QUARTERLY REPORT<br />
FOR THE PERIOD: OCTOBER - DECEMBER 2009<br />
QUARTER 11<br />
Offices:<br />
4th Floor Private Mail Bag 56<br />
Heritage Tower<br />
Stadium Post Office<br />
6 th Avenue Accra, <strong>Ghana</strong><br />
Ridge West, Accra Tel: (233) 21 666 619<br />
Fax: (233) 21 666 669<br />
Website: www.mida.gov.gh
Contents<br />
A. EXECUTIVE SUMMARY ............................................................................................................................... - 3 -<br />
B. PROGRESS IN OVERALL PROGRAM IMPLEMENTATION ................................................................. - 5 -<br />
C. PROGRESS IN PROJECT ACTIVITY IMPLEMENTATION ................................................................. - 11 -<br />
PROJECT 1: AGRICULTURE PROJECT ................................................................................................ - 11 -<br />
ACTIVITY 1: COMMERCIAL TRAINING ACTIVITY .................................................................................. - 11 -<br />
ACTIVITY 2: IRRIGATION DEVELOPMENT ............................................................................................. - 15 -<br />
ACTIVITY 3: LAND TENURE FACILITATION ........................................................................................... - 15 -<br />
ACTIVITY 4: IMPROVEMENT OF POST-HARVEST HANDLING AND VALUE CHAIN SERVICES ....... - 19 -<br />
ACTIVITY 5: IMPROVEMENT OF CREDIT SERVICES FOR ON-FARM AND<br />
VALUE-CHAIN INVESTMENTS ........................................................................................... - 21 -<br />
ACTIVITY 6: REHABILITATION OF FEEDER ROADS ............................................................................ - 24 -<br />
PROJECT 2: TRANSPORTATION PROJECT ......................................................................................... - 27 -<br />
ACTIVITY 2.1: N1 ACTIVITY ....................................................................................................................... - 27 -<br />
ACTIVITY 2.2: TRUNK ROADS ACTIVITY ................................................................................................. - 28 -<br />
ACTIVITY 2.3: FERRY ACTIVITY ................................................................................................................ - 29 -<br />
PROJECT 3: RURAL DEVELOPMENT PROJECT .................................................................................. - 30 -<br />
ACTIVITY 1: PUBLIC PROCUREMENT & CAPACITY-BUILDING .......................................................... - 30 -<br />
ACTIVITY 2: COMMUNITY SERVICES ...................................................................................................... - 33 -<br />
ACTIVITY 3: FINANCIAL SERVICES ......................................................................................................... - 37 -<br />
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT .................................................................. - 39 -<br />
D. PROGRAM MANAGEMENT AND GOVERNANCE ........................................................................... - 40 -<br />
E. KEY MONITORING AND EVALUATION (M&E) ACTIVITIES ...................................................... - 41 -<br />
F. SUPPORT TO PROJECT IMPLEMENTATION ................................................................................... - 42 -<br />
G. IMPLEMENTATION IMPEDIMENTS AND MITIGATION MEASURES ............................................ - 44 -<br />
PROJECT 1: AGRICULTURE PROJECT ................................................................................................... - 44 -<br />
ACTIVITY 1: COMMERCIAL AGRICULTURE TRAINING ....................................................................... - 44 -<br />
ACTIVITY 2: IRRIGATION DEVELOPMENT ............................................................................................. - 44 -<br />
ACTIVITY 3: LAND TENURE FACILITATION ACTIVITY ......................................................................... - 44 -<br />
ACTIVITY 4: POST HARVEST INVESTMENT AND VALUE CHAIN SERVICES ACTIVITES ................... - 44 -<br />
ACTIVITY 5: CREDIT SERVICES ................................................................................................................ - 45 -<br />
PROJECT 2:TRANSPORTATION PROJECT ............................................................................................ - 45 -<br />
ACTIVITY 1: N1 HIGHWAY ......................................................................................................................... - 45 -<br />
ACTIVITY 2: TRUNK AND FEEDER ........................................................................................................... - 45 -<br />
ACTIVITY 3: FERRY SERVICES .................................................................................................................. - 46 -<br />
PROJECT 3:RURAL DEVELOPMENT PROJECT ................................................................................... - 46 -<br />
ACTIVITY 1: PROCUREMENT CAPACITY ACTIVITY ............................................................................... - 46 -<br />
ACTIVITY 2: COMMUNITY SERVICES ACTIVITY ..................................................................................... - 46 -<br />
ACTIVITY 3: FINANCIAL SERVICES ......................................................................................................... - 47 -<br />
ANNEXES ............................................................................................................................................................. - 48 -
MCC QUARTERLY REPORT – QUARTER ELEVEN<br />
COMPACT COUNTRY : GHANA<br />
REPORTING PERIOD : 1 ST OCTOBER – 31 ST DECEMBER 2009<br />
REPORT DATE : 31 ST DECEMBER 2009<br />
CONTACT PERSON : ABIGAIL ABANDOH-SAM, M&E DIRECTOR<br />
______________________________________________________________________________<br />
A. EXECUTIVE SUMMARY<br />
Introduction<br />
The <strong>Ghana</strong> MCA Program entered the second half of Implementation during the Quarter.<br />
The Commercial Training of Farmers continued, and FBOs were also assisted that had participated in the<br />
Training were assisted to prepare Business Plans. Progress was made towards providing Farmers access<br />
to Irrigation Facilities with the signing of Contracts to cover work in the Northern Agricultural and the<br />
Afram Basin Zones.<br />
Work commenced on one of the three (3) Lots of Feeder Roads planned for the Southern Horticultural<br />
Belt in the Eastern and Central Regions, and there were pre-Construction activities for the other two Lots.<br />
Contract was signed with Messrs. China Jiangsu Jianda Incorporated for the construction of Agogo-<br />
Dome Trunk Road. Similarly, <strong>MiDA</strong> and Messrs. Moniz da Maia Serra & Fortunato-Empereiteros (MSF)<br />
signed Contract for the construction of N1 Lot 2 Works. Evaluation of Bids for the Ferry Works on<br />
Rehabilitation of Floating Dock & Construction of two (2) and the Extension of Landing Stages and<br />
Rehabilitation of Terminals was completed and the Reports forwarded to MCC for approval.<br />
Agreements were reached with <strong>Ghana</strong> Institute of Management & Public Administration (GIMPA),<br />
Catholic Institute of Business and Technology (CIBT), Takoradi Polytechnic and Koforidua Polytechnic<br />
on how soon they would begin using the Procurement Curricula and Modules and in order to plan for the<br />
provision of textbooks to support the Training. Twenty (25) flood affected school blocks (out of a total of<br />
30) were completed under Phase IB of the School Reconstruction Activity and are ready to be handed<br />
over to the beneficiary Communities. Work on the remaining 5 Project Sites is about 82% complete.<br />
Agriculture Project<br />
Twenty-eight (28) Task Orders were issued for the Training of about 21,000 Farmers who belong to<br />
FBOs in the Phase II Early and Phase I Late groups of the Commercial Training Program. The FBOs<br />
were also assisted to prepare Business Plans.<br />
Contracts were signed for the Technical Feasibility Studies, Design and Supervision of<br />
Rehabilitation/Extension of Works for Irrigation in the Northern Agriculture and the Afram Basin Zones.<br />
These studies cover 4,234 ha out of the total land potential of 5,060 ha for Irrigation that have been<br />
identified in all the three Zones.<br />
Under the Land Activity, work on the issuing of 168 Land Title Certificates was completed during the<br />
Quarter. During the same period the Alternative Dispute Resolution (ADR) Consultant completed her<br />
work and the Winneba Land Registration Office was also completed.<br />
Expressions of Interest were received for the three (3) Public Pack Houses proposed to be built at<br />
Mariakrom, Otwekrom and Akorley in the Akuapim South, Gomoa and Yilo Krobo Districts respectively.<br />
- 3 -
Procurement<br />
(a) Bid Evaluations and Contract Negotiations<br />
Twelve (12) major Procurement Activities began in the Quarter, of which four (4) were<br />
completed. Ten (10) major Solicitation Documents were issued during the period, while one (1)<br />
major Consultancy Assignment and six (6) Bids for Works were evaluated.<br />
(b)<br />
Contracts Awarded<br />
Major Contracts awarded during the Quarter were valued at USD169, 571,480. This is broken<br />
down as follows:<br />
i. Value (by Month):<br />
October : US$141,978,241<br />
November : US$ 2,810,000<br />
December : US$ 24,783,239<br />
ii.<br />
Value (by Project Components):<br />
Agriculture : US$ 48,034,775<br />
Transportation : US$109,566,705<br />
Rural Development : US$ 11,200,000<br />
Monitoring and Evaluation : US$ 770,000<br />
Program Administration : US$ -<br />
MCA FUNDS – RECEIPTS AND DISBURSEMENTS<br />
Qtr. 11 Year to Date Compact Period to Date<br />
(Oct-Dec 2009) (Jan-Dec 2009) (Aug 2006 - Dec 2009)<br />
Actual Commitments 151,388,397 202,440,680 338,428,052<br />
MCC Disbursements 30,191,110 81,310,552 116,947,887<br />
Cash in Hand 3,916,321<br />
- 4 -
B. PROGRESS IN OVERALL PROGRAM IMPLEMENTATION<br />
(1) AGRICULTURE PROJECT<br />
Commercial Training Activity<br />
• Twenty-eight (28) Task Orders were issued and signed in October for the training of 424<br />
FBOs for Phase II Early. Cumulatively 142 Task Orders have been issued.<br />
• About 21 000 farmers took part in the FBO Capacity Building Training organized for the<br />
Phase II Early group and 14,000 took part for Phase I Late Training.<br />
• All business plans for 424 FBOs in Phase II Early Stage I Training, have been finalized.<br />
• Two hundred and eighty six (286) Business Plans for Phase I Late Trainees have been<br />
prepared.<br />
• Out of the 59 MoFA Staff trained under the Training of Trainers for Global GAP, 26 were<br />
certified.<br />
Irrigation Activity<br />
• Inception Reports have been received from Messrs. SNC Lavalin, the Consultants for Lot 1<br />
(Northern Agric Zone) and Lot 3 (Southern Horticultural Belt)<br />
• Messrs Royal Haskoning, the Consultant for Lot 2 (Afram Basin) signed their Contract on<br />
21st October. The Inception Report has been submitted and reviewed.<br />
• About 1,000 ha of the remaining potential land are being designed by RICs under the Small<br />
Scale Irrigation projects during Quarter 11.<br />
• 4,234 ha out of the identified total land potential of 5,060 ha for Irrigation has been awarded<br />
on Contract for the Technical Feasibility Studies, Design and Supervision of Rehabilitation/<br />
Extension of Works.<br />
Land Activity<br />
The following are the achievements:<br />
Pilot Land Title Registration:<br />
• Fieldwork for all the six (6) Sections (total of 3,457 parcels) of the Pilot Registration<br />
District (PRD) comprising inventory, pillaring and surveying have been completed as<br />
follows:<br />
i. Section 1: 760 Parcels (100% complete);<br />
ii. Section 2: 718 Parcels (100% complete);<br />
iii. Section 3: 915 Parcels (100% complete);<br />
iv. Section 4: 267 Parcels (100% complete);<br />
v. Section 5: 198 Parcels (100% complete); and<br />
vi. Section 6: 599 Parcels (100% complete).<br />
• Section 2 (711 parcels) and Section 5 (198 parcels) had Parcel Plans <strong>full</strong>y developed and<br />
approved by the Survey and Mapping Division (SMD) of the Lands Commission and<br />
ready for Title Certificates to be issued.<br />
• 40% of Section 1; 20% of Section 3; 85% of Section 4; and 30% of Section 6 had their<br />
Parcels Plans completed but yet to be approved by the SMD.<br />
• 168 Title Certificates were ready to be handed over to Proprietors.<br />
- 5 -
• The ADR Consultant completed her work with the submission of a comprehensive<br />
Report in October 2009.<br />
• The Winneba Land Registration Office was completed in October 2009.<br />
Baseline on Clearing of Backlog of Land Cases:<br />
With the completion of the Baseline Sub-Activity, attention has now shifted to<br />
refurbishing three (Agona Swedru, Tamale, and Nsawam) out of the 10 Courts. These are<br />
at various stages of completion. GOG made available to the Judicial Service an amount of<br />
GH¢500,000 for the refurbishment of the seven (7) other Courts.<br />
Public Education & Information Dissemination:<br />
The Draft TOR has been submitted to MCC for their comments.<br />
Post Harvest Activity<br />
• Held meeting with Firms that have been shortlisted to benefit from ABCs on the 11 th of<br />
December 2009 to engage them in the organization and management process.<br />
• Fifteen (15) Expressions of Interest were received for the 3 (three) Public Pack houses at<br />
Mariakrom, Otwekrom and Akorley in the Akuapim South, Gomoa and Yilo Krobo Districts<br />
respectively. A Pre-bid Meeting was held on 1 st December 2009, and Bids were submitted on<br />
30 th December.<br />
• KIA Perishable Cargo Centre: The Consultants, Messrs Vek-Verhoef submitted the<br />
Economic Viability and Environmental Review Reports. The results of the review of the<br />
Report by <strong>MiDA</strong> and other Stakeholders, which showed that it was weak on economic<br />
analysis, have been forwarded to the Consultants.<br />
• The Draft Seed and Plant Protection Bills have been forwarded to Parliament.<br />
• To date, four (4) Pre-Coolers have been installed.<br />
Credit Services Activity<br />
• An amount of US$ 2,093,515.81 was disbursed in the Quarter, bringing the cumulative total<br />
to date to US$ 12,707,915.90.<br />
• The Portfolio-at-Risk stood at 18% as at the end of the Quarter.<br />
• <strong>MiDA</strong> Management approved modalities to commence Disbursement under the Grant to<br />
PFIs in support of the setting up of Loan Offices and Means of Transport (Motor Cycles and<br />
Motor Vehicles) to improve On-site Inspections and monitoring of Borrowers.<br />
Rehabilitation of Feeder Roads<br />
LOT 1 (Northern Region Roads – NR Series)<br />
• Solicitation of Bids for the Construction Works on Lots NR1 and NR2 ended on 28th<br />
October, 2009. MCC and Board Approvals of Bid Evaluation Report on recommended<br />
Contractor were obtained.<br />
• <strong>MiDA</strong> issued Letters of Acceptance to Messrs. China Zhongmei Construction limited (Lot<br />
NR1) and Messrs. China Zhong Hao limited (Lot NR2) on 10 th December, 2009.<br />
LOT 2 (Eastern and Central Region Roads – EC Series)<br />
• Pre-construction activities for Lot EC1 ended with Sod-Cutting Ceremony held at Odeikrom;<br />
the work is being executed by Messrs. Big Aidoo Construction Limited.<br />
• Pre-construction activities for the start of works on all road segments under Lots EC2 and<br />
EC3 being executed by Messrs. GKL/Kamsad JV.<br />
- 6 -
LOT 3 (Volta Region Roads – VR Series)<br />
• Procurement process for the re-bidding of Lot VR1 commenced on 15 th October, 2009. Bid<br />
Evaluation Report on Lot VR1 was sent for MCC Approval.<br />
