Our business<br />

Energy Development &Services<br />

“We are well positioned for the<br />

major developments in our target<br />

markets”<br />

ments in ever deeper waters and harsher<br />

environments. US Geological Survey anticipates<br />

that up to 25 percent of the world’s<br />

unproven reserves are tobefound in the<br />

Arctic and surrounding regions. For us this<br />

represents agreat opportunity, since field<br />

developments for arctic conditions,<br />

environmentally sensitive areas and deep<br />

waters are our core competence.<br />

New achievements and repeat<br />

business<br />

Our construction of the world’s most<br />

advanced semisubmersible drilling rigs,<br />

the <strong>Aker</strong> Spitsbergen and <strong>Aker</strong> Barents,<br />

and the construction and installation of the<br />

world’s first offshore terminal for the<br />

receiving and regasification of liquefied<br />

natural gas, stand out in <strong>2008</strong>. Both<br />

projects rank as international milestones.<br />

In September, ConocoPhillips awarded<br />

us a front-end engineering and design<br />

(FEED) contract covering the first three<br />

phases of asignificant part of the Greater<br />

Ekofisk Area, including FEED work for two<br />

platform topsides, three jackets, bridges<br />

and substructures.<br />

In the Caspian region we hold astrong<br />

position in the ongoing phase one development<br />

of the giant Kashagan field offshore<br />

Kazakhstan. During <strong>2008</strong> we delivered four<br />

topsides and utility modules from our own<br />

yards. We also mobilised for alarger role in<br />

the hook-up phase of the field modules,<br />

employing more than 1400 people on the<br />

project by the end of <strong>2008</strong>.<br />

In joint venture with CB&I and Worley-<br />

Parsons, we received aletter of intent from<br />

Agip KCO in October, followed by a<br />

contract award in December for FEED<br />

services for phase two of the full-field<br />

development of the Kashagan field. The<br />

scope of work includes both onshore and<br />

offshore facilities and pipelines. It also<br />

includes options for further involvement in<br />

following phases as well as neighbouring<br />

field developments.<br />

The maintenance and modifications<br />

market has along term, steady level of<br />

investment in order to maintain safe and<br />

efficient operations, increase recovery<br />

rates and ensure compliance with local<br />

regulations. Activity within this market has<br />

been high in <strong>2008</strong> with significant repeat,<br />

long term business. Our maintenance and<br />

modifications contract at Tampen covers<br />

nine platforms and employs 500 engineers.<br />

StatoilHydro released two options under<br />

this contract to <strong>Aker</strong> <strong>Solutions</strong> in July <strong>2008</strong>.<br />

In December <strong>2008</strong>, an option under the<br />

Statfjord Late Life project was exercised,<br />

extending work on the Statfjord Band C<br />

topsides to 2011.<br />

Goals and objectives for 2009<br />

Our main emphasis is on growing the business<br />

by maintaining our North Sea market<br />

share, expanding in the international<br />

market and strengthening our technology<br />

base. We will secure our share ofthe:<br />

growing gas market<br />

field life extensions for North Sea<br />

facilities<br />

emerging floating LNG market<br />

growing deepwater market<br />

emerging opportunities in arctic areas<br />

stable North Sea development market<br />

expanding northern Caspian Sea<br />

activities<br />

sustainable shallow water business<br />

in South East Asia<br />

Strong fundamentals<br />

Due tothe global financial crisis evolving<br />

in <strong>2008</strong>, weexpect to see some delays in<br />

awarding new build projects in 2009. However,<br />

the long term outlook for strategic<br />

new build activities is still promising and<br />

we are well positioned for the major<br />

developments in all our target markets. We<br />

expect continued high demand for maintenance<br />

and modifications services in 2009.<br />

Gjøa –anFPS with environmental<br />

focus. Our unique floating platform<br />

expertise ispart ofthe basis for our<br />

delivery of the Gjøa platform to<br />

StatoilHydro in 2010. Gjøa will be the<br />

second field off Norway tobe<br />

powered by hydroelectric power<br />

transmitted via cable from land. This<br />

will reduce carbon emissions.<br />

Developing the Kashagan field.<br />

We are playing asignificant part in<br />

developing one of the world’s largest<br />

oil fields, the Kashagan field inthe<br />

Caspian Sea. In this demanding field<br />

development wedemonstrate our<br />

competitive strength inoffshore technology<br />

inenvironmentally sensitive<br />

areas and for harsh climatic<br />

conditions.<br />

<strong>Aker</strong> <strong>Solutions</strong> annual <strong>report</strong> <strong>2008</strong> 21