QUARTERLY REPORT<br />

FOR THE PERIOD: OCTOBER - DECEMBER 2009<br />

QUARTER 11<br />

Offices:<br />

4th Floor Private Mail Bag 56<br />

Heritage Tower<br />

Stadium Post Office<br />

6 th Avenue Accra, <strong>Ghana</strong><br />

Ridge West, Accra Tel: (233) 21 666 619<br />

Fax: (233) 21 666 669<br />

Website: www.mida.gov.gh


Contents<br />

A. EXECUTIVE SUMMARY ............................................................................................................................... - 3 -<br />

B. PROGRESS IN OVERALL PROGRAM IMPLEMENTATION ................................................................. - 5 -<br />

C. PROGRESS IN PROJECT ACTIVITY IMPLEMENTATION ................................................................. - 11 -<br />

PROJECT 1: AGRICULTURE PROJECT ................................................................................................ - 11 -<br />

ACTIVITY 1: COMMERCIAL TRAINING ACTIVITY .................................................................................. - 11 -<br />

ACTIVITY 2: IRRIGATION DEVELOPMENT ............................................................................................. - 15 -<br />

ACTIVITY 3: LAND TENURE FACILITATION ........................................................................................... - 15 -<br />

ACTIVITY 4: IMPROVEMENT OF POST-HARVEST HANDLING AND VALUE CHAIN SERVICES ....... - 19 -<br />

ACTIVITY 5: IMPROVEMENT OF CREDIT SERVICES FOR ON-FARM AND<br />

VALUE-CHAIN INVESTMENTS ........................................................................................... - 21 -<br />

ACTIVITY 6: REHABILITATION OF FEEDER ROADS ............................................................................ - 24 -<br />

PROJECT 2: TRANSPORTATION PROJECT ......................................................................................... - 27 -<br />

ACTIVITY 2.1: N1 ACTIVITY ....................................................................................................................... - 27 -<br />

ACTIVITY 2.2: TRUNK ROADS ACTIVITY ................................................................................................. - 28 -<br />

ACTIVITY 2.3: FERRY ACTIVITY ................................................................................................................ - 29 -<br />

PROJECT 3: RURAL DEVELOPMENT PROJECT .................................................................................. - 30 -<br />

ACTIVITY 1: PUBLIC PROCUREMENT & CAPACITY-BUILDING .......................................................... - 30 -<br />

ACTIVITY 2: COMMUNITY SERVICES ...................................................................................................... - 33 -<br />

ACTIVITY 3: FINANCIAL SERVICES ......................................................................................................... - 37 -<br />

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT .................................................................. - 39 -<br />

D. PROGRAM MANAGEMENT AND GOVERNANCE ........................................................................... - 40 -<br />

E. KEY MONITORING AND EVALUATION (M&E) ACTIVITIES ...................................................... - 41 -<br />

F. SUPPORT TO PROJECT IMPLEMENTATION ................................................................................... - 42 -<br />

G. IMPLEMENTATION IMPEDIMENTS AND MITIGATION MEASURES ............................................ - 44 -<br />

PROJECT 1: AGRICULTURE PROJECT ................................................................................................... - 44 -<br />

ACTIVITY 1: COMMERCIAL AGRICULTURE TRAINING ....................................................................... - 44 -<br />

ACTIVITY 2: IRRIGATION DEVELOPMENT ............................................................................................. - 44 -<br />

ACTIVITY 3: LAND TENURE FACILITATION ACTIVITY ......................................................................... - 44 -<br />

ACTIVITY 4: POST HARVEST INVESTMENT AND VALUE CHAIN SERVICES ACTIVITES ................... - 44 -<br />

ACTIVITY 5: CREDIT SERVICES ................................................................................................................ - 45 -<br />

PROJECT 2:TRANSPORTATION PROJECT ............................................................................................ - 45 -<br />

ACTIVITY 1: N1 HIGHWAY ......................................................................................................................... - 45 -<br />

ACTIVITY 2: TRUNK AND FEEDER ........................................................................................................... - 45 -<br />

ACTIVITY 3: FERRY SERVICES .................................................................................................................. - 46 -<br />

PROJECT 3:RURAL DEVELOPMENT PROJECT ................................................................................... - 46 -<br />

ACTIVITY 1: PROCUREMENT CAPACITY ACTIVITY ............................................................................... - 46 -<br />

ACTIVITY 2: COMMUNITY SERVICES ACTIVITY ..................................................................................... - 46 -<br />

ACTIVITY 3: FINANCIAL SERVICES ......................................................................................................... - 47 -<br />

ANNEXES ............................................................................................................................................................. - 48 -


MCC QUARTERLY REPORT – QUARTER ELEVEN<br />

COMPACT COUNTRY : GHANA<br />

REPORTING PERIOD : 1 ST OCTOBER – 31 ST DECEMBER 2009<br />

REPORT DATE : 31 ST DECEMBER 2009<br />

CONTACT PERSON : ABIGAIL ABANDOH-SAM, M&E DIRECTOR<br />

______________________________________________________________________________<br />

A. EXECUTIVE SUMMARY<br />

Introduction<br />

The <strong>Ghana</strong> MCA Program entered the second half of Implementation during the Quarter.<br />

The Commercial Training of Farmers continued, and FBOs were also assisted that had participated in the<br />

Training were assisted to prepare Business Plans. Progress was made towards providing Farmers access<br />

to Irrigation Facilities with the signing of Contracts to cover work in the Northern Agricultural and the<br />

Afram Basin Zones.<br />

Work commenced on one of the three (3) Lots of Feeder Roads planned for the Southern Horticultural<br />

Belt in the Eastern and Central Regions, and there were pre-Construction activities for the other two Lots.<br />

Contract was signed with Messrs. China Jiangsu Jianda Incorporated for the construction of Agogo-<br />

Dome Trunk Road. Similarly, <strong>MiDA</strong> and Messrs. Moniz da Maia Serra & Fortunato-Empereiteros (MSF)<br />

signed Contract for the construction of N1 Lot 2 Works. Evaluation of Bids for the Ferry Works on<br />

Rehabilitation of Floating Dock & Construction of two (2) and the Extension of Landing Stages and<br />

Rehabilitation of Terminals was completed and the Reports forwarded to MCC for approval.<br />

Agreements were reached with <strong>Ghana</strong> Institute of Management & Public Administration (GIMPA),<br />

Catholic Institute of Business and Technology (CIBT), Takoradi Polytechnic and Koforidua Polytechnic<br />

on how soon they would begin using the Procurement Curricula and Modules and in order to plan for the<br />

provision of textbooks to support the Training. Twenty (25) flood affected school blocks (out of a total of<br />

30) were completed under Phase IB of the School Reconstruction Activity and are ready to be handed<br />

over to the beneficiary Communities. Work on the remaining 5 Project Sites is about 82% complete.<br />

Agriculture Project<br />

Twenty-eight (28) Task Orders were issued for the Training of about 21,000 Farmers who belong to<br />

FBOs in the Phase II Early and Phase I Late groups of the Commercial Training Program. The FBOs<br />

were also assisted to prepare Business Plans.<br />

Contracts were signed for the Technical Feasibility Studies, Design and Supervision of<br />

Rehabilitation/Extension of Works for Irrigation in the Northern Agriculture and the Afram Basin Zones.<br />

These studies cover 4,234 ha out of the total land potential of 5,060 ha for Irrigation that have been<br />

identified in all the three Zones.<br />

Under the Land Activity, work on the issuing of 168 Land Title Certificates was completed during the<br />

Quarter. During the same period the Alternative Dispute Resolution (ADR) Consultant completed her<br />

work and the Winneba Land Registration Office was also completed.<br />

Expressions of Interest were received for the three (3) Public Pack Houses proposed to be built at<br />

Mariakrom, Otwekrom and Akorley in the Akuapim South, Gomoa and Yilo Krobo Districts respectively.<br />

- 3 -


Procurement<br />

(a) Bid Evaluations and Contract Negotiations<br />

Twelve (12) major Procurement Activities began in the Quarter, of which four (4) were<br />

completed. Ten (10) major Solicitation Documents were issued during the period, while one (1)<br />

major Consultancy Assignment and six (6) Bids for Works were evaluated.<br />

(b)<br />

Contracts Awarded<br />

Major Contracts awarded during the Quarter were valued at USD169, 571,480. This is broken<br />

down as follows:<br />

i. Value (by Month):<br />

October : US$141,978,241<br />

November : US$ 2,810,000<br />

December : US$ 24,783,239<br />

ii.<br />

Value (by Project Components):<br />

Agriculture : US$ 48,034,775<br />

Transportation : US$109,566,705<br />

Rural Development : US$ 11,200,000<br />

Monitoring and Evaluation : US$ 770,000<br />

Program Administration : US$ -<br />

MCA FUNDS – RECEIPTS AND DISBURSEMENTS<br />

Qtr. 11 Year to Date Compact Period to Date<br />

(Oct-Dec 2009) (Jan-Dec 2009) (Aug 2006 - Dec 2009)<br />

Actual Commitments 151,388,397 202,440,680 338,428,052<br />

MCC Disbursements 30,191,110 81,310,552 116,947,887<br />

Cash in Hand 3,916,321<br />

- 4 -


B. PROGRESS IN OVERALL PROGRAM IMPLEMENTATION<br />

(1) AGRICULTURE PROJECT<br />

Commercial Training Activity<br />

• Twenty-eight (28) Task Orders were issued and signed in October for the training of 424<br />

FBOs for Phase II Early. Cumulatively 142 Task Orders have been issued.<br />

• About 21 000 farmers took part in the FBO Capacity Building Training organized for the<br />

Phase II Early group and 14,000 took part for Phase I Late Training.<br />

• All business plans for 424 FBOs in Phase II Early Stage I Training, have been finalized.<br />

• Two hundred and eighty six (286) Business Plans for Phase I Late Trainees have been<br />

prepared.<br />

• Out of the 59 MoFA Staff trained under the Training of Trainers for Global GAP, 26 were<br />

certified.<br />

Irrigation Activity<br />

• Inception Reports have been received from Messrs. SNC Lavalin, the Consultants for Lot 1<br />

(Northern Agric Zone) and Lot 3 (Southern Horticultural Belt)<br />

• Messrs Royal Haskoning, the Consultant for Lot 2 (Afram Basin) signed their Contract on<br />

21st October. The Inception Report has been submitted and reviewed.<br />

• About 1,000 ha of the remaining potential land are being designed by RICs under the Small<br />

Scale Irrigation projects during Quarter 11.<br />

• 4,234 ha out of the identified total land potential of 5,060 ha for Irrigation has been awarded<br />

on Contract for the Technical Feasibility Studies, Design and Supervision of Rehabilitation/<br />

Extension of Works.<br />

Land Activity<br />

The following are the achievements:<br />

Pilot Land Title Registration:<br />

• Fieldwork for all the six (6) Sections (total of 3,457 parcels) of the Pilot Registration<br />

District (PRD) comprising inventory, pillaring and surveying have been completed as<br />

follows:<br />

i. Section 1: 760 Parcels (100% complete);<br />

ii. Section 2: 718 Parcels (100% complete);<br />

iii. Section 3: 915 Parcels (100% complete);<br />

iv. Section 4: 267 Parcels (100% complete);<br />

v. Section 5: 198 Parcels (100% complete); and<br />

vi. Section 6: 599 Parcels (100% complete).<br />

• Section 2 (711 parcels) and Section 5 (198 parcels) had Parcel Plans <strong>full</strong>y developed and<br />

approved by the Survey and Mapping Division (SMD) of the Lands Commission and<br />

ready for Title Certificates to be issued.<br />

• 40% of Section 1; 20% of Section 3; 85% of Section 4; and 30% of Section 6 had their<br />

Parcels Plans completed but yet to be approved by the SMD.<br />

• 168 Title Certificates were ready to be handed over to Proprietors.<br />

- 5 -


• The ADR Consultant completed her work with the submission of a comprehensive<br />

Report in October 2009.<br />

• The Winneba Land Registration Office was completed in October 2009.<br />

Baseline on Clearing of Backlog of Land Cases:<br />

With the completion of the Baseline Sub-Activity, attention has now shifted to<br />

refurbishing three (Agona Swedru, Tamale, and Nsawam) out of the 10 Courts. These are<br />

at various stages of completion. GOG made available to the Judicial Service an amount of<br />

GH¢500,000 for the refurbishment of the seven (7) other Courts.<br />

Public Education & Information Dissemination:<br />

The Draft TOR has been submitted to MCC for their comments.<br />

Post Harvest Activity<br />

• Held meeting with Firms that have been shortlisted to benefit from ABCs on the 11 th of<br />

December 2009 to engage them in the organization and management process.<br />

• Fifteen (15) Expressions of Interest were received for the 3 (three) Public Pack houses at<br />

Mariakrom, Otwekrom and Akorley in the Akuapim South, Gomoa and Yilo Krobo Districts<br />

respectively. A Pre-bid Meeting was held on 1 st December 2009, and Bids were submitted on<br />

30 th December.<br />

• KIA Perishable Cargo Centre: The Consultants, Messrs Vek-Verhoef submitted the<br />

Economic Viability and Environmental Review Reports. The results of the review of the<br />

Report by <strong>MiDA</strong> and other Stakeholders, which showed that it was weak on economic<br />

analysis, have been forwarded to the Consultants.<br />

• The Draft Seed and Plant Protection Bills have been forwarded to Parliament.<br />

• To date, four (4) Pre-Coolers have been installed.<br />

Credit Services Activity<br />

• An amount of US$ 2,093,515.81 was disbursed in the Quarter, bringing the cumulative total<br />

to date to US$ 12,707,915.90.<br />

• The Portfolio-at-Risk stood at 18% as at the end of the Quarter.<br />

• <strong>MiDA</strong> Management approved modalities to commence Disbursement under the Grant to<br />

PFIs in support of the setting up of Loan Offices and Means of Transport (Motor Cycles and<br />

Motor Vehicles) to improve On-site Inspections and monitoring of Borrowers.<br />

Rehabilitation of Feeder Roads<br />

LOT 1 (Northern Region Roads – NR Series)<br />

• Solicitation of Bids for the Construction Works on Lots NR1 and NR2 ended on 28th<br />

October, 2009. MCC and Board Approvals of Bid Evaluation Report on recommended<br />

Contractor were obtained.<br />

• <strong>MiDA</strong> issued Letters of Acceptance to Messrs. China Zhongmei Construction limited (Lot<br />

NR1) and Messrs. China Zhong Hao limited (Lot NR2) on 10 th December, 2009.<br />

LOT 2 (Eastern and Central Region Roads – EC Series)<br />

• Pre-construction activities for Lot EC1 ended with Sod-Cutting Ceremony held at Odeikrom;<br />

the work is being executed by Messrs. Big Aidoo Construction Limited.<br />

• Pre-construction activities for the start of works on all road segments under Lots EC2 and<br />

EC3 being executed by Messrs. GKL/Kamsad JV.<br />

- 6 -


LOT 3 (Volta Region Roads – VR Series)<br />

• Procurement process for the re-bidding of Lot VR1 commenced on 15 th October, 2009. Bid<br />

Evaluation Report on Lot VR1 was sent for MCC Approval.<br />

• <strong>MiDA</strong> Board objected to the recommended Contractor for Lot VR2 on 26 th October, 2009.<br />

• Procurement process for the re-bidding of Lot VR2 commenced on 16 th December, 2009.<br />

• <strong>MiDA</strong> Board approval for award of Contract for Lot VR3 was obtained on 9 th December,<br />

2009, and Letter of Acceptance was issued to Messrs. Justmoh Construction Limited on 10 th<br />

December, 2009.<br />

• Messrs. Justmoh Construction Limited submitted Performance Guarantee to <strong>MiDA</strong> on 21 st<br />

December, 2009.<br />

(2) TRANSPORTATION PROJECT<br />

N.1 Highway Activity<br />

N1 Lot 1 Main Works: Tetteh Quarshie Interchange to Apenkwa Bridge (6.1 km)<br />

• Construction Works on the N1 Lot 1 by Messrs China Railway (Wuju) Group is steadily<br />

progressing along the entire corridor of the Tetteh Quarshie Interchange - Apenkwa<br />

Interchange.<br />

N1 Lot 2 Main Works: Apenkwa Bridge to Mallam Junction (8.125 km)<br />

• <strong>MiDA</strong> and Messrs. Moniz da Maia Serra & Fortunato-Empereiteros (MSF) signed Contract<br />

for the construction of N1 Lot 2 Works on 1st October, 2009; Contractor has started preconstructional<br />

activities at Mallam Junction prior to Project Kick Off.<br />

N1 Highway Relocation of Utilities<br />

• Electricity<br />

i. The Contractor had been furnished with Punch list on Lot 1 as at 22nd December, 2009.<br />

ii. Electricity relocation works on existing road crossings at Water Works (N1 Lot 2) was<br />

completed on 30th December, 2009.<br />

iii. Relocation of 33Kv and 11KV High tension Lines under Contract Lot 1 is in progress.<br />

iv. Utility Works under Section II of Lot 2 is in progress.<br />

• Telecom<br />

i. The Contractor had been furnished with Punch list on Lot 1 as at 22 nd December, 2009.<br />

ii. Telecom relocation works on existing road crossings at Water works (N1 Lot 2)<br />

completed as at 30 th December, 2009.<br />

• Water<br />

i. Contractor furnished with Punch list on Lot 1 works as at 22 nd December, 2009.<br />

ii. Water relocation works on existing road crossings at Water works (N1 Lot 2) in progress<br />

since 18 th December, 2009.<br />

RAP and Resettlement Issues for Lots 1&2<br />

• <strong>MiDA</strong> received List of Property Owners within Priority Section 2 on 23 rd December, 2009.<br />

• Negotiations and payments in progress for Property Owners within Priority Section 1<br />

Offsite Drainage Study<br />

• Consultant submitted to <strong>MiDA</strong> Final Design Report (Task 3) of the Offsite Drainage Study<br />

on 7 th December, 2009.<br />

- 7 -


Trunk Roads Activity<br />

• <strong>MiDA</strong> and Messrs. China Jiangsu Jianda Incorporated signed Contract for the construction of<br />

Agogo- Dome trunk road (75.21km). There was a Sod-cutting Ceremony at the Site on 22nd<br />

October, 2009. Contractor has commenced pre-constructional activities on Site.<br />

Ferry Activity<br />

• Solicitation of Bids for the Rehabilitation of Floating Dock & Construction of two (2) Ferries<br />

(Lot FS1) and the Extension of Landing Stages and Rehabilitation of Terminals (Lot FS2)<br />

ended on 2nd December, 2009. Bid Evaluation exercise completed and Reports forwarded to<br />

MCC for approval.<br />

(3) RURAL DEVELOPMENT PROJECT<br />

Procurement Capacity Activity<br />

i. A Stakeholders Workshop was held to review and discuss the Draft Curricula and Modules<br />

presented by Crown Agents.<br />

ii. The revised version of the Draft Curricula and Modules have been reviewed by the PC/PPA<br />

and comments forwarded to Crown Agents. The Consultant has submitted a final version of<br />

the Curricula and Modules.<br />

iii. A Draft Report of the 2009 Internship Program has been presented to MCC. Comments have<br />

been received.<br />

iv. Agreements arising out of discussions to determine how soon Institutions would begin using<br />

the Curricula and Modules and, therefore, need to be supported with textbooks have been<br />

reached with <strong>Ghana</strong> Institute of Management & Public Administration (GIMPA), Catholic<br />

Institute of Business and Technology (CIBT), Takoradi and Koforidua Polytechnics.<br />

Community Services<br />

i. Rehabilitation of Schools<br />

Phase IA: The outstanding furniture for Savelugu Nanton District have been <strong>full</strong>y supplied<br />

and accepted by Inspection Teams.<br />

Phase IB: Twenty (25) flood affected school blocks were completed under Phase IB of the<br />

School Reconstruction Activity and are ready to be handed over to the beneficiary<br />

Communities. Work on the remaining five (5) Project Sites is about 82% complete.<br />

Community Teacher Training Program (<strong>MiDA</strong>/MoE/USAID MOU): Training is ongoing<br />

for two hundred and sixty (260) Community Teachers in all the three Intervention Zones in<br />

<strong>MiDA</strong>-rehabilitated Schools and others in the Districts.<br />

ii.<br />

Feasibility Studies<br />

Schools and Water & Sanitation Facilities: Final Engineering Reports of new Schools, new<br />

Water and Sanitation facilities to farming Communities in the Southern and Northern Zones<br />

have been completed by Consultants and reviewed. Feasibility Studies of new Schools, new<br />

Water and Sanitation Facilities to farming Communities for the Afram Basin Zone have been<br />

completed and reviewed. Draft detailed Designs of the Facilities are ongoing.<br />

- 8 -


Rural Electrification: Final Detailed Design Reports on the provision of a 26km, 33kV O/H<br />

Lines and 10 Transformer Stations in the SHB and 67km, 33kV O/H Lines and two (2)<br />

Transformer Stations in the NAZ have been completed and reviewed. Tender Documents<br />

have been completed and ready to be issued.<br />

Tamale Water Extension Project (TWEP): Feasibility Studies on the Tamale Water<br />

Extension Project have been completed and reviewed. Draft detailed Designs are ongoing.<br />

iii.<br />

Selection of Indefinite Delivery, Indefinite Quantities (IDIQ) Consultants<br />

Bid Evaluations have been completed for the selection of IDIQ Works Contractors for<br />

Education, Water and Sanitation Facilities.<br />

iv.<br />

Implementing Entity Agreements (IEAs)<br />

Ministry of Local Government and Rural Development: Four (4) Regional Workshops<br />

planned to take place in all the three (3) Intervention Zones, were rescheduled to start in<br />

February 2010. The Workshops are intended to sensitize the new District Authorities about<br />

their roles and responsibilities under the Compact.<br />

Financial Services Activity<br />

The Cheque Codeline Clearing System was stabilized in the Accra Tema Clearing Zone with<br />

over 80% of the country’s cheques handled by the System.<br />

Bid Document for the procurement of Consultant for the Legal Review of Payment System<br />

Laws was issued in October 2009 and the Technical Evaluation of the three Bids received<br />

was completed in December 2009.<br />

(4) OTHER ACTIVITIES<br />

(i) Program Audits<br />

Internal: The Internal Audit Team completed the audit of the Credit Activity. The audit<br />

focused on Disbursements to Participating Financial Institutions in the Northern, Volta,<br />

Eastern and Ashanti Regions. As part of the audit, the Team visited the Rural Banks, Farmer<br />

Based Organizations and farming outlets.<br />

The Audit Team also held meetings with Project Teams to understand the major risks<br />

associated with the various Projects. The information gathered will assist the Audit Team in<br />

the preparation of the 2010 Internal Audit Annual Plan.<br />

External: Messrs PricewaterhouseCoopers completed the Financial Audit of MCC Resources<br />

for the period ended June 2009. <strong>MiDA</strong> is awaiting Office of Inspector General’s approval of<br />

the External Audit Report.<br />

(ii) Zonal Advisory Committees<br />

The Second Round of District Advisory Committee (DAC) Meetings were held in 17<br />

Districts – 12 in the Southern Zone, and all the five (5) Districts in the Northern Zone. The<br />

Second Round Meetings built on the First Round Meetings held in all the Districts in the<br />

- 9 -


previous Quarters by providing more feedback on how the local people think implementation<br />

has gone so far and how some challenges can be overcome.<br />

(iii) Board of Directors<br />

There were two Board Meetings during the period under review - a follow-up of the<br />

25 th Meeting, held on 26 th October, 2009; and the 26 th Board Meeting which was also<br />

held on 9 th December, 2009. The 26 th Meeting approved the Quarter 12 Disbursement<br />

Request and accompanying Reports.<br />

An Induction Workshop was held for the Board in November, 2009.<br />

The Government nominated, and following the approval of MCC and the <strong>MiDA</strong><br />

Board, appointed Prof. Samuel Sefa-Dedeh to the Chair of <strong>MiDA</strong>. The appointment<br />

took effect from 4 th January, 2010 for a term of three years.<br />

(iv) Visitors<br />

MCC: The under listed MCC Officials visited <strong>MiDA</strong> to collaborate with their local<br />

counterparts on ongoing Projects:<br />

Claudia D’Andrea (Resettlement), Mr. Duke Burruss (Agric Commercialization), Dr.<br />

Zongmin Li (Land), Jolyne Sanjak (Land), Mark Marquardt (Consultant - Land),<br />

Kevin Barthel – 2 Visits (Land), Nancy Convard – 2 Visits (Environmental & Social<br />

Impact), Ellen Moran (Agric Infrastructure), Mary Jo Johnson (Procurement),<br />

Gretchen Goodhart (Associate Director, <strong>Ghana</strong> Compact Implementation), Rodney<br />

Chow (Agric Infrastructure), Ray Norman (Irrigation Development), Jake Grimshaw<br />