• <strong>MiDA</strong> Board objected to the recommended Contractor for Lot VR2 on 26 th October, 2009.<br />
• Procurement process for the re-bidding of Lot VR2 commenced on 16 th December, 2009.<br />
• <strong>MiDA</strong> Board approval for award of Contract for Lot VR3 was obtained on 9 th December,<br />
2009, and Letter of Acceptance was issued to Messrs. Justmoh Construction Limited on 10 th<br />
December, 2009.<br />
• Messrs. Justmoh Construction Limited submitted Performance Guarantee to <strong>MiDA</strong> on 21 st<br />
December, 2009.<br />
(2) TRANSPORTATION PROJECT<br />
N.1 Highway Activity<br />
N1 Lot 1 Main Works: Tetteh Quarshie Interchange to Apenkwa Bridge (6.1 km)<br />
• Construction Works on the N1 Lot 1 by Messrs China Railway (Wuju) Group is steadily<br />
progressing along the entire corridor of the Tetteh Quarshie Interchange - Apenkwa<br />
Interchange.<br />
N1 Lot 2 Main Works: Apenkwa Bridge to Mallam Junction (8.125 km)<br />
• <strong>MiDA</strong> and Messrs. Moniz da Maia Serra & Fortunato-Empereiteros (MSF) signed Contract<br />
for the construction of N1 Lot 2 Works on 1st October, 2009; Contractor has started preconstructional<br />
activities at Mallam Junction prior to Project Kick Off.<br />
N1 Highway Relocation of Utilities<br />
• Electricity<br />
i. The Contractor had been furnished with Punch list on Lot 1 as at 22nd December, 2009.<br />
ii. Electricity relocation works on existing road crossings at Water Works (N1 Lot 2) was<br />
completed on 30th December, 2009.<br />
iii. Relocation of 33Kv and 11KV High tension Lines under Contract Lot 1 is in progress.<br />
iv. Utility Works under Section II of Lot 2 is in progress.<br />
• Telecom<br />
i. The Contractor had been furnished with Punch list on Lot 1 as at 22 nd December, 2009.<br />
ii. Telecom relocation works on existing road crossings at Water works (N1 Lot 2)<br />
completed as at 30 th December, 2009.<br />
• Water<br />
i. Contractor furnished with Punch list on Lot 1 works as at 22 nd December, 2009.<br />
ii. Water relocation works on existing road crossings at Water works (N1 Lot 2) in progress<br />
since 18 th December, 2009.<br />
RAP and Resettlement Issues for Lots 1&2<br />
• <strong>MiDA</strong> received List of Property Owners within Priority Section 2 on 23 rd December, 2009.<br />
• Negotiations and payments in progress for Property Owners within Priority Section 1<br />
Offsite Drainage Study<br />
• Consultant submitted to <strong>MiDA</strong> Final Design Report (Task 3) of the Offsite Drainage Study<br />
on 7 th December, 2009.<br />
- 7 -
Trunk Roads Activity<br />
• <strong>MiDA</strong> and Messrs. China Jiangsu Jianda Incorporated signed Contract for the construction of<br />
Agogo- Dome trunk road (75.21km). There was a Sod-cutting Ceremony at the Site on 22nd<br />
October, 2009. Contractor has commenced pre-constructional activities on Site.<br />
Ferry Activity<br />
• Solicitation of Bids for the Rehabilitation of Floating Dock & Construction of two (2) Ferries<br />
(Lot FS1) and the Extension of Landing Stages and Rehabilitation of Terminals (Lot FS2)<br />
ended on 2nd December, 2009. Bid Evaluation exercise completed and Reports forwarded to<br />
MCC for approval.<br />
(3) RURAL DEVELOPMENT PROJECT<br />
Procurement Capacity Activity<br />
i. A Stakeholders Workshop was held to review and discuss the Draft Curricula and Modules<br />
presented by Crown Agents.<br />
ii. The revised version of the Draft Curricula and Modules have been reviewed by the PC/PPA<br />
and comments forwarded to Crown Agents. The Consultant has submitted a final version of<br />
the Curricula and Modules.<br />
iii. A Draft Report of the 2009 Internship Program has been presented to MCC. Comments have<br />
been received.<br />
iv. Agreements arising out of discussions to determine how soon Institutions would begin using<br />
the Curricula and Modules and, therefore, need to be supported with textbooks have been<br />
reached with <strong>Ghana</strong> Institute of Management & Public Administration (GIMPA), Catholic<br />
Institute of Business and Technology (CIBT), Takoradi and Koforidua Polytechnics.<br />
Community Services<br />
i. Rehabilitation of Schools<br />
Phase IA: The outstanding furniture for Savelugu Nanton District have been <strong>full</strong>y supplied<br />
and accepted by Inspection Teams.<br />
Phase IB: Twenty (25) flood affected school blocks were completed under Phase IB of the<br />
School Reconstruction Activity and are ready to be handed over to the beneficiary<br />
Communities. Work on the remaining five (5) Project Sites is about 82% complete.<br />
Community Teacher Training Program (<strong>MiDA</strong>/MoE/USAID MOU): Training is ongoing<br />
for two hundred and sixty (260) Community Teachers in all the three Intervention Zones in<br />
<strong>MiDA</strong>-rehabilitated Schools and others in the Districts.<br />
ii.<br />
Feasibility Studies<br />
Schools and Water & Sanitation Facilities: Final Engineering Reports of new Schools, new<br />
Water and Sanitation facilities to farming Communities in the Southern and Northern Zones<br />
have been completed by Consultants and reviewed. Feasibility Studies of new Schools, new<br />
Water and Sanitation Facilities to farming Communities for the Afram Basin Zone have been<br />
completed and reviewed. Draft detailed Designs of the Facilities are ongoing.<br />
- 8 -
Rural Electrification: Final Detailed Design Reports on the provision of a 26km, 33kV O/H<br />
Lines and 10 Transformer Stations in the SHB and 67km, 33kV O/H Lines and two (2)<br />
Transformer Stations in the NAZ have been completed and reviewed. Tender Documents<br />
have been completed and ready to be issued.<br />
Tamale Water Extension Project (TWEP): Feasibility Studies on the Tamale Water<br />
Extension Project have been completed and reviewed. Draft detailed Designs are ongoing.<br />
iii.<br />
Selection of Indefinite Delivery, Indefinite Quantities (IDIQ) Consultants<br />
Bid Evaluations have been completed for the selection of IDIQ Works Contractors for<br />
Education, Water and Sanitation Facilities.<br />
iv.<br />
Implementing Entity Agreements (IEAs)<br />
Ministry of Local Government and Rural Development: Four (4) Regional Workshops<br />
planned to take place in all the three (3) Intervention Zones, were rescheduled to start in<br />
February 2010. The Workshops are intended to sensitize the new District Authorities about<br />
their roles and responsibilities under the Compact.<br />
Financial Services Activity<br />
The Cheque Codeline Clearing System was stabilized in the Accra Tema Clearing Zone with<br />
over 80% of the country’s cheques handled by the System.<br />
Bid Document for the procurement of Consultant for the Legal Review of Payment System<br />
Laws was issued in October 2009 and the Technical Evaluation of the three Bids received<br />
was completed in December 2009.<br />
(4) OTHER ACTIVITIES<br />
(i) Program Audits<br />
Internal: The Internal Audit Team completed the audit of the Credit Activity. The audit<br />
focused on Disbursements to Participating Financial Institutions in the Northern, Volta,<br />
Eastern and Ashanti Regions. As part of the audit, the Team visited the Rural Banks, Farmer<br />
Based Organizations and farming outlets.<br />
The Audit Team also held meetings with Project Teams to understand the major risks<br />
associated with the various Projects. The information gathered will assist the Audit Team in<br />
the preparation of the 2010 Internal Audit Annual Plan.<br />
External: Messrs PricewaterhouseCoopers completed the Financial Audit of MCC Resources<br />
for the period ended June 2009. <strong>MiDA</strong> is awaiting Office of Inspector General’s approval of<br />
the External Audit Report.<br />
(ii) Zonal Advisory Committees<br />
The Second Round of District Advisory Committee (DAC) Meetings were held in 17<br />
Districts – 12 in the Southern Zone, and all the five (5) Districts in the Northern Zone. The<br />
Second Round Meetings built on the First Round Meetings held in all the Districts in the<br />
- 9 -
previous Quarters by providing more feedback on how the local people think implementation<br />
has gone so far and how some challenges can be overcome.<br />
(iii) Board of Directors<br />
There were two Board Meetings during the period under review - a follow-up of the<br />
25 th Meeting, held on 26 th October, 2009; and the 26 th Board Meeting which was also<br />
held on 9 th December, 2009. The 26 th Meeting approved the Quarter 12 Disbursement<br />
Request and accompanying Reports.<br />
An Induction Workshop was held for the Board in November, 2009.<br />
The Government nominated, and following the approval of MCC and the <strong>MiDA</strong><br />
Board, appointed Prof. Samuel Sefa-Dedeh to the Chair of <strong>MiDA</strong>. The appointment<br />
took effect from 4 th January, 2010 for a term of three years.<br />
(iv) Visitors<br />
MCC: The under listed MCC Officials visited <strong>MiDA</strong> to collaborate with their local<br />
counterparts on ongoing Projects:<br />
Claudia D’Andrea (Resettlement), Mr. Duke Burruss (Agric Commercialization), Dr.<br />
Zongmin Li (Land), Jolyne Sanjak (Land), Mark Marquardt (Consultant - Land),<br />
Kevin Barthel – 2 Visits (Land), Nancy Convard – 2 Visits (Environmental & Social<br />
Impact), Ellen Moran (Agric Infrastructure), Mary Jo Johnson (Procurement),<br />
Gretchen Goodhart (Associate Director, <strong>Ghana</strong> Compact Implementation), Rodney<br />
Chow (Agric Infrastructure), Ray Norman (Irrigation Development), Jake Grimshaw<br />
(Information Technology), Jason Bauer (Director, Private Sector Initiatives), Martin<br />
Slough (Credit & Financial Services), Arlene Brown (Fiscal Accountability),<br />
Anthony Coleman (Infrastructure), Tom Hohenthaner (Legal).<br />
Advocacy: Representatives of Women Thrive Worldwide, a US-based Advocacy<br />
Group, visited <strong>Ghana</strong> and held discussions with <strong>MiDA</strong> Management.<br />
- 10 -
C. PROGRESS IN PROJECT ACTIVITY IMPLEMENTATION<br />
PROJECT 1:<br />
AGRICULTURE PROJECT<br />
ACTIVITY 1: FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE<br />
(“COMMERCIAL TRAINING ACTIVITY”)<br />
Activity Objective:<br />
To speed up the development of business skills and build capacity among FBOs and their business<br />
partners, (including Service Providers to FBOs and other entities adding value to agricultural crops; such<br />
as Processors).<br />
QTR. 11 PROGRESS<br />
FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />
(“COMMERCIAL TRAINING ACTIVITY”)<br />
INDICATOR: Number of Task Orders Issued (290)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
112 28 142<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Task Orders Issued Phase I<br />
Late<br />
• 28 TOs were issued to TTSPs on<br />
21 st October Phase II Early Stage II<br />
(Technical) Training as follows:<br />
- North: 8 TOs for the training of<br />
144 FBOs.<br />
- Afram Basin: 14 TOs for the<br />
training of 164 FBOs.<br />
- South: 6 TOs for the training of<br />
116 FBOs.<br />
.<br />
• Receive Request for<br />
Task Orders for Phase<br />
I Late, Stage II<br />
• Issue 28 Task Orders<br />
for Phase I Late,<br />
Stage II in January<br />
2010<br />
INDICATOR: Number of Agribusinesses Assisted (1,320)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
650 1,076 2,305<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Assist FBOs to prepare<br />
business plans<br />
i. Value Chain Workshops<br />
conducted<br />
• 424 Phase II Early FBOs were<br />
assisted to prepare Business Plans<br />
• 286 Phase I Late FBOs were<br />
assisted to prepare Business Plans<br />
• The Afram RIC facilitated the<br />
formation of Value Chain Networks<br />
or Associations to promote<br />
development, sustainability and<br />
increase production and sales<br />
volumes in Value Chain Crops<br />
- 11 -<br />
• Obtain finalized<br />
Business Plans for<br />
286 FBOs<br />
• Launch 6 Value<br />
Chain Associations<br />
i. Support SMEs in various • List of SMEs are currently being • Shortlist 120 SMEs in
FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />
(“COMMERCIAL TRAINING ACTIVITY”)<br />
skills development<br />
i. Assist FBOs and SMEs<br />
to receive Credit<br />
i. FBOs assisted to access<br />
Markets<br />
reviewed to develop a shortlist of<br />
120.<br />
• 88 FBOs received Credit in the<br />
North during the Quarter.<br />
• No FBO at Afram received Credit<br />
within the Quarter.<br />
• 9 FBOs in the South received<br />
Credit.<br />
• North<br />
- FBO market linkages are being<br />
strengthened.<br />
• Afram<br />
- 18 FBOs were linked to markets<br />
as follows: four (4) linked to<br />
Whytebage International; one (1)<br />
linked to Yam Exporters, and 13<br />
linked to Plantain Exporter.<br />
• South<br />
- 120 Mango and Rice FBOs were<br />
linked to markets created by Blue<br />
Skies (Mango) and Finatrade<br />
(Rice).<br />
all the Zones.<br />
• Finalize Training<br />
Modules and Plan for<br />
SMEs Training by<br />
end of January<br />
• Assist FBOs to access<br />
Markets<br />
• Follow-up on<br />
linkages to facilitate<br />
sustainable<br />
relationships<br />
ii.<br />
Establishment of Demo<br />
Centres<br />
• Demo Centre in the form of<br />
Technology Park has been<br />
established in the Northern Zone<br />
• 114 Farmers benefited from the five<br />
Demo Centres in the Southern<br />
Horticultural Belt<br />
• Finalize establishment<br />
of Demo centres in<br />
the Afram<br />
iii.<br />
Assist Farmers to<br />
become Global Gap<br />
certified<br />
• Out of the 59 MoFA Staff that were<br />
trained, 28 were certified as<br />
Trainers<br />
• Identify Farmers who<br />
need Global GAP<br />
Certification<br />
INDICATOR: Number of FBOs trained in Commercial Agriculture (1,200)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
600 410 648<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Train Phase II Early FBOs<br />
in Capacity Building<br />
• 424 Phase II Early FBOs took part<br />
in Stage II (Technical Training).<br />
• The breakdown by Zone was as<br />
follows: 144 in the Northern Zone,<br />
164 in Afram Basin and 116 in the<br />
Southern Horticultural Belt.<br />
- 12 -<br />
• Continue Handholding’<br />
of FBOs till<br />
April
FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />
(“COMMERCIAL TRAINING ACTIVITY”)<br />
• 410 FBOs were considered Trained<br />
(i.e. met the criteria for Training - at<br />
least 80 percent of their Members<br />
attending a minimum of 50 percent<br />
of the time).<br />
• The distribution by Zone of the<br />
Trained FBOs was as follows: 144<br />
in the North, 158 in Afram and 108<br />
in the South.<br />
ii.<br />
Train 286 FBOs Phase I<br />
late in Capacity Building<br />
• 286 FBOs participated in trained in<br />
FBO Capacity<br />
• 266 of the 286 FBOs are regarded as<br />
trained: 85 out of the 95in the North;<br />
all the 114 in Afram, and 67 out of<br />
the 77 in the South.<br />
• Provide 286 Phase II<br />
FBOs with Stage II<br />
Training by March<br />
INDICATOR: Number of farmers trained in commercial Agriculture (60,000)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
30,000 19,967 34,669<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Train 21,000 Farmers (Phase<br />
II Early) in FBO Capacity<br />
Building<br />
ii. Train 14,000 Farmers in FBO<br />
Capacity Building<br />
• 20,705 Farmers in Phase II Early<br />
FBOs took part in Technical<br />
Training (i.e. Stage II) out of which<br />
19,667 can be classified as trained in<br />
stage one according to the set<br />
criteria as follows:<br />
Zone Took part Trained<br />
North 6979 6879<br />
Afram 7885 7543<br />
South 5841 5245<br />
Total 20705 19667<br />
