CONTRACT NO - Gujarat State Disaster Management Authority
CONTRACT NO - Gujarat State Disaster Management Authority
CONTRACT NO - Gujarat State Disaster Management Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(i)<br />
(ii)<br />
(iii)<br />
(iv)<br />
(v)<br />
(vi)<br />
(vii)<br />
Three (3) Copies of the Supplier invoice showing the following details<br />
(a) No. & Date of Bills or Invoice.<br />
(b) No. & Date of Purchase Order.<br />
(c) Name & Specification of Item.<br />
(d) Name of Manufacturer & Model / Make / Brand<br />
(e) Quantity<br />
(f) Unit Price and<br />
(g) Total cost<br />
Tender Notice No. 06 of 2013<br />
Railway receipt / acknowledgment of receipt of goods from the consignee(s);<br />
Three (3) Copies of packing list identifying the contents of each package;<br />
Insurance Certificate;<br />
Manufacturer's / Supplier's warranty certificate;<br />
Inspection Certificate issued by the Inspector(s), and the Supplier's factory inspection<br />
report; and<br />
Certificate of Origin.<br />
The above documents shall be received by the Purchaser before arrival of the goods / stores /<br />
material(s) (except where the goods / stores / material(s) have been delivered directly to the<br />
Consignee with all documents) and, if not received, the Supplier will be responsible for any<br />
consequent expenses.<br />
22. Insurance<br />
22.1. The Goods supplied under the Contract shall be fully insured in Indian Rupees against loss<br />
or damage incidental to manufacture or acquisition, transportation, storage and delivery in<br />
the manner specified in Clause 22.2.<br />
22.2. For delivery of goods / stores / material(s) at site, the insurance shall be obtained by the<br />
Supplier in an amount equal to 110% of the value of the goods from "warehouse to<br />
warehouse" (final destinations) on "All Risks" basis including War Risks and Strikes.<br />
22.3. In the event of breakages or loss of stores during transit against purchase order the said<br />
quantity will have to be replaced by the supplier. The purchaser will not pay separately for<br />
transit insurance and the supplier will be responsible for the goods / stores / material(s) as<br />
soon as possible, but not later than 15 days from the date of arrival of stores at destinations<br />
notify the supplier of any loss or damages to the goods / stores / material(s) that might /<br />
should have occurred during the transit.<br />
23. Termination<br />
23.1. Without prejudice to GSDMA’s right to price adjustment by way of discount or any other<br />
right or remedy available to GSDMA, GSDMA may terminate the Contract or any part<br />
thereof by a written notice to the Supplier, if:<br />
(i)<br />
The Supplier fails to comply with any material term of the Contract.<br />
(ii) The Supplier informs GSDMA of its inability to deliver the goods / stores /<br />
material(s) or any part thereof within the stipulated delivery period or such inability<br />
otherwise becomes apparent.<br />
SIGNATURE & STAMP OF BIDDER<br />
30