(Information Technology), Jason Bauer (Director, Private Sector Initiatives), Martin<br />

Slough (Credit & Financial Services), Arlene Brown (Fiscal Accountability),<br />

Anthony Coleman (Infrastructure), Tom Hohenthaner (Legal).<br />

Advocacy: Representatives of Women Thrive Worldwide, a US-based Advocacy<br />

Group, visited <strong>Ghana</strong> and held discussions with <strong>MiDA</strong> Management.<br />

- 10 -


C. PROGRESS IN PROJECT ACTIVITY IMPLEMENTATION<br />

PROJECT 1:<br />

AGRICULTURE PROJECT<br />

ACTIVITY 1: FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE<br />

(“COMMERCIAL TRAINING ACTIVITY”)<br />

Activity Objective:<br />

To speed up the development of business skills and build capacity among FBOs and their business<br />

partners, (including Service Providers to FBOs and other entities adding value to agricultural crops; such<br />

as Processors).<br />

QTR. 11 PROGRESS<br />

FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />

(“COMMERCIAL TRAINING ACTIVITY”)<br />

INDICATOR: Number of Task Orders Issued (290)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

112 28 142<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Task Orders Issued Phase I<br />

Late<br />

• 28 TOs were issued to TTSPs on<br />

21 st October Phase II Early Stage II<br />

(Technical) Training as follows:<br />

- North: 8 TOs for the training of<br />

144 FBOs.<br />

- Afram Basin: 14 TOs for the<br />

training of 164 FBOs.<br />

- South: 6 TOs for the training of<br />

116 FBOs.<br />

.<br />

• Receive Request for<br />

Task Orders for Phase<br />

I Late, Stage II<br />

• Issue 28 Task Orders<br />

for Phase I Late,<br />

Stage II in January<br />

2010<br />

INDICATOR: Number of Agribusinesses Assisted (1,320)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

650 1,076 2,305<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Assist FBOs to prepare<br />

business plans<br />

i. Value Chain Workshops<br />

conducted<br />

• 424 Phase II Early FBOs were<br />

assisted to prepare Business Plans<br />

• 286 Phase I Late FBOs were<br />

assisted to prepare Business Plans<br />

• The Afram RIC facilitated the<br />

formation of Value Chain Networks<br />

or Associations to promote<br />

development, sustainability and<br />

increase production and sales<br />

volumes in Value Chain Crops<br />

- 11 -<br />

• Obtain finalized<br />

Business Plans for<br />

286 FBOs<br />

• Launch 6 Value<br />

Chain Associations<br />

i. Support SMEs in various • List of SMEs are currently being • Shortlist 120 SMEs in


FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />

(“COMMERCIAL TRAINING ACTIVITY”)<br />

skills development<br />

i. Assist FBOs and SMEs<br />

to receive Credit<br />

i. FBOs assisted to access<br />

Markets<br />

reviewed to develop a shortlist of<br />

120.<br />

• 88 FBOs received Credit in the<br />

North during the Quarter.<br />

• No FBO at Afram received Credit<br />

within the Quarter.<br />

• 9 FBOs in the South received<br />

Credit.<br />

• North<br />

- FBO market linkages are being<br />

strengthened.<br />

• Afram<br />

- 18 FBOs were linked to markets<br />

as follows: four (4) linked to<br />

Whytebage International; one (1)<br />

linked to Yam Exporters, and 13<br />

linked to Plantain Exporter.<br />

• South<br />

- 120 Mango and Rice FBOs were<br />

linked to markets created by Blue<br />

Skies (Mango) and Finatrade<br />

(Rice).<br />

all the Zones.<br />

• Finalize Training<br />

Modules and Plan for<br />

SMEs Training by<br />

end of January<br />

• Assist FBOs to access<br />

Markets<br />

• Follow-up on<br />

linkages to facilitate<br />

sustainable<br />

relationships<br />

ii.<br />

Establishment of Demo<br />

Centres<br />

• Demo Centre in the form of<br />

Technology Park has been<br />

established in the Northern Zone<br />

• 114 Farmers benefited from the five<br />

Demo Centres in the Southern<br />

Horticultural Belt<br />

• Finalize establishment<br />

of Demo centres in<br />

the Afram<br />

iii.<br />

Assist Farmers to<br />

become Global Gap<br />

certified<br />

• Out of the 59 MoFA Staff that were<br />

trained, 28 were certified as<br />

Trainers<br />

• Identify Farmers who<br />

need Global GAP<br />

Certification<br />

INDICATOR: Number of FBOs trained in Commercial Agriculture (1,200)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

600 410 648<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Train Phase II Early FBOs<br />

in Capacity Building<br />

• 424 Phase II Early FBOs took part<br />

in Stage II (Technical Training).<br />

• The breakdown by Zone was as<br />

follows: 144 in the Northern Zone,<br />

164 in Afram Basin and 116 in the<br />

Southern Horticultural Belt.<br />

- 12 -<br />

• Continue Handholding’<br />

of FBOs till<br />

April


FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />

(“COMMERCIAL TRAINING ACTIVITY”)<br />

• 410 FBOs were considered Trained<br />

(i.e. met the criteria for Training - at<br />

least 80 percent of their Members<br />

attending a minimum of 50 percent<br />

of the time).<br />

• The distribution by Zone of the<br />

Trained FBOs was as follows: 144<br />

in the North, 158 in Afram and 108<br />

in the South.<br />

ii.<br />

Train 286 FBOs Phase I<br />

late in Capacity Building<br />

• 286 FBOs participated in trained in<br />

FBO Capacity<br />

• 266 of the 286 FBOs are regarded as<br />

trained: 85 out of the 95in the North;<br />

all the 114 in Afram, and 67 out of<br />

the 77 in the South.<br />

• Provide 286 Phase II<br />

FBOs with Stage II<br />

Training by March<br />

INDICATOR: Number of farmers trained in commercial Agriculture (60,000)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

30,000 19,967 34,669<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Train 21,000 Farmers (Phase<br />

II Early) in FBO Capacity<br />

Building<br />

ii. Train 14,000 Farmers in FBO<br />

Capacity Building<br />

• 20,705 Farmers in Phase II Early<br />

FBOs took part in Technical<br />

Training (i.e. Stage II) out of which<br />

19,667 can be classified as trained in<br />

stage one according to the set<br />

criteria as follows:<br />

Zone Took part Trained<br />

North 6979 6879<br />

Afram 7885 7543<br />

South 5841 5245<br />

Total 20705 19667<br />

• After farmer list validation, 13602<br />

Phase I Late farmers took part in the<br />

FBO Capacity building training out<br />

of which 13246 may be counted as<br />

trained<br />

Zone Took Part Trained<br />

North 4020 4178<br />

Afram 5499 5563<br />

South 4083 3505<br />

Total 13602 13246<br />

• Review and approve<br />

zonal training <strong>report</strong>s<br />

• Train Phase I late<br />

farmers in Technical<br />

Training<br />

• Distribute starter<br />

packs to all Phase I<br />

Late and Phase II<br />

early farmers<br />

• Review and approve<br />

Zonal Training<br />

Reports<br />

• Train Phase I Late<br />

Farmers (Stage II -<br />

Technical Training)<br />

• Distribute Starter<br />

Packs to all Phase I<br />

Late and Phase II<br />

Early Farmers<br />

INDICATOR: Hectares under production with MCC support (53,060)<br />

TARGET(ANNUAL) APR ACTUALS TO DATE (OCT-DEC<br />

2009- MAR 2010<br />

2009)<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

- 13 -


FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />

(“COMMERCIAL TRAINING ACTIVITY”)<br />

9100 11,114.76 11,114.76<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Implementation of<br />

Voucher System-Starter<br />

Pack to assist farmers<br />

• Starter Pack procurement for<br />

33,000 Farmers is ongoing for Phase<br />

I Late and Phase II Early Farmers<br />

• Deliver Starter Packs<br />

to about 33,000<br />

Farmers<br />

ii.<br />

Hectares under production<br />

as a result of credit<br />

• The Northern RIC identified 8,298<br />

hectares under production.<br />

• The Southern RIC identified<br />

2816.76 hectares under production.<br />

• Follow-up on credit<br />

disbursed to support<br />

production<br />

INDICATOR: Number of Farmers adopting new technology<br />

TARGET(ANNUAL) APR ACTUALS TO DATE (OCT-DEC<br />

2009- MAR 2010<br />

2009)<br />

7074 7074<br />

i. Number of Farmers<br />

adopting technology<br />

• North – Out of 4435 farmers, 2559<br />

(57%) were observed to have<br />

adopted improved technology.<br />

• South – 100% adoption is <strong>report</strong>ed<br />

by 4515farmers who have<br />

completed the Technical Skills<br />

Training. This was validated by the<br />

Monitoring Committees of the<br />

FBOs<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

• Receive technology<br />

adoption <strong>report</strong>s from<br />

Afram Basin<br />

- 14 -


ACTIVITY 2: IRRIGATION DEVELOPMENT<br />

Activity Objective:<br />

To establish a limited number of Retention Ponds and Weirs requested by the FBOs and FBO<br />

Partnerships, for whom access to Water is critical to the success of their Business objectives.<br />

QTR. 10 PROGRESS<br />

IRRIGATION DEVELOPMENT<br />

Indicator: Number of Feasibility Studies approved (10)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE TO<br />

DATE<br />

10 0 0<br />

ACTIVITY STATUS NEXT STEPS<br />

INDICATOR: Value of Signed Contract for Feasibility Studies and /or Design (US$ 7,998,114.00)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE TO<br />

DATE<br />

US$7,998,114.00 US$ 1,998,113.00 US$ 4,704,631.00<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Award Contracts for<br />

Feasibility Studies on<br />

Irrigation Infrastructure<br />

• Contract for Lot 2 (worth<br />

US$1,998,113.00), which covers<br />

four (4) Feasibilities Studies, was<br />

signed with Royal Haskoning.<br />

• Inception Reports for all 10<br />

Studies were received.<br />

• Receive Feasibility<br />

Reports<br />

• Follow-up up on<br />

training of Water Users<br />

Associations on Old<br />

Schemes with<br />

consultants<br />

INDICATOR: Percent of Contracted Feasibility Studies and /or Design completed (100%)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

ACTUALS AS OF<br />

(DATE)<br />

42.8% 0 0<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Complete Feasibility and<br />

Design Phases of Consultancy<br />

services Milestones.<br />

• Stakeholder Consultation Meeting<br />

was held on 12 th December 2009 to<br />

solicit inputs into contents of<br />

Feasibility Studies for the North and<br />

South.<br />

• Finalize detailed<br />

requirements on 1000 ha<br />

of land with potential for<br />

fast track irrigation<br />

Identification of FBOs with Access to Potential New or Rehabilitated Irrigation Facilities<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

ACTUALS AS OF<br />

(DATE)<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Identify FBOs that have<br />

access to potential new or<br />

rehabilitated Irrigation<br />

Facilities<br />

• Identification of FBOs and<br />

formation of Water Users<br />

Associations (WUAs) is in<br />

progress<br />

• Finalize number of FBOs<br />

that require Training in<br />

use and management of<br />

Irrigation Facilities<br />

- 15 -


ACTIVITY 3:<br />

LAND TENURE FACILITATION<br />

Activity Objectives:<br />

i. Improve Tenure Security for existing Land Users;<br />

ii. Facilitate access to (higher value) Agricultural Lands by Investors.<br />

QTR. 11 PROGRESS<br />

LAND ACTIVITY<br />

INDICATOR: Percent of People aware of their Land Rights in Pilot Land Registration Areas (50%<br />

increase from Baseline)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

N/A N/A N/A<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Sign Contract for Data<br />

Collection to measure<br />

Awareness of Land Rights<br />

• Contract was signed on 21 st<br />

October 2009.<br />

• Collect data on<br />

awareness<br />

INDICATOR: Percent of identified Land Disputes resolved in the Pilot Land Registration Areas<br />

(80%)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

70% 90% 90%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Continue ADR Mediation<br />

on cases coming up during<br />

Registration of Proprietors<br />

• No new cases were identified or<br />

resolved in the Quarter.<br />

• Cumulatively, 18 out of 20 cases<br />

have so far been resolved in all six<br />

Sections of the PRD.<br />

• Continue ADR<br />

Mediation on cases<br />

coming up during<br />

Registration of<br />

Proprietors.<br />

INDICATOR: Total Number of Land Parcels Registered in the Pilot Land Registration Areas<br />

(4,800)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

1800 0 103<br />

INDICATOR: Rural Hectares Formalized (17,019)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

2,713 TBD TBD<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Issue Land Title<br />

Certificates to Proprietors<br />

• 169 Land Parcels were registered in<br />

the Quarter.<br />

• Present Land Title<br />

Certificates<br />

• Continue with<br />

Registration of Land<br />

Parcels<br />

- 16 -


ii. Incorporate inputs of<br />

MCC Consultant and<br />

Independent Assessor on<br />

Land Titling<br />

iii. Draft Procedural Manual<br />

on Land Titling<br />

• Action Plan with clear timelines and<br />

benchmarks approved by MCC on<br />

24 th December, 2009.<br />

• Manual approved by MCC on 24 th<br />

December, 2009.<br />

Implement Action<br />

Plan<br />

Test Procedural<br />

Manual in Awutu<br />

Senya Pilot 1<br />

INDICATOR: Rural Hectares Mapped (17,019)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

2,960 612 4,271<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Map Rural Land<br />

Parcels<br />

• Completed the mapping of a total<br />

of 612 ha in Section 3 during the<br />

Quarter.<br />

• Cumulatively, 4,271 ha have been<br />

mapped to date.<br />

• Map Rural Land<br />

Parcels covering other<br />

Sections<br />

INDICATOR: Total Number of Parcels surveyed in the Pilot Land Registration Areas (4,800)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

1,800 492 2,980<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Continue with<br />

surveying of<br />

inventoried parcels<br />

• A total of 492 Parcels were surveyed<br />

during the Quarter.<br />

• Cumulatively, 2,980 Parcels have<br />

been surveyed.<br />

• Continue with<br />

surveying of<br />

inventoried parcels<br />

INDICATOR: Parcels of Land inventoried in the Pilot Land Registration Areas (4,800)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

1,800 924 3,412<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Complete Inventory of<br />

Parcels<br />

• Data on 924 Individual Parcels were<br />

inventoried in the Quarter.<br />

• Cumulatively, 3,412 Individual<br />

Parcels have been inventoried.<br />

• Complete Inventory of<br />

Land Parcels<br />

INDICATOR: Percent of Backlog of Land Cases Cleared by the Judicial Service (95%)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

95% 0% 0%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Continue Refurbishment<br />

of 10 Circuit Courts<br />

• Refurbishment of three (3) Circuit<br />

Courts (Nsawam, Agona Swedru<br />

and Tamale) is in progress.<br />

• Judicial Service secured GHC<br />

500,000 from GoG for the<br />

refurbishment of seven (7) other<br />

Circuit Courts.<br />

Refurbish seven (7) other<br />

Circuit Courts with GoG<br />

funding (GHC 500,000)<br />

- 17 -


INDICATOR: Number of Landholders reached by Public Outreach Efforts (10,000)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

6,000 0 4,794<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Re-scope Consultancy for • Draft ToRs for the re-scoped<br />

• Finalize ToRs<br />

Public Education/<br />

Information<br />

Dissemination<br />

program completed.<br />

• Issue RFP<br />

INDICATOR: Number of Personnel Trained (200)<br />

TARGET (ANNUAL) APR<br />

2009-MAR 2010)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

194 0 73<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Train Stakeholders on<br />

Alternative Dispute<br />

• No Stakeholders were trained in<br />

the Quarter.<br />

Resolution (ADR) • Cumulatively, 73 Stakeholders<br />

trained in ADR.<br />

INDICATOR: Number of Buildings Rehabilitated/Constructed (3)<br />

TARGET (ANNUAL) APR<br />

2008-MAR 2009)<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

3 1 1<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Complete Construction of<br />

Land Title Site Office.<br />

• Construction has been completed.<br />

- 18 -


ACTIVITY 4: IMPROVEMENT OF POST-HARVEST HANDLING AND VALUE CHAIN<br />

SERVICES<br />

Activity Objectives:<br />

i. To encourage and facilitate Strategic Investments by FBOs into Post-harvest Infrastructure.<br />

ii. To build the Capacity of Public Sector Organizations to introduce and monitor Compliance with<br />

International Plant Protection Standards.<br />

QUARTER 11 PROGRESS<br />

POST HARVEST<br />

INDICATOR: Area of Cold Storage facilities constructed (1738 m2)<br />

TARGET(ANNUAL) ACTUALS TO DATE (OCT-DEC CUMMULATIVE TO DATE<br />

APR 2009- MAR 2010<br />

2009)<br />

1021 270.2 426.2<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Procure and install Pre-<br />

Coolers<br />

• Bomart Farms completed<br />

installation of Cooling Unit in a<br />

newly constructed Pack House.<br />

• Monitor installation of Cooling<br />

Facilities and other Units at<br />

2K, Koranco and Prudent<br />

Farms<br />

INDICATOR: Number of feasibility studies approved (5)<br />

TARGET(ANNUAL) ACTUALS TO DATE (OCT-DEC CUMMULATIVE TO DATE<br />

APR 2009- MAR 2010<br />

2009)<br />

5 0 0<br />

INDICATOR: Area of Pack houses and other Post Harvest Infrastructure constructed (17076 m 2 )<br />

TARGET(ANNUAL) ACTUALS TO DATE (OCT-DEC CUMMULATIVE TO DATE<br />

APR 2009- MAR 2010<br />

2009)<br />

0 0 0<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Carry out preconstruction<br />

activities for KIA-<br />

PCC<br />

• Viability Report was submitted and<br />

reviewed.<br />

• Consultants were requested to<br />

provide detailed socioeconomic<br />

analysis to support proposed Design<br />

• Receive and review Viability<br />

Report by end of January<br />

• Finalize Ownership and<br />

Management Terms for KIA<br />

PCC by March<br />

ii.<br />

iii.<br />

iv.<br />

Design and Build<br />

three Public Pack<br />

Houses.<br />

Design and Build<br />

25 Agric-Business<br />

Centers<br />

Other post harvest<br />

facilities<br />

• Pre-Bid Meeting was held on 1 st<br />

December with 15 Firms that had<br />

expressed interest.<br />

• Bids were opened on 30 th<br />

December and are currently being<br />

evaluated.<br />

• Stakeholder Meeting was held<br />

with prospective Beneficiaries on<br />

the 11 th of December to solicit<br />

input for the preparation of the<br />

Organization and Management<br />

Document.<br />

• RIC-Afram provided FBOs with<br />

- 19 -<br />

• Finalize Ownership and<br />

Management Terms for PPH<br />

by January<br />

• Commence Site Inspection of<br />

ABCs by 16 th January


POST HARVEST<br />

Technical Assistance to construct<br />

16 improved Maize Cribs.<br />

INDICATOR: Volume of products passing through post-harvest treatment (metric tons)<br />

TARGET(ANNUAL)<br />

APR 2009- MAR 2010<br />

ACTUALS TO DATE (OCT-DEC<br />

2009)<br />

CUMMULATIVE ACTUALS<br />

TO DATE<br />

111,820 2,804.2 6,129<br />

• The products passing through postharvest<br />

treatment in the Southern<br />

Horticultural Belt amounted to<br />

2,804.2 metric tons.<br />

i. Measure volume of<br />

products passing through<br />

post-harvest treatment<br />

Compliance with IPPC<br />

i. Facilitate passage of<br />

Seed Law and Plant<br />

Protection Law<br />

• Draft Plant and Seed Bills were<br />

forwarded to Parliament for debate<br />

and enactment<br />

• Hold Review Workshop for<br />

Agric and Subsidiary<br />

Legislation Committees of<br />

Parliament from the 29 th<br />

January to the 1 st February<br />

2010.<br />

• Finalize TOR for WRI,<br />

PPRSD and GSB equipment<br />

procurement and Training<br />

Needs Assessment<br />

- 20 -


ACTIVITY 5 IMPROVEMENT OF CREDIT SERVICES FOR ON-FARM AND<br />

VALUE-CHAIN INVESTMENTS<br />

Activity Objective:<br />

To augment the supply of, and access to Credit provided by Financial Institutions operating in the<br />

Intervention Zones.<br />

QTR. 11 PROGRESS<br />

AGRICULTURAL CREDIT ACTIVITY<br />

INDICATOR: Portfolio at risk of Agricultural Loan Fund (20%)<br />

ANNUAL TARGET<br />

(Apr 09 – Mar 10)<br />

ACTUALS TO DATE<br />

(October 09 – Dec 09)<br />

CUMMULATIVE ACTUALS<br />

TO DATE<br />

20% 18% 18%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Monitor Agricultural Loan<br />

Fund Disbursement<br />

ii. Training and Building<br />

Capacity of PFIs<br />

• Bank of <strong>Ghana</strong> undertook<br />

Monitoring Visits to 15 PFIs in<br />

all the Intervention Zones. Met<br />

with Key Management and<br />

Board Representatives to press<br />

for better oversight of ACP<br />

Funds.<br />

• <strong>MiDA</strong> Management approved<br />

modalities for implementing the<br />

Grants for PFI Loan Offices and<br />

Means of Transport (Motor<br />

Cycles and Motor Vehicles) to<br />

improve On-site Inspections<br />

and monitoring of Borrowers<br />

• Held a Stakeholder Review<br />

Workshop in November 2009 to<br />

garner feedback to improve the<br />

management of the ACP Funds<br />

• Bank of <strong>Ghana</strong> demanded and<br />

enforced the repayment of<br />

Overdue Payment of 3<br />

Commercial Banks in<br />

December 2009.<br />

• Stakeholders’ Meeting was<br />

used to correct perceived<br />

weaknesses in the Financial<br />

Accounting and Record<br />

Keeping of ACP Funds at the<br />

PFI level.<br />

- 21 -<br />

• Review 50% of the ACP<br />

Portfolio to identify in greater<br />

detail the quality of the<br />

Portfolio and Implement<br />

Measures to Improve the<br />

Quality of Performance<br />

• Implement rigorous monitoring<br />

on-site field trips to ensure<br />

compliance with ACP policies<br />

(BoG/ACPC)<br />

• Implement a wider program to<br />

collect Overdue Payment by<br />

PFIs in collaboration with the<br />

Management of Bank of <strong>Ghana</strong><br />

• Carry out the following<br />

Capacity Building Activities:<br />

- Skill-based Training in<br />

Core Agric Credit<br />

Appraisal and Monitoring<br />

- Additional training in<br />

Innovative Lending<br />

Products<br />

- Mentoring & Coaching<br />

- Loan Performance<br />

Monitoring


INDICATOR: Value of Loans disbursed to Clients from Agricultural Loan Fund (US$ 35,000,000)<br />

ANNUAL TARGET<br />

(Apr 09 – Mar 10)<br />

ACTUALS TO DATE<br />

(October 09 – Dec 09)<br />

CUMMULATIVE ACTUALS<br />

TO DATE<br />

US$ 15,000,000 US$ 2,093,515.81 US$ 12,707,915.90<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Process ACP Draw-Down<br />

Requests<br />

ii. Coordinate activities of<br />

Consultants and IEs engaged<br />

in Loan Disbursement<br />

• An amount of US$<br />

2,093,515.81 was disbursed<br />

through PFIs, bringing the<br />

cumulative disbursement to<br />

US$ 12,707,915.90.<br />

• <strong>MiDA</strong> Management approved<br />

modalities to commence<br />

Disbursement under the Grant<br />

to PFIs in support of the<br />

setting up of Loan Offices.<br />

• Coordinated the activities of<br />

PFIs, BoG, MoFA, CMC,<br />

RICs, TTSPs, and FBOs/SMEs<br />

to improve disbursement.<br />

• Held Meetings at the National<br />

and Zonal levels to coordinate<br />

activities of both Agric and<br />

Credit Teams.<br />

• Increase the number of PFIs<br />

actively participating in ACP<br />

• Increase disbursements to<br />

PFIs for eligible Beneficiaries<br />

(to meet Quarterly Target)<br />

• Implement arrangements to<br />

disburse under the Grant to<br />

PFIs in support of the setting<br />

up of Loan Offices<br />

• Enhance coordination of<br />

Agric Team’s Business<br />

Planning Training with the<br />

Banking Sector<br />

• Continue with regular<br />

Meetings to coordinate<br />

Program and Zonal level<br />

Activities of both Agric and<br />

Credit Teams.<br />

INDICATOR: Number of Loans disbursed to Clients from Agricultural Loan Fund (540)<br />

ANNUAL TARGET<br />

ACTUALS TO DATE CUMMULATIVE ACTUALS<br />

(Apr 09 – Mar 10)<br />

(October 09 – Dec 09)<br />

TO DATE<br />

270 55 279<br />

INDICATOR: Number of Clients receiving Loans from Agricultural Loan Fund (16,050)<br />