• After farmer list validation, 13602<br />
Phase I Late farmers took part in the<br />
FBO Capacity building training out<br />
of which 13246 may be counted as<br />
trained<br />
Zone Took Part Trained<br />
North 4020 4178<br />
Afram 5499 5563<br />
South 4083 3505<br />
Total 13602 13246<br />
• Review and approve<br />
zonal training <strong>report</strong>s<br />
• Train Phase I late<br />
farmers in Technical<br />
Training<br />
• Distribute starter<br />
packs to all Phase I<br />
Late and Phase II<br />
early farmers<br />
• Review and approve<br />
Zonal Training<br />
Reports<br />
• Train Phase I Late<br />
Farmers (Stage II -<br />
Technical Training)<br />
• Distribute Starter<br />
Packs to all Phase I<br />
Late and Phase II<br />
Early Farmers<br />
INDICATOR: Hectares under production with MCC support (53,060)<br />
TARGET(ANNUAL) APR ACTUALS TO DATE (OCT-DEC<br />
2009- MAR 2010<br />
2009)<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
- 13 -
FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE ACTIVITY<br />
(“COMMERCIAL TRAINING ACTIVITY”)<br />
9100 11,114.76 11,114.76<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Implementation of<br />
Voucher System-Starter<br />
Pack to assist farmers<br />
• Starter Pack procurement for<br />
33,000 Farmers is ongoing for Phase<br />
I Late and Phase II Early Farmers<br />
• Deliver Starter Packs<br />
to about 33,000<br />
Farmers<br />
ii.<br />
Hectares under production<br />
as a result of credit<br />
• The Northern RIC identified 8,298<br />
hectares under production.<br />
• The Southern RIC identified<br />
2816.76 hectares under production.<br />
• Follow-up on credit<br />
disbursed to support<br />
production<br />
INDICATOR: Number of Farmers adopting new technology<br />
TARGET(ANNUAL) APR ACTUALS TO DATE (OCT-DEC<br />
2009- MAR 2010<br />
2009)<br />
7074 7074<br />
i. Number of Farmers<br />
adopting technology<br />
• North – Out of 4435 farmers, 2559<br />
(57%) were observed to have<br />
adopted improved technology.<br />
• South – 100% adoption is <strong>report</strong>ed<br />
by 4515farmers who have<br />
completed the Technical Skills<br />
Training. This was validated by the<br />
Monitoring Committees of the<br />
FBOs<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
• Receive technology<br />
adoption <strong>report</strong>s from<br />
Afram Basin<br />
- 14 -
ACTIVITY 2: IRRIGATION DEVELOPMENT<br />
Activity Objective:<br />
To establish a limited number of Retention Ponds and Weirs requested by the FBOs and FBO<br />
Partnerships, for whom access to Water is critical to the success of their Business objectives.<br />
QTR. 10 PROGRESS<br />
IRRIGATION DEVELOPMENT<br />
Indicator: Number of Feasibility Studies approved (10)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE TO<br />
DATE<br />
10 0 0<br />
ACTIVITY STATUS NEXT STEPS<br />
INDICATOR: Value of Signed Contract for Feasibility Studies and /or Design (US$ 7,998,114.00)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE TO<br />
DATE<br />
US$7,998,114.00 US$ 1,998,113.00 US$ 4,704,631.00<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Award Contracts for<br />
Feasibility Studies on<br />
Irrigation Infrastructure<br />
• Contract for Lot 2 (worth<br />
US$1,998,113.00), which covers<br />
four (4) Feasibilities Studies, was<br />
signed with Royal Haskoning.<br />
• Inception Reports for all 10<br />
Studies were received.<br />
• Receive Feasibility<br />
Reports<br />
• Follow-up up on<br />
training of Water Users<br />
Associations on Old<br />
Schemes with<br />
consultants<br />
INDICATOR: Percent of Contracted Feasibility Studies and /or Design completed (100%)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
ACTUALS AS OF<br />
(DATE)<br />
42.8% 0 0<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Complete Feasibility and<br />
Design Phases of Consultancy<br />
services Milestones.<br />
• Stakeholder Consultation Meeting<br />
was held on 12 th December 2009 to<br />
solicit inputs into contents of<br />
Feasibility Studies for the North and<br />
South.<br />
• Finalize detailed<br />
requirements on 1000 ha<br />
of land with potential for<br />
fast track irrigation<br />
Identification of FBOs with Access to Potential New or Rehabilitated Irrigation Facilities<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
ACTUALS AS OF<br />
(DATE)<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Identify FBOs that have<br />
access to potential new or<br />
rehabilitated Irrigation<br />
Facilities<br />
• Identification of FBOs and<br />
formation of Water Users<br />
Associations (WUAs) is in<br />
progress<br />
• Finalize number of FBOs<br />
that require Training in<br />
use and management of<br />
Irrigation Facilities<br />
- 15 -
ACTIVITY 3:<br />
LAND TENURE FACILITATION<br />
Activity Objectives:<br />
i. Improve Tenure Security for existing Land Users;<br />
ii. Facilitate access to (higher value) Agricultural Lands by Investors.<br />
QTR. 11 PROGRESS<br />
LAND ACTIVITY<br />
INDICATOR: Percent of People aware of their Land Rights in Pilot Land Registration Areas (50%<br />
increase from Baseline)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
N/A N/A N/A<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Sign Contract for Data<br />
Collection to measure<br />
Awareness of Land Rights<br />
• Contract was signed on 21 st<br />
October 2009.<br />
• Collect data on<br />
awareness<br />
INDICATOR: Percent of identified Land Disputes resolved in the Pilot Land Registration Areas<br />
(80%)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
70% 90% 90%<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Continue ADR Mediation<br />
on cases coming up during<br />
Registration of Proprietors<br />
• No new cases were identified or<br />
resolved in the Quarter.<br />
• Cumulatively, 18 out of 20 cases<br />
have so far been resolved in all six<br />
Sections of the PRD.<br />
• Continue ADR<br />
Mediation on cases<br />
coming up during<br />
Registration of<br />
Proprietors.<br />
INDICATOR: Total Number of Land Parcels Registered in the Pilot Land Registration Areas<br />
(4,800)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
1800 0 103<br />
INDICATOR: Rural Hectares Formalized (17,019)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
2,713 TBD TBD<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Issue Land Title<br />
Certificates to Proprietors<br />
• 169 Land Parcels were registered in<br />
the Quarter.<br />
• Present Land Title<br />
Certificates<br />
• Continue with<br />
Registration of Land<br />
Parcels<br />
- 16 -
ii. Incorporate inputs of<br />
MCC Consultant and<br />
Independent Assessor on<br />
Land Titling<br />
iii. Draft Procedural Manual<br />
on Land Titling<br />
• Action Plan with clear timelines and<br />
benchmarks approved by MCC on<br />
24 th December, 2009.<br />
• Manual approved by MCC on 24 th<br />
December, 2009.<br />
Implement Action<br />
Plan<br />
Test Procedural<br />
Manual in Awutu<br />
Senya Pilot 1<br />
INDICATOR: Rural Hectares Mapped (17,019)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
2,960 612 4,271<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Map Rural Land<br />
Parcels<br />
• Completed the mapping of a total<br />
of 612 ha in Section 3 during the<br />
Quarter.<br />
• Cumulatively, 4,271 ha have been<br />
mapped to date.<br />
• Map Rural Land<br />
Parcels covering other<br />
Sections<br />
INDICATOR: Total Number of Parcels surveyed in the Pilot Land Registration Areas (4,800)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
1,800 492 2,980<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Continue with<br />
surveying of<br />
inventoried parcels<br />
• A total of 492 Parcels were surveyed<br />
during the Quarter.<br />
• Cumulatively, 2,980 Parcels have<br />
been surveyed.<br />
• Continue with<br />
surveying of<br />
inventoried parcels<br />
INDICATOR: Parcels of Land inventoried in the Pilot Land Registration Areas (4,800)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
1,800 924 3,412<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Complete Inventory of<br />
Parcels<br />
• Data on 924 Individual Parcels were<br />
inventoried in the Quarter.<br />
• Cumulatively, 3,412 Individual<br />
Parcels have been inventoried.<br />
• Complete Inventory of<br />
Land Parcels<br />
INDICATOR: Percent of Backlog of Land Cases Cleared by the Judicial Service (95%)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
95% 0% 0%<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Continue Refurbishment<br />
of 10 Circuit Courts<br />
• Refurbishment of three (3) Circuit<br />
Courts (Nsawam, Agona Swedru<br />
and Tamale) is in progress.<br />
• Judicial Service secured GHC<br />
500,000 from GoG for the<br />
refurbishment of seven (7) other<br />
Circuit Courts.<br />
Refurbish seven (7) other<br />
Circuit Courts with GoG<br />
funding (GHC 500,000)<br />
- 17 -
INDICATOR: Number of Landholders reached by Public Outreach Efforts (10,000)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
6,000 0 4,794<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Re-scope Consultancy for • Draft ToRs for the re-scoped<br />
• Finalize ToRs<br />
Public Education/<br />
Information<br />
Dissemination<br />
program completed.<br />
• Issue RFP<br />
INDICATOR: Number of Personnel Trained (200)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
194 0 73<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Train Stakeholders on<br />
Alternative Dispute<br />
• No Stakeholders were trained in<br />
the Quarter.<br />
Resolution (ADR) • Cumulatively, 73 Stakeholders<br />
trained in ADR.<br />
INDICATOR: Number of Buildings Rehabilitated/Constructed (3)<br />
TARGET (ANNUAL) APR<br />
2008-MAR 2009)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
3 1 1<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Complete Construction of<br />
Land Title Site Office.<br />
• Construction has been completed.<br />
- 18 -
ACTIVITY 4: IMPROVEMENT OF POST-HARVEST HANDLING AND VALUE CHAIN<br />
SERVICES<br />
Activity Objectives:<br />
i. To encourage and facilitate Strategic Investments by FBOs into Post-harvest Infrastructure.<br />
ii. To build the Capacity of Public Sector Organizations to introduce and monitor Compliance with<br />
International Plant Protection Standards.<br />
QUARTER 11 PROGRESS<br />
POST HARVEST<br />
INDICATOR: Area of Cold Storage facilities constructed (1738 m2)<br />
TARGET(ANNUAL) ACTUALS TO DATE (OCT-DEC CUMMULATIVE TO DATE<br />
APR 2009- MAR 2010<br />
2009)<br />
1021 270.2 426.2<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Procure and install Pre-<br />
Coolers<br />
• Bomart Farms completed<br />
installation of Cooling Unit in a<br />
newly constructed Pack House.<br />
• Monitor installation of Cooling<br />
Facilities and other Units at<br />
2K, Koranco and Prudent<br />
Farms<br />
INDICATOR: Number of feasibility studies approved (5)<br />
TARGET(ANNUAL) ACTUALS TO DATE (OCT-DEC CUMMULATIVE TO DATE<br />
APR 2009- MAR 2010<br />
2009)<br />
5 0 0<br />
INDICATOR: Area of Pack houses and other Post Harvest Infrastructure constructed (17076 m 2 )<br />
TARGET(ANNUAL) ACTUALS TO DATE (OCT-DEC CUMMULATIVE TO DATE<br />
APR 2009- MAR 2010<br />
2009)<br />
0 0 0<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Carry out preconstruction<br />
activities for KIA-<br />
PCC<br />
• Viability Report was submitted and<br />
reviewed.<br />
• Consultants were requested to<br />
provide detailed socioeconomic<br />
analysis to support proposed Design<br />
• Receive and review Viability<br />
Report by end of January<br />
• Finalize Ownership and<br />
Management Terms for KIA<br />
PCC by March<br />
ii.<br />
iii.<br />
iv.<br />
Design and Build<br />
three Public Pack<br />
Houses.<br />
Design and Build<br />
25 Agric-Business<br />
Centers<br />
Other post harvest<br />
facilities<br />
• Pre-Bid Meeting was held on 1 st<br />
December with 15 Firms that had<br />
expressed interest.<br />
• Bids were opened on 30 th<br />
December and are currently being<br />
evaluated.<br />
• Stakeholder Meeting was held<br />
with prospective Beneficiaries on<br />
the 11 th of December to solicit<br />
input for the preparation of the<br />
Organization and Management<br />
Document.<br />
• RIC-Afram provided FBOs with<br />
- 19 -<br />
• Finalize Ownership and<br />
Management Terms for PPH<br />
by January<br />
• Commence Site Inspection of<br />
ABCs by 16 th January
POST HARVEST<br />
Technical Assistance to construct<br />
16 improved Maize Cribs.<br />
INDICATOR: Volume of products passing through post-harvest treatment (metric tons)<br />
TARGET(ANNUAL)<br />
APR 2009- MAR 2010<br />
ACTUALS TO DATE (OCT-DEC<br />
2009)<br />
CUMMULATIVE ACTUALS<br />
TO DATE<br />
111,820 2,804.2 6,129<br />
• The products passing through postharvest<br />
treatment in the Southern<br />
Horticultural Belt amounted to<br />
2,804.2 metric tons.<br />
i. Measure volume of<br />
products passing through<br />
post-harvest treatment<br />
Compliance with IPPC<br />
i. Facilitate passage of<br />
Seed Law and Plant<br />
Protection Law<br />
• Draft Plant and Seed Bills were<br />
forwarded to Parliament for debate<br />
and enactment<br />
• Hold Review Workshop for<br />
Agric and Subsidiary<br />
Legislation Committees of<br />
Parliament from the 29 th<br />
January to the 1 st February<br />
2010.<br />
• Finalize TOR for WRI,<br />
PPRSD and GSB equipment<br />
procurement and Training<br />
Needs Assessment<br />
- 20 -
ACTIVITY 5 IMPROVEMENT OF CREDIT SERVICES FOR ON-FARM AND<br />
VALUE-CHAIN INVESTMENTS<br />
Activity Objective:<br />
To augment the supply of, and access to Credit provided by Financial Institutions operating in the<br />
Intervention Zones.<br />
QTR. 11 PROGRESS<br />
AGRICULTURAL CREDIT ACTIVITY<br />
INDICATOR: Portfolio at risk of Agricultural Loan Fund (20%)<br />
ANNUAL TARGET<br />
(Apr 09 – Mar 10)<br />
ACTUALS TO DATE<br />
(October 09 – Dec 09)<br />
CUMMULATIVE ACTUALS<br />
TO DATE<br />
20% 18% 18%<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Monitor Agricultural Loan<br />
Fund Disbursement<br />
ii. Training and Building<br />
Capacity of PFIs<br />
• Bank of <strong>Ghana</strong> undertook<br />
Monitoring Visits to 15 PFIs in<br />
all the Intervention Zones. Met<br />
with Key Management and<br />
Board Representatives to press<br />
for better oversight of ACP<br />
Funds.<br />
• <strong>MiDA</strong> Management approved<br />
modalities for implementing the<br />
Grants for PFI Loan Offices and<br />
Means of Transport (Motor<br />
Cycles and Motor Vehicles) to<br />
improve On-site Inspections<br />
and monitoring of Borrowers<br />
• Held a Stakeholder Review<br />
Workshop in November 2009 to<br />
garner feedback to improve the<br />
management of the ACP Funds<br />
• Bank of <strong>Ghana</strong> demanded and<br />
enforced the repayment of<br />
Overdue Payment of 3<br />
Commercial Banks in<br />
December 2009.<br />
• Stakeholders’ Meeting was<br />
used to correct perceived<br />
weaknesses in the Financial<br />
Accounting and Record<br />
Keeping of ACP Funds at the<br />
PFI level.<br />
- 21 -<br />
• Review 50% of the ACP<br />
Portfolio to identify in greater<br />
detail the quality of the<br />
Portfolio and Implement<br />
Measures to Improve the<br />
Quality of Performance<br />
• Implement rigorous monitoring<br />
on-site field trips to ensure<br />
compliance with ACP policies<br />
(BoG/ACPC)<br />
• Implement a wider program to<br />
collect Overdue Payment by<br />
PFIs in collaboration with the<br />
Management of Bank of <strong>Ghana</strong><br />
• Carry out the following<br />
Capacity Building Activities:<br />
- Skill-based Training in<br />
Core Agric Credit<br />
Appraisal and Monitoring<br />
