Part 1 - Palmerston North City Council
Part 1 - Palmerston North City Council
Part 1 - Palmerston North City Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
gemconsulting<br />
This natural character of the area will change as a result of the proposed works. The river channel will be<br />
located closer to the right bank of the river and the river will take a more constant and gentler curve around<br />
the corner as it did previously. The rock lining and upstream groyne will be visible for much of the time, the<br />
exception being in flood events that exceed the annual return period flood level. The works may also see<br />
the introduction of a public access to the left bank of the river. Some people may also find that the<br />
presence of people on the left hand side of the river detracts from the character of the area. It is not<br />
expected that there will be any change to any habitats offered by the Pari Reserve, and it is likely that there<br />
will be improvements in habitats offered by the river due to the stabilisation of the erosion from the cliff<br />
above.<br />
The realignment of the Mangaotane Stream is not likely to change the natural character of the area to any<br />
great extent. Currently the stream runs through exotic scrub before joining the river at the subject site and<br />
is extremely difficult to identify from the right bank of the Manawatu River. Once realigned, the stream will<br />
continue to flow through similar vegetation as it does now and would still be difficult to identify.<br />
The access track between the river crossing and subject site on the left bank would likely be visible and<br />
could detract from the natural character that bank. It is intended to top soil and grass all access tracks to<br />
help prevent erosion and it is expected that the track would quickly revegetate with light scrub similar to<br />
that around it after its use has ceased.<br />
Effects on infrastructure (MWRC monitoring station and Fitzherbert Bridge)<br />
The MWRC has a river monitoring station near the former Teachers College. This station is of considerable<br />
importance to the Regional <strong>Council</strong> as it is used to monitor levels and flow rates of the river and in turn this<br />
information is used in and to assess various resource consents and to inform policy development. Any<br />
changes to the accuracy of the recordings from this station are likely to have on‐going effects and could<br />
possibly affect third parties through the monitoring of resource consent conditions. Changes in the<br />
accuracy of recordings from the station can occur though changes in the river bed. Regular monitoring of<br />
the river bed is carried out to detect natural bed changes and the flow rating is maintained accordingly.<br />
The proposed works have potential to cause changes to the channel bed profile that could affect the flow<br />
ratings from the recording station. The applicant has been in discussions with the <strong>Council</strong>’s Catchment<br />
Information Department regarding this issue and has reached an agreement that is satisfactory to both<br />
departments of the <strong>Council</strong>. A copy of the agreement is attached to this report as Appendix G.<br />
The Fitzherbert Bridge crosses the Manawatu River approximately 1km downstream of the subject site. The<br />
proposed works will not affect the bridge in any way.<br />
Effects on existing flood protection infrastructure<br />
One of the reasons for carrying out the proposed works is to provide long term protection for existing flood<br />
protection infrastructure. If left to erode the cliff, the river will eventually change direction and start to<br />
undermine the flood protection structures on the right bank of the river. The proposed works will prevent<br />
that from happening. Overall there will only be beneficial effects on the flood protection infrastructure.<br />
Effects on adjacent and residential properties<br />
Due to the erosion in this area very little of the works will actually occur in the river bed as surveyed. In fact<br />
most of the works will occur on land titles that are owned by the PNCC (Lot 13 DP 72989 and Cliff Road<br />
reserve), PMB Landco Ltd (Lot 51 DP 382375) and the Hargreaves title (Section 219 Town of Fitzherbert).<br />
Essentially, the surveyed river bed is the adjacent property on the city side of the subject site and PMB<br />
Landco Ltd and the PNCC own most of the land adjacent to the site on the left bank. Some of the reasons<br />
for the proposal are to protect land adjacent to the river from undue erosion and to protect flood<br />
protection structures from being undermined in the future. It is considered that the proposal will have<br />
significant benefits for the adjacent land.<br />
There are some residential properties on Waicola Drive that are starting to erode. The works will protect<br />
these properties by preventing the river from undermining the eastern cliff below these properties.<br />
21