ANNUAL TARGET<br />

ACTUALS TO DATE CUMMULATIVE ACTUALS<br />

(Apr 09 – Mar 10)<br />

(October 09 – Dec 09)<br />

TO DATE<br />

13,000 2,171 9,744<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Process Business Plans of<br />

FBOs graduating from the<br />

Commercial Development<br />

of Farmer-Based<br />

Organizations (CDFO)<br />

Training Program.<br />

• An additional 55 Loans<br />

(covering 2, 171 Clients) were<br />

disbursed, bringing the<br />

cumulative to 269 (9, 744<br />

Clients).<br />

• Process the Business Plans of<br />

420 FBOs (21,000 members)<br />

that graduated in August and<br />

298 FBOs (14,000 members)<br />

that graduated in November<br />

from the Stage I (Business<br />

Plan and Skills) Training.<br />

- 22 -


INDICATOR: Number of Participating Financial Institutions accredited (60)<br />

ANNUAL TARGET<br />

(Apr 09 – Mar 10)<br />

ACTUALS TO DATE<br />

(October 09 – Dec 09)<br />

CUMMULATIVE ACTUALS<br />

TO DATE<br />

55 3 56<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Provide Accreditation to<br />

PFIs<br />

• Three (3) additional<br />

accreditations recorded, all<br />

FNGOs.<br />

• The cumulative number of<br />

Accredited PFIs is now 56,<br />

comprising 11 Commercial<br />

Banks, two (2) Savings &<br />

Loans Companies, 34 Rural<br />

and Community Banks and<br />

nine (9) FNGOs, and located<br />

in all the three Footprint<br />

Zones of <strong>MiDA</strong>.<br />

• Engage with the Banking<br />

Sector to improve the<br />

number of active members<br />

on the PFI Accredited List.<br />

• Increase number of<br />

Commercial Banks as PFIs<br />

INDICATOR: Number of Participating Financial Institutions’ Staff trained (480)<br />

ANNUAL TARGET<br />

(Apr 09 – Mar 10)<br />

ACTUALS TO DATE<br />

(October 09 – Dec 09)<br />

200 0 173<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Organize Training and<br />

Sensitization Programs in<br />

Agric Credit<br />

• There was no core Agric<br />

Finance Training for PFIs and<br />

Senior Management.<br />

• Stakeholders’ Meeting was used<br />

to correct perceived weaknesses<br />

in the financial accounting and<br />

record keeping of ACP Funds at<br />

the PFI level.<br />

CUMMULATIVE ACTUALS<br />

TO DATE<br />

• Carry out the following<br />

Capacity Building Activities:<br />

- Skill-based Training in<br />

Core Agric Credit<br />

Appraisal and Monitoring<br />

- Additional training in<br />

Innovative Lending<br />

Products<br />

- Mentoring & Coaching<br />

- Loan Performance<br />

Monitoring<br />

INDICATOR: Total Outstanding Principal Balance for group/individual loans (US$35,000,000)<br />

ANNUAL TARGET<br />

(Apr 09 – Mar 10)<br />

ACTUALS TO DATE<br />

(October 09 – Dec 09)<br />

CUMMULATIVE ACTUALS<br />

TO DATE<br />

US$ 15,000,000 US$ 1,216,176.99 US$ 9,344,875.34<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Coordinate Activities with<br />

Agric Team<br />

• The cumulative Outstanding<br />

Principal Balance stood at<br />

US$ 9,344,875.34.<br />

• There was active coordination<br />

between the Agric Credit and<br />

Agric Teams at Program and<br />

Zonal Levels<br />

• Continue effective<br />

coordination with Agric<br />

Team’s CDFO Program at<br />

both Program and Zonal<br />

Levels<br />

*This is based on funds disbursed to the PFIs by Bank of <strong>Ghana</strong><br />

**This is based on funds actually disbursed by PFIs to final borrowers. There is a significant amount of funds<br />

disbursed by Bank of <strong>Ghana</strong> to PFIs which are yet to be disbursed to borrowers. This is partly due to phased<br />

disbursements to borrowers according to stages of need agreed between borrowers and PFIs.<br />

- 23 -


ACTIVITY 6: REHABILITATION OF FEEDER ROADS<br />

Activity Objective:<br />

To reduce transportation costs and time by rehabilitating up to 950 km of Feeder Roads in eight (8)<br />

Districts in the Intervention Zones in order to:<br />

i. Increase access to major domestic and international markets.<br />

ii. Facilitate transportation linkages from rural areas to social service networks (including, for<br />

instance, hospitals, clinics and schools).<br />

QTR 11 PROGRESS<br />

1.6 FEEDER ROADS<br />

INDICATOR: Value of Signed Contracts for Feeder Road Works (USD 62,436,571)<br />

TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

2009- MAR 2010<br />

(OCT - DEC 2009)<br />

USD 24,436,011 USD 18,443,422.17 USD 18,443,422.17<br />

INDICATOR: Kilometers of Feeder Roads completed (406km)<br />

TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

2009- MAR 2010<br />

(OCT - DEC 2009)<br />

N/A 1 N/A N/A<br />

ACTIVITY STATUS NEXT STEPS<br />

LOT 1(NR series)<br />

i. Close/Open Bids for NR<br />

Series.<br />

ii. Commence Evaluation of<br />

Bids for NR Series.<br />

iii. Obtain MCC Approval for<br />

BEP Report on NR Series<br />

iv. Obtain <strong>MiDA</strong> Board<br />

Approval of Recommended<br />

Contractors for NR Series.<br />

LOT 2 (EC series)<br />

Obtain Performance<br />

Securities.<br />

• Bids were submitted and opened on<br />

28 th October, 2009.<br />

• Evaluation of Bids started on 9 th<br />

November, and was completed on<br />

23 rd November, 2009.<br />

• MCC and Board approvals for<br />

Award of Contracts to Respective<br />

Contractors were obtained on 9 th<br />

December, 2009.<br />

• Letters of Acceptance were issued<br />

to Respective Contractors on 10 th<br />

December, 2009.<br />

• Performance Guarantees were<br />

submitted to <strong>MiDA</strong> on 31 st<br />

December, 2009.<br />

• Performance Securities for Lots<br />

EC2 & EC3 were received on 2 nd<br />

October, 2009<br />

• Performance Security for EC1 was<br />

received on 12 th October, 2009.<br />

• Sign Contract with<br />

Respective Contractors.<br />

• Mobilize to commence the<br />

works.<br />

1 Targets have been earmarked for <strong>report</strong>ing in Year 4.<br />

- 24 -


i. Sign Contract for Lots EC2<br />

and EC3.<br />

ii. Issue Notification to start<br />

Work for EC2 and EC3.<br />

iii. Hand over site to<br />

Contractors.<br />

LOT 3 (VR series)<br />

i. Re-issue Request for Bids<br />

for Lot VR1 Works<br />

ii. Obtain <strong>MiDA</strong> Board<br />

Approval for Award of<br />

Contract for recommended<br />

Contractor for Lot VR 2.<br />

iii. Obtained MCC and <strong>MiDA</strong><br />

Approval for Contract<br />

Award and Signing of Lot<br />

VR3.<br />

iv. Obtain USIAD Approval<br />

to Commence Procurement<br />

for Bidding of Lot VR4<br />

Works<br />

• Contracts were signed with Messrs<br />

GKL/Kamsad JV for Lots EC2 &<br />

EC3 on 5 th October, 2009.<br />

• Contract was signed with Messrs.<br />

Big Aidoo for Lot EC1 on 13 th<br />

October, 2009.<br />

• Consultant issued notice to<br />

commence Works on 15 th October,<br />

2009<br />

• Sod cutting to commence Works<br />

was held for Lot EC1 on 24 th<br />

November 2009<br />

• Physical Works for all three Lots<br />

commenced in December, 2009.<br />

• Procurement process for re-bidding<br />

of Lot VR1 commenced on 15 th<br />

October, 2009.<br />

• Bids closed for Lot VR1 on 26 th<br />

November, 2009.<br />

• Evaluation of Bids was completed<br />

and Report submitted to MCC for<br />

approval on 29 th December, 2009<br />

• <strong>MiDA</strong> Board did not give approval<br />

to the recommended Contractor for<br />

Lot VR2 on 26 th October, 2009.<br />

• Procurement process for re-bidding<br />

of Lot VR2 commenced on 16 th<br />

December, 2009.<br />

• MCC and Board Approvals for<br />

Award of Contract for Lot VR3<br />

were obtained on 9 th December,<br />

2009<br />

• Performance Guarantee was<br />

received from Messrs. Justmoh<br />

Construction limited (Lot VR3) on<br />

21 st December, 2009.<br />

• USAID still processing Lot VR 4<br />

for funding.<br />

• Continue Construction<br />

Works at all three (3) Sites<br />

• Obtain Approvals from MCC<br />

and Board for award of<br />

contract on Lot VR 1(Re-<br />

Bid).<br />

• Close and Evaluate received<br />

Bids for Lot VR2.<br />

• Obtain Approvals from MCC<br />

and Board for award of<br />

Contract on Lot VR 1.<br />

• Sign Contract on Lot VR3<br />

with Messrs. Justmoh<br />

Construction Limited.<br />

• Hand-over of Site to winning<br />

Contractor.<br />

• Obtain USIAD Approval to<br />

Commence Procurement for<br />

Bidding of Lot VR4 Works<br />

INDICATOR: Kilometers of Feeder Roads designed (950 km)<br />

TARGET(ANNAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

2009- MAR 2010<br />

(OCT - DEC 2009)<br />

950 km 31.18 km 570.81km<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Design Feeder Roads – LOT • Draft designs on 227.2 km of • Obtain Final Designs on<br />

1: NR Series) (337.1 km) to additional road length under 227.2 km of Roads<br />

- 25 -


DFR Standards<br />

ii. Design Feeder Roads – LOT<br />

2: EC Series (386.5 km) to<br />

DFR Standards<br />

iii. Design Feeder Roads – VR<br />

Series: LOT 3 (221.3 km) to<br />

DFR Standards<br />

Tranche B submitted.<br />

• Cumulatively, 110.5 km total<br />

road length (Tranche A) designed<br />

have been approved.<br />

• Draft designs on 43.8 km of<br />

additional road length under<br />

Tranche B submitted.<br />

• Cumulatively, 283.11 km total<br />

road length (Tranches A&B)<br />

designed have been approved.<br />

• 31.18 km of additional road<br />

length designed under Tranche B.<br />

• Cumulatively, 177.20 km total<br />

road length (Tranches A&B)<br />

designed have been approved.<br />

(Tranche B) by end of<br />

Quarter 12.<br />

• Obtain Final Designs on<br />

43.8 km of Roads (Tranche<br />

B) by end of Quarter 12.<br />

INDICATOR: Percent of Contracted Design/Feasibility Studies completed (100%)<br />

TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

2009- MAR 2010<br />

(OCT -DEC 2009)<br />

100% 32.7% 89.8%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Complete Design/<br />

Feasibility Studies for<br />

944.9km of Feeder Roads<br />

• 32.7% of Feasibility/Designs was<br />

completed during the Quarter<br />

• Overall completion of Feasibility<br />

Designs is 89.8% for Lots 1, 2 &<br />

3.<br />

• Complete Final Designs on<br />

outstanding Contract<br />

(10.2%).<br />

INDICATOR: Number of Environmental Assessments approved<br />

TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

2009- MAR 2010<br />

(OCT -DEC 2009)<br />

3 0 2<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Obtain Environmental<br />

Permit for Lot 1: NR Series<br />

• Payment for Permit for NR Roads<br />

was made to EPA on 30th<br />

December, 2009.<br />

• Obtain EPA Permit for NR<br />

Series.<br />

INDICATOR: Number of RAPs for Feeder Roads as appropriate<br />

TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

2009- MAR 2010<br />

(OCT -DEC 2009)<br />

3 1 3<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Obtain Approval for Feeder<br />

Roads Mini-RAPs<br />

• Mini-RAPs for Lots 2 and 3<br />

submitted to MCC for Approval.<br />

• Mini Rap for the Lot 1 (NR Series)<br />

submitted by Consultant.<br />

• Implement Mini-RAP for<br />

Lot 2.<br />

- 26 -


PROJECT 2: TRANSPORTATION PROJECT<br />

Objective:<br />

To reduce Transportation cost affecting Agricultural Commerce at the Sub-Regional and Regional levels,<br />

in order to improve the Competitiveness of Agricultural Producers using Roads in the Intervention Zones.<br />

QTR. 11 PROGRESS<br />

2.1 N1 ACTIVITY<br />

INDICATOR: Percent of Contracted Road Works disbursed: N1 Lot 1 (100%)<br />

TARGET(ANNUAL) ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

APR 2009- MAR 2010<br />

(OCT-DEC 2009)<br />

41.6% 5.35% 17.80%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Carry out General<br />

Excavation and Filling<br />

Works on Ch. 2+000<br />

to Ch. 4+900<br />

• Actual Physical Completion achieved<br />

was 19.64% as against Planned Physical<br />

Completion of 22.7 %.<br />

• Supervision Reports on Monthly<br />

Progress of N1 Lot 1 Main Works<br />

obtained.<br />

• Monthly Technical Meetings for N1 Lot<br />

1 Construction Works organized.<br />

- 27 -<br />

• Clear Site of structures.<br />

• Carry out Earthworks<br />

• Execute Drainage Works<br />

• Continue Foundation for<br />

Bridge and Retaining Walls<br />

at Dimples Interchange<br />

INDICATOR: Percent of Contracted Road Works disbursed: N1 Lot 2 (100%)<br />

TARGET(ANNUAL)<br />

APR 2009- MAR 2010<br />

ACTUALS FOR THE QUARTER (OCT-<br />

DEC 2009)<br />

CUMMULATIVE TO<br />

DATE<br />

41.6% 10% 10%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Sign Contract with<br />

Messrs.MSF.<br />

• <strong>MiDA</strong> signed Contract with Messrs.<br />

Moniz da Maia Serra & Fortunato-<br />

Empereiteros (MSF), the Contractor for<br />

ii.<br />

iii.<br />

Issue Notice to<br />

Commence N1 Lot<br />

2 Works.<br />

Carry out pre-<br />

Construction<br />

Activities<br />

N1 Lot 2 on 1 st October, 2009.<br />

• ICT-BANS JV issued Notice of Works<br />

commencement on 14 th October, 2009<br />

• 23 rd December, 2009.<br />

• <strong>MiDA</strong> handed over Section 1(Km<br />

12+500 to Km 14+119) to Contractor<br />

on 15 th October, 2009.<br />

• Contractor submitted of evidence of<br />

insurance on 13 th November, 2009.<br />

• <strong>MiDA</strong> received Contractor’s revised<br />

Work Program and Method Statement<br />

on 15 th December, 2009.<br />

• Environmental Baseline Survey <strong>report</strong>,<br />

revised EMP, revised Health and<br />

Safety Management Plans were<br />

received on 15 th December, 2009.<br />

• ICT BANs and Messrs. MSF jointly<br />

inspected Utility Relocation Works at<br />

• Hand over all Sections of<br />

N1 Lot 2.<br />

• Complete topographic<br />

surveys for entire<br />

corridor.<br />

• Complete Pile foundation<br />

tests on Site.<br />

• Commence STI and AID<br />

awareness on site<br />

• Complete investigations<br />

on Quarries and Borrow<br />

pits.


various Utility crossing points within<br />

Section 1 (Ch. 12+500–Ch. 14+119) on<br />

23 rd December, 2009.<br />

INDICATOR: Number of RAPs approved (2)<br />

TARGET(ANNUAL)<br />

APR 2009- MAR 2010<br />

ACTUALS FOR THE QUARTER (OCT-<br />

DEC 2009)<br />

CUMMULATIVE TO<br />

DATE<br />

1 1 1<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Procure Contractor to<br />

commence<br />

Construction Works at<br />

Ayi-Mensa Relocation<br />

Site (N1 Lot 1)<br />

• Contractor was procured for the<br />

Construction of Ayi-Mensa Site for Cane<br />

and Rattan Group of PAPs.<br />

ii. Procure Contractor to<br />

complete Kokroko<br />

Resettlement Site (N1<br />

Lot 2)<br />

2.2 TRUNK ROADS ACTIVITY<br />

• Drawings and Bill of Quantities (BOQ)<br />

for reinstatement of Kokroko re-location<br />

Site is under review.<br />

• Procure Contractor to<br />

complete reinstatement of<br />

Kokroko Site.<br />

INDICATOR: Kilometers of Trunk Roads designed (230 km)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC ‘09)<br />

CUMMULATIVE TO<br />

DATE<br />

230 0 75.21<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Submit Interim Designs for<br />

Tranche B Roads<br />

• Interim and Draft Designs on<br />

168.5km of additional Road length<br />

under Tranche B was submitted.<br />

• Obtain Final Designs on<br />

168.5km of roads under<br />

Tranche B by end of<br />

Quarter.<br />

INDICATOR: Percent of Contracted Design/Feasibility Studies completed (100%)<br />

TARGET(ANNUAL) APR<br />

2009- MAR 2010<br />

ACTUALS FOR THE QUARTER<br />

(OCT-DEC ‘09)<br />

CUMMULATIVE TO<br />

DATE<br />

100% 70.32%<br />

ACTIVITY STATUS NEXT STEPS<br />

• Complete Feasibility<br />

Studies/ Designs on<br />

outstanding 32.5%.<br />

• Overall completion of Feasibility<br />

Studies/ Designs is 70.32%.<br />

• Complete outstanding<br />

Final Designs.<br />

INDICATOR: Number of RAPs approved (1)<br />

TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />

2009- MAR 2010 QUARTER (OCT-DEC ‘09)<br />

1 0 0<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Obtain Mini-RAP approval<br />

for Trunk Road Tranche A<br />

• Mini-RAP under review by<br />

<strong>MiDA</strong> and MCC.<br />

• Engineer/Contractor to<br />

commence Implementation of<br />

Mini RAP<br />

- 28 -


2.3 FERRY ACTIVITY<br />

INDICATOR: Rehabilitation of Akosombo Floating Dock Completed<br />

TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />

2009- MAR 2010 QUARTER (OCT–DEC 2009)<br />

N/A 2 N/A N/A<br />

INDICATOR: Percent Physical Completion of Floating Dock and Construction of 2 No. Ferries<br />

TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />

2009- MAR 2010 QUARTER (OCT–DEC 2009)<br />

N/A 3 N/A N/A<br />

INDICATOR: Value of Signed Contracts for Works: Ferry and Floating dock (USD 5,905,000)<br />

TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />

2009- MAR 2010 QUARTER (OCT–DEC 2009)<br />

5,905,000 0 0<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Rehabilitate Floating Dock<br />

and Construct 2 No. Ro-Ro<br />

Ferries to Germanscher<br />

Lloyds (GL) Classification<br />

Standards (Lot FS1)<br />

• Bids for FS1 were submitted and<br />

opened on 2nd December, 2009.<br />

• Evaluation of Bids was<br />

completed on 18 th December,<br />

2009.<br />

• BEP Report was submitted to<br />

<strong>MiDA</strong> Management on 21 st<br />

December, 2009.<br />

• <strong>MiDA</strong> received MCC approval<br />

on 31 st December, 2009.<br />

• Obtain MCC and <strong>MiDA</strong> Board<br />

approvals for award of<br />

Contract.<br />

• Sign Contract with winning<br />

Contractor.<br />

• Commence Pre-construction<br />

activities(Mobilization period)<br />

INDICATOR: Percent Physical Completion of Civil Works at Landing Stages and Ferry Terminals<br />

TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />

2009- MAR 2010 QUARTER (OCT –DEC ‘09)<br />

N/A N/A N/A<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Carry out Extension of<br />

Landing Stages and<br />

Rehabilitation of Terminal<br />

Facilities (Lot FS2)<br />

• There was no successful Bid for<br />

Lot FS2.<br />

.<br />

• Commence procurement<br />

process for re-Bidding of Lot<br />

FS2.<br />

• Submit/Open Bids for Lot FS2<br />

• Evaluate received Bids<br />

• Obtain MCC and <strong>MiDA</strong> Board<br />

approvals for award of<br />

Contract.<br />

• Sign Contract with<br />

recommended Contractor.<br />

Other: Removal of Stumps<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Provide Designs for Stump<br />

Removal<br />

• VRA submitted priced BOQ to<br />

<strong>MiDA</strong>.<br />

• Modify current <strong>MiDA</strong>/<br />

VRA/ VLTC MoU into IEA<br />

2 Targets have been earmarked for <strong>report</strong>ing from Year 4 (i.e. April 2010)<br />

3 Targets have been earmarked for <strong>report</strong>ing from Year 4 (i.e. April 2010)<br />

- 29 -


PROJECT 3:<br />

RURAL DEVELOPMENT PROJECT<br />

Objective:<br />

To support Agricultural and Agri-business Development under the Agriculture Project and to strengthen<br />

Rural Institutions that provide complementary Services.<br />

ACTIVITY 1: PROCUREMENT CAPACITY ACTIVITY<br />

Activity Objectives:<br />

i. To strengthen the Capacity of various Procurement Entities in Government Organizations, to Procure<br />

Goods, Works and Services with greater Economy, Efficiency and Effectiveness.<br />

ii. Enable Entities to implement <strong>Ghana</strong>’s Public Procurement Act 2003 (Act 663) by assisting in the<br />

development of Training Materials for the Staff of such Entities, the formation of a Career path within<br />

the Public Sector for Procurement Professionals and the placement of Trainees in such Procurement<br />

Entities, to provide them with practical experience.<br />

Development of Modules<br />

Indicator: Number of Tertiary Institutions using the Modules developed by PPA/<strong>MiDA</strong> (8)<br />

TARGET (ANNUAL)<br />

APR 2009-MAR 2010<br />

ACTUALS TO DATE<br />

OCT – DEC 2009<br />

CUMMULATIVE<br />

ACTUALS TO DATE<br />

1 0 0<br />

ACTIVITY STATUS NEXT STEP<br />

i. Obtain Revised Draft<br />

Curricula and Modules<br />

from Crown Agents,<br />

• Crown Agents submitted a revised<br />

version of the Draft Curricula and<br />

Modules to PPA/<strong>MiDA</strong> on 15 th<br />

October 2009 as scheduled.<br />

• The Draft Curricula was reviewed by<br />

the PPA and further revision<br />

requested for the Curricula and<br />

Modules for the 4-Year Bachelor’s<br />

Degree Program.<br />

ii.<br />

Working Group to<br />

complete review of<br />

Revised Draft Curricula<br />

and Modules<br />

• Revisions to the Curricula and<br />

Modules were completed by Crown<br />

Agents and revised versions of the<br />

documentation submitted on 15 th<br />

December, 2009. Further revisions<br />

were requested of the Consultant for<br />

incorporation in the Final Version.<br />

iii.<br />

iv.<br />

Finalize Curricula and<br />

Modules<br />

Hold Stakeholders<br />

Workshop on Draft<br />

Curricula and Modules<br />

• The Draft Final Version of the<br />

Curricula and Modules was submitted<br />

to PPA/ <strong>MiDA</strong> on 31 st Dec., 2009.<br />

• A Stakeholders Workshop was held<br />

on 24 th and 25 th November, 2009 to<br />

discuss the Draft Curricula and<br />

• Obtain PPA/<strong>MiDA</strong><br />

Approval of the Draft Final<br />

version of the Curricula<br />

and Modules.<br />

- 30 -


Modules for all three categories of<br />

Procurement Training envisaged;<br />

namely i) 3–6 months Training for<br />

Procurement Practitioners, ii) 15–24<br />

months post-HND course, and iii) 4-<br />

year Bachelors Degree courses with a<br />

Procurement option for WASSCE<br />

students.<br />

• The following 12 Tertiary Institutions<br />

participated in the Workshop:<br />

i. Catholic Institute of Business &<br />

Technology<br />

ii. Kwame Nkrumah University of<br />

Science & Technology<br />

iii. University of Cape Coast<br />

iv. <strong>Ghana</strong> Institute of Management<br />

& Public Administration<br />

v. Methodist University<br />

vi. Central University College<br />

vii. University College of<br />

Management Studies<br />

viii. Zenith University College<br />

ix. Institute of Professional Studies<br />

x. Koforidua Polytechnic<br />

xi. Accra Polytechnic<br />

xii. Takoradi Polytechnic<br />

v. Hold Consultations with<br />

Tertiary Institutions<br />

vi. Hold Consultations with<br />

Stakeholders<br />

• Held discussions with the following<br />

on the proposed dates for the<br />

commencement of Procurement<br />

Training:<br />

- Catholic Institute of Business and<br />

Technology (CIBT)<br />

- <strong>Ghana</strong> Institute of Management<br />

and Public Administration<br />

(GIMPA)<br />

- Management, Development and<br />

Productivity Institute (MDPI)<br />

- Koforidua Polytechnic<br />

- Kumasi Polytechnic<br />

- Takoradi Polytechnic<br />

• Views of the following Stakeholders<br />

have been incorporated into the Draft<br />

Final Versions of the Curricula and<br />

Modules for procurement Training:<br />

- 31 -<br />

• Obtain Final Versions of<br />

the Curricula and Modules<br />

for various categories of<br />

Procurement Training.<br />

• Obtain PPA/<strong>MiDA</strong><br />

Approval for Report on<br />

the Curricula and<br />

Modules.<br />

• Distribute copies of Report<br />

to Tertiary Institutions.<br />

• Commence Procurement<br />

Training as follows:<br />

- CIBT: Feb 2010,<br />

starting with 2 nd Year<br />

Business Students<br />

- GIMPA: Post-HND<br />

and B.Sc. programs in<br />

Feb 2010.<br />

- MDPI: 3-6 month<br />

course by Mar 2010.<br />

Comments of various<br />

stakeholders attending the<br />

Stakeholders Workshop are to<br />

be incorporated in the final


- National Council for Tertiary<br />

Education<br />

- National Accreditation Board<br />

- Curriculum Development Section<br />

of the Ministry of Education<br />

- Management Development &<br />

Productivity Institute<br />

- <strong>Ghana</strong> Institutions of Engineers<br />

- <strong>Ghana</strong> Institution of Surveyors<br />

- <strong>Ghana</strong> Institute of Architects<br />

- Ministry of Trade & Industry<br />

- Chartered Institute of Purchasing<br />

& Supply, <strong>Ghana</strong><br />

Version of the Curricula and<br />

Modules.<br />

Procurement Training in <strong>Ghana</strong><br />

Number of individuals completing Internships (1600)<br />

TARGET (ANNUAL)<br />

ACTUALS TO DATE<br />

APR 2009-MAR 2010<br />

OCT – DEC 2009<br />

CUMMULATIVE<br />

ACTUALS<br />

TO DATE<br />

300 0 265<br />

Number of Institutions that agree to accept Interns (500)<br />

TARGET (ANNUAL)<br />

APR 2009-MAR 2010<br />

ACTUALS TO DATE<br />

OCT – DEC 2009<br />

CUMMULATIVE<br />

ACTUALS<br />

TO DATE<br />

150 0 180<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Evaluate effectiveness<br />

of Internship Program.<br />

• Surveys to assess the 2009 Internship<br />

Program have been conducted at the<br />

Kumasi, Takoradi, Accra and<br />

Koforidua Polytechnics.<br />

• Responses received have been used to<br />

produce a Report (90% complete)<br />

which represents an evaluation of the<br />

2009 Internship Program.<br />

• MCC’s comments will be<br />

incorporated in the final<br />

version of the Report.<br />

ii.<br />

Post interns to Hosting<br />

Institutions.<br />

• Solicit vacancies from<br />

Public Sector Institutions<br />

early enough.<br />

• Complete Postings by end<br />

March 2010.<br />

• Complete Consultations<br />

with NSS on Placement of<br />

Interns at Institutions where<br />

they undertook their<br />

Internship Program<br />

- 32 -


ACTIVITY 2: COMMUNITY SERVICES<br />

Activity Objectives:<br />

i. To support and protect Agricultural Investments in the 30 Districts, by ensuring that Community<br />

