2.2.3 Future Projects<br />

1. NRDA Caminada Headl<strong>and</strong> Beach <strong>and</strong> Dune <strong>Restoration</strong> Increment 2 (BA-143, NRDA) –<br />

Project design for the proposed NRDA component of the Caminada Headl<strong>and</strong> Beach <strong>and</strong><br />

Dune <strong>Restoration</strong> Project is expected to be completed by early 2013. The design includes<br />

4.27 MCY of s<strong>and</strong> from the same borrow area in the South Pelto Block as BA-45 (above), to<br />

construct a 7 foot high dune with a 290 foot width along with a 4.5 foot high <strong>and</strong> 65 foot<br />

wide beach over a project length of 8.9 miles. It is expected to create a surface area of about<br />

532 acres.<br />

2.3 Modern Delta System (Chenier Ronquille to Scofield Isl<strong>and</strong>)<br />

2.3.1 Constructed Projects<br />

1. Vegetative Plantings of a Dredged Material Disposal Site on Gr<strong>and</strong> Terre Isl<strong>and</strong> (BA-28;<br />

CWPPRA; 2001) – The goal of this project is to stabilize dredged material sites on West<br />

Gr<strong>and</strong> Terre Isl<strong>and</strong>. This objective was achieved through vegetation plantings <strong>and</strong> by<br />

purchasing grazing rights on the <strong>isl<strong>and</strong></strong> for the 20-year life of the project.<br />

2. East Gr<strong>and</strong> Terre Isl<strong>and</strong> <strong>Restoration</strong> (BA-30; CIAP; 2010) – The goal of this project is to<br />

stabilize <strong>and</strong> benefit 1,575 acres of <strong>barrier</strong> <strong>isl<strong>and</strong></strong> habitat <strong>and</strong> extend the <strong>isl<strong>and</strong></strong>'s life<br />

expectancy by filling breaches <strong>and</strong> tidal inlets in the shoreline, <strong>and</strong> reinforce the existing<br />

shoreline with s<strong>and</strong>. For this about 621 acres of <strong>barrier</strong> <strong>isl<strong>and</strong></strong> were created by restoring 2.8<br />

miles of <strong>barrier</strong> shoreline through construction of a 6 foot high dune along with 165 acres of<br />

beach habitat <strong>and</strong> construction of about 456 acre marsh platform using about 3 MCY of s<strong>and</strong><br />

<strong>and</strong> 1.6 MCY of mixed sediment from two offshore borrow areas. Although CPRA<br />

constructed this projects using CIAP 2007 funds, this project was engineered, designed,<br />

permitted, <strong>and</strong> received the necessary l<strong>and</strong> rights for construction, through the CWPPRA<br />

program, in partnership with the NOAA Fisheries.<br />

3. Barataria Barrier Isl<strong>and</strong> Complex Project: Pelican Isl<strong>and</strong> <strong>and</strong> Pass La Mer to Chal<strong>and</strong> Pass<br />

<strong>Restoration</strong> (BA-38; CWPPRA; 2007, 2012) – The objectives of this project were to create<br />

<strong>barrier</strong> <strong>isl<strong>and</strong></strong> habitat, enhance storm-related surge <strong>and</strong> wave protection, prevent overtopping<br />

during storms, <strong>and</strong> increase the volume of s<strong>and</strong> within the active <strong>barrier</strong> system. This project<br />

includes restoration of two <strong>barrier</strong> <strong>isl<strong>and</strong></strong>s, viz. the Chal<strong>and</strong> Headl<strong>and</strong> portion of this project<br />

which was constructed in 2007 <strong>and</strong> construction of the Pelican Isl<strong>and</strong> segment which began<br />

in May 2011<strong>and</strong> completed in 2012. Additionally in June 2010, the State began construction<br />

of a <strong>barrier</strong> berm in response to the Deepwater Horizon oil spill from Shell Isl<strong>and</strong> to Scofield<br />

Isl<strong>and</strong> west of the river to safeguard its coast from the effects of the oil. The construction of<br />

the berm introduced a significant amount of s<strong>and</strong> into the <strong>barrier</strong> <strong>isl<strong>and</strong></strong> system.<br />

<br />

Pass La Mer to Chal<strong>and</strong> Pass <strong>Restoration</strong> (BA-38-1; CWPPRA; 2007) – A total<br />

fill area of 484 acres was created which included about 254 acres of back <strong>barrier</strong><br />

marsh platform with an average elevation of 2.5 feet. Marsh platform was<br />

constructed using about 1.0 MCY of overburden mixed sediment from an offshore<br />

borrow area. About 2.4 MCY of s<strong>and</strong> was placed to build about 230 acres of<br />

6 | P a g e