- Additional training in<br />
Innovative Lending<br />
Products<br />
- Mentoring & Coaching<br />
- Loan Performance<br />
Monitoring
INDICATOR: Value of Loans disbursed to Clients from Agricultural Loan Fund (US$ 35,000,000)<br />
ANNUAL TARGET<br />
(Apr 09 – Mar 10)<br />
ACTUALS TO DATE<br />
(October 09 – Dec 09)<br />
CUMMULATIVE ACTUALS<br />
TO DATE<br />
US$ 15,000,000 US$ 2,093,515.81 US$ 12,707,915.90<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Process ACP Draw-Down<br />
Requests<br />
ii. Coordinate activities of<br />
Consultants and IEs engaged<br />
in Loan Disbursement<br />
• An amount of US$<br />
2,093,515.81 was disbursed<br />
through PFIs, bringing the<br />
cumulative disbursement to<br />
US$ 12,707,915.90.<br />
• <strong>MiDA</strong> Management approved<br />
modalities to commence<br />
Disbursement under the Grant<br />
to PFIs in support of the<br />
setting up of Loan Offices.<br />
• Coordinated the activities of<br />
PFIs, BoG, MoFA, CMC,<br />
RICs, TTSPs, and FBOs/SMEs<br />
to improve disbursement.<br />
• Held Meetings at the National<br />
and Zonal levels to coordinate<br />
activities of both Agric and<br />
Credit Teams.<br />
• Increase the number of PFIs<br />
actively participating in ACP<br />
• Increase disbursements to<br />
PFIs for eligible Beneficiaries<br />
(to meet Quarterly Target)<br />
• Implement arrangements to<br />
disburse under the Grant to<br />
PFIs in support of the setting<br />
up of Loan Offices<br />
• Enhance coordination of<br />
Agric Team’s Business<br />
Planning Training with the<br />
Banking Sector<br />
• Continue with regular<br />
Meetings to coordinate<br />
Program and Zonal level<br />
Activities of both Agric and<br />
Credit Teams.<br />
INDICATOR: Number of Loans disbursed to Clients from Agricultural Loan Fund (540)<br />
ANNUAL TARGET<br />
ACTUALS TO DATE CUMMULATIVE ACTUALS<br />
(Apr 09 – Mar 10)<br />
(October 09 – Dec 09)<br />
TO DATE<br />
270 55 279<br />
INDICATOR: Number of Clients receiving Loans from Agricultural Loan Fund (16,050)<br />
ANNUAL TARGET<br />
ACTUALS TO DATE CUMMULATIVE ACTUALS<br />
(Apr 09 – Mar 10)<br />
(October 09 – Dec 09)<br />
TO DATE<br />
13,000 2,171 9,744<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Process Business Plans of<br />
FBOs graduating from the<br />
Commercial Development<br />
of Farmer-Based<br />
Organizations (CDFO)<br />
Training Program.<br />
• An additional 55 Loans<br />
(covering 2, 171 Clients) were<br />
disbursed, bringing the<br />
cumulative to 269 (9, 744<br />
Clients).<br />
• Process the Business Plans of<br />
420 FBOs (21,000 members)<br />
that graduated in August and<br />
298 FBOs (14,000 members)<br />
that graduated in November<br />
from the Stage I (Business<br />
Plan and Skills) Training.<br />
- 22 -
INDICATOR: Number of Participating Financial Institutions accredited (60)<br />
ANNUAL TARGET<br />
(Apr 09 – Mar 10)<br />
ACTUALS TO DATE<br />
(October 09 – Dec 09)<br />
CUMMULATIVE ACTUALS<br />
TO DATE<br />
55 3 56<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Provide Accreditation to<br />
PFIs<br />
• Three (3) additional<br />
accreditations recorded, all<br />
FNGOs.<br />
• The cumulative number of<br />
Accredited PFIs is now 56,<br />
comprising 11 Commercial<br />
Banks, two (2) Savings &<br />
Loans Companies, 34 Rural<br />
and Community Banks and<br />
nine (9) FNGOs, and located<br />
in all the three Footprint<br />
Zones of <strong>MiDA</strong>.<br />
• Engage with the Banking<br />
Sector to improve the<br />
number of active members<br />
on the PFI Accredited List.<br />
• Increase number of<br />
Commercial Banks as PFIs<br />
INDICATOR: Number of Participating Financial Institutions’ Staff trained (480)<br />
ANNUAL TARGET<br />
(Apr 09 – Mar 10)<br />
ACTUALS TO DATE<br />
(October 09 – Dec 09)<br />
200 0 173<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Organize Training and<br />
Sensitization Programs in<br />
Agric Credit<br />
• There was no core Agric<br />
Finance Training for PFIs and<br />
Senior Management.<br />
• Stakeholders’ Meeting was used<br />
to correct perceived weaknesses<br />
in the financial accounting and<br />
record keeping of ACP Funds at<br />
the PFI level.<br />
CUMMULATIVE ACTUALS<br />
TO DATE<br />
• Carry out the following<br />
Capacity Building Activities:<br />
- Skill-based Training in<br />
Core Agric Credit<br />
Appraisal and Monitoring<br />
- Additional training in<br />
Innovative Lending<br />
Products<br />
- Mentoring & Coaching<br />
- Loan Performance<br />
Monitoring<br />
INDICATOR: Total Outstanding Principal Balance for group/individual loans (US$35,000,000)<br />
ANNUAL TARGET<br />
(Apr 09 – Mar 10)<br />
ACTUALS TO DATE<br />
(October 09 – Dec 09)<br />
CUMMULATIVE ACTUALS<br />
TO DATE<br />
US$ 15,000,000 US$ 1,216,176.99 US$ 9,344,875.34<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Coordinate Activities with<br />
Agric Team<br />
• The cumulative Outstanding<br />
Principal Balance stood at<br />
US$ 9,344,875.34.<br />
• There was active coordination<br />
between the Agric Credit and<br />
Agric Teams at Program and<br />
Zonal Levels<br />
• Continue effective<br />
coordination with Agric<br />
Team’s CDFO Program at<br />
both Program and Zonal<br />
Levels<br />
*This is based on funds disbursed to the PFIs by Bank of <strong>Ghana</strong><br />
**This is based on funds actually disbursed by PFIs to final borrowers. There is a significant amount of funds<br />
disbursed by Bank of <strong>Ghana</strong> to PFIs which are yet to be disbursed to borrowers. This is partly due to phased<br />
disbursements to borrowers according to stages of need agreed between borrowers and PFIs.<br />
- 23 -
ACTIVITY 6: REHABILITATION OF FEEDER ROADS<br />
Activity Objective:<br />
To reduce transportation costs and time by rehabilitating up to 950 km of Feeder Roads in eight (8)<br />
Districts in the Intervention Zones in order to:<br />
i. Increase access to major domestic and international markets.<br />
ii. Facilitate transportation linkages from rural areas to social service networks (including, for<br />
instance, hospitals, clinics and schools).<br />
QTR 11 PROGRESS<br />
1.6 FEEDER ROADS<br />
INDICATOR: Value of Signed Contracts for Feeder Road Works (USD 62,436,571)<br />
TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
2009- MAR 2010<br />
(OCT - DEC 2009)<br />
USD 24,436,011 USD 18,443,422.17 USD 18,443,422.17<br />
INDICATOR: Kilometers of Feeder Roads completed (406km)<br />
TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
2009- MAR 2010<br />
(OCT - DEC 2009)<br />
N/A 1 N/A N/A<br />
ACTIVITY STATUS NEXT STEPS<br />
LOT 1(NR series)<br />
i. Close/Open Bids for NR<br />
Series.<br />
ii. Commence Evaluation of<br />
Bids for NR Series.<br />
iii. Obtain MCC Approval for<br />
BEP Report on NR Series<br />
iv. Obtain <strong>MiDA</strong> Board<br />
Approval of Recommended<br />
Contractors for NR Series.<br />
LOT 2 (EC series)<br />
Obtain Performance<br />
Securities.<br />
• Bids were submitted and opened on<br />
28 th October, 2009.<br />
• Evaluation of Bids started on 9 th<br />
November, and was completed on<br />
23 rd November, 2009.<br />
• MCC and Board approvals for<br />
Award of Contracts to Respective<br />
Contractors were obtained on 9 th<br />
December, 2009.<br />
• Letters of Acceptance were issued<br />
to Respective Contractors on 10 th<br />
December, 2009.<br />
• Performance Guarantees were<br />
submitted to <strong>MiDA</strong> on 31 st<br />
December, 2009.<br />
• Performance Securities for Lots<br />
EC2 & EC3 were received on 2 nd<br />
October, 2009<br />
• Performance Security for EC1 was<br />
received on 12 th October, 2009.<br />
• Sign Contract with<br />
Respective Contractors.<br />
• Mobilize to commence the<br />
works.<br />
1 Targets have been earmarked for <strong>report</strong>ing in Year 4.<br />
- 24 -
i. Sign Contract for Lots EC2<br />
and EC3.<br />
ii. Issue Notification to start<br />
Work for EC2 and EC3.<br />
iii. Hand over site to<br />
Contractors.<br />
LOT 3 (VR series)<br />
i. Re-issue Request for Bids<br />
for Lot VR1 Works<br />
ii. Obtain <strong>MiDA</strong> Board<br />
Approval for Award of<br />
Contract for recommended<br />
Contractor for Lot VR 2.<br />
iii. Obtained MCC and <strong>MiDA</strong><br />
Approval for Contract<br />
Award and Signing of Lot<br />
VR3.<br />
iv. Obtain USIAD Approval<br />
to Commence Procurement<br />
for Bidding of Lot VR4<br />
Works<br />
• Contracts were signed with Messrs<br />
GKL/Kamsad JV for Lots EC2 &<br />
EC3 on 5 th October, 2009.<br />
• Contract was signed with Messrs.<br />
Big Aidoo for Lot EC1 on 13 th<br />
October, 2009.<br />
• Consultant issued notice to<br />
commence Works on 15 th October,<br />
2009<br />
• Sod cutting to commence Works<br />
was held for Lot EC1 on 24 th<br />
November 2009<br />
• Physical Works for all three Lots<br />
commenced in December, 2009.<br />
• Procurement process for re-bidding<br />
of Lot VR1 commenced on 15 th<br />
October, 2009.<br />
• Bids closed for Lot VR1 on 26 th<br />
November, 2009.<br />
• Evaluation of Bids was completed<br />
and Report submitted to MCC for<br />
approval on 29 th December, 2009<br />
• <strong>MiDA</strong> Board did not give approval<br />
to the recommended Contractor for<br />
Lot VR2 on 26 th October, 2009.<br />
• Procurement process for re-bidding<br />
of Lot VR2 commenced on 16 th<br />
December, 2009.<br />
• MCC and Board Approvals for<br />
Award of Contract for Lot VR3<br />
were obtained on 9 th December,<br />
2009<br />
• Performance Guarantee was<br />
received from Messrs. Justmoh<br />
Construction limited (Lot VR3) on<br />
21 st December, 2009.<br />
• USAID still processing Lot VR 4<br />
for funding.<br />
• Continue Construction<br />
Works at all three (3) Sites<br />
• Obtain Approvals from MCC<br />
and Board for award of<br />
contract on Lot VR 1(Re-<br />
Bid).<br />
• Close and Evaluate received<br />
Bids for Lot VR2.<br />
• Obtain Approvals from MCC<br />
and Board for award of<br />
Contract on Lot VR 1.<br />
• Sign Contract on Lot VR3<br />
with Messrs. Justmoh<br />
Construction Limited.<br />
• Hand-over of Site to winning<br />
Contractor.<br />
• Obtain USIAD Approval to<br />
Commence Procurement for<br />
Bidding of Lot VR4 Works<br />
INDICATOR: Kilometers of Feeder Roads designed (950 km)<br />
TARGET(ANNAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
2009- MAR 2010<br />
(OCT - DEC 2009)<br />
950 km 31.18 km 570.81km<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Design Feeder Roads – LOT • Draft designs on 227.2 km of • Obtain Final Designs on<br />
1: NR Series) (337.1 km) to additional road length under 227.2 km of Roads<br />
- 25 -
DFR Standards<br />
ii. Design Feeder Roads – LOT<br />
2: EC Series (386.5 km) to<br />
DFR Standards<br />
iii. Design Feeder Roads – VR<br />
Series: LOT 3 (221.3 km) to<br />
DFR Standards<br />
Tranche B submitted.<br />
• Cumulatively, 110.5 km total<br />
road length (Tranche A) designed<br />
have been approved.<br />
• Draft designs on 43.8 km of<br />
additional road length under<br />
Tranche B submitted.<br />
• Cumulatively, 283.11 km total<br />
road length (Tranches A&B)<br />
designed have been approved.<br />
• 31.18 km of additional road<br />
length designed under Tranche B.<br />
• Cumulatively, 177.20 km total<br />
road length (Tranches A&B)<br />
designed have been approved.<br />
(Tranche B) by end of<br />
Quarter 12.<br />
• Obtain Final Designs on<br />
43.8 km of Roads (Tranche<br />
B) by end of Quarter 12.<br />
INDICATOR: Percent of Contracted Design/Feasibility Studies completed (100%)<br />
TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
2009- MAR 2010<br />
(OCT -DEC 2009)<br />
100% 32.7% 89.8%<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Complete Design/<br />
Feasibility Studies for<br />
944.9km of Feeder Roads<br />
• 32.7% of Feasibility/Designs was<br />
completed during the Quarter<br />
• Overall completion of Feasibility<br />
Designs is 89.8% for Lots 1, 2 &<br />
3.<br />
• Complete Final Designs on<br />
outstanding Contract<br />
(10.2%).<br />
INDICATOR: Number of Environmental Assessments approved<br />
TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
2009- MAR 2010<br />
(OCT -DEC 2009)<br />
3 0 2<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Obtain Environmental<br />
Permit for Lot 1: NR Series<br />
• Payment for Permit for NR Roads<br />
was made to EPA on 30th<br />
December, 2009.<br />
• Obtain EPA Permit for NR<br />
Series.<br />
INDICATOR: Number of RAPs for Feeder Roads as appropriate<br />
TARGET(ANNUAL) APR ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
2009- MAR 2010<br />
(OCT -DEC 2009)<br />
3 1 3<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Obtain Approval for Feeder<br />
Roads Mini-RAPs<br />
• Mini-RAPs for Lots 2 and 3<br />
submitted to MCC for Approval.<br />
• Mini Rap for the Lot 1 (NR Series)<br />
submitted by Consultant.<br />
• Implement Mini-RAP for<br />
Lot 2.<br />
- 26 -
PROJECT 2: TRANSPORTATION PROJECT<br />
Objective:<br />
To reduce Transportation cost affecting Agricultural Commerce at the Sub-Regional and Regional levels,<br />
in order to improve the Competitiveness of Agricultural Producers using Roads in the Intervention Zones.<br />
QTR. 11 PROGRESS<br />
2.1 N1 ACTIVITY<br />
INDICATOR: Percent of Contracted Road Works disbursed: N1 Lot 1 (100%)<br />
TARGET(ANNUAL) ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />
APR 2009- MAR 2010<br />
(OCT-DEC 2009)<br />
41.6% 5.35% 17.80%<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Carry out General<br />
Excavation and Filling<br />
Works on Ch. 2+000<br />
to Ch. 4+900<br />
• Actual Physical Completion achieved<br />
was 19.64% as against Planned Physical<br />
Completion of 22.7 %.<br />
• Supervision Reports on Monthly<br />
Progress of N1 Lot 1 Main Works<br />
obtained.<br />
• Monthly Technical Meetings for N1 Lot<br />
1 Construction Works organized.<br />
- 27 -<br />
• Clear Site of structures.<br />
• Carry out Earthworks<br />
• Execute Drainage Works<br />
• Continue Foundation for<br />
Bridge and Retaining Walls<br />
at Dimples Interchange<br />
INDICATOR: Percent of Contracted Road Works disbursed: N1 Lot 2 (100%)<br />
TARGET(ANNUAL)<br />
APR 2009- MAR 2010<br />
ACTUALS FOR THE QUARTER (OCT-<br />
DEC 2009)<br />
CUMMULATIVE TO<br />
DATE<br />
41.6% 10% 10%<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Sign Contract with<br />
Messrs.MSF.<br />
• <strong>MiDA</strong> signed Contract with Messrs.<br />
Moniz da Maia Serra & Fortunato-<br />
Empereiteros (MSF), the Contractor for<br />
ii.<br />
iii.<br />
Issue Notice to<br />
Commence N1 Lot<br />
2 Works.<br />
Carry out pre-<br />
Construction<br />
Activities<br />
N1 Lot 2 on 1 st October, 2009.<br />
• ICT-BANS JV issued Notice of Works<br />
commencement on 14 th October, 2009<br />
• 23 rd December, 2009.<br />
• <strong>MiDA</strong> handed over Section 1(Km<br />
12+500 to Km 14+119) to Contractor<br />
on 15 th October, 2009.<br />
• Contractor submitted of evidence of<br />
insurance on 13 th November, 2009.<br />
• <strong>MiDA</strong> received Contractor’s revised<br />
Work Program and Method Statement<br />
on 15 th December, 2009.<br />
• Environmental Baseline Survey <strong>report</strong>,<br />
revised EMP, revised Health and<br />
Safety Management Plans were<br />
received on 15 th December, 2009.<br />
• ICT BANs and Messrs. MSF jointly<br />
inspected Utility Relocation Works at<br />
• Hand over all Sections of<br />
N1 Lot 2.<br />
• Complete topographic<br />
surveys for entire<br />
corridor.<br />
• Complete Pile foundation<br />
tests on Site.<br />
• Commence STI and AID<br />
awareness on site<br />
• Complete investigations<br />
on Quarries and Borrow<br />
pits.