Services are available to the Beneficiary Farmers and Families.<br />

ii. To improve basic Social Infrastructure like Education, Water and Sanitation, and Rural Electrification,<br />

to serve as the catalyst for improvements in Rural Agricultural Production.<br />

QTR. 11 PROGRESS<br />

3.2a Local Government Service Delivery<br />

INDICATOR: Level of Citizen Satisfaction with Services<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(JUL-SEP 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

N/A N/A N/A<br />

MILESTONES/<br />

STATUS<br />

NEXT STEPS<br />

ACTIVITIES<br />

i. Operationalize IEA<br />

with MLGRD<br />

• Four (4) Regional Workshops intended<br />

to sensitize District Authorities could<br />

not come off as planned.<br />

• Liaise with MLGRD to<br />

organize Sensitization<br />

Workshops in February<br />

2010<br />

3.2b Education Facilities Sub-Activity<br />

INDICATOR: Number of Schools rehabilitated (35)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

35 N/A (All 35 completed by end of Q9) 35<br />

MILESTONES/<br />

STATUS<br />

NEXT STEPS<br />

ACTIVITIES<br />

i. Rehabilitate 35<br />

schools in 10 Districts<br />

and supply requisite<br />

furniture<br />

• Outstanding furniture for Savelugu<br />

Nanton District have been <strong>full</strong>y<br />

supplied and accepted by Inspection<br />

Teams.<br />

• Training is ongoing for 260<br />

Community Teachers in all the three<br />

Intervention Zones in <strong>MiDA</strong><br />

Rehabilitated Schools and other ones in<br />

the Districts.<br />

• Monitor completed<br />

projects during Defects<br />

Liability Period in<br />

Akuapim Municipality,<br />

Kwahu North, Kwahu East<br />

and Kwahu South<br />

Districts.<br />

- 33 -


INDICATOR: Number of School Blocks constructed (361)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

30 4 24<br />

MILESTONES/<br />

STATUS<br />

NEXT STEPS<br />

ACTIVITIES<br />

i. Reconstruct 30 flood<br />

affected Schools in 5<br />

districts of the<br />

Northern Intervention<br />

Area<br />

• Cumulatively, 24 School Blocks made<br />

up of seven (7) in Tolon-Kumbungu,<br />

six (6) in West Mamprusi, two (2) in<br />

Savelugu Nanton, five (5) in Karaga<br />

Districts, and four (4) in Tamale Metro<br />

have been completed.<br />

• On the average, about 82% of Civil<br />

Works have been completed on the<br />

• Complete, commission<br />

and take over Phase IB<br />

(Flood-affected Schools)<br />

• Award Contracts for the<br />

supply of Furniture to<br />

Flood-affected Schools<br />

ii. Prepare IDIQ<br />

Qualification<br />

documents for the<br />

selection of<br />

Contractors( Phase II)<br />

remaining 5 project sites.<br />

• Pre-Bid Meetings were organized for<br />

Prospective Contractors on the 12 th ,<br />

14 th and 16 th October, 2009 in Tamale,<br />

Kumasi and Accra respectively.<br />

• Bids were received on the 5 th , 6 th and<br />

9 th of November, 2009.<br />

• Bids Evaluation was completed on 24<br />

November, 2009.<br />

• Sign IDIQ Contracts for<br />

Phase II Education<br />

Projects<br />

INDICATOR: Number of School Blocks designed and diligenced (396)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

396 117 182<br />

MILESTONES/<br />

STATUS<br />

NEXT STEPS<br />

ACTIVITIES<br />

i. Sign contract for Task<br />

Order for educational<br />

facilities for the<br />

Southern Horticultural<br />

Belt (SHB)<br />

• Final Detailed Engineering Report on<br />

53 School Blocks, three (3) Teachers’<br />

Accommodation and 37 Toilet/Urinals<br />

were submitted by the Consultant and<br />

reviewed.<br />

• Issue Works Orders and<br />

sign Contracts<br />

ii. Sign contract for Task<br />

Order for educational<br />

facilities for the<br />

Northern Agricultural<br />

Zone (NAZ)<br />

iii. Sign contract for Task<br />

Order for educational<br />

facilities for the Afram<br />

Basin Zone (ABZ)<br />

• Final Detailed Engineering Report on<br />

64 School Blocks, three (3) Teachers’<br />

Accommodation, one (1) ICT Center<br />

and 67 Toilets/Urinals were submitted<br />

by the Consultant and reviewed.<br />

• Feasibility Studies Report on 64<br />

School Blocks, three (3) Teachers’<br />

Accommodation, one (1) ICT Center<br />

and 67 Toilets/Urinals were submitted<br />

by the Consultant and reviewed.<br />

• Issue Works Orders and<br />

sign Contracts<br />

• Obtain Detailed<br />

Engineering Design<br />

Report from Consultant<br />

Other Education Facilities Sub-Activity Milestones/Activities<br />

i. Operationalize IEA • Proposal for incremental cost budget<br />

with the Ministry of submitted by the MoE to <strong>MiDA</strong><br />

Education (MoE) reviewed and accepted.<br />

• Collaborate with the MoE<br />

to achieve its objectives<br />

under the IEA.<br />

- 34 -


3.2c Water and Sanitation Sub-Activity<br />

INDICATOR: Number of boreholes/wells/non-conventional water systems identified and<br />

diligenced for construction (350)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

150 144 144<br />

MILESTONES/ACTIVI STATUS<br />

NEXT STEPS<br />

TIES<br />

i. Sign Contract for Task<br />

Order for Boreholes and<br />

Pipe Extensions for the<br />

Southern Horticultural<br />

Belt (SHB)<br />

• Final Detailed Engineering Report for<br />

86 Boreholes were received from the<br />

Consultant and reviewed.<br />

ii. Sign Contract for Task<br />

Order for Boreholes and<br />

Small Town Water<br />

System (STWS) for the<br />

Northern Agricultural<br />

Zone (NAZ)<br />

iii. Sign contract for Works<br />

order for boreholes and<br />

STWS for the Afram<br />

Basin<br />

• Final Detailed Engineering Report for<br />

58 Boreholes were received from the<br />

Consultant and reviewed.<br />

• Feasibility Studies Report for 93<br />

boreholes submitted and reviewed.<br />

• Issue Works Orders and<br />

sign Contracts<br />

• Issue Works Orders and<br />

sign Contracts<br />

• Obtain Draft Detailed<br />

Design Report from<br />

Consultants.<br />

INDICATOR: Number of Small Town Water System (STWS) identified and diligenced for<br />

construction (25)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

(OCT-DEC 2009)<br />

25 1 1<br />

MILESTONES/ACTIVI STATUS<br />

NEXT STEPS<br />

TIES<br />

iv. Sign Contract for Task • Feasibility Studies Report for 1<br />

Order for Small Town STWS was received from the<br />

Water System (STWS) Consultant and reviewed.<br />

for the Northern<br />

Agricultural Zone<br />

(NAZ)<br />

• Issue Works Orders and<br />

sign Contracts<br />

Sign contract for Works<br />

order for STWS for the<br />

Afram Basin<br />

• Feasibility Studies Report for 13<br />

STWS were submitted and reviewed.<br />

• Obtain Final Engineering<br />

Report from Consultants.<br />

• Issue Works Orders and<br />

sign Contracts<br />

INDICATOR: Number of Pipe Extension Projects designed and diligenced for construction (10)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

10 9 9<br />

MILESTONES/ACTIVI STATUS<br />

NEXT STEPS<br />

TIES<br />

v. Sign contract for the • Feasibility Study Report and EIA<br />

Tamale Water Extension Scoping Report for TWEP were<br />

Project (TWEP)<br />

received from the Consultant and<br />

reviewed.<br />

• Draft Detailed Engineering Design is<br />

- 35 -<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

• Obtain Draft Detailed<br />

Engineering Design<br />

Report from Consultants.<br />

• Commence Bidding<br />

Process for the


vi. Sign Contract for Works<br />

Contract for Pipe<br />

Extensions for the<br />

Southern Horticultural<br />

Belt (SHB)<br />

ongoing.<br />

• Final Detailed Engineering Report for<br />

9 Pipe Extensions were received from<br />

the Consultant and reviewed<br />

procurement of<br />

Contractors<br />

• Issue Works Orders and<br />

sign contracts<br />

Other Water and Sanitation Sub-Activity Milestones/Activities<br />

i. Operationalize IEA with • Proposal for incremental cost budget<br />

MWRWH<br />

submitted by the MWRWH to <strong>MiDA</strong><br />

was reviewed and accepted.<br />

• Collaborate with the<br />

Ministry to achieve its<br />

objectives under the IEA.<br />

3.2d Rural Electrification Sub-Activity<br />

INDICATOR: Number of Rural Electrification Projects identified and diligenced for construction<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

10 10 10<br />

INDICATOR: Kilometers of Electricity Lines identified and diligence (200 km)<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(OCT-DEC 2009)<br />

CUMULATIVE<br />

ACTUALS TO DATE<br />

93 93 93<br />

MILESTONES/<br />

STATUS<br />

NEXT STEPS<br />

ACTIVITIES<br />

i. Sign Contract for Task<br />

Order for Feasibility<br />

Studies for 33kV O/H<br />

lines and transformer<br />

Stations in the Southern<br />

Zone<br />

• Final Engineering Design Report for<br />

26km, 33kV O/H lines and 10<br />

Transformer Stations was completed by<br />

Consultant, reviewed and accepted by<br />

<strong>MiDA</strong>.<br />

• Bidding Documents for the solicitation<br />

of Contractors were completed.<br />

• Issue Bidding Documents<br />

and evaluate.<br />

• Award Contracts for Rural<br />

Electrification Projects for<br />

the Southern Zone.<br />

• Undertake Due Diligence<br />

on the Agri-Business<br />

Centers to assess the<br />

Energy needs.<br />

ii. Sign Contract for Task<br />

Order for the<br />

Construction of 33kV<br />

O/H lines and<br />

Transformer Stations in<br />

the Northern Zone<br />

• Final Engineering Design Report for<br />

67km, 33kV O/H lines and 2<br />

Transformer Stations was completed by<br />

Consultant, reviewed and accepted by<br />

<strong>MiDA</strong>.<br />

• Bidding Documents for the solicitation<br />

of Contractors were completed.<br />

• Issue Bidding Documents<br />

and evaluate<br />

• Award Contracts for Rural<br />

Electrification Projects for<br />

the Northern Zone.<br />

• Undertake Due Diligence<br />

on the Agri-Business<br />

Centers to assess the<br />

Energy needs.<br />

Other Rural Electrification Sub-Activity Milestones/Activities<br />

Sign IEA with Ministry of • Proposed Budget for incremental cost<br />

Energy<br />

received from MoEn still under review<br />

pending the outcome of due diligence<br />

on the ABCs.<br />

• Define final scope of<br />

works for the Agric<br />

Business Centers 4 .<br />

4 Awaiting selection of ABC from <strong>MiDA</strong> Agric Department<br />

- 36 -


ACTIVITY 3: FINANCIAL SERVICES<br />

Objectives:<br />

i. To improve the efficiency of the National Payments and Settlements System through the<br />

establishment of an Electronic Payment System.<br />

ii. To enhance access to Financial Services in the Rural Economy through the Automation,<br />

Computerization and Interconnectivity of all the Rural Banks in the country.<br />

QTR. 11 PROGRESS<br />

FINANCIAL SERVICES ACTIVITY<br />

INDICATOR: Number of Interbank Transactions (600,000)<br />

ANNUAL TARGET<br />

ACTUALS TO DATE<br />

CUMMULATIVE<br />

(Apr 09 – Mar 10)<br />

(October 09 – Dec 09)<br />

ACTUALS TO DATE<br />

400,000 0 0<br />

INDICATOR: Value of Deposit Accounts in Rural Banks (US$ 600,000,000)<br />

ANNUAL TARGET<br />

ACTUALS TO DATE<br />

CUMMULATIVE<br />

(Apr 09 – Mar 10)<br />

(October 09 – Dec 09)<br />

ACTUALS TO DATE<br />

US$ 400,000,000 TBD Not available<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Implement Cheque Codeline<br />

and Automated Clearing<br />

House Systems<br />

ii. Procure Consultant for Legal<br />

Review of Payment System<br />

Laws<br />

iii. Implement Public Awareness<br />

Campaign for Payment<br />

Systems<br />

• Implementation of the Cheque<br />

Codeline Clearing System in<br />

Accra-Tema Clearing Zone<br />

stabilized with over 80% of the<br />

country’s Cheques handled by the<br />

System.<br />

• Issued Bid Document in October<br />

2009.<br />

• Technical Evaluation of the three<br />

Bids received was completed in<br />

December 2009.<br />

• Public Awareness Campaign<br />

expanded countrywide with<br />

special emphasis for Christmas<br />

Season Audiences<br />

- 37 -<br />

• Go Live Nationwide for the<br />

Cheque Codeline Clearing &<br />

Automated Clearing House<br />

Systems in January 2010.<br />

• Procure additional Licenses<br />

for all 28 Participating<br />

Banks as back-ups to their<br />

Clearing House Gateway<br />

Servers.<br />

• Consultant to conduct<br />

review of existing Payment<br />

System Laws<br />

• Continue Public Awareness<br />

Campaign to improve<br />

adoption by the Business<br />

Community and the General<br />

Public.<br />

INDICATOR: Number of Participating Financial Institutions (PFIs) automated under the<br />

Automation/Computerization and Interconnectivity of Rural Banks Activity (121)<br />

ANNUAL TARGET<br />

ACTUALS TO DATE<br />

CUMMULATIVE<br />

(Apr 09 – Mar 10)<br />

(October 09 – Dec 09)<br />

ACTUALS TO DATE<br />

21 0 0


ACTIVITY STATUS NEXT STEPS<br />

i. Procure Services of<br />

Consultants for the <strong>Ghana</strong><br />

Rural Bank Computerization<br />

and Interconnectivity Project<br />

• The following Contracts are<br />

operational:<br />

- Project Management<br />

Support Consultant (PMSC)<br />

- eMerge Software<br />

Implementation<br />

Consultancy<br />

- Data Centre Consultancy<br />

• The following Contracts were<br />

signed:<br />

- Temenos Banking<br />

Applications Licenses for<br />

the GRBCIP<br />

- Local Area Network (LAN)<br />

- Personal Computers and<br />

Accessories<br />

- Electric Generator Sets<br />

• Civil and Electrical Works for<br />

the Primary Data Center was<br />

completed and the Servers<br />

installed and powered.<br />

• Configuration of eMerge<br />

Banking Software on the<br />

Central Servers at the Data<br />

Centre<br />

• Installation of servers and<br />

related equipments at the<br />

Disaster Recovery Site.<br />

• User Acceptance Test for<br />

eMerge Banking Software<br />

• Go live for minimum of 8<br />

rural banks<br />

• Installation of the<br />

following:<br />

- Local Area Network<br />

- Electric Generator Sets<br />

- PCs and Accessories<br />

INDICATOR: Number of Participating Financial Institutions (PFIs) Connected to the WAN (121)<br />

ANNUAL TARGET<br />

ACTUALS TO DATE<br />

CUMMULATIVE<br />

(Apr 09 – Mar 10)<br />

(October 09 – Dec 09)<br />

ACTUALS TO DATE<br />

21 0 0<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Procure Services of WAN • WAN Design and Scoping • Install VSAT Equipments<br />

Consultants<br />

Reports was completed<br />

and link to Data Centre for<br />

400 Sites<br />

- 38 -


ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT<br />

Objectives:<br />

i. Carry out Strategic Environmental Assessments for three Intervention Zones with a focus on<br />

identifying Key Environmental and Social Issues, assessing Cumulative Impacts and proposing broad<br />

Mitigation Framework under which MCA Projects will be implemented.<br />

ii. Ensure that all MIDA’s Documents satisfy MCC and EPA Guidelines.<br />

QTR. 11 PROGRESS<br />

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT<br />

INDICATOR: Total Number of Resettlement Action Plans Approved (6)<br />

ANNUAL TARGET ACTUALS FOR THE QUARTER CUMUILATIVE<br />

(Apr 09 – Mar 10)<br />

(OCT-DEC 2009)<br />

ACTUALS TO DATE<br />

2 3 5<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Complete Negotiations and<br />

Payments for PAPs for<br />

Construction Sections 1 &2 on<br />

N1 Lot 2<br />

• Section 1 of N1 Lot 2 (Mallam-<br />

Awoshie) has been handed over to<br />

Contractor<br />

\<br />

ii. Obtain Approval for Trunk and<br />

Feeder Roads RAPs<br />

• RAPs for Lots 1, 2&4 of T&F were<br />

approved in the Quarter.<br />

INDICATOR: Total Number of Environmental Assessments Approved (5)<br />

TARGET (ANNUAL)<br />

2<br />

(Carried over from previous year)<br />

ACTUALS FOR THE QUARTER CUMULATIVE<br />

(OCT-DEC 2009)<br />

ACTUALS TO DATE<br />

1 4<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Obtain Environmental Permit • Environmental Permit for Lot 1<br />

for Feeder Roads<br />

Feeder Roads was obtained from<br />

ii. Obtain Environmental Permit<br />

for Tamale Water Extension<br />

Project<br />

iii. Obtain Environmental Permit<br />

for Educational Infrastructure<br />

iv. Obtain Environmental Permit<br />

for Electrification Projects<br />

EPA.<br />

• Scoping Reports for Tamale Water<br />

Expansion was submitted to EPA.<br />

• Submitted Scoping Report for<br />

Educational Infrastructure for EPA<br />

Environmental Approval.<br />

• Scoping Report for Rural<br />

Electrification is being finalized by<br />

Consultant.<br />

- 39 -


D. PROGRAM MANAGEMENT AND GOVERNANCE<br />

Board Meetings<br />

(i)<br />

Board of Directors: There were two Board Meetings during the period under review – a followup<br />

of the 25 th Meeting, held on 26 th October, 2009; and the 26 th Board Meeting which was also<br />

held on 9 th December, 2009. The 26 th Meeting approved the Quarter 12 Disbursement Request<br />

and accompanying Reports.<br />

An Induction Workshop was held for the Board in November, 2009.<br />

(ii)<br />

Board Chair: The Government nominated, and following the approval of MCC and the <strong>MiDA</strong><br />

Board, appointed Prof. Samuel Sefa-Dedeh to the Chair of <strong>MiDA</strong>. The appointment took effect<br />

from 4 th January, 2010 for a term of three years.<br />

Program Audit<br />

(i)<br />

Internal: The Internal Audit Team completed the audit of the Credit Activity. The Audit focused<br />

on Disbursements to Participating Financial Institutions in the Northern, Volta, Eastern and<br />

Ashanti Regions. As part of the Audit, the Team visited the Rural Banks, Farmer Based<br />

Organizations and Farming Outlets.<br />

The Audit Team also held Meetings with Project Teams to understand the major risks associated<br />

with the various Projects. The information gathered will assist the Audit Team in the preparation<br />

of the 2010 Internal Audit Annual Plan.<br />

(ii)<br />

External: Messrs PricewaterhouseCoopers completed the Financial Audit of MCC Resources<br />

for the period ended June 2009. <strong>MiDA</strong> is awaiting Office of Inspector General’s approval of the<br />

External Audit Report.<br />

Zonal Advisory Committees (ZACs)<br />

The Second Round of District Advisory Committee (DAC) Meetings were held in 17 Districts – 12 in the<br />

Southern Zone, and all the five (5) Districts in the Northern Zone. The Second Round Meetings built on<br />

the First Round Meetings which were held in all the Districts in the previous Quarters by providing more<br />

feedback on how the local people think implementation has gone so far and how some challenges can be<br />

overcome. The Meetings also afforded <strong>MiDA</strong> an opportunity to keep Beneficiary Communities informed<br />

about what is to be expected as we begin a new year.<br />

Project Finance<br />

The Finance Team, together with the Fiscal Agent, responded to the operational needs of <strong>MiDA</strong> and met<br />

all MCC requirements. The Disbursement Request (DR), Quarterly Financial Report (QFR) and the<br />

Detailed Financial Plans (DFP) were submitted to MCC for approval. In addition, the monthly Fund<br />

Accountability Statements were prepared and submitted on time by the Fiscal Agent.<br />

Staff Numbers<br />

With the employment of four persons during the Quarter, the total number of Staff in <strong>MiDA</strong>’s<br />

employment as at the end of December 2009 was 74. In addition, the seven (7) Project Support<br />

Consultants who were engaged to strengthen Internal Capacity remained at post.<br />

- 40 -


E. KEY MONITORING AND EVALUATION (M&E) ACTIVITIES<br />

Activity Objectives:<br />

i. Monitor the various components of the <strong>Ghana</strong> Compact to determine whether <strong>MiDA</strong> is achieving<br />

intended results.<br />

ii. Evaluate the larger Impacts of the <strong>Ghana</strong> Compact.<br />

iii. Highlight the M&E requirements that <strong>MiDA</strong> must meet in order to receive Disbursements.<br />

iv. Guide Program Implementation and Management, so that Stakeholders understand what Results<br />

are expected, by when the Results should be achieved, and who is responsible for achieving and<br />

<strong>report</strong>ing them.<br />

v. Provide a Framework that will alert Stakeholders on Performance problems for adjustments to be<br />

made as needed.<br />

QTR. 10 PROGRESS<br />

MONITORING AND EVALUATION<br />

INDICATOR: Clean GLSS5+ Baseline Data received by <strong>MiDA</strong><br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(JUL-SEP 2009)<br />

CUMULATIVE ACTUALS<br />

TO DATE<br />

31-May-2009 28-May-2009 28-May-2009<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Obtain Descriptive<br />

Report<br />

• Received the Draft GLSS 5+<br />

Descriptive Report from ISSER in<br />

October 2009.<br />

• Obtain Final Descriptive<br />

Report<br />

INDICATOR: FBO Baseline Data received<br />

TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />

(JUL-SEP 2009)<br />

31-May-2009 21-Aug-2009 N/A<br />

i. Obtain Descriptive<br />

Report<br />

• Received the Draft FBO Descriptive<br />

Report in November 2009.<br />

.<br />

CUMULATIVE ACTUALS<br />

TO DATE<br />

• Obtain Final Descriptive<br />

Report<br />

- 41 -


F. SUPPORT TO PROJECT IMPLEMENTATION<br />

COMMUNITY AND PUBLIC OUTREACH AND STAKEHOLDER CONSULTATIONS<br />

AND SENSITIZATION<br />

Objectives:<br />

i. Provide a platform for Continuous Consultation with the Private Sector, Civil Society, Local and<br />

Regional Governments.<br />

ii. Encourage representatives of the Private Sector, Civil Society, Local and Regional Governments<br />

to provide advice and input to <strong>MiDA</strong> regarding the Implementation of the Compact Program.<br />

QTR. 11 PROGRESS<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Facilitate District<br />

Advisory Committees<br />

Meetings<br />

• A total of 17 Second Round DAC<br />

Meetings were held to meet the<br />

demand of the Governance Agreement<br />

for the holding of at last two Meetings<br />

per year.<br />

• Four Districts in the Southern Zone<br />

were not ready to hold the scheduled<br />

Second Round Meetings<br />

• All nine districts in the Afram Basin<br />

Zone could not hold the Second Round<br />

Meetings before the year ended.<br />

• Schedule a set of Meetings<br />

in the next quarter to cover<br />

the second round meetings<br />

missed.<br />

• Schedule First Round<br />

Meetings for the year<br />

2010.<br />

• Participate periodically in<br />

District Assembly<br />

Meetings to provide<br />

updates and briefing.<br />

ii. Carry out Publicity on<br />

Resettlement for Persons<br />

affected by the N1<br />

Highway Construction<br />

iii. Create and Sustain<br />

Public Awareness of<br />

<strong>MiDA</strong> Activities<br />

• N1 Activities were publicized through<br />

regular Press Releases, Publications in<br />

the Print Media, AMA’s Publicity<br />

Vans announcements, person-to-person<br />

contacts, Radio/TV announcements<br />

and appearances on Radio and TV by<br />

the Senior Management, the<br />

Resettlement Team and the<br />

Transportation Project Manager.<br />

• Provided Publicity in both the Print<br />

and Electronic Media (Radio and TV)<br />

on the various Activities of <strong>MiDA</strong>.<br />

There were a number of Radio<br />

Interviews with the CEO and other<br />

Project Managers on the various<br />

Projects.<br />

• The Transportation and Agriculture<br />

Infrastructure Project Manager was on<br />

TV more than three times while other<br />

Managers made occasional<br />

appearances when the need arose.<br />

• Radio interviews and interviews for<br />

Newspaper publication have been more<br />

regular.<br />

- 42 -<br />

• Ensure Publicity is<br />

maintained<br />

• Continue to arrange<br />

specific Programs in the<br />

Broadcast Media to inform<br />

the Public about the<br />

activities of <strong>MiDA</strong>.


