25.02.2015 Views

Annual report 2008 - Aker Solutions

Annual report 2008 - Aker Solutions

Annual report 2008 - Aker Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Our business<br />

Energy Development &Services<br />

Positioned for the future<br />

The Energy Development &Services (ED&S) business area<br />

develops new oil and gas production facilities, both offshore and<br />

onshore, and delivers operational services for the entire lifecycle of<br />

such facilities.<br />

Highlights <strong>2008</strong><br />

Successful delivery of the<br />

world’s first offshore receiving<br />

and regasification terminal for<br />

liquefied natural gas -the<br />

Adriatic LNG project<br />

Construction of the world’s<br />

most advanced semisubmersible<br />

drilling rigs, the<br />

<strong>Aker</strong> Spitsbergen and <strong>Aker</strong><br />

Barents of <strong>Aker</strong> H-6e design<br />

Long-term repeat business for<br />

maintenance and modifications<br />

work in the North Sea<br />

Front-end engineering and<br />

design (FEED) contract for<br />

substantial work on the Greater<br />

Ekofisk Area, one of the major<br />

upcoming redevelopments on<br />

the Norwegian Continental Shelf<br />

Contract award injoint venture<br />

with partners WorleyParsons<br />

and Chicago Bridge &Iron<br />

(CB&I) for full field development<br />

FEED for the Kashagan<br />

development<br />

Merger of two business areas to<br />

create Energy Development &<br />

Services, apowerful, focused<br />

engineering and technology,<br />

fabrication and installation force<br />

with aflexible cost base<br />

Development EBITDA<br />

NOK million<br />

1500<br />

Proven track record<br />

With experience from more than 20 percent<br />

of the oil and gas related floater designs in<br />

the world, few if any contractors can match<br />

our wide portfolio of solutions and services<br />

across segments including floaters,<br />

concrete and arctic technologies. We have<br />

50 percent of our home market on the<br />

Norwegian Continental Shelf in both new<br />

build developments and maintenance and<br />

modifications services. Within the maintenance<br />

and modifications arena, <strong>Aker</strong><br />

<strong>Solutions</strong> is the only major contractor that<br />

has apresence in both the Norwegian and<br />

the UK markets.<br />

Over the years we have achieved a<br />

strong position in the northern Caspian<br />

region, most recently through our work on<br />

phase one of the giant Kashagan field offshore<br />

Kazakhstan.<br />

We are well positioned for upcoming<br />

field developments in the Arctic region,<br />

including projects like the concrete gravity<br />

base structure for Sakhalin Ionthe east<br />

coast of Russia; the large gas field development,<br />

Shtokman, in the Barents Sea; and<br />

for developments in the deepwater region<br />

of the Gulf of Mexico.<br />

Close toour customers<br />

The business area maintains astrong base<br />

in Norway. Three main engineering and<br />

management centres are located in Oslo,<br />

Stavanger and Bergen, while smaller<br />

offices are kept close to our key customers’<br />

operational centres. Three fully-owned<br />

construction yards on the coast of Norway,<br />

in Egersund, Stord and Verdal, are strategically<br />

located on the doorstep of the<br />

North Sea market.<br />

Internationally, wehave afull fledged<br />

service base in Aberdeen in the UK and<br />

have established local offices in Attyrau<br />

and Aktau in Kazhakstan. Remaining close<br />

to our customers we also have engineering<br />

offices in Houston in the US, Perth in<br />

Australia, St. Johns in Canada, Kuala<br />

Lumpur in Malaysia and Pori in Finland.<br />

The power to deliver<br />

ED&S had an annual revenue of NOK<br />

22 684 million and 8 542 employees at<br />

year end <strong>2008</strong>. This powerful resource<br />

includes 4000 engineers as well as avast<br />

pool of 3600 skilled operators. In <strong>2008</strong> we<br />

also engaged an average of approximately<br />

4000 contract staff.<br />

Our three construction yards operate<br />

individually as centres of excellence for<br />

different construction tasks and, when<br />

combined with our engineering and<br />

management resources, are astrong EPC<br />

turnkey supplier for small and large<br />

projects.<br />

Changing with our customers<br />

In March <strong>2008</strong>, <strong>Aker</strong> <strong>Solutions</strong> decided<br />

to combine the strengths and streamline<br />

the operations of the previous business<br />

areas Maintenance, Modifications and<br />

Operations (MMO) and Field Development<br />

(FD). The new business area, ED&S,<br />

became operational on 1September <strong>2008</strong>.<br />

Our large international organisation<br />

of skilled engineers, proven project<br />

managers and experienced operators<br />

is recognised for its ability to see<br />

opportunities, for adding value to customer<br />

businesses and for its predictable<br />

deliveries. The new organisation is tailored<br />

1200<br />

900<br />

600<br />

Key figures ED&S <strong>2008</strong> 2007 2006<br />

300<br />

0<br />

-300<br />

-600<br />

2006<br />

2007<br />

<strong>2008</strong><br />

Operating revenue NOK mill 22 684 24 921 24 594<br />

EBITDA NOK mill -475 1391 1244<br />

EBITDA margin Percent -2.1 5.6 5.1<br />

Order intake NOK mill 16 681 19 792 24 717<br />

Order backlog 31.12 NOK mill 18 315 24 317 29 764<br />

Number of employees 31.12 Man years 8542 8163 8493<br />

<strong>Aker</strong> <strong>Solutions</strong> annual <strong>report</strong> <strong>2008</strong> 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!