various Utility crossing points within<br />
Section 1 (Ch. 12+500–Ch. 14+119) on<br />
23 rd December, 2009.<br />
INDICATOR: Number of RAPs approved (2)<br />
TARGET(ANNUAL)<br />
APR 2009- MAR 2010<br />
ACTUALS FOR THE QUARTER (OCT-<br />
DEC 2009)<br />
CUMMULATIVE TO<br />
DATE<br />
1 1 1<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Procure Contractor to<br />
commence<br />
Construction Works at<br />
Ayi-Mensa Relocation<br />
Site (N1 Lot 1)<br />
• Contractor was procured for the<br />
Construction of Ayi-Mensa Site for Cane<br />
and Rattan Group of PAPs.<br />
ii. Procure Contractor to<br />
complete Kokroko<br />
Resettlement Site (N1<br />
Lot 2)<br />
2.2 TRUNK ROADS ACTIVITY<br />
• Drawings and Bill of Quantities (BOQ)<br />
for reinstatement of Kokroko re-location<br />
Site is under review.<br />
• Procure Contractor to<br />
complete reinstatement of<br />
Kokroko Site.<br />
INDICATOR: Kilometers of Trunk Roads designed (230 km)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC ‘09)<br />
CUMMULATIVE TO<br />
DATE<br />
230 0 75.21<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Submit Interim Designs for<br />
Tranche B Roads<br />
• Interim and Draft Designs on<br />
168.5km of additional Road length<br />
under Tranche B was submitted.<br />
• Obtain Final Designs on<br />
168.5km of roads under<br />
Tranche B by end of<br />
Quarter.<br />
INDICATOR: Percent of Contracted Design/Feasibility Studies completed (100%)<br />
TARGET(ANNUAL) APR<br />
2009- MAR 2010<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC ‘09)<br />
CUMMULATIVE TO<br />
DATE<br />
100% 70.32%<br />
ACTIVITY STATUS NEXT STEPS<br />
• Complete Feasibility<br />
Studies/ Designs on<br />
outstanding 32.5%.<br />
• Overall completion of Feasibility<br />
Studies/ Designs is 70.32%.<br />
• Complete outstanding<br />
Final Designs.<br />
INDICATOR: Number of RAPs approved (1)<br />
TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />
2009- MAR 2010 QUARTER (OCT-DEC ‘09)<br />
1 0 0<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Obtain Mini-RAP approval<br />
for Trunk Road Tranche A<br />
• Mini-RAP under review by<br />
<strong>MiDA</strong> and MCC.<br />
• Engineer/Contractor to<br />
commence Implementation of<br />
Mini RAP<br />
- 28 -
2.3 FERRY ACTIVITY<br />
INDICATOR: Rehabilitation of Akosombo Floating Dock Completed<br />
TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />
2009- MAR 2010 QUARTER (OCT–DEC 2009)<br />
N/A 2 N/A N/A<br />
INDICATOR: Percent Physical Completion of Floating Dock and Construction of 2 No. Ferries<br />
TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />
2009- MAR 2010 QUARTER (OCT–DEC 2009)<br />
N/A 3 N/A N/A<br />
INDICATOR: Value of Signed Contracts for Works: Ferry and Floating dock (USD 5,905,000)<br />
TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />
2009- MAR 2010 QUARTER (OCT–DEC 2009)<br />
5,905,000 0 0<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Rehabilitate Floating Dock<br />
and Construct 2 No. Ro-Ro<br />
Ferries to Germanscher<br />
Lloyds (GL) Classification<br />
Standards (Lot FS1)<br />
• Bids for FS1 were submitted and<br />
opened on 2nd December, 2009.<br />
• Evaluation of Bids was<br />
completed on 18 th December,<br />
2009.<br />
• BEP Report was submitted to<br />
<strong>MiDA</strong> Management on 21 st<br />
December, 2009.<br />
• <strong>MiDA</strong> received MCC approval<br />
on 31 st December, 2009.<br />
• Obtain MCC and <strong>MiDA</strong> Board<br />
approvals for award of<br />
Contract.<br />
• Sign Contract with winning<br />
Contractor.<br />
• Commence Pre-construction<br />
activities(Mobilization period)<br />
INDICATOR: Percent Physical Completion of Civil Works at Landing Stages and Ferry Terminals<br />
TARGET(ANNUAL) APR ACTUALS FOR THE CUMMULATIVE TO DATE<br />
2009- MAR 2010 QUARTER (OCT –DEC ‘09)<br />
N/A N/A N/A<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Carry out Extension of<br />
Landing Stages and<br />
Rehabilitation of Terminal<br />
Facilities (Lot FS2)<br />
• There was no successful Bid for<br />
Lot FS2.<br />
.<br />
• Commence procurement<br />
process for re-Bidding of Lot<br />
FS2.<br />
• Submit/Open Bids for Lot FS2<br />
• Evaluate received Bids<br />
• Obtain MCC and <strong>MiDA</strong> Board<br />
approvals for award of<br />
Contract.<br />
• Sign Contract with<br />
recommended Contractor.<br />
Other: Removal of Stumps<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Provide Designs for Stump<br />
Removal<br />
• VRA submitted priced BOQ to<br />
<strong>MiDA</strong>.<br />
• Modify current <strong>MiDA</strong>/<br />
VRA/ VLTC MoU into IEA<br />
2 Targets have been earmarked for <strong>report</strong>ing from Year 4 (i.e. April 2010)<br />
3 Targets have been earmarked for <strong>report</strong>ing from Year 4 (i.e. April 2010)<br />
- 29 -
PROJECT 3:<br />
RURAL DEVELOPMENT PROJECT<br />
Objective:<br />
To support Agricultural and Agri-business Development under the Agriculture Project and to strengthen<br />
Rural Institutions that provide complementary Services.<br />
ACTIVITY 1: PROCUREMENT CAPACITY ACTIVITY<br />
Activity Objectives:<br />
i. To strengthen the Capacity of various Procurement Entities in Government Organizations, to Procure<br />
Goods, Works and Services with greater Economy, Efficiency and Effectiveness.<br />
ii. Enable Entities to implement <strong>Ghana</strong>’s Public Procurement Act 2003 (Act 663) by assisting in the<br />
development of Training Materials for the Staff of such Entities, the formation of a Career path within<br />
the Public Sector for Procurement Professionals and the placement of Trainees in such Procurement<br />
Entities, to provide them with practical experience.<br />
Development of Modules<br />
Indicator: Number of Tertiary Institutions using the Modules developed by PPA/<strong>MiDA</strong> (8)<br />
TARGET (ANNUAL)<br />
APR 2009-MAR 2010<br />
ACTUALS TO DATE<br />
OCT – DEC 2009<br />
CUMMULATIVE<br />
ACTUALS TO DATE<br />
1 0 0<br />
ACTIVITY STATUS NEXT STEP<br />
i. Obtain Revised Draft<br />
Curricula and Modules<br />
from Crown Agents,<br />
• Crown Agents submitted a revised<br />
version of the Draft Curricula and<br />
Modules to PPA/<strong>MiDA</strong> on 15 th<br />
October 2009 as scheduled.<br />
• The Draft Curricula was reviewed by<br />
the PPA and further revision<br />
requested for the Curricula and<br />
Modules for the 4-Year Bachelor’s<br />
Degree Program.<br />
ii.<br />
Working Group to<br />
complete review of<br />
Revised Draft Curricula<br />
and Modules<br />
• Revisions to the Curricula and<br />
Modules were completed by Crown<br />
Agents and revised versions of the<br />
documentation submitted on 15 th<br />
December, 2009. Further revisions<br />
were requested of the Consultant for<br />
incorporation in the Final Version.<br />
iii.<br />
iv.<br />
Finalize Curricula and<br />
Modules<br />
Hold Stakeholders<br />
Workshop on Draft<br />
Curricula and Modules<br />
• The Draft Final Version of the<br />
Curricula and Modules was submitted<br />
to PPA/ <strong>MiDA</strong> on 31 st Dec., 2009.<br />
• A Stakeholders Workshop was held<br />
on 24 th and 25 th November, 2009 to<br />
discuss the Draft Curricula and<br />
• Obtain PPA/<strong>MiDA</strong><br />
Approval of the Draft Final<br />
version of the Curricula<br />
and Modules.<br />
- 30 -
Modules for all three categories of<br />
Procurement Training envisaged;<br />
namely i) 3–6 months Training for<br />
Procurement Practitioners, ii) 15–24<br />
months post-HND course, and iii) 4-<br />
year Bachelors Degree courses with a<br />
Procurement option for WASSCE<br />
students.<br />
• The following 12 Tertiary Institutions<br />
participated in the Workshop:<br />
i. Catholic Institute of Business &<br />
Technology<br />
ii. Kwame Nkrumah University of<br />
Science & Technology<br />
iii. University of Cape Coast<br />
iv. <strong>Ghana</strong> Institute of Management<br />
& Public Administration<br />
v. Methodist University<br />
vi. Central University College<br />
vii. University College of<br />
Management Studies<br />
viii. Zenith University College<br />
ix. Institute of Professional Studies<br />
x. Koforidua Polytechnic<br />
xi. Accra Polytechnic<br />
xii. Takoradi Polytechnic<br />
v. Hold Consultations with<br />
Tertiary Institutions<br />
vi. Hold Consultations with<br />
Stakeholders<br />
• Held discussions with the following<br />
on the proposed dates for the<br />
commencement of Procurement<br />
Training:<br />
- Catholic Institute of Business and<br />
Technology (CIBT)<br />
- <strong>Ghana</strong> Institute of Management<br />
and Public Administration<br />
(GIMPA)<br />
- Management, Development and<br />
Productivity Institute (MDPI)<br />
- Koforidua Polytechnic<br />
- Kumasi Polytechnic<br />
- Takoradi Polytechnic<br />
• Views of the following Stakeholders<br />
have been incorporated into the Draft<br />
Final Versions of the Curricula and<br />
Modules for procurement Training:<br />
- 31 -<br />
• Obtain Final Versions of<br />
the Curricula and Modules<br />
for various categories of<br />
Procurement Training.<br />
• Obtain PPA/<strong>MiDA</strong><br />
Approval for Report on<br />
the Curricula and<br />
Modules.<br />
• Distribute copies of Report<br />
to Tertiary Institutions.<br />
• Commence Procurement<br />
Training as follows:<br />
- CIBT: Feb 2010,<br />
starting with 2 nd Year<br />
Business Students<br />
- GIMPA: Post-HND<br />
and B.Sc. programs in<br />
Feb 2010.<br />
- MDPI: 3-6 month<br />
course by Mar 2010.<br />
Comments of various<br />
stakeholders attending the<br />
Stakeholders Workshop are to<br />
be incorporated in the final
- National Council for Tertiary<br />
Education<br />
- National Accreditation Board<br />
- Curriculum Development Section<br />
of the Ministry of Education<br />
- Management Development &<br />
Productivity Institute<br />
- <strong>Ghana</strong> Institutions of Engineers<br />
- <strong>Ghana</strong> Institution of Surveyors<br />
- <strong>Ghana</strong> Institute of Architects<br />
- Ministry of Trade & Industry<br />
- Chartered Institute of Purchasing<br />
& Supply, <strong>Ghana</strong><br />
Version of the Curricula and<br />
Modules.<br />
Procurement Training in <strong>Ghana</strong><br />
Number of individuals completing Internships (1600)<br />
TARGET (ANNUAL)<br />
ACTUALS TO DATE<br />
APR 2009-MAR 2010<br />
OCT – DEC 2009<br />
CUMMULATIVE<br />
ACTUALS<br />
TO DATE<br />
300 0 265<br />
Number of Institutions that agree to accept Interns (500)<br />
TARGET (ANNUAL)<br />
APR 2009-MAR 2010<br />
ACTUALS TO DATE<br />
OCT – DEC 2009<br />
CUMMULATIVE<br />
ACTUALS<br />
TO DATE<br />
150 0 180<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Evaluate effectiveness<br />
of Internship Program.<br />
• Surveys to assess the 2009 Internship<br />
Program have been conducted at the<br />
Kumasi, Takoradi, Accra and<br />
Koforidua Polytechnics.<br />
• Responses received have been used to<br />
produce a Report (90% complete)<br />
which represents an evaluation of the<br />
2009 Internship Program.<br />
• MCC’s comments will be<br />
incorporated in the final<br />
version of the Report.<br />
ii.<br />
Post interns to Hosting<br />
Institutions.<br />
• Solicit vacancies from<br />
Public Sector Institutions<br />
early enough.<br />
• Complete Postings by end<br />
March 2010.<br />
• Complete Consultations<br />
with NSS on Placement of<br />
Interns at Institutions where<br />
they undertook their<br />
Internship Program<br />
- 32 -
ACTIVITY 2: COMMUNITY SERVICES<br />
Activity Objectives:<br />
i. To support and protect Agricultural Investments in the 30 Districts, by ensuring that Community<br />
Services are available to the Beneficiary Farmers and Families.<br />
ii. To improve basic Social Infrastructure like Education, Water and Sanitation, and Rural Electrification,<br />
to serve as the catalyst for improvements in Rural Agricultural Production.<br />
QTR. 11 PROGRESS<br />
3.2a Local Government Service Delivery<br />
INDICATOR: Level of Citizen Satisfaction with Services<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(JUL-SEP 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
N/A N/A N/A<br />
MILESTONES/<br />
STATUS<br />
NEXT STEPS<br />
ACTIVITIES<br />
i. Operationalize IEA<br />
with MLGRD<br />
• Four (4) Regional Workshops intended<br />
to sensitize District Authorities could<br />
not come off as planned.<br />
• Liaise with MLGRD to<br />
organize Sensitization<br />
Workshops in February<br />
2010<br />
3.2b Education Facilities Sub-Activity<br />
INDICATOR: Number of Schools rehabilitated (35)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
35 N/A (All 35 completed by end of Q9) 35<br />
MILESTONES/<br />
STATUS<br />
NEXT STEPS<br />
ACTIVITIES<br />
i. Rehabilitate 35<br />
schools in 10 Districts<br />
and supply requisite<br />
furniture<br />
• Outstanding furniture for Savelugu<br />
Nanton District have been <strong>full</strong>y<br />
supplied and accepted by Inspection<br />
Teams.<br />
• Training is ongoing for 260<br />
Community Teachers in all the three<br />
Intervention Zones in <strong>MiDA</strong><br />
Rehabilitated Schools and other ones in<br />
the Districts.<br />
• Monitor completed<br />
projects during Defects<br />
Liability Period in<br />
Akuapim Municipality,<br />
Kwahu North, Kwahu East<br />
and Kwahu South<br />
Districts.<br />
- 33 -
INDICATOR: Number of School Blocks constructed (361)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
30 4 24<br />
MILESTONES/<br />
STATUS<br />
NEXT STEPS<br />
ACTIVITIES<br />
i. Reconstruct 30 flood<br />
affected Schools in 5<br />
districts of the<br />
Northern Intervention<br />
Area<br />
• Cumulatively, 24 School Blocks made<br />
up of seven (7) in Tolon-Kumbungu,<br />
six (6) in West Mamprusi, two (2) in<br />
Savelugu Nanton, five (5) in Karaga<br />
Districts, and four (4) in Tamale Metro<br />
have been completed.<br />
• On the average, about 82% of Civil<br />
Works have been completed on the<br />
• Complete, commission<br />
and take over Phase IB<br />
(Flood-affected Schools)<br />
• Award Contracts for the<br />
supply of Furniture to<br />
Flood-affected Schools<br />
ii. Prepare IDIQ<br />
Qualification<br />
documents for the<br />
selection of<br />
Contractors( Phase II)<br />
remaining 5 project sites.<br />
• Pre-Bid Meetings were organized for<br />
Prospective Contractors on the 12 th ,<br />