ACTIVITY STATUS NEXT STEPS<br />

iv. Maintain Outdoor<br />

Signages<br />

• Renewed and replaced a few damaged<br />

signs<br />

• Maintain routine checks<br />

v. Collaborate with Civil<br />

Society<br />

vi. Maintain <strong>MiDA</strong> Website<br />

(www.mida.gov.gh)<br />

• Collaborated with GAPVOD and held<br />

two Meetings in the Afram Basin Zone<br />

with NGOs, CSOs, CBOs at the local<br />

level in attendance<br />

• The Website was monitored daily.<br />

• Information was uploaded onto the<br />

Website weekly.<br />

• The Home Page was revamped<br />

monthly to present Information on a<br />

friendlier basis to users.<br />

• Schedule Meetings to be<br />

held in the Southern and<br />

Northern Zone Districts<br />

• Continue uploading<br />

information on the Website<br />

as they become available<br />

- 43 -


G. IMPLEMENTATION IMPEDIMENTS AND MITIGATION MEASURES<br />

PROJECT 1: AGRICULTURE PROJECT<br />

ACTIVITY 1: COMMERCIAL AGRICULTURE TRAINING<br />

PROJECT 1: AGRICULTURE PROJECT<br />

ACTIVITY 1: FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE<br />

ACTIVITY (“COMMERCIAL TRAINING ACTIVITY”)<br />

Commercial Training<br />

Bad road conditions to some Training Sites made it difficult for some FBO Members to travel. To<br />

mitigate this, discussions are on-going to provide Training outside rainy season.<br />

Data on market targets<br />

The current situation where Market Targets have been linked to the Business Plans prepared for the<br />

purpose accessing Credit makes it difficult to collect data because of the lack of credit to most Farmers. It<br />

is, therefore, proposed that the setting of Market Targets should be decoupled from receipt of, or access to<br />

Credit in the Business Plans.<br />

ACTIVITY 2: IRRIGATION DEVELOPMENT<br />

There was no major impediment.<br />

ACTIVITY 3: LAND TENURE FACILITATION<br />

The implementation impediments were in relation to Land Title Registration, comprising the Survey of<br />

Land Parcels and Registration of Land Rights; Judicial Service clearing of Backlog of Land Cases; and<br />

the Public Education and Information Dissemination component.<br />

Land Title Registration:<br />

The Land Team’s facilitation role was hampered by the unanticipated time that had been spent on the<br />

Evaluation of the Land Administration component of the Compacts. The registration is preceded by visits<br />

to the communities to convert oral grants to written contracts.<br />

Backlog of Land Cases:<br />

The initial lack of adequate GOG Funds to refurbish all the 10 Courts meant concentration on only three.<br />

GOG has now made available funds to cover all the 10 Circuit Courts.<br />

Public Education and Information Dissemination component:<br />

This activity had to be re-scoped from nine (9) to only four (4) Districts. The re-scoping follows<br />

an evaluation on the Land Activity.<br />

ACTIVITY 4: POST HARVEST INVESTMENT AND VALUE CHAIN SERVICES<br />

The passage of the Plant Protection Act has delayed. To prevent further delays, a second Workshop is<br />

planned for the Select Committees on Agriculture and Subsidiary Legislation in the next Quarter.<br />

- 44 -


ACTIVITY 5: CREDIT SERVICES<br />

There was a general decline in the disbursement of Funds during the Quarter under review, a reflection of<br />

the slow-down in demand for agric financing as the major season in the major agricultural areas<br />

approached or came to an end in its production cycle.<br />

Some modest achievements were recorded during the Quarter including (i) the recruitment of additional<br />

FNGOs to increase the number of accredited PFIs, (ii) demand for disbursements to post harvest borrowers<br />

to purchase the produce from production activities, (iii) the increase in the distribution of the credit to more<br />

smallholders in FBOs (d) implementation by Bank of <strong>Ghana</strong> Management of tough measures to demand<br />

outstanding payments by three Commercial Banks in default, and (iv) improved Stakeholder consultations.<br />

The persistence of rather worrying trends remained a source of concern. Over last Quarter, the major<br />

impediments which confronted the Credit Program included (i) a doubling of the growing delinquencies,<br />

that is, inability by PFIs/Borrowers to meet their maturing Principal and Interest Payments which increased<br />

from 9.96% to 18% by end December 2010, (ii) high Lending Interest Rates, (iii) increasing number of<br />

PFIs which have become or remain ineligible to lend due to various breaches in Key Indicators<br />

benchmarked in the Policies and Procedures Manual thus restricting ability of PFIs to lend, (iv) the over<br />

concentration of Credit in the SHB and also the Production segment of the Value Chain thereby skewing<br />

the Risk Profile of the Portfolio of the Lending Institutions; and (v) weak Monitoring and Reporting<br />

mechanism to engender rapid and effective control of identified deficiencies in the Credit Flow Cycle.<br />

The efforts to mitigate these challenges have been unrelenting. They have included the following:<br />

i. Sensitizing the Banks to improve their Risk Management practices and encourage Lending to other<br />

levels of the Value Chain. These measures were reinforced during the Field Trips by BoG and ACPC<br />

Teams and also during the ACP Stakeholders Review Meeting held in Kumasi in November 2009.<br />

ii. The approval by <strong>MiDA</strong> Management and the commencement of implementation of the Grants to<br />

PFIs to acquire effective means of Transport to improve Oversight of Loans extended to Smallholder<br />

Farmers who are dispersed over wide geographic Locations, in addition to its intention to develop<br />

Loan Offices to improve access to Finance by Rural Dwellers.<br />

iii. Continued implementation but this time more focused Skill-based (rather than Knowledge building)<br />

Training of the PFIs staff to be more effective in the Appraisal and Monitoring of Agric Credit<br />

through Mentoring and Coaching of PFI Staff by ACPC to improve Repayments and more effective<br />

Loan structuring.<br />

PROJECT 2: TRANSPORTATION PROJECT<br />

There were few modifications to the Work Plan causing Timelines for Deliverables to Quarter 11 to slip.<br />

This was as a result of delays in Procurement for Trunk and Feeder road works.<br />

In accordance with the Contract, deliverables of the Project Management Support Consultant are on<br />

schedule. Also, <strong>MiDA</strong>/MCC organized a 5-day Workshop for Consultants/Contractors on Contract<br />

Administration, Management of the Works, implementation of Environmental, Health and Safety Plans,<br />

Quality Control and Risk Management at Site.<br />

ACTIVITY 1: N1 HIGHWAY<br />

The challenges to the main Works are the inability to timely implement the RAP for N1 Lot 2 which has<br />

been on the critical path since the last Quarter. <strong>MiDA</strong> and LVB are collaborating to expedite action on the<br />

implementation of the RAP.<br />

ACTIVITY 2: TRUNK AND FEEDER<br />

There has been slight change in Timelines for Trunk Road Activity and Feeder Road Lot EC Series (Lot 2)<br />

as Pre-construction activities, especially <strong>full</strong> mobilization of resources at the Sites is still in progress.<br />

Timelines on Procurement for the NR Series (Lots NR1 & NR 2) is steadily on course. The Procurement<br />

- 45 -


process is expected to end in Quarter 12. For the Volta Region, Lot VR1 was re-advertised. Delays<br />

occurred with the award of Contract for VR2. Lot VR3 received MCC and <strong>MiDA</strong> Board approvals. In<br />

spite of the delays to VR roads (Lot 3), it is expected that the successful Bidders will put in extra work<br />

during good weather to gain time.<br />

ACTIVITY 3: FERRY SERVICES<br />

There were slight slippages in Timelines for the Ferry Project Activity. Procurement for all components<br />

commenced in Quarter 11 as planned. However, prospective Bidders did not <strong>full</strong>y meet requirements in the<br />

Bidding Documents. Therefore, <strong>MiDA</strong>/CKP acted on the advice by the Bid Evaluation Panel to seek<br />

clarification on Proposals submitted by the recommended Bidder for Lot FS1 prior to Negotiations, and the<br />

need to re-bid for Lot FS2. The Procurement process will continue in Quarter 12.<br />

PROJECT 3: RURAL DEVELOPMENT PROJECT<br />

ACTIVITY 1: PROCUREMENT CAPACITY ACTIVITY<br />

Late presentation of major deliverable by Crown Agents delayed the holding of the Stakeholders<br />

Conference. Submission of the Draft Final versions of the Curricula and Modules were consequently<br />

delayed. The inclusion of major Stakeholders like the National Accreditation Board, the National Council<br />

for Tertiary Education, the National Board for Professional and Technician Examinations in the<br />

Stakeholders Conference is expected to expedite implementation processes.<br />

ACTIVITY 2: COMMUNITY SERVICES ACTIVITY<br />

Delays in signing IDIQ Contracts<br />

The absence of standardized Templates for the Evaluation Process in the selection of IDIQ<br />

Contractors resulted in several reviews of the Evaluation Panel Reports culminating in the delay of<br />

receiving no objection from MCC. The envisaged mitigation measure is to standardize Templates to help<br />

expedite the process in future Evaluations.<br />

Delays in completing Phase Flood-Affected Schools<br />

Cash flow problems and inaccessibility to Project Sites, especially in the Karaga District, affected the<br />

completion of Civil Works on schedule. Poor delivery and lack of commitment to Project Implementation<br />

on the part of one Contractor, Messrs Rabumat Construction Limited, has led to the termination of his<br />

Contract. Recommendation has been made to select one of the hard working Contractors for the re-award<br />

of the terminated Contract in order to fast track the process of completion.<br />

Delays in Rural Electrification Projects<br />

There was no significant progress in the selection of the Agri-Business Centers (ABCs). The delay has<br />

caused a slippage in finalizing the Scope of Works for Rural Electrification Projects and in the signing of<br />

an IEA with the Ministry of Energy. This is to be mitigated through liaison with the Agric<br />

Commercialization Department to expedite action on the selection of Sites for the Centers.<br />

Operationalization of IEAs<br />

Delay in the startup of the Phase II Projects affected various Sector Ministries in the operationalization of<br />

the IEAs. To make the IEAs operational, the CS Team is fast tracking most of its planned activities to<br />

enable all the Entities come on board.<br />

- 46 -


ACTIVITY 3: FINANCIAL SERVICES<br />

<strong>Ghana</strong> Rural Bank Computerization and Interconnectivity Project (GRBCIP)<br />

The <strong>full</strong> complement of Consultants, Contractors and Suppliers are all now in place and making progress<br />

with respect to Project timelines.<br />

There were a number of impediments and challenges which were as follows: (i) the complexity of the<br />

Project created inter-dependency challenges, (ii) delays in making advance Payments to the Contractors<br />

supplying Equipment, thus delaying ordering of equipment, (iii) the unsuitability of the proposed Disaster<br />

Recovery Site which necessitated a change of the Site, and (iii) delay in the arrival of the Central Server<br />

for installation.<br />

Strategies adopted to mitigate the challenges include (i) developing a rigorous integrated Implementation<br />

Plan which took care of the various Contractor/Supplier performance and deployment inter-dependencies,<br />

(ii) deploying additional Resources to expedite the Confirmation of Advance Payment Guarantees as<br />

required of Consultants/Contractors in the Procurement process, (ii) liaised with Apex Bank and GhIPSS<br />

for the allocation of an alternative Site at GhIPSS to host the Disaster Recovery Site, and (iv) arranging a<br />

temporary Server which was used as a Central Server prior to the arrival of the main supplies of<br />

Equipment.<br />

With the above challenges and impediments resolved, the Timelines for the Project is on track and<br />

expected to be completed on schedule.<br />

- 47 -


ANNEXES<br />

- 48 -


MILLENNIUM DEVELOPMENT AUTHORITY<br />

ANNEX A: INDICATOR TRACKING TABLE FOR QUARTER 11<br />

Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal Net Income/Revenue US$ Level TBD TBD TBD<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Crop Income<br />

(Northern Zone)<br />

US$ Level 700 1645 1645<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Crop Income (Afram<br />

Basin Zone - East)<br />

US$ Level 820 1271 1271<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Crop Income (Afram<br />

Basin Zone - West)<br />

US$ Level 540 1306.80 1306.80<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Crop Income<br />

(Southern Zone)<br />

US$ Level 1860 2473.80 2473.80<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Aggregate Poverty<br />

Gap of beneficiaries<br />

US$ Level TBD TBD TBD<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Crop Income from<br />

staples<br />

US$ Level TBD TBD TBD<br />

<strong>Ghana</strong><br />

Compact/Mi<br />

DA Program<br />

0.1 Compact Goal Goal<br />

Crop Income from<br />

high-value crops<br />

US$ Level TBD TBD TBD<br />

Agriculture<br />

Project<br />

Activity<br />

0.2a Program<br />

Objective 1<br />

Objective<br />

Productivity of land in<br />

Afram Basin: Maize<br />

Metric tons/<br />

hectare<br />

Level 1.90 1.92 1.98 2.13 2.13<br />

- 49 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Agriculture<br />

Project<br />

Activity<br />

0.2a Program<br />

Objective 1<br />

Objective<br />

Productivity of land in<br />

the Northern Zone:<br />

Soya<br />

Metric tons/<br />

hectare<br />

Level 1.22 1.26 1.36 1.50 1.50<br />

Agriculture<br />

Project<br />

Activity<br />

0.2a Program<br />

Objective 1<br />

Objective<br />

Productivity of land in<br />

Southern Zone:<br />

Export-grade<br />

Pineapple<br />

Metric tons/<br />

hectare<br />

Level 8 8.08 8.64 10.08 10.08<br />

Agriculture<br />

Project<br />

Activity<br />

0.2b Program<br />

Objective 2<br />

Objective<br />

Additional <strong>Ghana</strong>ian<br />

agriculture exports:<br />

Pineapple<br />

Metric tons<br />

Cumula<br />

tive<br />

0 8300 14500 21700 21700<br />

Agriculture<br />

Project<br />

Activity<br />

0.2b Program<br />

Objective 2<br />

Objective<br />

Additional <strong>Ghana</strong>ian<br />

agriculture exports:<br />

Mango<br />

Metric tons<br />

Cumula<br />

tive<br />

0 576 2913 2913<br />

Agriculture<br />

Project<br />

Activity<br />

0.2b Program<br />

Objective 2<br />

Objective<br />

Additional <strong>Ghana</strong>ian<br />

agriculture exports:<br />

Fresh vegetables<br />

(pepper)<br />

Metric tons<br />

Cumula<br />

tive<br />

0 1344 2192 3178 3178<br />

Agriculture<br />

Project<br />

Activity<br />

0.2b Program<br />

Objective 2<br />

Objective<br />

<strong>Ghana</strong> Discount<br />

(Pineapple)<br />

Number Level 0.75 0.75 0.78-0.81 0.81-0.88 0.81-0.88<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Outcome<br />

Percent of FBOs<br />

meeting market<br />

targets<br />

Percent Level 0 50% 55% 60% 60%<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Output<br />

Number of<br />

agribusinesses<br />

assisted<br />

Number<br />

Increm<br />

ental<br />

0 310 394 27.1% 335 958<br />

31-Dec-<br />

2009<br />

650 958 147.38% 350 10 1,320<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Outcome<br />

Hectares under<br />

production with MCC<br />

support<br />

Hectares<br />

Increm<br />

ental<br />

0 280 0 -100% 0 4969.6<br />

31-Dec-<br />

2009<br />

9100 4,969.6 54.61% 17720 25960 53060<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Outcome<br />

Number of farmers<br />

adopting new<br />

technologies and<br />

farming methods<br />

Number<br />

Increm<br />

ental<br />

0 5100 Not available<br />

31-Dec-<br />

2009<br />

12750 TBD TBD 15,300 17,850 51,000<br />

- 50 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Agriculture<br />

Project<br />

Activity<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Indicator<br />

Level<br />

Outcome<br />

Indicator<br />

Number of<br />

enterprises that have<br />

applied improved<br />

techniques<br />

Unit<br />

Number<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Increm<br />

ental<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

0 4<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

31-Dec-<br />

2009<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

7 4 57.14% 20 58 85<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Outcome<br />

Percent Level 20 10-14% Not available TBD<br />

Percent of post<br />

harvest loss at farmgate<br />

31-Dec-<br />

2009<br />

10-14% TBD TBD 10-14% 10-14% 10-14%<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Output<br />

Number of FBOs<br />

trained in Commercial<br />

Agriculture<br />

Number<br />

Increm<br />

ental<br />

0 300 238 -21% 0<br />

31-Dec-<br />

2009<br />

600 300 1,200<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Output<br />

Number of farmers<br />

trained in Commercial<br />

Agriculture<br />

Number<br />

Increm<br />

ental<br />

0 15,000 14,702 -1.99% 0<br />

31-Dec-<br />

2009<br />

30000 15000 60,000<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Process<br />

milestone<br />

Training &Technical<br />

Service Provider Task<br />

Orders issued<br />

Number<br />

Increm<br />

ental<br />

0 58 58 0.00 28 28<br />

31-Dec-<br />

2009<br />

174 84 48.28% 58 290<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Process<br />

milestone<br />

Value Chains mapped Number Level 0 17 17 0.0% 17<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Process<br />

milestone<br />

Blanket Purchase<br />

Agreement awarded<br />

Number Level 0 29 29 0.0% 29<br />

Agriculture<br />

Project<br />

Activity<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Guidelines on<br />

Irrigation<br />

Development<br />

developed and<br />

approved by MCC<br />

Guidelines on postharvest<br />

developed<br />

and approved by<br />

MCC<br />

Date Date None 22-Aug-2008 15-Sep-2008<br />

Date Date None 22-Aug-2008 15-Sep-2008<br />

5 weeks<br />

past due<br />

date<br />

5 weeks<br />

past due<br />

date<br />

22-Aug-<br />

2008<br />

22-Aug-<br />

2008<br />

Agriculture<br />

Project<br />

Activity<br />

1.1. Commercial<br />

Agricultural<br />

Training<br />

Process<br />

milestone<br />

Guidelines on FBO<br />

vouchers developed<br />

and approved by<br />

MCC<br />

Date Date None 15-Aug-2008 8-Sep-2008<br />

3 weeks<br />

past due<br />

date<br />

15-Aug-<br />

2008<br />

- 51 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Outcome<br />

Additional hectares<br />

irrigated with MCC<br />

support<br />

Hectares<br />

Increm<br />

ental<br />

0 280 0 -100.0% 0<br />

31-Dec-<br />

2009<br />

1100 0 0.00% 1,720 1,900 5,000<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Output<br />

Number of irrigation<br />

facilities constructed/<br />

rehabilitated<br />

Number<br />

Cumula<br />

tive<br />

0 10 10<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Process<br />

milestone<br />

Hectares of land with<br />

potential for new/<br />

rehabilitated irrigation<br />

facilities identified<br />

Hectares<br />

Cumula<br />

tive<br />

0 5,060 5,084 0.5% 5,060<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Process<br />

milestone<br />

Number of<br />

Feasibilities Studies<br />

approved<br />

Number<br />

Cumula<br />

tive<br />

0 0 0<br />

31-Dec-<br />

2009<br />

10 0 0.00% 10<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for<br />

feasibility and/or<br />

design studies<br />

US$<br />

Cumula<br />

tive<br />

0 0<br />

3,616,589.<br />

00<br />

31-Dec-<br />

2009<br />

2,487,00<br />

6.00<br />

3,616,589 145.42% 4,388,00<br />

6.00<br />

5,812,06<br />

6.00<br />

5,812,00<br />

6.00<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for irrigation<br />

works<br />

US$<br />

Cumula<br />

tive<br />

0 5,844,40<br />

0.00<br />

14,610,4<br />

00.00<br />

14,610,4<br />

00.00<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

design/feasibility<br />

studies for irrigation<br />

completed<br />

Percent<br />

Cumula<br />

tive<br />

0 0.00<br />

31-Dec-<br />

2009<br />

42.8 20 46.07% 75.5 100 100%<br />

Agriculture<br />

Project<br />

Activity<br />

1.2. Irrigation<br />

Activity<br />

Process<br />

milestone<br />

Percent of value of<br />

contracted irrigation<br />

works disbursed<br />

Percent<br />

Increm<br />

ental<br />

0 40 60 100%<br />

Agriculture<br />

Project<br />

Activity<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Outcome<br />

1.3. Land Activity Outcome<br />

Percent of people<br />

aware of their land<br />

rights in Pilot Land<br />

Registration Areas<br />

Percent of identified<br />

land disputes<br />

resolved in the Pilot<br />

Land Registration<br />

Areas<br />

Percent Level TBD TBD<br />

Percent Level 0 86.67% 90.00<br />

30-Nov-<br />

2009<br />

30%<br />

increase<br />

from<br />

baseline<br />

50%<br />

increase<br />

from<br />

baseline<br />

50%<br />

increase<br />

from<br />

baseline<br />

70% 90 128.57 75% 80% 80%<br />

- 52 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Agriculture<br />

Project<br />

Activity<br />

Activity<br />

Indicator<br />

Level<br />

1.3. Land Activity Outcome<br />

Indicator<br />

Total number of land<br />

parcels registered in<br />

the Pilot Land<br />

Registration Areas<br />

Unit<br />

Number<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Increm<br />

ental<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

0 103 0<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

30-Dec-<br />

2009<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

1800 103 5.72% 3000 4800<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Output<br />

Rural Hectares<br />

formalized<br />

Hectares<br />

Increm<br />

ental<br />

0 132.76<br />

31-Dec-<br />

2009<br />

2713 TBD TBD 2960 11346 17019<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Output<br />

Rural Hectares<br />

mapped<br />

Hectares<br />

Increm<br />

ental<br />

0 2713 749 -72% 2399 612<br />

31-Dec-<br />

2009<br />

2960 3,522 118.99% 11346 17019<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Output<br />

