Our business<br />
Energy Development &Services<br />
“We are well positioned for the<br />
major developments in our target<br />
markets”<br />
ments in ever deeper waters and harsher<br />
environments. US Geological Survey anticipates<br />
that up to 25 percent of the world’s<br />
unproven reserves are tobefound in the<br />
Arctic and surrounding regions. For us this<br />
represents agreat opportunity, since field<br />
developments for arctic conditions,<br />
environmentally sensitive areas and deep<br />
waters are our core competence.<br />
New achievements and repeat<br />
business<br />
Our construction of the world’s most<br />
advanced semisubmersible drilling rigs,<br />
the <strong>Aker</strong> Spitsbergen and <strong>Aker</strong> Barents,<br />
and the construction and installation of the<br />
world’s first offshore terminal for the<br />
receiving and regasification of liquefied<br />
natural gas, stand out in <strong>2008</strong>. Both<br />
projects rank as international milestones.<br />
In September, ConocoPhillips awarded<br />
us a front-end engineering and design<br />
(FEED) contract covering the first three<br />
phases of asignificant part of the Greater<br />
Ekofisk Area, including FEED work for two<br />
platform topsides, three jackets, bridges<br />
and substructures.<br />
In the Caspian region we hold astrong<br />
position in the ongoing phase one development<br />
of the giant Kashagan field offshore<br />
Kazakhstan. During <strong>2008</strong> we delivered four<br />
topsides and utility modules from our own<br />
yards. We also mobilised for alarger role in<br />
the hook-up phase of the field modules,<br />
employing more than 1400 people on the<br />
project by the end of <strong>2008</strong>.<br />
In joint venture with CB&I and Worley-<br />
Parsons, we received aletter of intent from<br />
Agip KCO in October, followed by a<br />
contract award in December for FEED<br />
services for phase two of the full-field<br />
development of the Kashagan field. The<br />
scope of work includes both onshore and<br />
offshore facilities and pipelines. It also<br />
includes options for further involvement in<br />
following phases as well as neighbouring<br />
field developments.<br />
The maintenance and modifications<br />
market has along term, steady level of<br />
investment in order to maintain safe and<br />
efficient operations, increase recovery<br />
rates and ensure compliance with local<br />
regulations. Activity within this market has<br />
been high in <strong>2008</strong> with significant repeat,<br />
long term business. Our maintenance and<br />
modifications contract at Tampen covers<br />
nine platforms and employs 500 engineers.<br />
StatoilHydro released two options under<br />
this contract to <strong>Aker</strong> <strong>Solutions</strong> in July <strong>2008</strong>.<br />
In December <strong>2008</strong>, an option under the<br />
Statfjord Late Life project was exercised,<br />
extending work on the Statfjord Band C<br />
topsides to 2011.<br />
Goals and objectives for 2009<br />
Our main emphasis is on growing the business<br />
by maintaining our North Sea market<br />
share, expanding in the international<br />
market and strengthening our technology<br />
base. We will secure our share ofthe:<br />
growing gas market<br />
field life extensions for North Sea<br />
facilities<br />
emerging floating LNG market<br />
growing deepwater market<br />
emerging opportunities in arctic areas<br />
stable North Sea development market<br />
expanding northern Caspian Sea<br />
activities<br />
sustainable shallow water business<br />
in South East Asia<br />
Strong fundamentals<br />
Due tothe global financial crisis evolving<br />
in <strong>2008</strong>, weexpect to see some delays in<br />
awarding new build projects in 2009. However,<br />
the long term outlook for strategic<br />
new build activities is still promising and<br />
we are well positioned for the major<br />
developments in all our target markets. We<br />
expect continued high demand for maintenance<br />
and modifications services in 2009.<br />
Gjøa –anFPS with environmental<br />
focus. Our unique floating platform<br />
expertise ispart ofthe basis for our<br />
delivery of the Gjøa platform to<br />
StatoilHydro in 2010. Gjøa will be the<br />
second field off Norway tobe<br />
powered by hydroelectric power<br />
transmitted via cable from land. This<br />
will reduce carbon emissions.<br />
Developing the Kashagan field.<br />
We are playing asignificant part in<br />
developing one of the world’s largest<br />
oil fields, the Kashagan field inthe<br />
Caspian Sea. In this demanding field<br />
development wedemonstrate our<br />
competitive strength inoffshore technology<br />
inenvironmentally sensitive<br />
areas and for harsh climatic<br />
conditions.<br />
<strong>Aker</strong> <strong>Solutions</strong> annual <strong>report</strong> <strong>2008</strong> 21