14 th and 16 th October, 2009 in Tamale,<br />
Kumasi and Accra respectively.<br />
• Bids were received on the 5 th , 6 th and<br />
9 th of November, 2009.<br />
• Bids Evaluation was completed on 24<br />
November, 2009.<br />
• Sign IDIQ Contracts for<br />
Phase II Education<br />
Projects<br />
INDICATOR: Number of School Blocks designed and diligenced (396)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
396 117 182<br />
MILESTONES/<br />
STATUS<br />
NEXT STEPS<br />
ACTIVITIES<br />
i. Sign contract for Task<br />
Order for educational<br />
facilities for the<br />
Southern Horticultural<br />
Belt (SHB)<br />
• Final Detailed Engineering Report on<br />
53 School Blocks, three (3) Teachers’<br />
Accommodation and 37 Toilet/Urinals<br />
were submitted by the Consultant and<br />
reviewed.<br />
• Issue Works Orders and<br />
sign Contracts<br />
ii. Sign contract for Task<br />
Order for educational<br />
facilities for the<br />
Northern Agricultural<br />
Zone (NAZ)<br />
iii. Sign contract for Task<br />
Order for educational<br />
facilities for the Afram<br />
Basin Zone (ABZ)<br />
• Final Detailed Engineering Report on<br />
64 School Blocks, three (3) Teachers’<br />
Accommodation, one (1) ICT Center<br />
and 67 Toilets/Urinals were submitted<br />
by the Consultant and reviewed.<br />
• Feasibility Studies Report on 64<br />
School Blocks, three (3) Teachers’<br />
Accommodation, one (1) ICT Center<br />
and 67 Toilets/Urinals were submitted<br />
by the Consultant and reviewed.<br />
• Issue Works Orders and<br />
sign Contracts<br />
• Obtain Detailed<br />
Engineering Design<br />
Report from Consultant<br />
Other Education Facilities Sub-Activity Milestones/Activities<br />
i. Operationalize IEA • Proposal for incremental cost budget<br />
with the Ministry of submitted by the MoE to <strong>MiDA</strong><br />
Education (MoE) reviewed and accepted.<br />
• Collaborate with the MoE<br />
to achieve its objectives<br />
under the IEA.<br />
- 34 -
3.2c Water and Sanitation Sub-Activity<br />
INDICATOR: Number of boreholes/wells/non-conventional water systems identified and<br />
diligenced for construction (350)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
150 144 144<br />
MILESTONES/ACTIVI STATUS<br />
NEXT STEPS<br />
TIES<br />
i. Sign Contract for Task<br />
Order for Boreholes and<br />
Pipe Extensions for the<br />
Southern Horticultural<br />
Belt (SHB)<br />
• Final Detailed Engineering Report for<br />
86 Boreholes were received from the<br />
Consultant and reviewed.<br />
ii. Sign Contract for Task<br />
Order for Boreholes and<br />
Small Town Water<br />
System (STWS) for the<br />
Northern Agricultural<br />
Zone (NAZ)<br />
iii. Sign contract for Works<br />
order for boreholes and<br />
STWS for the Afram<br />
Basin<br />
• Final Detailed Engineering Report for<br />
58 Boreholes were received from the<br />
Consultant and reviewed.<br />
• Feasibility Studies Report for 93<br />
boreholes submitted and reviewed.<br />
• Issue Works Orders and<br />
sign Contracts<br />
• Issue Works Orders and<br />
sign Contracts<br />
• Obtain Draft Detailed<br />
Design Report from<br />
Consultants.<br />
INDICATOR: Number of Small Town Water System (STWS) identified and diligenced for<br />
construction (25)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
(OCT-DEC 2009)<br />
25 1 1<br />
MILESTONES/ACTIVI STATUS<br />
NEXT STEPS<br />
TIES<br />
iv. Sign Contract for Task • Feasibility Studies Report for 1<br />
Order for Small Town STWS was received from the<br />
Water System (STWS) Consultant and reviewed.<br />
for the Northern<br />
Agricultural Zone<br />
(NAZ)<br />
• Issue Works Orders and<br />
sign Contracts<br />
Sign contract for Works<br />
order for STWS for the<br />
Afram Basin<br />
• Feasibility Studies Report for 13<br />
STWS were submitted and reviewed.<br />
• Obtain Final Engineering<br />
Report from Consultants.<br />
• Issue Works Orders and<br />
sign Contracts<br />
INDICATOR: Number of Pipe Extension Projects designed and diligenced for construction (10)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
10 9 9<br />
MILESTONES/ACTIVI STATUS<br />
NEXT STEPS<br />
TIES<br />
v. Sign contract for the • Feasibility Study Report and EIA<br />
Tamale Water Extension Scoping Report for TWEP were<br />
Project (TWEP)<br />
received from the Consultant and<br />
reviewed.<br />
• Draft Detailed Engineering Design is<br />
- 35 -<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
• Obtain Draft Detailed<br />
Engineering Design<br />
Report from Consultants.<br />
• Commence Bidding<br />
Process for the
vi. Sign Contract for Works<br />
Contract for Pipe<br />
Extensions for the<br />
Southern Horticultural<br />
Belt (SHB)<br />
ongoing.<br />
• Final Detailed Engineering Report for<br />
9 Pipe Extensions were received from<br />
the Consultant and reviewed<br />
procurement of<br />
Contractors<br />
• Issue Works Orders and<br />
sign contracts<br />
Other Water and Sanitation Sub-Activity Milestones/Activities<br />
i. Operationalize IEA with • Proposal for incremental cost budget<br />
MWRWH<br />
submitted by the MWRWH to <strong>MiDA</strong><br />
was reviewed and accepted.<br />
• Collaborate with the<br />
Ministry to achieve its<br />
objectives under the IEA.<br />
3.2d Rural Electrification Sub-Activity<br />
INDICATOR: Number of Rural Electrification Projects identified and diligenced for construction<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
10 10 10<br />
INDICATOR: Kilometers of Electricity Lines identified and diligence (200 km)<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
93 93 93<br />
MILESTONES/<br />
STATUS<br />
NEXT STEPS<br />
ACTIVITIES<br />
i. Sign Contract for Task<br />
Order for Feasibility<br />
Studies for 33kV O/H<br />
lines and transformer<br />
Stations in the Southern<br />
Zone<br />
• Final Engineering Design Report for<br />
26km, 33kV O/H lines and 10<br />
Transformer Stations was completed by<br />
Consultant, reviewed and accepted by<br />
<strong>MiDA</strong>.<br />
• Bidding Documents for the solicitation<br />
of Contractors were completed.<br />
• Issue Bidding Documents<br />
and evaluate.<br />
• Award Contracts for Rural<br />
Electrification Projects for<br />
the Southern Zone.<br />
• Undertake Due Diligence<br />
on the Agri-Business<br />
Centers to assess the<br />
Energy needs.<br />
ii. Sign Contract for Task<br />
Order for the<br />
Construction of 33kV<br />
O/H lines and<br />
Transformer Stations in<br />
the Northern Zone<br />
• Final Engineering Design Report for<br />
67km, 33kV O/H lines and 2<br />
Transformer Stations was completed by<br />
Consultant, reviewed and accepted by<br />
<strong>MiDA</strong>.<br />
• Bidding Documents for the solicitation<br />
of Contractors were completed.<br />
• Issue Bidding Documents<br />
and evaluate<br />
• Award Contracts for Rural<br />
Electrification Projects for<br />
the Northern Zone.<br />
• Undertake Due Diligence<br />
on the Agri-Business<br />
Centers to assess the<br />
Energy needs.<br />
Other Rural Electrification Sub-Activity Milestones/Activities<br />
Sign IEA with Ministry of • Proposed Budget for incremental cost<br />
Energy<br />
received from MoEn still under review<br />
pending the outcome of due diligence<br />
on the ABCs.<br />
• Define final scope of<br />
works for the Agric<br />
Business Centers 4 .<br />
4 Awaiting selection of ABC from <strong>MiDA</strong> Agric Department<br />
- 36 -
ACTIVITY 3: FINANCIAL SERVICES<br />
Objectives:<br />
i. To improve the efficiency of the National Payments and Settlements System through the<br />
establishment of an Electronic Payment System.<br />
ii. To enhance access to Financial Services in the Rural Economy through the Automation,<br />
Computerization and Interconnectivity of all the Rural Banks in the country.<br />
QTR. 11 PROGRESS<br />
FINANCIAL SERVICES ACTIVITY<br />
INDICATOR: Number of Interbank Transactions (600,000)<br />
ANNUAL TARGET<br />
ACTUALS TO DATE<br />
CUMMULATIVE<br />
(Apr 09 – Mar 10)<br />
(October 09 – Dec 09)<br />
ACTUALS TO DATE<br />
400,000 0 0<br />
INDICATOR: Value of Deposit Accounts in Rural Banks (US$ 600,000,000)<br />
ANNUAL TARGET<br />
ACTUALS TO DATE<br />
CUMMULATIVE<br />
(Apr 09 – Mar 10)<br />
(October 09 – Dec 09)<br />
ACTUALS TO DATE<br />
US$ 400,000,000 TBD Not available<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Implement Cheque Codeline<br />
and Automated Clearing<br />
House Systems<br />
ii. Procure Consultant for Legal<br />
Review of Payment System<br />
Laws<br />
iii. Implement Public Awareness<br />
Campaign for Payment<br />
Systems<br />
• Implementation of the Cheque<br />
Codeline Clearing System in<br />
Accra-Tema Clearing Zone<br />
stabilized with over 80% of the<br />
country’s Cheques handled by the<br />
System.<br />
• Issued Bid Document in October<br />
2009.<br />
• Technical Evaluation of the three<br />
Bids received was completed in<br />
December 2009.<br />
• Public Awareness Campaign<br />
expanded countrywide with<br />
special emphasis for Christmas<br />
Season Audiences<br />
- 37 -<br />
• Go Live Nationwide for the<br />
Cheque Codeline Clearing &<br />
Automated Clearing House<br />
Systems in January 2010.<br />
• Procure additional Licenses<br />
for all 28 Participating<br />
Banks as back-ups to their<br />
Clearing House Gateway<br />
Servers.<br />
• Consultant to conduct<br />
review of existing Payment<br />
System Laws<br />
• Continue Public Awareness<br />
Campaign to improve<br />
adoption by the Business<br />
Community and the General<br />
Public.<br />
INDICATOR: Number of Participating Financial Institutions (PFIs) automated under the<br />
Automation/Computerization and Interconnectivity of Rural Banks Activity (121)<br />
ANNUAL TARGET<br />
ACTUALS TO DATE<br />
CUMMULATIVE<br />
(Apr 09 – Mar 10)<br />
(October 09 – Dec 09)<br />
ACTUALS TO DATE<br />
21 0 0
ACTIVITY STATUS NEXT STEPS<br />
i. Procure Services of<br />
Consultants for the <strong>Ghana</strong><br />
Rural Bank Computerization<br />
and Interconnectivity Project<br />
• The following Contracts are<br />
operational:<br />
- Project Management<br />
Support Consultant (PMSC)<br />
- eMerge Software<br />
Implementation<br />
Consultancy<br />
- Data Centre Consultancy<br />
• The following Contracts were<br />
signed:<br />
- Temenos Banking<br />
Applications Licenses for<br />
the GRBCIP<br />
- Local Area Network (LAN)<br />
- Personal Computers and<br />
Accessories<br />
- Electric Generator Sets<br />
• Civil and Electrical Works for<br />
the Primary Data Center was<br />
completed and the Servers<br />
installed and powered.<br />
• Configuration of eMerge<br />
Banking Software on the<br />
Central Servers at the Data<br />
Centre<br />
• Installation of servers and<br />
related equipments at the<br />
Disaster Recovery Site.<br />
• User Acceptance Test for<br />
eMerge Banking Software<br />
• Go live for minimum of 8<br />
rural banks<br />
• Installation of the<br />
following:<br />
- Local Area Network<br />
- Electric Generator Sets<br />
- PCs and Accessories<br />
INDICATOR: Number of Participating Financial Institutions (PFIs) Connected to the WAN (121)<br />
ANNUAL TARGET<br />
ACTUALS TO DATE<br />
CUMMULATIVE<br />
(Apr 09 – Mar 10)<br />
(October 09 – Dec 09)<br />
ACTUALS TO DATE<br />
21 0 0<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Procure Services of WAN • WAN Design and Scoping • Install VSAT Equipments<br />
Consultants<br />
Reports was completed<br />
and link to Data Centre for<br />
400 Sites<br />
- 38 -
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT<br />
Objectives:<br />
i. Carry out Strategic Environmental Assessments for three Intervention Zones with a focus on<br />
identifying Key Environmental and Social Issues, assessing Cumulative Impacts and proposing broad<br />
Mitigation Framework under which MCA Projects will be implemented.<br />
ii. Ensure that all MIDA’s Documents satisfy MCC and EPA Guidelines.<br />
QTR. 11 PROGRESS<br />
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT<br />
INDICATOR: Total Number of Resettlement Action Plans Approved (6)<br />
ANNUAL TARGET ACTUALS FOR THE QUARTER CUMUILATIVE<br />
(Apr 09 – Mar 10)<br />
(OCT-DEC 2009)<br />
ACTUALS TO DATE<br />
2 3 5<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Complete Negotiations and<br />
Payments for PAPs for<br />
Construction Sections 1 &2 on<br />
N1 Lot 2<br />
• Section 1 of N1 Lot 2 (Mallam-<br />
Awoshie) has been handed over to<br />
Contractor<br />
\<br />
ii. Obtain Approval for Trunk and<br />
Feeder Roads RAPs<br />
• RAPs for Lots 1, 2&4 of T&F were<br />
approved in the Quarter.<br />
INDICATOR: Total Number of Environmental Assessments Approved (5)<br />
TARGET (ANNUAL)<br />
2<br />
(Carried over from previous year)<br />
ACTUALS FOR THE QUARTER CUMULATIVE<br />
(OCT-DEC 2009)<br />
ACTUALS TO DATE<br />
1 4<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Obtain Environmental Permit • Environmental Permit for Lot 1<br />
for Feeder Roads<br />
Feeder Roads was obtained from<br />
ii. Obtain Environmental Permit<br />
for Tamale Water Extension<br />
Project<br />
iii. Obtain Environmental Permit<br />
for Educational Infrastructure<br />
iv. Obtain Environmental Permit<br />
for Electrification Projects<br />
EPA.<br />
• Scoping Reports for Tamale Water<br />
Expansion was submitted to EPA.<br />
• Submitted Scoping Report for<br />
Educational Infrastructure for EPA<br />
Environmental Approval.<br />
• Scoping Report for Rural<br />
Electrification is being finalized by<br />
Consultant.<br />
- 39 -
D. PROGRAM MANAGEMENT AND GOVERNANCE<br />
Board Meetings<br />
(i)<br />
Board of Directors: There were two Board Meetings during the period under review – a followup<br />
of the 25 th Meeting, held on 26 th October, 2009; and the 26 th Board Meeting which was also<br />
held on 9 th December, 2009. The 26 th Meeting approved the Quarter 12 Disbursement Request<br />
and accompanying Reports.<br />
An Induction Workshop was held for the Board in November, 2009.<br />
(ii)<br />
Board Chair: The Government nominated, and following the approval of MCC and the <strong>MiDA</strong><br />
Board, appointed Prof. Samuel Sefa-Dedeh to the Chair of <strong>MiDA</strong>. The appointment took effect<br />
from 4 th January, 2010 for a term of three years.<br />
Program Audit<br />
(i)<br />
Internal: The Internal Audit Team completed the audit of the Credit Activity. The Audit focused<br />