Total number of<br />

parcels surveyed in<br />

the Pilot Land<br />

Registration Areas<br />

Number<br />

Increm<br />

ental<br />

0 1024 414 -60% 1402 492<br />

31-Dec-<br />

2009<br />

1800 2,566 142.56% 1976 4800<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Parcels of land<br />

inventoried in the Pilot<br />

Land Registration<br />

Areas<br />

Number<br />

Increm<br />

ental<br />

0 1024 521 -49% 1387 924<br />

31-Dec-<br />

2009<br />

1800 2,891 160.61% 1976 4800<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Outcome<br />

Percent of backlog of<br />

land cases cleared by<br />

the Judicial Service<br />

Percent Level 0 0 95% 95%<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Backlog of land cases<br />

identified<br />

Date Date None<br />

15-Jun-<br />

2009<br />

39,993<br />

2 weeks<br />

past due<br />

date<br />

15-Jun-<br />

2009<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Procurement of<br />

Needs Assessment<br />

Consultant completed<br />

Date Date None 27-Oct-2008 3-Dec-2008<br />

37 days<br />

past due<br />

date<br />

27-Oct-<br />

2008<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Road Map and TORs<br />

for Public Education<br />

and Small Grants<br />

finalized and<br />

approved<br />

Date Date None 26-Nov-2008 18-Nov-2008<br />

6 days<br />

ahead of<br />

due date<br />

26-Nov-<br />

2008<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Number of<br />

preparatory studies<br />

completed<br />

Number<br />

Cumula<br />

tive<br />

0 3 4 33.3% 3<br />

- 53 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Legal and Regulatory<br />

reforms adopted<br />

Number<br />

Increm<br />

ental<br />

0 1 2 100% 1 0<br />

31-Dec-<br />

2009<br />

3 1 33.33% 3 2 9<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Output<br />

Number of<br />

landholders reached<br />

by public outreach<br />

efforts<br />

Number<br />

Increm<br />

ental<br />

0 4,000 4794 19.9% 0 0<br />

31-Dec-<br />

2009 6,000<br />

0 0.00% 10000<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Output<br />

Number of Personnel<br />

Trained<br />

Number<br />

Increm<br />

ental<br />

0 6 6 0.0% 22 0<br />

25-Aug-<br />

2009<br />

194 51 26.29% 200<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity Output<br />

Number of buildings<br />

rehabilitated/<br />

constructed<br />

Number<br />

Cumula<br />

tive<br />

0 0 0 0.0% 0 1<br />

31-Dec-<br />

2009<br />

1 1 100.00% 3 3<br />

Agriculture<br />

Project<br />

Activity<br />

1.3. Land Activity<br />

Process<br />

milestone<br />

Value of equipment<br />

purchased<br />

US$<br />

Increm<br />

ental<br />

0 66,000 66,000 0.0% 0 0<br />

31-Dec-<br />

2009 200,000<br />

0 0.00% 266000<br />

Agriculture<br />

Project<br />

Activity<br />

1.4. Post-Harvest<br />

Activity<br />

Outcome<br />

Volume of products<br />

passing through postharvest<br />

treatment<br />

(metric tons)<br />

Metric tons<br />

Increm<br />

ental<br />

0 3324.8 2804.2<br />

31-Dec-<br />

2009<br />

111,820 6,129 5.48% 129,900 143,400 385,120<br />

Agriculture<br />

Project<br />

Activity<br />

1.4. Post-Harvest<br />

Activity<br />

Output<br />

Number of Cooling<br />

facilities installed<br />

Number<br />

Cumula<br />

tive<br />

0 7 2 -71.4% 3 4<br />

31-Dec-<br />

2009<br />

7 4 57.14% 12 12<br />

Agriculture<br />

Project<br />

Activity<br />

1.4. Post-Harvest<br />

Activity<br />

Output<br />

Area of cold storage<br />

facilities constructed<br />

Square<br />

Meters<br />

Increm<br />

ental<br />

0 156 114.2<br />

31-Dec-<br />

2009<br />

1021 270 26.46% 717 1738<br />

Agriculture<br />

Project<br />

Activity<br />

1.4. Post-Harvest<br />

Activity<br />

Output<br />

Area of Pack-Houses<br />

and other Post-<br />

Harvest Infrastructure<br />

constructed<br />

Square<br />

Meters<br />

Increm<br />

ental<br />

0 17076 17076<br />

Agriculture<br />

Project<br />

Activity<br />

1.4. Post-Harvest<br />

Activity<br />

Process<br />

milestone<br />

Number of<br />

Feasibilities Studies<br />

approved<br />

Number Level 0 0<br />

31-Dec-<br />

2009<br />

5 3 60.00% 5<br />

- 54 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Agriculture<br />

Project<br />

Activity<br />

Activity<br />

1.4. Post-Harvest<br />

Activity<br />

Indicator<br />

Level<br />

Process<br />

milestone<br />

Indicator<br />

Pack house/Other<br />

Post-Harvest<br />

Infrastructure sites<br />

identified<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Date Date None<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

30-Oct-<br />

2009<br />

Actuals<br />

as of<br />

(Date)<br />

31-Dec-<br />

2009<br />

Annual<br />

Target<br />

31-Dec-<br />

2009<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Completed<br />

2 months<br />

ahead of<br />

due date<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

31-Dec-<br />

2009<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit Activity Outcome<br />

Portfolio-at-risk of<br />

Agricultural Loan<br />

Fund<br />

Percent Level 0% 20 0 N/A 13.90 18.00%<br />

31-Dec-<br />

2009<br />

20% 0 N/A 20% 20% 20%<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit Activity Outcome<br />

Value of loans<br />

disbursed to clients<br />

from agricultural loan<br />

fund<br />

US$<br />

Cumula<br />

tive<br />

0 7,000,000 7,161,000 2.3% 10,327,084.5<br />

3<br />

12,707,915<br />

.90<br />

31-Dec-<br />

2009<br />

15,000,0<br />

00<br />

12,707,916 84.72%<br />

25,000,0<br />

00<br />

35,000,0<br />

00<br />

35,000,0<br />

00<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit Activity Output<br />

Number of loans<br />

disbursed to clients<br />

from agricultural loan<br />

fund<br />

Number<br />

Cumula<br />

tive<br />

0 90 42 -53.3% 214 269<br />

31-Dec-<br />

2009<br />

270 269 99.63% 360<br />

540<br />

540<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit Activity Output<br />

Number of clients<br />

receiving loans<br />

disbursed from<br />

agricultural loan fund<br />

Number<br />

Cumula<br />

tive<br />

0 5,000 7573 9744<br />

31-Dec-<br />

2009<br />

13,000 9,744 74.95% 15,500<br />

18,000<br />

18,000<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit Activity Output<br />

Number of<br />

Participating Financial<br />

Institutions accredited<br />

Number<br />

Cumula<br />

tive<br />

0 40 45 12.5% 53 56<br />

31-Dec-<br />

2009<br />

55 56 101.82% 60 60 60<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit Activity Output<br />

Number of<br />

Participating Financial<br />

Institutions' staff<br />

trained<br />

Number<br />

Increm<br />

ental<br />

0 120 119 -0.8% 25 0<br />

31-Dec-<br />

2009<br />

200 173 86.50% 100 60 480<br />

Agriculture<br />

Project<br />

Activity<br />

1.5. Credit<br />

Activity<br />

Output<br />

Total outstanding<br />

principal balance for<br />

group/ individual<br />

loans<br />

US$<br />

Cumula<br />

tive<br />

0 7,000,000 7,161,000 2.3%<br />

8,009,721.35<br />

9,344,875.<br />

34<br />

31-Dec-<br />

2009<br />

15,000,0<br />

00<br />

9,344,875 62.30% 25,000,0<br />

00<br />

35,000,0<br />

00<br />

35,000,0<br />

00<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Outcome<br />

International<br />

Roughness Index<br />

Meters/km Level 12.69 5.47 5.47<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Outcome<br />

Annualized Average<br />

Daily Traffic<br />

Number Level 298.02 TBD TBD<br />

- 55 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Output<br />

Kilometers of feeder<br />

roads completed<br />

Km<br />

Cumula<br />

tive<br />

0 96.7 406 406<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

feeder road works<br />

disbursed<br />

Percent<br />

Cumula<br />

tive<br />

0 15.00<br />

31-Dec-<br />

2009<br />

39.14 15 38.32% 72.86 100 100<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for feeder<br />

road works<br />

US$<br />

Cumula<br />

tive<br />

0<br />

18,443,422<br />

.17<br />

31-Dec-<br />

2009<br />

24,436,0<br />

11<br />

18,443,422 75.48%<br />

45,491,1<br />

94<br />

62,436,5<br />

71<br />

62,436,5<br />

71<br />

Agriculture<br />

Project<br />

Activity<br />

1.6 Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Kilometers of feeder<br />

roads under works<br />

contracts<br />

Km<br />

Cumula<br />

tive<br />

0 146.24<br />

31-Dec-<br />

2009<br />

358 146 40.85% 406 406 406<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Kilometers of feeder<br />

roads designed<br />

Km<br />

Cumula<br />

tive<br />

0 950 0 0.0% 539.63 570.81<br />

31-Dec-<br />

2009<br />

950 570.81 60.09% 950<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

design/feasibility<br />

studies completed<br />

Percent<br />

Cumula<br />

tive<br />

0 72.33 55.7 16.6% 57.10 89.84<br />

31-Dec-<br />

2009<br />

100% 89.84 89.84 100%<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for<br />

feasibility and/or<br />

design studies<br />

US$ Level 0 2,452,376 2,352,375 -4.1%<br />

2,452,37<br />

6<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Number of<br />

Environmental<br />

Assessments<br />

approved<br />

Number<br />

Cumula<br />

tive<br />

0 3 2 -33.3% 2 2<br />

31-Dec-<br />

2009<br />

3 2 66.67% 3<br />

Agriculture<br />

Project<br />

Activity<br />

1.6. Feeder Roads<br />

Activity<br />

Process<br />

milestone<br />

Number of RAPs for<br />

Feeder roads as<br />

appropriate<br />

Number<br />

Cumula<br />

tive<br />

0 3 0 -100.0% 0 3<br />

31-Dec-<br />

2009<br />

3 3 100.00% 3<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Outcome<br />

Volume-to-capacity<br />

ratio on N1<br />

Number Level 0.85-1 0.26 0.26<br />

- 56 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Outcome<br />

Vehicles per hour at<br />

peak hour<br />

Number Level >2000 3120 3120<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Outcome<br />

Travel time at peak<br />

hour<br />

Minutes Level 60 min 20 min 20 min<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Outcome<br />

International<br />

Roughness Index<br />

Meters/km Level 4 2.5 2.5<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Outcome<br />

Annualized Average<br />

Daily Traffic<br />

Number Level 27737 36530 36530<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Output<br />

Percent of contracted<br />

road works disbursed:<br />

N1, Lot 1<br />

Percent<br />

Increm<br />

ental<br />

0 10% 10.00% 0% 2.45 2.80<br />

31-Dec-<br />

2009<br />

41.6% 5.25 12.62 29.2% 19.2% 100%<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Output<br />

Percent of contracted<br />

road works disbursed:<br />

N1, Lot 2<br />

Percent<br />

Increm<br />

ental<br />

0 0 10.00<br />

31-Dec-<br />

2009<br />

41.6% 10 24.04% 29.2% 29.2% 100%<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for road<br />

works N1, Lot 1<br />

US$<br />

Cumula<br />

tive<br />

0<br />

43,412,150<br />

42,168,601 -2.9%<br />

43,412,1<br />

50<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for road<br />

works N1, Lot 2<br />

US$<br />

Cumula<br />

tive<br />

0 0<br />

83,666,04<br />

6.33<br />

31-Dec-<br />

2009<br />

58,000,0<br />

00<br />

83,666,04<br />

6<br />

144.25<br />

58,000,0<br />

00<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Kilometers of N1 Lot<br />

1 under works<br />

contracts<br />

Km<br />

Cumula<br />

tive<br />

0 6<br />

31-Dec-<br />

2009<br />

6 6 100.00% 6<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Kilometers of N1 Lot<br />

2 under works<br />

contracts<br />

Km<br />

Cumula<br />

tive<br />

0 8.125<br />

31-Dec-<br />

2009<br />

8.125 8.125 100.00% 8.125<br />

- 57 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Kilometers of N1<br />

designed<br />

Km Level 0 14.125 14.125 0 14.125<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity Output<br />

Kilometers of road<br />

upgraded<br />

Km<br />

Cumula<br />

tive<br />

0 14.125 14.125<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

(design/feasibility)<br />

study completed<br />

Percent<br />

Cumula<br />

tive<br />

0 100 57.5 -42.5% 106.03 106.03<br />

31-Dec-<br />

2009<br />

100 106.03 106.03% 100%<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for<br />

feasibility and/or<br />

design study<br />

US$ Level 0 935,298.00 1,027,026.00 9.81% 935,298<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Number of<br />

Environmental<br />

Assessments<br />

approved<br />

Number<br />

Increm<br />

ental<br />

0 1 1 0.0% 1<br />

Transportatio<br />

n Project<br />

Activity<br />

2.1. N1- Activity<br />

Process<br />

milestone<br />

Number of RAPs<br />

approved<br />

Number<br />

Increm<br />

ental<br />

0 1 1 0.0% 0 1<br />

31-Dec-<br />

2009<br />

1 1 100.00% 2<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Outcome<br />

Annualized Average<br />

Daily Traffic<br />

Number Level 221.5 235 258.5 258.5<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Outcome<br />

International<br />

Roughness Index<br />

Meters/km Level 9 - 12 3.5 3.5 3.5<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Output<br />

Kilometers of trunk<br />

roads completed<br />

Km<br />

Cumula<br />

tive<br />

0 75.21 75.21<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

roads works<br />

disbursed<br />

US$<br />

Increm<br />

ental<br />

0 0 10.00<br />

31-Dec-<br />

2009<br />

44.2% 10 22.62 47.5% 8.3% 100%<br />

- 58 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for road<br />

works<br />

US$<br />

Cumula<br />

tive<br />

0 0 25,900,659<br />

31-Dec-<br />

2009<br />

11,622,7<br />

50<br />

25,900,659 222.84% 24,098,2<br />

30<br />

26,288,3<br />

12<br />

26,288,3<br />

12<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Kilometers of trunk<br />

roads under works<br />

contracts<br />

US$<br />

Cumula<br />

tive<br />

0 75.21<br />

31-Dec-<br />

2009<br />

75.21 75.21 100.00% 75.21<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Kilometers of trunk<br />

roads designed<br />

Km<br />

Cumula<br />

tive<br />

0 230 75.21 -67.3% 75.21 75.21<br />

31-Dec-<br />

2009<br />

230 75.21 32.70% 230<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Output<br />

Percent of contracted<br />

design/feasibility<br />

studies completed<br />

Percent<br />

Cumula<br />

tive<br />

0 67.0 57.5 -14.2% 67.50 70.32<br />

31-Dec-<br />

2009<br />

100 67.50 67.50% 100<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for<br />

feasibility and/or<br />

design studies<br />

US$ Level 0<br />

933,699.00 933,699.00<br />

0.0% 933,699<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Number of<br />

Environmental<br />

Assessments<br />

approved<br />

Number<br />

Cumula<br />

tive<br />

0 1 0 -100.0% 1 1<br />

31-Dec-<br />

2009<br />

1 1 100.00% 1<br />

Transportatio<br />

n Project<br />

Activity<br />

2.2. Trunk Roads<br />

Activity<br />

Process<br />

milestone<br />

Number of RAPs<br />

approved<br />

Number<br />

Cumula<br />

tive<br />

0 0 1<br />

31-Dec-<br />

2009<br />

1 0 0.00% 1<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Outcome<br />

Travel time for walkon<br />

passengers.<br />

Minutes Level 128.4 94.2 94.2<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Outcome<br />

Travel time for small<br />

vehicles<br />

Minutes Level 135.5 132 132<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Outcome Travel time for trucks. Minutes Level 1,200 390 390<br />

- 59 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Outcome<br />

Annualized Average<br />

Daily Traffic<br />

(vehicles).<br />

Number Level 58 63.8 63.8<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Outcome<br />

Annualized Average<br />

Daily Traffic<br />

(passengers)<br />

Number Level 620 651 651<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Rehabilitation of<br />

Akosombo Floating<br />

Dock Completed<br />

Date Date None<br />

30-Jun-<br />

2010<br />

30-Jun-<br />

2010<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Percent Physical<br />

Completion of Civil<br />

Works at Landing<br />

Stages<br />

Percent<br />

Increm<br />

ental<br />

0 44.6% 55.4% 100%<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Output<br />

Landing stages<br />

rehabilitated<br />

Number<br />

Increm<br />

ental<br />

0 2 2<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Rehabilitation of<br />

Landing Stages<br />

Completed<br />

Date Date None<br />

31-Dec-<br />

2010<br />

31-Dec-<br />

2010<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Percent Physical<br />

Completion of Ferry<br />

Terminals<br />

Percent<br />

Increm<br />

ental<br />

0 33.3% 66.7% 100%<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity Output<br />

Ferry Terminals<br />

upgraded<br />

Number<br />

Increm<br />

ental<br />

0 2 2<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

work disbursed: ferry<br />

and floating dock<br />

percent<br />

Increm<br />

ental<br />

0 50% 50% 100<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Percent of contracted<br />

work disbursed:<br />

landings and<br />

terminals<br />

percent<br />

Increm<br />

ental<br />

0 50% 50% 100<br />

- 60 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Transportatio<br />

n Project<br />

Activity<br />

2.3. Ferry Activity<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for works:<br />

ferry and floating dock<br />

US$<br />

Increm<br />

ental<br />

0 0 0<br />

31-Dec-<br />

2009<br />

5,905,00<br />

0<br />

0 0.00%<br />

5,905,00<br />

0<br />

Transportatio<br />

n Project<br />

Activity<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

2.3. Ferry Activity<br />

3.1. Procurement<br />

Capacity Activity<br />

3.1. Procurement<br />

Capacity Activity<br />

3.1. Procurement<br />

Capacity Activity<br />

3.1. Procurement<br />

Capacity Activity<br />

Process<br />

milestone<br />

Output<br />

Output<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Value of signed<br />

contracts for works:<br />

landings and<br />

terminals<br />

Number of Practicing<br />

procurement<br />

personnel who<br />

complete training<br />

modules<br />

Number of individuals<br />

completing<br />

Internships at<br />

Ministries,<br />

Departments and<br />

Agencies (MDAs) and<br />

Metropolitan,<br />

Municipal and District<br />

Assemblies (MMDAs)<br />

Number of<br />

Procurement students<br />

at various tertiary<br />

institutions who have<br />

success<strong>full</strong>y<br />

completed one year<br />

of coursework<br />

Number of<br />

Procurement students<br />

at various tertiary<br />

institutions who have<br />

success<strong>full</strong>y<br />

completed two years<br />

of coursework<br />

US$<br />

Number<br />

Number<br />

Number<br />

Number<br />

Increm<br />

ental<br />

Cumula<br />

tive<br />

Increm<br />

ental<br />

Increm<br />

ental<br />

Increm<br />

ental<br />

0 585,200 585,200<br />

0 400 900 900<br />

0 265 0<br />

31-Dec-<br />

2009<br />

1,170,40<br />

0<br />

300 265 88.33% 600 700 1600<br />

0 280 800 1080<br />

0 250 250<br />

Rural<br />

Development<br />

3.1. Procurement<br />

Capacity Activity<br />

Outcome<br />

Number of Interns<br />

who gain employment<br />

in public procurement.<br />

Number<br />

Increm<br />

ental<br />

0 100 100 200<br />

Rural<br />

Development<br />

3.1. Procurement<br />

Capacity Activity<br />

Outcome<br />

Number of Tertiary<br />

Institutions using the<br />

Modules developed<br />

by Public<br />

Procurement<br />

Authority/<strong>MiDA</strong><br />

Number<br />

Increm<br />

ental<br />

0 0<br />

31-Dec-<br />

2009<br />

1 0 0.00% 5 2 8<br />

- 61 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Rural<br />

Development<br />

3.1. Procurement<br />

Capacity Activity<br />

Process<br />

milestone<br />

Number of Institutions<br />

that agree to accept<br />

Interns<br />

Number<br />

Increm<br />

ental<br />

0 1 0<br />

31-Dec-<br />

2009<br />

150 180 120.00% 250 100 500<br />

Rural<br />

Development<br />

3.2a Local<br />

Government<br />

Service Delivery<br />

Outcome<br />

Level of citizen<br />

satisfaction with<br />

services<br />

Levels of<br />

satisfaction<br />

Level TBD TBD<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Outcome<br />

Number of students<br />

enrolled in schools<br />

affected by education<br />

facilities sub-activity<br />

Number<br />

Cumula<br />

tive<br />

58,606 61,538 64,468 67,399 67,399<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Outcome<br />

Additional female<br />

students enrolled in<br />

schools affected by<br />

Education Facilities<br />

Sub-Activity<br />

Number<br />

Increm<br />

ental<br />

0 1,202 1,202 1,202 3,606<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Output<br />

Number of school<br />

blocks rehabilitated<br />

Number<br />

Cumula<br />

tive<br />

0 35 30 -14% 35 35<br />

31-Dec-<br />

2009<br />

35 35 100.00% 35<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Output<br />

Number of school<br />

blocks constructed<br />

Number<br />

Cumula<br />

tive<br />

0 20 25<br />

31-Dec-<br />

2009<br />

30 22 73.33% 78 361 361<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Number of school<br />

blocks designed and<br />

diligenced<br />

Number<br />

Cumula<br />

tive<br />

0 125 30 -76% 65 182<br />

31-Dec-<br />

2009<br />

396 65 16.41% 396<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Percent of works<br />

contract sums<br />

(construction/rehabilit<br />

ation) disbursed<br />

Value of signed works<br />

contracts for MCCsupported<br />

educational<br />

facility<br />

(construction/rehabilit<br />

ation)<br />

Percent<br />

US$<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

0 63.87<br />

0 3,485,778.<br />

00<br />

31-Dec-<br />

2009<br />

31-Dec-<br />

2009<br />

20% 63.87 NA 95% 100% 100%<br />

NA 3,485,778 NA NA NA NA<br />

Rural<br />

Development<br />

3.2b Education<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Shortlist of IDIQ<br />

consultants/contractor<br />

s developed<br />

Date Date None 15-Oct-2008 23-Dec-2008<br />

10 weeks<br />

past due<br />

15-Oct-<br />

2008<br />

- 62 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Indicator<br />

Level<br />

Outcome<br />

Indicator<br />

Distance to collect<br />

water<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Meters Level 336 250 250<br />

Outcome Time to collect water Minutes Level 30.24 25 25<br />

Outcome<br />

Outcome<br />

Output<br />

Output<br />

Outcome<br />

Output<br />

Incidence of Guinea<br />

worm<br />

Volume of domestic<br />

water consumption<br />

Number of people<br />

affected by Water and<br />

Sanitation Facilities<br />

Sub-Activity<br />

Number of people<br />

trained in hygiene and<br />

sanitary best<br />

practices<br />

Number of<br />

Households with<br />

access to improved<br />

water supply<br />

Number of water<br />

points constructed<br />

Number Level 1.64 0.75 0.75<br />

Liters per<br />

capita per<br />

day<br />

Number<br />

Number<br />

Number<br />

Number<br />

Level TBD TBD TBD TBD<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

0 52,000 129,840 129,840<br />

0<br />

0.00 31-Dec-<br />

2009<br />

249<br />

0.00<br />

0.00% 1,329 1,661 1,661<br />

TBD TBD TBD TBD<br />

0 164 371 385<br />

Rural<br />

Development<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Percent of works<br />

contract sums for<br />

Boreholes disbursed<br />

Percent<br />

Cumula<br />

tive<br />

0<br />

0.00 31-Dec-<br />

2009<br />

20%<br />

0.00<br />

0.00% 95% 100% 100%<br />

Rural<br />

Development<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Percent of works<br />

contract sums for<br />

Small Town Water<br />

System disbursed<br />

Percent<br />

Cumula<br />

tive<br />

0<br />

0.00 31-Dec-<br />

2009<br />

20%<br />

0.00<br />

0.00% 95% 100% 100%<br />

- 63 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Indicator<br />

Level<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Indicator<br />

Percent of works<br />

contract sums for<br />

Pipe Extension<br />

Projects disbursed<br />

Percent of works<br />

contract sum for<br />

Tamale Water<br />

Extension Project<br />

disbursed<br />

Value of Boreholes<br />

construction contracts<br />

signed<br />

Unit<br />

Percent<br />

Percent<br />

US$<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Baseline<br />

0<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

0.00 31-Dec-<br />

2009<br />

Annual<br />

Target<br />

20%<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

0.00<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

0.00% 95% 100% 100%<br />

0 90% 100% 100%<br />

0<br />

0.00 31-Dec-<br />

2009<br />

Not<br />

required<br />

0.00 Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Rural<br />

Development<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Value of Small Town<br />

