System Preservation and Maintenance<br />

Woodrow Wilson Bridge (WWB)<br />

The WWB project is complete. The operations, maintenance and inspection of<br />

the new bridge will be handled by a new and innovative process. <strong>Maryland</strong> and<br />

Virginia are jointly pursuing a turnkey asset management services contract that<br />

will essentially privatize these bridge functions, as well as many other routine<br />

services along the 7.5 mile long I-95/I-495 corridor in which the WWB is located.<br />

This contract will be for a term of five years with two, two-year options for<br />

renewal, for a potential total of nine years.<br />

MD 362 bridge over Monie Creek.<br />

ICC Project<br />

All of the design work for the ICC bridges in all three contracts is complete.<br />

Design for a number of walls, sound barriers, drainage structures and other<br />

small structures is ongoing. Please refer to the Mobility and Congestion Relief<br />

chapter for more information on the ICC project or go to www.iccproject.com.<br />

Special bridge projects completed:<br />

SHA replaced the MD 362 (Mt. Vernon Road) bridge over Monie Creek in<br />

Somerset County in five weeks instead of the usual 10 weeks. Work began<br />

on July 7, 2009 and the bridge was opened to traffic on August 14, 2009.<br />

MD 131 (Seminary Avenue) bridge over the tributary to Roland Run was<br />

totally replaced over four weekend closures, including casting concrete<br />

piling and installation of pre-cast, pre-stressed concrete slabs all completed<br />

in place. Traffic on this $1.4 million project was continuously maintained<br />

during all week days. Work started on July 7, 2009 and the bridge was<br />

finished on August 11, 2009.<br />

Workers driving pile during construction of<br />

McDonogh Road bridge deck replacement.<br />

Other bridge projects completed:<br />

MD 67 (Rohrersville Road) bridge deck overlay over Israel Creek in<br />

Washington County.<br />

MD 97 (Washington Road) bridge deck replacement over Morgan Run for<br />

$1.13 million in Carroll County.<br />

MD 109 (Old Hundred Road) bridge deck replacement over Little Bennett<br />

Creek for $1 million in Montgomery County.<br />

38<br />