Our business<br />
Energy Development &Services<br />
Positioned for the future<br />
The Energy Development &Services (ED&S) business area<br />
develops new oil and gas production facilities, both offshore and<br />
onshore, and delivers operational services for the entire lifecycle of<br />
such facilities.<br />
Highlights <strong>2008</strong><br />
Successful delivery of the<br />
world’s first offshore receiving<br />
and regasification terminal for<br />
liquefied natural gas -the<br />
Adriatic LNG project<br />
Construction of the world’s<br />
most advanced semisubmersible<br />
drilling rigs, the<br />
<strong>Aker</strong> Spitsbergen and <strong>Aker</strong><br />
Barents of <strong>Aker</strong> H-6e design<br />
Long-term repeat business for<br />
maintenance and modifications<br />
work in the North Sea<br />
Front-end engineering and<br />
design (FEED) contract for<br />
substantial work on the Greater<br />
Ekofisk Area, one of the major<br />
upcoming redevelopments on<br />
the Norwegian Continental Shelf<br />
Contract award injoint venture<br />
with partners WorleyParsons<br />
and Chicago Bridge &Iron<br />
(CB&I) for full field development<br />
FEED for the Kashagan<br />
development<br />
Merger of two business areas to<br />
create Energy Development &<br />
Services, apowerful, focused<br />
engineering and technology,<br />
fabrication and installation force<br />
with aflexible cost base<br />
Development EBITDA<br />
NOK million<br />
1500<br />
Proven track record<br />
With experience from more than 20 percent<br />
of the oil and gas related floater designs in<br />
the world, few if any contractors can match<br />
our wide portfolio of solutions and services<br />
across segments including floaters,<br />
concrete and arctic technologies. We have<br />
50 percent of our home market on the<br />
Norwegian Continental Shelf in both new<br />
build developments and maintenance and<br />
modifications services. Within the maintenance<br />
and modifications arena, <strong>Aker</strong><br />
<strong>Solutions</strong> is the only major contractor that<br />
has apresence in both the Norwegian and<br />
the UK markets.<br />
Over the years we have achieved a<br />
strong position in the northern Caspian<br />
region, most recently through our work on<br />
phase one of the giant Kashagan field offshore<br />
Kazakhstan.<br />
We are well positioned for upcoming<br />
field developments in the Arctic region,<br />
including projects like the concrete gravity<br />
base structure for Sakhalin Ionthe east<br />
coast of Russia; the large gas field development,<br />
Shtokman, in the Barents Sea; and<br />
for developments in the deepwater region<br />
of the Gulf of Mexico.<br />
Close toour customers<br />
The business area maintains astrong base<br />
in Norway. Three main engineering and<br />
management centres are located in Oslo,<br />
Stavanger and Bergen, while smaller<br />
offices are kept close to our key customers’<br />
operational centres. Three fully-owned<br />
construction yards on the coast of Norway,<br />
in Egersund, Stord and Verdal, are strategically<br />
located on the doorstep of the<br />
North Sea market.<br />
Internationally, wehave afull fledged<br />
service base in Aberdeen in the UK and<br />
have established local offices in Attyrau<br />
and Aktau in Kazhakstan. Remaining close<br />
to our customers we also have engineering<br />
offices in Houston in the US, Perth in<br />
Australia, St. Johns in Canada, Kuala<br />
Lumpur in Malaysia and Pori in Finland.<br />
The power to deliver<br />
ED&S had an annual revenue of NOK<br />
22 684 million and 8 542 employees at<br />
year end <strong>2008</strong>. This powerful resource<br />
includes 4000 engineers as well as avast<br />
pool of 3600 skilled operators. In <strong>2008</strong> we<br />
also engaged an average of approximately<br />
4000 contract staff.<br />
Our three construction yards operate<br />
individually as centres of excellence for<br />
different construction tasks and, when<br />
combined with our engineering and<br />
management resources, are astrong EPC<br />
turnkey supplier for small and large<br />
projects.<br />
Changing with our customers<br />
In March <strong>2008</strong>, <strong>Aker</strong> <strong>Solutions</strong> decided<br />
to combine the strengths and streamline<br />
the operations of the previous business<br />
areas Maintenance, Modifications and<br />
Operations (MMO) and Field Development<br />
(FD). The new business area, ED&S,<br />
became operational on 1September <strong>2008</strong>.<br />
Our large international organisation<br />
of skilled engineers, proven project<br />
managers and experienced operators<br />
is recognised for its ability to see<br />
opportunities, for adding value to customer<br />
businesses and for its predictable<br />
deliveries. The new organisation is tailored<br />
1200<br />
900<br />
600<br />
Key figures ED&S <strong>2008</strong> 2007 2006<br />
300<br />
0<br />
-300<br />
-600<br />
2006<br />
2007<br />
<strong>2008</strong><br />
Operating revenue NOK mill 22 684 24 921 24 594<br />
EBITDA NOK mill -475 1391 1244<br />
EBITDA margin Percent -2.1 5.6 5.1<br />
Order intake NOK mill 16 681 19 792 24 717<br />
Order backlog 31.12 NOK mill 18 315 24 317 29 764<br />
Number of employees 31.12 Man years 8542 8163 8493<br />
<strong>Aker</strong> <strong>Solutions</strong> annual <strong>report</strong> <strong>2008</strong> 19