Water Systems<br />

construction contracts<br />

signed<br />

US$<br />

Cumula<br />

tive<br />

0<br />

0.00 31-Dec-<br />

2009<br />

Not<br />

required<br />

0.00 Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Rural<br />

Development<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Value of Pipe<br />

Extension Projects<br />

construction contracts<br />

signed<br />

US$<br />

Cumula<br />

tive<br />

0<br />

0.00 31-Dec-<br />

2009<br />

Not<br />

required<br />

0.00 Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Value of Tamale<br />

Water Extension<br />

Project construction<br />

contract signed<br />

Number of Standalone<br />

Boreholes/wells/nonconventional<br />

water<br />

systems identified<br />

and diligenced for<br />

rehabilitation/construc<br />

tion<br />

Number of Small<br />

Town Water System<br />

(STWS) designed and<br />

diligenced for<br />

construction<br />

Number of Pipe<br />

Extension Projects<br />

designed and<br />

Diligenced for<br />

construction<br />

US$<br />

Number<br />

Number<br />

Number<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

0<br />

0<br />

0<br />

0<br />

0.00 31-Dec-<br />

2009<br />

0.00 0.00 31-Dec-<br />

2009<br />

0.00 0.00 31-Dec-<br />

2009<br />

0.00 0.00 31-Dec-<br />

2009<br />

Not<br />

required<br />

150<br />

25<br />

10<br />

0.00 Not<br />

required<br />

0.00<br />

0.00<br />

0.00<br />

Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

0.00% 350 350<br />

0.00% 25<br />

0.00% 10<br />

- 64 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Rural<br />

Development<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2c Water and<br />

Sanitation<br />

Facilities Sub-<br />

Activity<br />

3.2d Rural<br />

Electrification<br />

Sub-Activity<br />

Indicator<br />

Level<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Process<br />

milestone<br />

Output<br />

Indicator<br />

Percent of<br />

consultancy fees<br />

disbursed for<br />

Boreholes, Small<br />

Town Water Systems<br />

and Pipe Extension<br />

Projects feasibility<br />

studies<br />

Percent of<br />

consultancy fees<br />

disbursed for Tamale<br />

Water Extension<br />

Project feasibility<br />

studies<br />

Value of Feasibility<br />

and/or Detailed<br />

Design Contracts for<br />

Boreholes, Small<br />

Town Water Systems<br />

and Pipe Extension<br />

Projects signed<br />

Value of Feasibility<br />

and/or Detailed<br />

Design Contract for<br />

Tamale Water<br />

Extension Project<br />

signed<br />

Number of agricultural<br />

facilities in target<br />

districts with<br />

electricity due to<br />

Rural Electrification<br />

Sub-Activity<br />

Unit<br />

Percent<br />

Percent<br />

US$<br />

US$<br />

Number<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Cumula<br />

tive<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

0 4.46<br />

0<br />

0<br />

0<br />

0<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

31-Dec-<br />

2009<br />

0.00 31-Dec-<br />

2009<br />

989,650.00<br />

519,825.00<br />

31-Dec-<br />

2009<br />

31-Dec-<br />

2009<br />

0.00 0.00 31-Dec-<br />

2009<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

NA 4 NA TBD TBD TBD<br />

NA<br />

0.00<br />

NA TBD TBD TBD<br />

NA 989,650 NA NA NA NA<br />

NA 519,825 NA NA NA NA<br />

4<br />

0.00<br />

0.00% 8 12 12<br />

Rural<br />

Development<br />

3.2d Rural<br />

Electrification<br />

Sub-Activity<br />

Process<br />

milestone<br />

Number of electricity<br />

projects identified and<br />

diligence<br />

Number<br />

Cumula<br />

tive<br />

0<br />

0.00 10.00 31-Dec-<br />

2009<br />

10<br />

10.00<br />

100.00% 12 12<br />

Rural<br />

Development<br />

3.2d Rural<br />

Electrification<br />

Sub-Activity<br />

Process<br />

milestone<br />

Kilometers of<br />

Electricity lines<br />

identified and<br />

diligence<br />

Km<br />

Cumula<br />

tive<br />

0<br />

0.00 93 31-Dec-<br />

2009<br />

93 93 100.00% 200 200<br />

Rural<br />

Development<br />

3.3. Financial<br />

Services Activity<br />

Outcome<br />

Number of inter-bank<br />

transactions<br />

Number<br />

Cumula<br />

tive<br />

210,000<br />

400,000<br />

450,000 600,000<br />

600,000<br />

- 65 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Activity<br />

Indicator<br />

Level<br />

Indicator<br />

Unit<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

Rural<br />

Development<br />

3.3. Financial<br />

Services Activity<br />

Outcome<br />

Value of deposit<br />

accounts in rural<br />

banks<br />

US$<br />

Cumula<br />

tive<br />

184,593,<br />

274<br />

0.00<br />

31-Dec-<br />

2009<br />

400,000,<br />

000<br />

500,000,<br />

000<br />

600,000,<br />

000<br />

600,000,<br />

000<br />

Rural<br />

Development<br />

3.3. Financial<br />

Services Activity<br />

Output<br />

Number of PFIs<br />

Automated under the<br />

Automation/Computer<br />

ization and<br />

interconnectivity of<br />

Rural Bank Activity<br />

Number<br />

Increm<br />

ental<br />

0 0.00 0.00<br />

31-Dec-<br />

2009<br />

21<br />

70 30<br />

121<br />

Rural<br />

Development<br />

3.3. Financial<br />

Services Activity<br />

Output<br />

Number of PFIs<br />

Connected to the<br />

WAN<br />

Number<br />

Increm<br />

ental<br />

0 0.00 0.00<br />

31-Dec-<br />

2009<br />

21<br />

70 30<br />

121<br />

Rural<br />

Development<br />

3.3. Financial<br />

Services Activity<br />

Process<br />

milestone<br />

Project Management<br />

Support Consultant<br />

(PMSC) contract<br />

signed<br />

Date Date None 30-Mar-2009 39,980<br />

77 Days<br />

past due<br />

30-Mar-<br />

2009<br />

Environment<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Process<br />

milestone<br />

Scoping Reports for<br />

the 3 Zones Delivered<br />

Date Date None 20-May-2008 23-May-2008<br />

3 days past<br />

due<br />

20-May-<br />

2008<br />

Environment<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Process<br />

milestone<br />

Public Consultation<br />

Strategy approved<br />

Date Date None 10-Jun-2008 30-Jun-2008<br />

16 days<br />

past due<br />

10-Jun-<br />

2008<br />

Environment<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Process<br />

milestone<br />

Draft Preliminary SEA<br />

approved<br />

Date Date None 13-Aug-2008 24-Sep-2008<br />

30 days<br />

past due<br />

13-Aug-<br />

2008<br />

Environment<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Process<br />

milestone<br />

Compact Level<br />

Environmental<br />

Indicators submitted<br />

Date Date None 23-Jul-2008<br />

9 months<br />

past due<br />

39,917<br />

9 months<br />

past due<br />

23-Jul-<br />

2008<br />

Environment<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Process<br />

milestone<br />

Environmental<br />

Protection Agency<br />

(EPA) IEA signed<br />

Date Date None 30-Jun-2008 24-Jul-2008<br />

18 days<br />

past due<br />

30-Jun-<br />

2008<br />

Environment<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Process<br />

milestone<br />

Total Number of<br />

Resettlement Action<br />

Plans (RAP)<br />

approved<br />

Number<br />

Increm<br />

ental<br />

0 4 1 -75.0% 0.00 3<br />

31-Dec-<br />

2009<br />

2 4 200.00 6<br />

- 66 -


Cumulative Past Performance through last<br />

completed Compact Year<br />

Last Quarter<br />

Current Quarter<br />

Performance for Current Compact<br />

Year<br />

Remaining Annual<br />

Targets<br />

End of<br />

Compact<br />

Target<br />

Project<br />

Environment<br />

Activity<br />

4.0 Environmental<br />

and Social<br />

Assessment<br />

Indicator<br />

Level<br />

Process<br />

milestone<br />

Indicator<br />

Total Number of<br />

Environmental<br />

Assessments<br />

approved<br />

Unit<br />

Number<br />

Indicat<br />

or<br />

Classifi<br />

cation<br />

Type<br />

Increm<br />

ental<br />

Baseline<br />

Q [1] to Q [8] (Apr 2008-Mar 2009)<br />

Cumulative<br />

Targets<br />

Cumulative<br />

Actuals<br />

Q [10] (Jul-<br />

Sep 2009)<br />

Deviation Actuals Actuals<br />

0 5 3 -40.0% 0 1<br />

Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />

Actuals<br />

as of<br />

(Date)<br />

31-Dec-<br />

2009<br />

Annual<br />

Target<br />

Cumulativ<br />

e Actual<br />

for<br />

Compact<br />

Year 3<br />

%<br />

Complete<br />

Towards<br />

Annual<br />

Target<br />

Y[4] (Apr<br />

2010-Mar<br />

2011)<br />

Y[5] (Apr<br />

2011-Feb<br />

2012)<br />

Q1 to<br />

Q20<br />

Target Target Target<br />

0 2 NA 5<br />

Monitoring &<br />

Evaluation<br />

5.0 Monitoring and<br />

Evaluation<br />

Process<br />

milestone<br />

Clean GLSS5+<br />

baseline data<br />

received by <strong>MiDA</strong><br />

Date Date None 28-May-2009<br />

31-May-<br />

2009<br />

39,961<br />

3 days<br />

before due<br />

31-May-<br />

2009<br />

Monitoring &<br />

Evaluation<br />

5.0 Monitoring and<br />

Evaluation<br />

Process<br />

milestone<br />

FBO survey launched Date Date None 1-Nov-2008 4-Nov-2008<br />

3 days past<br />

due<br />

1-Nov-<br />

2008<br />

Monitoring &<br />

Evaluation<br />

5.0 Monitoring and<br />

Evaluation<br />

Process<br />

milestone<br />

FBO baseline data<br />

received by <strong>MiDA</strong><br />

Date Date None 21-Aug-2009<br />

31-May-<br />

2009<br />

40,046<br />

13 weeks<br />

past due<br />

31-May-<br />

2009<br />

Monitoring &<br />

Evaluation<br />

5.0 Monitoring and<br />

Evaluation<br />

Process<br />

milestone<br />

Feeder Roads<br />

Investment Evaluation<br />

contract signed<br />

Date Date None 18-Nov-2008 30-Mar-2009<br />

14 weeks<br />

past due<br />

18-Nov-<br />

2008<br />

- 67 -


ANNEX B:<br />

Transportation Project Technical Report<br />

Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: N1 Highway Project<br />

Project Name<br />

Client<br />

Consultant<br />

Upgrading of N1 Highway between Tetteh Quarshie Interchange and<br />

Mallam Road Junction, Accra, <strong>Ghana</strong> to 3 lane Dual Carriageways with<br />

Adequate Public Transport Facilities and Grade Separated Structures.<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Intercontinental Consultants & Technocrats Pvt. Ltd (ICT), New Delhi,<br />

India in Joint Venture with Bans Consult Ltd, Accra, <strong>Ghana</strong><br />

Type of Service<br />

Cost of Consultancy<br />

Assignment<br />

Disbursement to Date<br />

Total Project Lengths<br />

Other Project<br />

Requirements<br />

Project Location<br />

Funding<br />

Contract Packages<br />

Feasibility Studies, Detailed Engineering Design including Preparation<br />

of EIA, RAP, Tender Documents and Construction Supervision.<br />

The Cost of Consultancy assignment is US$ 1,767, 425 (Foreign<br />

component) and GH¢ 1,303,409 (Local component)<br />

US$810,805.95 and GHC880,308.75<br />

14.10 Kms<br />

Grade Separated Structures and other Public Transport Facilities<br />

Within the Capital City in the Greater Accra Region and forms an<br />

Integral Part of the ECOWAS Trans West African Coastal Highway<br />

Network<br />

Phase I – Improvement Works and Design Part of Phase II - MCC<br />

Two<br />

Contract Signed Date 28 th December, 2007<br />

Commencement Date 7 th January, 2008<br />

Date of Completion Phase II: Construction Supervision commenced January 2009.<br />

Duration of Project 2 years from the effective date of Contract<br />

Variation of Contract ICT-BANS JV re-negotiated a Variation in Contract<br />

Time Elapsed till date 24 Months<br />

- 68 -


N1 Highway Works: LOT 1<br />

Project Name<br />

Upgrading of N1 Highway between Tetteh Quarshie Interchange and<br />

Apenkwa Interchange, Accra, <strong>Ghana</strong> to 3 lane Dual Carriageways with<br />

Adequate Public Transport Facilities and Grade Separated Structures.<br />

Client<br />

Contractor<br />

Type of Works<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Messrs. China Railway (WUJU) Group Corporation.<br />

Upgrading of the N1 Highway Project road section from Tetteh<br />

Quarshie Interchange to Apenkwa Interchange.<br />

Contract Sum<br />

US$ 42.2 Million<br />

Disbursement to Date US$ 7,505,630.59<br />

Total Project Lengths<br />

Other Project<br />

Requirements<br />

Project Location<br />

Funding<br />

6.05 Kms<br />

Grade Separated Structures and other Public Transport Facilities<br />

Within the Capital City in the Greater Accra Region and forms an<br />

Integral Part of the ECOWAS Trans West African Coastal Highway<br />

Network<br />

United States of America under the Millennium Challenge Account and<br />

the Government of <strong>Ghana</strong><br />

Contract Signed on Date 31 st December, 2008<br />

Commencement Date 27 th March, 2009<br />

Completion Date<br />

Duration of Project<br />

Time elapsed till date<br />

30 th June 2011 for Construction Phase<br />

30 months from date of commencement of Contract.<br />

12 months from the effective date of Signing of Contract<br />

N1 Highway Works: LOT 2<br />

Project Name<br />

Upgrading of N1 Highway between Apenkwa Interchange and Mallam<br />

Road Junction, Accra, <strong>Ghana</strong> to 3 lane Dual Carriageways with<br />

Adequate Public Transport Facilities and Grade Separated Structures.<br />

Client<br />

Contractor<br />

Type of Works<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Messrs. Moniz da Maia Serra & Fortunato-Empereiteros (MSF).<br />

Upgrading of the N1 Highway Project road section from Apenkwa<br />

Interchange to Mallam Junction.<br />

Contract Sum<br />

US$ 83.666 Million<br />

Disbursement to Date US$ 8,366,046.33<br />

Total Project Lengths<br />

Other Project<br />

Requirements<br />

Project Location<br />

8.119 Kms<br />

Grade Separated Structures and other Public Transport Facilities<br />

Within the Capital City in the Greater Accra Region and forms an<br />

Integral Part of the ECOWAS Trans West African Coastal Highway<br />

- 69 -


Network<br />

Funding<br />

United States of America under the Millennium Challenge Account and<br />

the Government of <strong>Ghana</strong><br />

Contract Signed on Date 1 st October, 2009<br />

Commencement Date 15 th October, 2009<br />

Completion Date 14 th October, 2011<br />

Duration of Project<br />

Time elapsed till date<br />

24 months from date of commencement of Contract.<br />

3months from the effective date of Signing of Contract<br />

- 70 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Feeder Roads – LOT 1<br />

Consultancy Services for Trunk and Feeder Roads Rehabilitation Project<br />

Project Name<br />

– LOT 1<br />

Client<br />

Consultant<br />

Type of Service<br />

Cost of Consultancy<br />

Assignment<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Kocks Consult GmbH Consulting Engineers in Association with RRI<br />

Rhein International GmbH and Conterra Ltd<br />

Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, Final Construction Design and Construction Supervision of<br />

Trunk and Feeder Roads Rehabilitation Project – LOT 1<br />

US$2,223,270.00<br />

Disbursement to Date US$ 630,292.75<br />

Total Project Lengths 337.1 Kms<br />

Length Designed<br />

Project Location<br />

Funding<br />

Contract Packages<br />

333.4 km<br />

In five (5) Districts in the Northern Region<br />

Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental<br />

and Social Evaluation; Final Design and Bid Document - MCC<br />

Two<br />

Contract Signed on Date 3 rd March, 2008<br />

Commencement Date 17 th March, 2008<br />

Date of Completion 17 th December, 2008<br />

Duration of Project<br />

Time Elapsed till date<br />

9 months from the commencement date<br />

21months, 3 weeks<br />

- 71 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Feeder Roads – LOT 2<br />

Project Name<br />

Client<br />

Consultant<br />

Consultancy Services for Trunk and Feeder Roads Rehabilitation Project<br />

– LOT 2<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Rom Consult Limited<br />

Type of Service Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, Final Construction Design and Construction Supervision of<br />

Trunk and Feeder Roads Rehabilitation Project – LOT 2<br />

Cost of Consultancy<br />

Assignment US$ 1,356,550.00<br />

Disbursement to Date US$ 644,739.63<br />

Total Lengths (Km)<br />

Length Designed<br />

Project Location<br />

Funding<br />

Contract Packages<br />

386.5 km<br />

283.1 km<br />

Southern Zone 1 - In six (6) Districts in the Central Region and Eastern<br />

Regions of <strong>Ghana</strong><br />

Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental<br />

and Social Evaluation; Final Design and Bid Document - MCC<br />

Three<br />

Contract Signed Date 21 st February, 2008<br />

Commencement Date 6 th March, 2008<br />

Date of Completion 6 th November, 2008<br />

Duration of Project<br />

Time Elapsed till date<br />

8 months from the commencement date<br />

22 months 3weeks<br />

- 72 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Feeder Roads – LOT 3<br />

Project Name Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />

LOT 3<br />

Client<br />

Consultant<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

SAI Consulting Engineers Pvt Limited in Joint Venture with Associated<br />

Consultant<br />

Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, Final Construction Design and Construction Supervision of<br />

Type of Service Trunk and Feeder Roads Rehabilitation Project – LOT 3<br />

Cost of Consultancy<br />

Assignment US$ 2,895,885.00<br />

Disbursement to Date US$ 838,265.00<br />

Total Project Lengths<br />

(Km) 221.30<br />

Project Location<br />

Funding<br />

Contract Packages<br />

Southern Zone 2 - In five(5) Districts in the Volta Region of <strong>Ghana</strong><br />

Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />

Social Evaluation; Final Design and Bid Document - MCC<br />

Three<br />

Contract Signed Date 12 th March, 2008<br />

Commencement Date 26 th March, 2008<br />

Date of Completion 26 th November, 2008<br />

Duration of Project<br />

Time Elapsed till date<br />

8 months from the commencement date<br />

21 months 2 weeks<br />

- 73 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Trunk Roads – LOT 4<br />

Project Name<br />

Client<br />

Consultant<br />

Type of Service<br />

Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />

LOT 4<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

H. P. Gauff Ingenieures GmbH & Co<br />

Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, Final Construction Design and Construction Supervision of<br />

Trunk and Feeder Roads Rehabilitation Project – LOT 4<br />

Cost of Consultancy<br />

Assignment The cost of consultancy assignment is US$ 2,079,638.00<br />

Disbursement to Date US$ 840,329.05 for Phase A1, A2, A3<br />

Total Project Length<br />

(Km) 227<br />

Project Location<br />

Funding<br />

Afram Basin - In six(6) Districts in the Eastern and Ashanti Regions of<br />

<strong>Ghana</strong><br />

Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />

Social Evaluation; Final Design and Bid Document - MCC<br />

Contract Packages Two<br />

Contract Signed on<br />

Date 3 rd March, 2008<br />

Commencement Date 17 h March, 2008<br />

Date of Completion 17 th November, 2008<br />

Duration of Project<br />

Time Elapsed till date<br />

8 months from the commencement date<br />

21months 3 weeks<br />

- 74 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Ferry Project<br />

Improvement of Volta Lake Transport Company (VLTC) Ferry Service at<br />

Project Name the Adawso-Ekye Amanfrom Ferry Crossing<br />

Client<br />

Consultant<br />

Type of Service<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Grontmij/Carl Bro in Association with Erria A/S and MAP Consult Limited<br />

Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, and Construction Supervision of Ferry Activity<br />

Cost of Consultancy<br />

Disbursement to Date<br />

Project Description<br />

Project Location<br />

Funding<br />

The cost of consultancy assignment is US$2,660,128.00<br />

US$622,399.00 for 100% payment on Phase I<br />

US$485,287.50 for 75% payment on Phase II<br />

• Rehabilitation of the Floating Dock at Akosombo<br />

• Construction of two new RoRo Ferries<br />

• Expansion of the Landing Stages at Ekye Amanfrom and Adawso<br />

• Construction of Terminal Facilities at Ekye Amanfrom and Adawso<br />

• Removal of Tree Stumps in the Navigational Path at Ekye<br />

Amanfrom to Adawso<br />

Eastern Region of <strong>Ghana</strong><br />

Phase I – Inception Report, Environmental Scoping Report, Final Feasibility<br />

Report including Preliminary ESIA Design Report – MCC<br />

Phase II – Final Design, and Preparation of Bidding and Contract<br />

Documents - MCC<br />

Contract Packages Three (Lot FS1, Lot FS2 and Lot FS3)<br />

Contract Signed on<br />

Date 14 th February, 2008<br />

Commencement Date 28 th February, 2008<br />

Date of Completion 28 th August 2008<br />

Phase I – Feasibility Studies, EIA and SIA -5 months<br />

Phase II – Final Design, and Preparation of Contract Documents and<br />

Tendering – 10 months<br />

Duration of Project Phase 3 – Supervision – 24 months<br />

Phase I of Project completed.<br />

Time Elapsed Phase II Works 15 months 2 weeks lapsed since 15 th September, 2008.<br />

- 75 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: KIA_PCC Project<br />

Consultant Services for a Perishable Cargo Centre at Kotoka International<br />

Project Name Airport (KIA-PCC)<br />

Client<br />

Consultant<br />

Type of Service<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Vek Adviesgroep B.V. in Association with Adviesburo Verhoef B.V. and<br />

Architectural & Engineering Services Limited (AESL)<br />

Consultancy Services for a Perishable Cargo Centre and Design of new<br />

Palletization facility at KIA.<br />

Cost of Consultancy<br />

Assignment The cost of consultancy assignment is US$1,450,000.00 and GHC 36,000.00<br />

Disbursement to Date<br />

Project Description<br />

Project Location<br />

Funding<br />

Contract Package One<br />

Contract Signed on<br />

Date 2 nd June, 2009<br />

Commencement Date 16 th June, 2009<br />

Nil<br />

Phase A<br />

• Review of Designs, Bidding Documents, Bill of Quantities, Cost and<br />

Returns, Design Preparation of Bidding Document of a New<br />

Palletization facility at KIA<br />

• Prepare Environmental Review and Environmental Assessment<br />

Report<br />

Phase B<br />

• Bidding and Evaluation of Bids for the Construction Works<br />

• Supervision Services for the Construction and Installation of<br />

Equipment in the PCC<br />

Phase C<br />

• Post Construction and Installation Services during Defects Liability<br />

Period.<br />

Greater Accra Region of <strong>Ghana</strong><br />

Phase A – Inception Report, Economic Viability Statement, Environmental<br />

Review Report and Assessment Register, Final Design Report and Bidding<br />

Documents– MCC<br />

Date of Completion 28 th August 2008<br />

Duration of Project Phase A – 7.5 months; Phase B – 14 months; Phase C – 12 months<br />

Time Elapsed till Phase A 6.5 months<br />

Date<br />

- 76 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Irrigation Development (LOT 1)<br />

Rehabilitation/Extension Works on 4 Selected Irrigation Schemes in the<br />

Project Name Northern Agriculture Zone<br />

Client<br />

Consultant<br />

Type of Service<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

SNC Lavalin International Incorporated<br />

Consultancy Services for the Provision of Feasibility Study, Final Design<br />

and Construction Supervision of Rehabilitation/Extension Works on<br />

irrigation Schemes in the Northern Agriculture Zone<br />

Cost of Consultancy<br />

Assignment The Cost of Consultancy assignment is US$ 2,751,669.00<br />

Disbursement to Date<br />

Project Description<br />

Project Location<br />

Funding<br />

Contract Package N/A<br />

Contract Signed on<br />

Date 10 th September, 2009<br />

Commencement Date 1 st October, 2009<br />

Nil<br />

Phase A<br />

• Conduct Feasibility Study, Preliminary Designs<br />

• Assessment of Environmental and Social Impacts<br />

• Preparation of EMPs, Resettlement Plans,<br />

• Organizational and Management Capacity Assessment in the<br />

Operation of the Rehabilitated Schemes.<br />

Phase B<br />

• Preparation of Final Engineering Designs<br />

• Bidding and Evaluation of Bids for the Construction Works<br />

Phase C<br />

• Supervision of Construction Works involved in the Rehabilitation,<br />

Extension and /or Construction of the Schemes.<br />

• Establishment of the Appropriate Operational and Management<br />

Systems on Rehabilitated Schemes.<br />

• Post Construction Supervision during Defects Liability Period.<br />

Northern Region<br />

Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />

Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />

Organizational and management Needs Assessment Report and Final<br />

Feasibility Report– MCC<br />

Date of Completion 31 st December, 2011<br />

Duration of Project Phase A – 4 months; Phase B – 5 months; Phase C – 30 months<br />