on Disbursements to Participating Financial Institutions in the Northern, Volta, Eastern and<br />
Ashanti Regions. As part of the Audit, the Team visited the Rural Banks, Farmer Based<br />
Organizations and Farming Outlets.<br />
The Audit Team also held Meetings with Project Teams to understand the major risks associated<br />
with the various Projects. The information gathered will assist the Audit Team in the preparation<br />
of the 2010 Internal Audit Annual Plan.<br />
(ii)<br />
External: Messrs PricewaterhouseCoopers completed the Financial Audit of MCC Resources<br />
for the period ended June 2009. <strong>MiDA</strong> is awaiting Office of Inspector General’s approval of the<br />
External Audit Report.<br />
Zonal Advisory Committees (ZACs)<br />
The Second Round of District Advisory Committee (DAC) Meetings were held in 17 Districts – 12 in the<br />
Southern Zone, and all the five (5) Districts in the Northern Zone. The Second Round Meetings built on<br />
the First Round Meetings which were held in all the Districts in the previous Quarters by providing more<br />
feedback on how the local people think implementation has gone so far and how some challenges can be<br />
overcome. The Meetings also afforded <strong>MiDA</strong> an opportunity to keep Beneficiary Communities informed<br />
about what is to be expected as we begin a new year.<br />
Project Finance<br />
The Finance Team, together with the Fiscal Agent, responded to the operational needs of <strong>MiDA</strong> and met<br />
all MCC requirements. The Disbursement Request (DR), Quarterly Financial Report (QFR) and the<br />
Detailed Financial Plans (DFP) were submitted to MCC for approval. In addition, the monthly Fund<br />
Accountability Statements were prepared and submitted on time by the Fiscal Agent.<br />
Staff Numbers<br />
With the employment of four persons during the Quarter, the total number of Staff in <strong>MiDA</strong>’s<br />
employment as at the end of December 2009 was 74. In addition, the seven (7) Project Support<br />
Consultants who were engaged to strengthen Internal Capacity remained at post.<br />
- 40 -
E. KEY MONITORING AND EVALUATION (M&E) ACTIVITIES<br />
Activity Objectives:<br />
i. Monitor the various components of the <strong>Ghana</strong> Compact to determine whether <strong>MiDA</strong> is achieving<br />
intended results.<br />
ii. Evaluate the larger Impacts of the <strong>Ghana</strong> Compact.<br />
iii. Highlight the M&E requirements that <strong>MiDA</strong> must meet in order to receive Disbursements.<br />
iv. Guide Program Implementation and Management, so that Stakeholders understand what Results<br />
are expected, by when the Results should be achieved, and who is responsible for achieving and<br />
<strong>report</strong>ing them.<br />
v. Provide a Framework that will alert Stakeholders on Performance problems for adjustments to be<br />
made as needed.<br />
QTR. 10 PROGRESS<br />
MONITORING AND EVALUATION<br />
INDICATOR: Clean GLSS5+ Baseline Data received by <strong>MiDA</strong><br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(JUL-SEP 2009)<br />
CUMULATIVE ACTUALS<br />
TO DATE<br />
31-May-2009 28-May-2009 28-May-2009<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Obtain Descriptive<br />
Report<br />
• Received the Draft GLSS 5+<br />
Descriptive Report from ISSER in<br />
October 2009.<br />
• Obtain Final Descriptive<br />
Report<br />
INDICATOR: FBO Baseline Data received<br />
TARGET (ANNUAL) ACTUALS FOR THE QUARTER<br />
(JUL-SEP 2009)<br />
31-May-2009 21-Aug-2009 N/A<br />
i. Obtain Descriptive<br />
Report<br />
• Received the Draft FBO Descriptive<br />
Report in November 2009.<br />
.<br />
CUMULATIVE ACTUALS<br />
TO DATE<br />
• Obtain Final Descriptive<br />
Report<br />
- 41 -
F. SUPPORT TO PROJECT IMPLEMENTATION<br />
COMMUNITY AND PUBLIC OUTREACH AND STAKEHOLDER CONSULTATIONS<br />
AND SENSITIZATION<br />
Objectives:<br />
i. Provide a platform for Continuous Consultation with the Private Sector, Civil Society, Local and<br />
Regional Governments.<br />
ii. Encourage representatives of the Private Sector, Civil Society, Local and Regional Governments<br />
to provide advice and input to <strong>MiDA</strong> regarding the Implementation of the Compact Program.<br />
QTR. 11 PROGRESS<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Facilitate District<br />
Advisory Committees<br />
Meetings<br />
• A total of 17 Second Round DAC<br />
Meetings were held to meet the<br />
demand of the Governance Agreement<br />
for the holding of at last two Meetings<br />
per year.<br />
• Four Districts in the Southern Zone<br />
were not ready to hold the scheduled<br />
Second Round Meetings<br />
• All nine districts in the Afram Basin<br />
Zone could not hold the Second Round<br />
Meetings before the year ended.<br />
• Schedule a set of Meetings<br />
in the next quarter to cover<br />
the second round meetings<br />
missed.<br />
• Schedule First Round<br />
Meetings for the year<br />
2010.<br />
• Participate periodically in<br />
District Assembly<br />
Meetings to provide<br />
updates and briefing.<br />
ii. Carry out Publicity on<br />
Resettlement for Persons<br />
affected by the N1<br />
Highway Construction<br />
iii. Create and Sustain<br />
Public Awareness of<br />
<strong>MiDA</strong> Activities<br />
• N1 Activities were publicized through<br />
regular Press Releases, Publications in<br />
the Print Media, AMA’s Publicity<br />
Vans announcements, person-to-person<br />
contacts, Radio/TV announcements<br />
and appearances on Radio and TV by<br />
the Senior Management, the<br />
Resettlement Team and the<br />
Transportation Project Manager.<br />
• Provided Publicity in both the Print<br />
and Electronic Media (Radio and TV)<br />
on the various Activities of <strong>MiDA</strong>.<br />
There were a number of Radio<br />
Interviews with the CEO and other<br />
Project Managers on the various<br />
Projects.<br />
• The Transportation and Agriculture<br />
Infrastructure Project Manager was on<br />
TV more than three times while other<br />
Managers made occasional<br />
appearances when the need arose.<br />
• Radio interviews and interviews for<br />
Newspaper publication have been more<br />
regular.<br />
- 42 -<br />
• Ensure Publicity is<br />
maintained<br />
• Continue to arrange<br />
specific Programs in the<br />
Broadcast Media to inform<br />
the Public about the<br />
activities of <strong>MiDA</strong>.
ACTIVITY STATUS NEXT STEPS<br />
iv. Maintain Outdoor<br />
Signages<br />
• Renewed and replaced a few damaged<br />
signs<br />
• Maintain routine checks<br />
v. Collaborate with Civil<br />
Society<br />
vi. Maintain <strong>MiDA</strong> Website<br />
(www.mida.gov.gh)<br />
• Collaborated with GAPVOD and held<br />
two Meetings in the Afram Basin Zone<br />
with NGOs, CSOs, CBOs at the local<br />
level in attendance<br />
• The Website was monitored daily.<br />
• Information was uploaded onto the<br />
Website weekly.<br />
• The Home Page was revamped<br />
monthly to present Information on a<br />
friendlier basis to users.<br />
• Schedule Meetings to be<br />
held in the Southern and<br />
Northern Zone Districts<br />
• Continue uploading<br />
information on the Website<br />
as they become available<br />
- 43 -
G. IMPLEMENTATION IMPEDIMENTS AND MITIGATION MEASURES<br />
PROJECT 1: AGRICULTURE PROJECT<br />
ACTIVITY 1: COMMERCIAL AGRICULTURE TRAINING<br />
PROJECT 1: AGRICULTURE PROJECT<br />
ACTIVITY 1: FARMER AND ENTERPRISE TRAINING IN COMMERCIAL AGRICULTURE<br />
ACTIVITY (“COMMERCIAL TRAINING ACTIVITY”)<br />
Commercial Training<br />
Bad road conditions to some Training Sites made it difficult for some FBO Members to travel. To<br />
mitigate this, discussions are on-going to provide Training outside rainy season.<br />
Data on market targets<br />
The current situation where Market Targets have been linked to the Business Plans prepared for the<br />
purpose accessing Credit makes it difficult to collect data because of the lack of credit to most Farmers. It<br />
is, therefore, proposed that the setting of Market Targets should be decoupled from receipt of, or access to<br />
Credit in the Business Plans.<br />
ACTIVITY 2: IRRIGATION DEVELOPMENT<br />
There was no major impediment.<br />
ACTIVITY 3: LAND TENURE FACILITATION<br />
The implementation impediments were in relation to Land Title Registration, comprising the Survey of<br />
Land Parcels and Registration of Land Rights; Judicial Service clearing of Backlog of Land Cases; and<br />
the Public Education and Information Dissemination component.<br />
Land Title Registration:<br />
The Land Team’s facilitation role was hampered by the unanticipated time that had been spent on the<br />
Evaluation of the Land Administration component of the Compacts. The registration is preceded by visits<br />
to the communities to convert oral grants to written contracts.<br />
Backlog of Land Cases:<br />
The initial lack of adequate GOG Funds to refurbish all the 10 Courts meant concentration on only three.<br />
GOG has now made available funds to cover all the 10 Circuit Courts.<br />
Public Education and Information Dissemination component:<br />
This activity had to be re-scoped from nine (9) to only four (4) Districts. The re-scoping follows<br />
an evaluation on the Land Activity.<br />
ACTIVITY 4: POST HARVEST INVESTMENT AND VALUE CHAIN SERVICES<br />
The passage of the Plant Protection Act has delayed. To prevent further delays, a second Workshop is<br />
planned for the Select Committees on Agriculture and Subsidiary Legislation in the next Quarter.<br />
- 44 -
ACTIVITY 5: CREDIT SERVICES<br />
There was a general decline in the disbursement of Funds during the Quarter under review, a reflection of<br />
the slow-down in demand for agric financing as the major season in the major agricultural areas<br />
approached or came to an end in its production cycle.<br />
Some modest achievements were recorded during the Quarter including (i) the recruitment of additional<br />
FNGOs to increase the number of accredited PFIs, (ii) demand for disbursements to post harvest borrowers<br />
to purchase the produce from production activities, (iii) the increase in the distribution of the credit to more<br />
smallholders in FBOs (d) implementation by Bank of <strong>Ghana</strong> Management of tough measures to demand<br />
outstanding payments by three Commercial Banks in default, and (iv) improved Stakeholder consultations.<br />
The persistence of rather worrying trends remained a source of concern. Over last Quarter, the major<br />
impediments which confronted the Credit Program included (i) a doubling of the growing delinquencies,<br />
that is, inability by PFIs/Borrowers to meet their maturing Principal and Interest Payments which increased<br />
from 9.96% to 18% by end December 2010, (ii) high Lending Interest Rates, (iii) increasing number of<br />
PFIs which have become or remain ineligible to lend due to various breaches in Key Indicators<br />
benchmarked in the Policies and Procedures Manual thus restricting ability of PFIs to lend, (iv) the over<br />
concentration of Credit in the SHB and also the Production segment of the Value Chain thereby skewing<br />
the Risk Profile of the Portfolio of the Lending Institutions; and (v) weak Monitoring and Reporting<br />
mechanism to engender rapid and effective control of identified deficiencies in the Credit Flow Cycle.<br />
The efforts to mitigate these challenges have been unrelenting. They have included the following:<br />
i. Sensitizing the Banks to improve their Risk Management practices and encourage Lending to other<br />
levels of the Value Chain. These measures were reinforced during the Field Trips by BoG and ACPC<br />
Teams and also during the ACP Stakeholders Review Meeting held in Kumasi in November 2009.<br />
ii. The approval by <strong>MiDA</strong> Management and the commencement of implementation of the Grants to<br />
PFIs to acquire effective means of Transport to improve Oversight of Loans extended to Smallholder<br />
Farmers who are dispersed over wide geographic Locations, in addition to its intention to develop<br />
Loan Offices to improve access to Finance by Rural Dwellers.<br />
iii. Continued implementation but this time more focused Skill-based (rather than Knowledge building)<br />
Training of the PFIs staff to be more effective in the Appraisal and Monitoring of Agric Credit<br />
through Mentoring and Coaching of PFI Staff by ACPC to improve Repayments and more effective<br />
Loan structuring.<br />
PROJECT 2: TRANSPORTATION PROJECT<br />
There were few modifications to the Work Plan causing Timelines for Deliverables to Quarter 11 to slip.<br />
This was as a result of delays in Procurement for Trunk and Feeder road works.<br />
In accordance with the Contract, deliverables of the Project Management Support Consultant are on<br />
schedule. Also, <strong>MiDA</strong>/MCC organized a 5-day Workshop for Consultants/Contractors on Contract<br />
Administration, Management of the Works, implementation of Environmental, Health and Safety Plans,<br />
Quality Control and Risk Management at Site.<br />
ACTIVITY 1: N1 HIGHWAY<br />
The challenges to the main Works are the inability to timely implement the RAP for N1 Lot 2 which has<br />
been on the critical path since the last Quarter. <strong>MiDA</strong> and LVB are collaborating to expedite action on the<br />
implementation of the RAP.<br />
ACTIVITY 2: TRUNK AND FEEDER<br />
There has been slight change in Timelines for Trunk Road Activity and Feeder Road Lot EC Series (Lot 2)<br />
as Pre-construction activities, especially <strong>full</strong> mobilization of resources at the Sites is still in progress.<br />
Timelines on Procurement for the NR Series (Lots NR1 & NR 2) is steadily on course. The Procurement<br />
- 45 -
process is expected to end in Quarter 12. For the Volta Region, Lot VR1 was re-advertised. Delays<br />
occurred with the award of Contract for VR2. Lot VR3 received MCC and <strong>MiDA</strong> Board approvals. In<br />
spite of the delays to VR roads (Lot 3), it is expected that the successful Bidders will put in extra work<br />
during good weather to gain time.<br />
ACTIVITY 3: FERRY SERVICES<br />
There were slight slippages in Timelines for the Ferry Project Activity. Procurement for all components<br />
commenced in Quarter 11 as planned. However, prospective Bidders did not <strong>full</strong>y meet requirements in the<br />
