><br />

started on September 13, 2010. Approximately 935,000 cubic yards of s<strong>and</strong> was placed<br />

between September 13 <strong>and</strong> November 23, 2010 for constructing approximately 14,755<br />

feet of berm. The construction template for berm reach W10 was identical to the other<br />

berm reaches. The berm was constructed within the footprint of the proposed CWPPRA<br />

Scofield Isl<strong>and</strong> <strong>Restoration</strong> Project (BA-40).<br />

2.3.2 Projects under Construction<br />

1. Riverine S<strong>and</strong> Mining/Scofield Isl<strong>and</strong> <strong>Restoration</strong> (BA-40; Berm Funds; 2013) – The goals<br />

of this project are to mitigate breaches <strong>and</strong> tidal inlets in the shoreline, reinforce the existing<br />

shoreline with s<strong>and</strong>, increase the width of the <strong>isl<strong>and</strong></strong> with back <strong>barrier</strong> marsh to increase<br />

<strong>isl<strong>and</strong></strong> longevity, <strong>and</strong> re-establish a s<strong>and</strong>y dune along the length of the shoreline to protect the<br />

back <strong>barrier</strong> marsh platform from sea level rise <strong>and</strong> storm damage. The beach-dune habitats<br />

are constructed by the s<strong>and</strong> dredged from a borrow area in the Lower Mississippi River via<br />

22 mile long pipeline <strong>and</strong> the marsh platform from offshore borrow source of mixed<br />

sediment. Although this project was designed under CWPPRA, construction began in<br />

December 2012 using Berm to Barrier Funds. This will create approximately 11,400 foot<br />

long beach <strong>and</strong> dune fill to close the breach areas <strong>and</strong> restore/protect the erosive beach. The<br />

dune component includes a 50 foot wide crest width at +6 feet NAVD88. The beach fill<br />

template includes a 100 foot wide construction berm at +4 feet NAVD88. The surface area of<br />

the proposed beach platform is approximately 223 acres measured at +4 feet NAVD88. The<br />

required fill volume is approximately 2.03 MCY (required excavation volume is<br />

approximately 2.64 MCY). An approximately 11,800 foot long marsh platform on the bay<br />

side of Scofield Isl<strong>and</strong> was constructed. The surface area of the proposed marsh platform is<br />

approximately 375 acres with target marsh platform elevation of +3.0 feet NAVD88. The<br />

required fill volume is approximately 1.74 MCY (the required excavation volume is<br />

approximately 2.79 MCY). It may be noted that Emergency Berm W-10 was built in front of<br />

this <strong>isl<strong>and</strong></strong> using about 0.964 MCY of s<strong>and</strong>.<br />

2. Shell Isl<strong>and</strong> <strong>Restoration</strong> – Shell Isl<strong>and</strong> is a critical component of the Barataria shoreline<br />

which has been breached into two <strong>isl<strong>and</strong></strong>s – east <strong>and</strong> west. <strong>Restoration</strong> of these two <strong>isl<strong>and</strong></strong>s<br />

was initially included in LCA BBBS Project. The Shell Isl<strong>and</strong> <strong>Restoration</strong> project would<br />