Time Elapsed till Phase A 3months<br />

Date<br />

- 77 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Irrigation Development (LOT 2)<br />

Rehabilitation/Extension Works on 4 Selected Irrigation Schemes in the<br />

Project Name Afram Basin Zone<br />

Client<br />

Consultant<br />

Type of Service<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Haskoning Nederland BV, ABP Consult Ltd. and SAL Consult Limited<br />

Consultancy Services for the Provision of Feasibility Study, Final Design<br />

and Construction Supervision of Rehabilitation/Extension Works on<br />

irrigation Schemes in the Afram Basin Zone<br />

Cost of Consultancy<br />

Assignment The Cost of Consultancy assignment is US$ 1,998,113.00<br />

Disbursement to Date<br />

Project Description<br />

Project Location<br />

Funding<br />

Contract Package N/A<br />

Contract Signed on<br />

Date 21 st October, 2009<br />

Commencement Date 11 th November, 2009<br />

Nil<br />

Phase A<br />

• Conduct Feasibility Study, Preliminary Designs<br />

• Assessment of Environmental and Social Impacts<br />

• Preparation of EMPs, Resettlement Plans,<br />

• Organizational and Management Capacity Assessment in the<br />

Operation of the Rehabilitated Schemes.<br />

Phase B<br />

• Preparation of Final Engineering Designs<br />

• Bidding and Evaluation of Bids for the Construction Works<br />

Phase C<br />

• Supervision of Construction Works involved in the Rehabilitation,<br />

Extension and /or Construction of the Schemes.<br />

• Establishment of the Appropriate Operational and Management<br />

Systems on Rehabilitated Schemes.<br />

• Post Construction Supervision during Defects Liability Period.<br />

Northern Region<br />

Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />

Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />

Organizational and Management Needs Assessment Report and Final<br />

Feasibility Report– MCC<br />

Date of Completion 31 st December, 2011<br />

Duration of Project Phase A – 4 months; Phase B – 5 months; Phase C – 30 months<br />

Time Elapsed till<br />

Date<br />

1.5 months<br />

- 78 -


Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Irrigation Development (LOT 3)<br />

Rehabilitation/Extension Works on 2 Selected Irrigation Schemes in the<br />

Project Name Southern Horticulture Zone<br />

Client<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Consultant<br />

Type of Service<br />

SNC Lavalin International Incorporated<br />

Consultancy Services for the Provision of Feasibility Study, Final Design<br />

and Construction Supervision of Rehabilitation/Extension Works on<br />

irrigation Schemes in the Southern Horticulture Zone<br />

Cost of Consultancy<br />

Assignment The Cost of Consultancy assignment is US$ 3,248,331.00<br />

Nil<br />

Disbursement to Date<br />

Phase A<br />

• Conduct Feasibility Study, Preliminary Designs<br />

• Assessment of Environmental and Social Impacts<br />

• Preparation of EMPs, Resettlement Plans,<br />

• Organizational and Management Capacity Assessment in the<br />

Operation of the Rehabilitated Schemes.<br />

Phase B<br />

• Preparation of Final Engineering Designs<br />

• Bidding and Evaluation of Bids for the Construction Works<br />

Phase C<br />

• Supervision of Construction Works involved in the Rehabilitation,<br />

Extension and /or Construction of the Schemes.<br />

• Establishment of the Appropriate Operational and Management<br />

Systems on Rehabilitated Schemes.<br />

Project Description • Post Construction Supervision during Defects Liability Period.<br />

Project Location Northern Region<br />

Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />

Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />

Organizational and management Needs Assessment Report and Final<br />

Funding<br />

Feasibility Report– MCC<br />

Contract Package N/A<br />

Contract Signed on<br />

Date 10 th September, 2009<br />

Commencement Date 1 st October, 2009<br />

Date of Completion 31 st December, 2011<br />

Duration of Project Phase A – 6 months; Phase B – 5 months; Phase C – 30 months<br />

Time Elapsed till<br />

Date<br />

3 months<br />

- 79 -


Annex C: Work Plans<br />

Output/Process<br />

Jan<br />

Commercial Agriculture -2010<br />

Feb Mar Apr May<br />

Jun<br />

Issue 28 TOs for Phase I I Late 400<br />

FBOs stage 1<br />

Demo Centres established in the Afram<br />

and Northern Zones<br />

120 SMEs out of 394 SMEs selected<br />

Train 120 SMEs<br />

Review and approve the Monitoring and<br />

Evaluation System for Impact Evaluation<br />

33,000 starter packs for Phase II early<br />

and Phase I late distributed<br />

Monitoring of Starter pack usage<br />

3500 farmers that require global gap<br />

training Identified<br />

Identify FBOs around irrigation sites<br />

Farm Measurement and data collection<br />

- 80 -


O utput/Process<br />

IRRIGATION ACTIVITY<br />

2 0 10<br />

JAN FEB MAR APR<br />

MAY<br />

JUN<br />

Phase A: Feasibility Study &<br />

Environmental Impact<br />

Assessment<br />

Environmental Scoping Report<br />

Draft Feasibility Study Report<br />

(including Preliminary<br />

Design Report, Draft EIA and EMP)<br />

Final Feasibility Study Report<br />

Phase B: Design & Bidding<br />

Pre-Qualification of Contractors<br />

Commencement of Design<br />

Draft Design Report + Bid<br />

Documents + Draft Organizational<br />

& Mgt System Report<br />

Final EIA + EMP + RAP<br />

Final Design Report, Bid<br />

Documents and Organizational &<br />

Mgt System Report<br />

DEC. 2009 – MARCH 2010<br />

DEC. 2009 - FEBRUARY 2010<br />

JANUARY – 3 RD MARCH 2010<br />

19 TH MARCH – 1 ST APRIL 2010<br />

MARCH 2010 – MAY 2010<br />

MARCH 2010<br />

1 ST MAY<br />

31 ST MAY<br />

7 TH JUNE 2010<br />

- 81 -


Land Tenure Facilitation Activity<br />

Timelines<br />

Step<br />

JAN<br />

FEB<br />

2 0 1 0<br />

MAR APR MAY JUNE<br />

JUL<br />

SEPT<br />

NOV<br />

(Awutu Senya 1)<br />

• Title Certificate to Farmers Issued<br />

• IEA - Winneba Land Title Site Office: Land<br />

Registration Management Software<br />

developed<br />

Awutu Senya 2 (Extension)<br />

• Consultants procured.<br />

• Identification of PRD carried out<br />

• PRD declared<br />

• Initial sensitization/gender/ADR/inventory<br />

work started<br />

Savelugu Nanton (North Pilot)<br />

• Feasibility done<br />

Refurbishment of 3 Circuit Courts Completed<br />

Public Education Campaign and Information Dissemination<br />

Consultant procured<br />

Training for Public Land Sector Agency Staff under<br />

Small Grants Program initiated<br />

- 82 -


PO ST H ARVEST INFRASTRUCTURE<br />

O utput/Process<br />

JAN FEB M AR<br />

2010<br />

APR M AY<br />

JUN<br />

K I A - P C C<br />

E c o n o m i c V ia b ili ty S ta te me n t<br />

D r a f t D e si g n R e po r t<br />

D r a f t B id d in g D o c u me n ts<br />

J A N – FE BR U AR Y 20 10<br />

J A N U A R Y – MA RC H 20 10<br />

J A N U A R Y – MA RC H 20 10<br />

P r o c u r e m<br />

e n t S tr a te g y R e p o rt<br />

F i n a l B i d d in g D o c um e nt s ( IC B )<br />

A P R I L – JU N 20 10<br />

A P R I L –MA Y 20 10<br />

P U B L I C P A C K H O U S E S<br />

B i d E v a l u a t io n E x er c is e<br />

M i D A<br />

R e qu e s t fo r in f o rma t io n t o C la r if y<br />

r e c e i v e d B id s<br />

S u b mi s s i o n o f B id E v a lu a ti o n R e po r t<br />

A<br />

M<br />

p p r o v a l s<br />

C C A p p r o v a l o f BE P Re p o rt<br />

B o a r d A p p r o v a l fo r A w a rd<br />

I s s u a n c e o f L e t e r of A c c ep t a nc e<br />

N e g o t i a t io n s w it h w i n i ng C o nt ra c to r<br />

S i g n i n g o f C o n tr a ct<br />

P r e - c o m m e n c e m en t A ct iv i ti e s<br />

2 0 t h JA N –2 3R DF EB R UA R Y<br />

1 0 T H FE B .<br />

2 6 T H FE B RU A RY<br />

MA R C H 20 10<br />

MA R C H 20 10<br />

A P R I L 20 10<br />

M A R C H –A P RIL 2 01 0<br />

A P R I L 20 10<br />

A P R I L – JU NE 2 01 0<br />

- 83 -


Activity Timelines – Credit Activity<br />

Output/Process<br />

2009 - 2010<br />

Oct Nov Dec Jan Feb Mar Apr<br />

May<br />

Portfolio at Risk (20%)<br />

Value of Agric Loans<br />

(Disbursement of ACP<br />

Loans)<br />

$20m<br />

# of PFIs Staff Trained<br />

# of PFIs Accredited<br />

200<br />

55<br />

Grants for Setting of PFI<br />

Loan Offices<br />

$250,000<br />

- 84 -


NR series Feeder Roads Timelines<br />

Output/Process<br />

2009<br />

JUL AUG SEP OCT NOV DEC<br />

Draft Final Designs & Bidding<br />

Documents<br />

MCC Approval of Bidding<br />

Documents<br />

Start of Procurement<br />

process<br />

Advert on Lots NR1 & NR2<br />

Evaluation of Bids for<br />

Lots NR1 and NR2<br />

Approvals<br />

MCC Approval<br />

Board Approval<br />

Negotiations<br />

Issuance of Letter of<br />

Acceptance<br />

15 th July<br />

28 th Aug<br />

31 st August 2009 - Mid- January 2010<br />

31 st August<br />

9 th -18 th Nov<br />

2 nd Dec<br />

October<br />

17 th Dec<br />

22 nd Dec<br />

23 rd Dec<br />

- 85 -


NR series Feeder Roads Timelines<br />

Output/Process<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

Negotiations with winning<br />

Contractors<br />

Signing of Contracts Lots NR<br />

1&2<br />

Mobilization of Contractors<br />

Pre-commencement meeting<br />

Issuance of Letters to<br />

Commence the Works<br />

Handing Over of Lots NR 1 &<br />

2 Sites<br />

Kick Off Meeting<br />

START OF CONSTRUCTION<br />

WORKS<br />

6 th JAN<br />

12 th JANUARY<br />

13 th JANUARY – 13 th APRIL 2010<br />

18 th JANUARY<br />

17 th FEBRUARY<br />

24 th FEBRUARY<br />

23 RD MARCH 2010<br />

APRIL 2010<br />

- 86 -


Output/Process<br />

Lot EC 1 Feeder Roads Timelines<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

Nsawam-Odeikrom-Pakro Raods<br />

(Zone 1)<br />

Demolition & Site Clearance<br />

Drainage Structures<br />

Construction of Culverts<br />

Construction of U-Drains<br />

Earthworks<br />

Excavate to Formation of Works<br />

Fill with Exc. Material from borrow pits<br />

ROADS & PAVINGS<br />

Scarify existing gravel & bitumen<br />

surface<br />

Reshaping and compaction works<br />

Provide, lay, compact natural Gravel<br />

Sub-base<br />

Provide, lay, compact natural Gravel<br />

Base<br />

Pre coat & spread 10mm chippings<br />

Pre coat & spread 14mm chippings<br />

Provide & place kerbs<br />

DECEMBER 2009 – SEPTEMBER 2010<br />

JANUARY 2010<br />

3 RD DECEMBER 2009 – 10 TH APRIL 2010<br />

JANUARY – JULY 2010<br />

JANUARY – FEBRUARY 2010<br />

DECEMBER 2009 – APRIL 2010<br />

JANUARY 2010 – JULY 2010<br />

MARCH – JULY 2010<br />

8 TH APRIL - AUGUST 2010<br />

19 TH APRIL – AUGUST 2010<br />

3 RD MAY – SEPTEMBER<br />

12 TH MAY - SEPTEMBER<br />

JUNE 2010<br />

- 87 -


Output/Process<br />

Lot EC 2 Feeder Roads Timelines<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

Akoti-Kwanyarko Bridge Works<br />

Excavation Works<br />

Blinding Works<br />

Casting of Abutment Foundation<br />

Concrete wall (1 st Lift)<br />

Casting of Abutment Foundation<br />

Concrete (2 nd Lift)<br />

Construction of Bearing seating and<br />

installation of Bearings<br />

Decks and Girders<br />

Earthworks<br />

Bridge Approach & Ancillary Works<br />

Upgrading of Ofaakor-Apra Road<br />

Earthworks<br />

Excavation & Filling works<br />

Reshaping and compaction works<br />

Drainage Structures<br />

Construction of Culverts, U-Drains<br />

Provision & Placement of in situ<br />

Concrete<br />

Precast Concrete & Pipeworks<br />

Roads & Paving Works<br />

DECEMBER 2009 – JULY 2010<br />

DECEMBER 2009 – MARCH 2010<br />

FEBRUARY – MARCH 2010<br />

FEBRUARY – MARCH 2010<br />

MARCH 2010<br />

JANUARY 2010 – APRIL 2010<br />

MARCH 2010 - APRIL 2010<br />

APRIL 2010 – MAY 2010<br />

JANUARY 2010 - MARCH 2010<br />

JANUARY 2010 - MARCH 2010<br />

JANUARY 2010 – MAY 2010<br />

JANUARY 2010 – JUNE 2010<br />

JANUARY 2010 – APRIL 2010<br />

APRIL 2010 – JUNE 2010<br />

- 88 -


Outp ut/ Pro ce ss<br />

Lot EC 3 Feeder Roads Timelines<br />

2 010<br />

JAN FE B M AR AP R M AY JUN<br />

D uayed en - Maame Ded e J n. –<br />

O tu krom Roa ds ( 7.31 km)<br />

Sett ing out of w orks<br />

Demolit ion & Site Clearanc e<br />

Ear th wor ks<br />

Exc avate in c ut and F ill<br />

Exc avate uns uitable mater ial & dis pose<br />

Exc avate in r ock & w ith blast ing and<br />

drilling<br />

Exc avate in B orrow pit and f ill t o<br />

embankment<br />

Sc arify exist ing Gr avel s urfac e<br />

Res hape and comp ac t f ormation<br />

D rai nage S tr uctu res<br />

Exc avation w orks<br />

Provis ion & Placement of in-s itu<br />

Conc rete<br />

Anc illaries<br />

Pr ecast C oncr ete<br />

Pipe wor ks & Conc rete Sur rounds<br />

Ro ads & Pavi ng W orks<br />

Ro ad Saf et y and Fu rn itu re<br />

JANUARY – APRIL 2 01 0<br />

JANAURY 20 10<br />

2 1 s t F EBRUARY – MARCH<br />

2 01 0<br />

JANUARY - 2 0 T H FEBRU ARY 20 1 0<br />

2 1 ST -2 8 TH F EB.2 01 0<br />

JANUARY 2 01 0 - F EBRUARY 20 10<br />

M ARCH 2 01 0<br />

FEBRUARY - M AY 20 1 0<br />

JANUARY 2 01 0 – AP RIL 2 01 0<br />

12 TH -2 1 ST M ARCH 20 10<br />

M ARCH – AP RIL 20 10<br />

22 ND MAR - APRIL<br />

2 7 T H MARCH – M AY 20 10<br />

13 TH AP RIL - 1 5 TH JUNE 20 10<br />

- 89 -


VR series Feeder Roads Timelines<br />

Output/Process<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

Procurement of Contractors<br />

Issuance of Letter of Acceptance<br />

(Lot VR1)<br />

Signing of Contract -Lot VR1<br />

Pre-Construction Activities<br />

Procurement for Lot VR2<br />

Court Injunction on Lot VR2<br />

Negotiation with winning<br />

Contractor (Lot VR3)<br />

Signing of Contract Lot VR3<br />

Mobilization of Resources<br />

Technical meeting with<br />

Contractor<br />

Issuance of Letter to commence<br />

Works<br />

Handing Over of Lot VR3 Sites<br />

Start of Works<br />

FEB. 2010<br />

FEB. – MARCH 2010<br />

JANUARY – MAR CH 2010<br />

JAN 2010<br />

6 th JAN<br />

12 th JAN 2010<br />

12 th JANUARY – 12 th APRIL 2010<br />

18 th JANUARY<br />

3 RD FEBRUARY<br />

10 TH FEBRUARY<br />

MARCH – JUNE 2010<br />

APRIL 2010<br />

- 90 -


Output/Process<br />

General Works<br />

Estab lishment of Contractor’s<br />

& Engineers Offices<br />

Contractor’s Lab oratory<br />

Plant & Equip ment<br />

Site Clearance & Demolition<br />

Earth Works<br />

Excavation<br />

Filling<br />

Road Works<br />

Cement treated Sub-Base Course<br />

Grad ed crushed Stone Base<br />

Drainage Structures<br />

Concrete Pip e Culverts<br />

Concrete Box Culverts<br />

Storm Drains<br />

Bridges<br />

Interchange at Dimp les<br />

Retaining Walls<br />

N.1 LOT 1 (TQM) Activity Timelines<br />

JUL 2 0 0 9 - FEB 2 0 1 0<br />

APR 2 0 0 9 – DECEMBER 2 0 1 0<br />

JUN 2 0 0 9 – DEC 2 0 1 0<br />

JUN 2 0 0 9 – FEBRUARY 2 0 1 1<br />

JANUARY 2 0 1 0 – MAY 2 0 1 1<br />

OCTOBER 2 0 0 9 – DECEMBER 2 0 1 0<br />

JULY 2 0 0 9 – MARCH 2 0 1 1<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

JAN 2 0 1 0<br />

APR 2 0 0 9 - MAR 2 0 1 0<br />

FEBRUARY 2 0 1 0 – MAY 2 0 1 1<br />

OCTOBER 2 0 0 9 – MAY 2 0 1 1<br />

OCTOBER 2 0 0 9 – MARCH 2 0 1 1<br />

JULY 2 0 0 9 – SEPTEMBER 2 0 1 0<br />

- 91 -


N.1 LOT 2 (TQM) Activity Timelines<br />

Output/Process<br />

Handing Over of Site<br />

Section 2, CH. 8+600 - 12+500<br />

Section 3, CH. 6+000 - 7+500<br />

Section 4, CH. 7+500 - 8+600<br />

Section 5, Interchange Loop<br />

Pre-Commencement A ctivities<br />

Establishment of Contractor’s<br />

& Engineers Offices<br />

Set up Contractor’s Laboratory,<br />

Plant & Equipment<br />

Kick Off meeting<br />

Earthworks<br />

General Works<br />

Filling<br />

Pavement works<br />

Sub-Base and Base material<br />

Drainage Works<br />

Insitu Concrete works<br />

Pipeworks<br />

18 th – 28 th FEBRAURY, 2010<br />

DECEMBER 2009 – MARCH 2010<br />

DECEMBER, 2009 – MARCH , 2010<br />

JANUARY 2010 – OCTOBER 2011<br />

DECEMBER 2009 – MARCH 2010<br />

FEBRUARY 2010 – MARCH 2010<br />

DECMBER 2009 – FEBRUARY 2010<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

JANUARY 2010 – MARCH 2010<br />

30 th MARCH, 2010<br />

30 th MARCH, 2010<br />

31 st MARCH , 2010<br />

DECMBER 2009 – FEBRUARY 2010<br />

30 th APRIL, 2010<br />

- 92 -


Output/Process<br />

Trunk Roads Timelines<br />

2010<br />

JAN FEB MAR APR MAY JUN<br />

Preparatory Works & Mobilisation.<br />

Setting Out of Works<br />

Mobilization of Equipment<br />

Temporary Crossing over Afram Basin<br />

Production of Crushed Aggregates<br />

Demolition & General Clearance<br />

Demolition<br />

General Clearance<br />

Earthworks<br />

Cut to Spoil & Borrow Excavation<br />

Compaction works<br />

Rock Excavation<br />

Drainage & Concrete Works<br />

Excavation, Blinding for Concrete Struc<br />

Construction of Culverts & U -drains<br />

Mass Concrete & Stone Pitching Works<br />

Road s & Pavings<br />

Scarifying, Reshaping & Compaction<br />

DEC, 2009 -<br />

JAN 2010 - FEBRUARY<br />

MARCH<br />

FEB - MARCH 2010<br />

JANUARY<br />

DEC. 2009 – MARCH 2010<br />

MARCH 2010 - NOVEMBER, 2010<br />

JULY 2010<br />

JUNeE 2010<br />

JUNE 2010<br />

JUNE 2010<br />

MAY 2010<br />

MAY 2010<br />

- 93 -


Output/Process<br />

Ferry Activity Timelines<br />

2010<br />

JAN FEB MAR APR MAY<br />

JUN<br />

Procurement process for Ferry<br />

Works<br />

Final Bid Clarification with Contractor<br />

MCC Approval of Bid Evaluation Report<br />

Board approval for Award of Contract<br />

Advert for Lot FS 2 Ferry Works<br />

Closing/Opening of Bids<br />

Evaluation of Bids for Lot FS1<br />

Preparation of IEA for Lot FS3 Ferry<br />

Works<br />

Approvals<br />

MCC Approvals on Lots FS2 & FS3<br />

Board Approvals for Lots FS2 & FS3<br />

JANUARY – APRIL 2010<br />

JAN - 23 RD FEB. 2010<br />

MARCH 2010<br />

MARCH – APRIL 2010<br />

MARCH 2010<br />

FEBRUARY – MARCH 2010<br />

APRIL - MAY 2010<br />

APRIL 2010<br />

APRIL – MAY 2010<br />

MAY –JUNE 2010<br />

- 94 -


Output/Process<br />

Community Services: Education<br />

OCT’09 NOV’09 DEC’09 JAN’10 FEB’10 MAR’10<br />

Rehabilitated 35 schools<br />

(Maintenance Period)<br />

Supply of Furniture for rehabilitated<br />

schools<br />

Construction of 30 Flood Affected<br />

Supply of Furniture for Flood<br />

Affected Project (Documentation by<br />

Procurement Department & CKP)<br />

Procurement of IDIQ contractors<br />

(Approval of Evaluation Reports in<br />

progress)<br />

Feasibility Studies – South<br />

Feasibility Studies – North<br />

Feasibility Studies - Afram<br />

- 95 -


Output/Process<br />

Community Services: Water & Sanitation<br />

OCT’09 NOV’09 DEC’09 JAN’10 FEB’10 MAR’10<br />

South Zone – 86 Boreholes and 9 Pipe<br />

Extensions identified and diligenced (10-<br />

09-09) Detailed designs for next quarter.<br />

Northern Zone – Contract signed (19-06-<br />

09); 58 Boreholes and 1 Small Town Water<br />

Supply System. Inception and Draft<br />

Feasibility Reports submitted. Detailed<br />

designs submitted and finalised.<br />

Feasibility of Tamale Water Extension<br />

Project (Contract Signed: 11-09-09)<br />

Inception <strong>report</strong> submitted. Feasibility<br />

studies submitted. Detailed design<br />

submitted.<br />

Afram Basin – Contract signed (13-08-<br />

09); Feasibility of 93 Boreholes and 13<br />

Small Town Water Systems in progress.<br />

Inception submitted. Feasibility submitted.<br />

Procurement of IDIQ contractors (July-<br />

Nov, 09). Evaluation <strong>report</strong> under review.<br />

- 96 -


Output/Process<br />

Community Services: Electrification -– 2009-2010<br />

OCT’09 NOV’09 DEC’09 JAN’10 FEB’10 MAR’10<br />

South Zone –Contract signed (15-06-<br />

09); Inception, Feasibility studies and<br />

Draft and Final detailed Reports for<br />

26km, 33kV O/H lines and 10<br />

transformer stations. Final detailed <strong>report</strong><br />

submitted and finalised.<br />

Northern Zone – Contract signed (15-<br />

06-09); Inception, Feasibility studies and<br />

Draft and Final detailed Reports for<br />

67km, 33kV O/H lines and 2 transformer<br />

stations. Final Detail Report submitted<br />

and finalised.<br />

Initial RAP and environmental Impact<br />

Assessments on the proposed Line Route<br />

mapped for the 67km, 33kV Savelugu-<br />

Nasia Irrigation Sub-Transmission Line<br />

in the Northern Zone. Draft Report<br />

submitted.<br />

- 97 -