Bidding Documents. Therefore, <strong>MiDA</strong>/CKP acted on the advice by the Bid Evaluation Panel to seek<br />
clarification on Proposals submitted by the recommended Bidder for Lot FS1 prior to Negotiations, and the<br />
need to re-bid for Lot FS2. The Procurement process will continue in Quarter 12.<br />
PROJECT 3: RURAL DEVELOPMENT PROJECT<br />
ACTIVITY 1: PROCUREMENT CAPACITY ACTIVITY<br />
Late presentation of major deliverable by Crown Agents delayed the holding of the Stakeholders<br />
Conference. Submission of the Draft Final versions of the Curricula and Modules were consequently<br />
delayed. The inclusion of major Stakeholders like the National Accreditation Board, the National Council<br />
for Tertiary Education, the National Board for Professional and Technician Examinations in the<br />
Stakeholders Conference is expected to expedite implementation processes.<br />
ACTIVITY 2: COMMUNITY SERVICES ACTIVITY<br />
Delays in signing IDIQ Contracts<br />
The absence of standardized Templates for the Evaluation Process in the selection of IDIQ<br />
Contractors resulted in several reviews of the Evaluation Panel Reports culminating in the delay of<br />
receiving no objection from MCC. The envisaged mitigation measure is to standardize Templates to help<br />
expedite the process in future Evaluations.<br />
Delays in completing Phase Flood-Affected Schools<br />
Cash flow problems and inaccessibility to Project Sites, especially in the Karaga District, affected the<br />
completion of Civil Works on schedule. Poor delivery and lack of commitment to Project Implementation<br />
on the part of one Contractor, Messrs Rabumat Construction Limited, has led to the termination of his<br />
Contract. Recommendation has been made to select one of the hard working Contractors for the re-award<br />
of the terminated Contract in order to fast track the process of completion.<br />
Delays in Rural Electrification Projects<br />
There was no significant progress in the selection of the Agri-Business Centers (ABCs). The delay has<br />
caused a slippage in finalizing the Scope of Works for Rural Electrification Projects and in the signing of<br />
an IEA with the Ministry of Energy. This is to be mitigated through liaison with the Agric<br />
Commercialization Department to expedite action on the selection of Sites for the Centers.<br />
Operationalization of IEAs<br />
Delay in the startup of the Phase II Projects affected various Sector Ministries in the operationalization of<br />
the IEAs. To make the IEAs operational, the CS Team is fast tracking most of its planned activities to<br />
enable all the Entities come on board.<br />
- 46 -
ACTIVITY 3: FINANCIAL SERVICES<br />
<strong>Ghana</strong> Rural Bank Computerization and Interconnectivity Project (GRBCIP)<br />
The <strong>full</strong> complement of Consultants, Contractors and Suppliers are all now in place and making progress<br />
with respect to Project timelines.<br />
There were a number of impediments and challenges which were as follows: (i) the complexity of the<br />
Project created inter-dependency challenges, (ii) delays in making advance Payments to the Contractors<br />
supplying Equipment, thus delaying ordering of equipment, (iii) the unsuitability of the proposed Disaster<br />
Recovery Site which necessitated a change of the Site, and (iii) delay in the arrival of the Central Server<br />
for installation.<br />
Strategies adopted to mitigate the challenges include (i) developing a rigorous integrated Implementation<br />
Plan which took care of the various Contractor/Supplier performance and deployment inter-dependencies,<br />
(ii) deploying additional Resources to expedite the Confirmation of Advance Payment Guarantees as<br />
required of Consultants/Contractors in the Procurement process, (ii) liaised with Apex Bank and GhIPSS<br />
for the allocation of an alternative Site at GhIPSS to host the Disaster Recovery Site, and (iv) arranging a<br />
temporary Server which was used as a Central Server prior to the arrival of the main supplies of<br />
Equipment.<br />
With the above challenges and impediments resolved, the Timelines for the Project is on track and<br />
expected to be completed on schedule.<br />
- 47 -
ANNEXES<br />
- 48 -
MILLENNIUM DEVELOPMENT AUTHORITY<br />
ANNEX A: INDICATOR TRACKING TABLE FOR QUARTER 11<br />
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal Net Income/Revenue US$ Level TBD TBD TBD<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Crop Income<br />
(Northern Zone)<br />
US$ Level 700 1645 1645<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Crop Income (Afram<br />
Basin Zone - East)<br />
US$ Level 820 1271 1271<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Crop Income (Afram<br />
Basin Zone - West)<br />
US$ Level 540 1306.80 1306.80<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Crop Income<br />
(Southern Zone)<br />
US$ Level 1860 2473.80 2473.80<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Aggregate Poverty<br />
Gap of beneficiaries<br />
US$ Level TBD TBD TBD<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Crop Income from<br />
staples<br />
US$ Level TBD TBD TBD<br />
<strong>Ghana</strong><br />
Compact/Mi<br />
DA Program<br />
0.1 Compact Goal Goal<br />
Crop Income from<br />
high-value crops<br />
US$ Level TBD TBD TBD<br />
Agriculture<br />
Project<br />
Activity<br />
0.2a Program<br />
Objective 1<br />
Objective<br />
Productivity of land in<br />
Afram Basin: Maize<br />
Metric tons/<br />
hectare<br />
Level 1.90 1.92 1.98 2.13 2.13<br />
- 49 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Agriculture<br />
Project<br />
Activity<br />
0.2a Program<br />
Objective 1<br />
Objective<br />
Productivity of land in<br />
the Northern Zone:<br />
Soya<br />
Metric tons/<br />
hectare<br />
Level 1.22 1.26 1.36 1.50 1.50<br />
Agriculture<br />
Project<br />
Activity<br />
0.2a Program<br />
Objective 1<br />
Objective<br />
Productivity of land in<br />
Southern Zone:<br />
Export-grade<br />
Pineapple<br />
Metric tons/<br />
hectare<br />
Level 8 8.08 8.64 10.08 10.08<br />
Agriculture<br />
Project<br />
Activity<br />
0.2b Program<br />
Objective 2<br />
Objective<br />
Additional <strong>Ghana</strong>ian<br />
agriculture exports:<br />
Pineapple<br />
Metric tons<br />
Cumula<br />
tive<br />
0 8300 14500 21700 21700<br />
Agriculture<br />
Project<br />
Activity<br />
0.2b Program<br />
Objective 2<br />
Objective<br />
Additional <strong>Ghana</strong>ian<br />
agriculture exports:<br />
Mango<br />
Metric tons<br />
Cumula<br />
tive<br />
0 576 2913 2913<br />
Agriculture<br />
Project<br />
Activity<br />
0.2b Program<br />
Objective 2<br />
Objective<br />
Additional <strong>Ghana</strong>ian<br />
agriculture exports:<br />
Fresh vegetables<br />
(pepper)<br />
Metric tons<br />
Cumula<br />
tive<br />
0 1344 2192 3178 3178<br />
Agriculture<br />
Project<br />
Activity<br />
0.2b Program<br />
Objective 2<br />
Objective<br />
<strong>Ghana</strong> Discount<br />
(Pineapple)<br />
Number Level 0.75 0.75 0.78-0.81 0.81-0.88 0.81-0.88<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Outcome<br />
Percent of FBOs<br />
meeting market<br />
targets<br />
Percent Level 0 50% 55% 60% 60%<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Output<br />
Number of<br />
agribusinesses<br />
assisted<br />
Number<br />
Increm<br />
ental<br />
0 310 394 27.1% 335 958<br />
31-Dec-<br />
2009<br />
650 958 147.38% 350 10 1,320<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Outcome<br />
Hectares under<br />
production with MCC<br />
support<br />
Hectares<br />
Increm<br />
ental<br />
0 280 0 -100% 0 4969.6<br />
31-Dec-<br />
2009<br />
9100 4,969.6 54.61% 17720 25960 53060<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Outcome<br />
Number of farmers<br />
adopting new<br />
technologies and<br />
farming methods<br />
Number<br />
Increm<br />
ental<br />
0 5100 Not available<br />
31-Dec-<br />
2009<br />
12750 TBD TBD 15,300 17,850 51,000<br />
- 50 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Agriculture<br />
Project<br />
Activity<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Indicator<br />
Level<br />
Outcome<br />
Indicator<br />
Number of<br />
enterprises that have<br />
applied improved<br />
techniques<br />
Unit<br />
Number<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Increm<br />
ental<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
0 4<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
31-Dec-<br />
2009<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
7 4 57.14% 20 58 85<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Outcome<br />
Percent Level 20 10-14% Not available TBD<br />
Percent of post<br />
harvest loss at farmgate<br />
31-Dec-<br />
2009<br />
10-14% TBD TBD 10-14% 10-14% 10-14%<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Output<br />
Number of FBOs<br />
trained in Commercial<br />
Agriculture<br />
Number<br />
Increm<br />
ental<br />
0 300 238 -21% 0<br />
31-Dec-<br />
2009<br />
600 300 1,200<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Output<br />
Number of farmers<br />
trained in Commercial<br />
Agriculture<br />
Number<br />
Increm<br />
ental<br />
0 15,000 14,702 -1.99% 0<br />
31-Dec-<br />
2009<br />
30000 15000 60,000<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Process<br />
milestone<br />
Training &Technical<br />
Service Provider Task<br />
Orders issued<br />
Number<br />
Increm<br />
ental<br />
0 58 58 0.00 28 28<br />
31-Dec-<br />
2009<br />
174 84 48.28% 58 290<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Process<br />
milestone<br />
Value Chains mapped Number Level 0 17 17 0.0% 17<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Process<br />
milestone<br />
Blanket Purchase<br />
Agreement awarded<br />
Number Level 0 29 29 0.0% 29<br />
Agriculture<br />
Project<br />
Activity<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Guidelines on<br />
Irrigation<br />
Development<br />
developed and<br />
approved by MCC<br />
Guidelines on postharvest<br />
developed<br />
and approved by<br />
MCC<br />
Date Date None 22-Aug-2008 15-Sep-2008<br />
Date Date None 22-Aug-2008 15-Sep-2008<br />
5 weeks<br />
past due<br />
date<br />
5 weeks<br />
past due<br />
date<br />
22-Aug-<br />
2008<br />
22-Aug-<br />
2008<br />
Agriculture<br />
Project<br />
Activity<br />
1.1. Commercial<br />
Agricultural<br />
Training<br />
Process<br />
milestone<br />
Guidelines on FBO<br />
vouchers developed<br />
and approved by<br />
MCC<br />
Date Date None 15-Aug-2008 8-Sep-2008<br />
3 weeks<br />
past due<br />
date<br />
15-Aug-<br />
2008<br />
- 51 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Outcome<br />
Additional hectares<br />
irrigated with MCC<br />
support<br />
Hectares<br />
Increm<br />
ental<br />
0 280 0 -100.0% 0<br />
31-Dec-<br />
2009<br />
1100 0 0.00% 1,720 1,900 5,000<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Output<br />
Number of irrigation<br />
facilities constructed/<br />
rehabilitated<br />
Number<br />
Cumula<br />
tive<br />
0 10 10<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Process<br />
milestone<br />
Hectares of land with<br />
potential for new/<br />
rehabilitated irrigation<br />
facilities identified<br />
Hectares<br />
Cumula<br />
tive<br />
0 5,060 5,084 0.5% 5,060<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Process<br />
milestone<br />
Number of<br />
Feasibilities Studies<br />
approved<br />
Number<br />
Cumula<br />
tive<br />
0 0 0<br />
31-Dec-<br />
2009<br />
10 0 0.00% 10<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for<br />
feasibility and/or<br />
design studies<br />
US$<br />
Cumula<br />
tive<br />
0 0<br />
3,616,589.<br />
00<br />
31-Dec-<br />
2009<br />
2,487,00<br />
6.00<br />
3,616,589 145.42% 4,388,00<br />
6.00<br />
5,812,06<br />
6.00<br />
5,812,00<br />
6.00<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for irrigation<br />
works<br />
US$<br />
Cumula<br />
tive<br />
0 5,844,40<br />
0.00<br />
14,610,4<br />
00.00<br />
14,610,4<br />
00.00<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
design/feasibility<br />
studies for irrigation<br />
completed<br />
Percent<br />
Cumula<br />
tive<br />
0 0.00<br />
31-Dec-<br />
2009<br />
42.8 20 46.07% 75.5 100 100%<br />
Agriculture<br />
Project<br />
Activity<br />
1.2. Irrigation<br />
Activity<br />
Process<br />
milestone<br />
Percent of value of<br />
contracted irrigation<br />
works disbursed<br />
Percent<br />
Increm<br />
ental<br />
0 40 60 100%<br />
Agriculture<br />
Project<br />
Activity<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Outcome<br />
1.3. Land Activity Outcome<br />
Percent of people<br />
aware of their land<br />
rights in Pilot Land<br />
Registration Areas<br />
Percent of identified<br />
land disputes<br />
resolved in the Pilot<br />
Land Registration<br />
Areas<br />
Percent Level TBD TBD<br />
Percent Level 0 86.67% 90.00<br />
30-Nov-<br />
2009<br />
30%<br />
increase<br />
from<br />
baseline<br />
50%<br />
increase<br />
from<br />
baseline<br />
50%<br />
increase<br />
from<br />
baseline<br />
70% 90 128.57 75% 80% 80%<br />
- 52 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Agriculture<br />
Project<br />
Activity<br />
Activity<br />
Indicator<br />
Level<br />
1.3. Land Activity Outcome<br />
Indicator<br />
Total number of land<br />
parcels registered in<br />
the Pilot Land<br />
Registration Areas<br />
Unit<br />
Number<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Increm<br />
ental<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
0 103 0<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
30-Dec-<br />
2009<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
1800 103 5.72% 3000 4800<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Output<br />
Rural Hectares<br />
formalized<br />
Hectares<br />
Increm<br />
ental<br />
0 132.76<br />
31-Dec-<br />
2009<br />
2713 TBD TBD 2960 11346 17019<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Output<br />
Rural Hectares<br />
mapped<br />
Hectares<br />
Increm<br />
ental<br />
0 2713 749 -72% 2399 612<br />
31-Dec-<br />
2009<br />
2960 3,522 118.99% 11346 17019<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Output<br />
Total number of<br />
parcels surveyed in<br />
the Pilot Land<br />
Registration Areas<br />
Number<br />
Increm<br />
ental<br />
0 1024 414 -60% 1402 492<br />
31-Dec-<br />
2009<br />
1800 2,566 142.56% 1976 4800<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Parcels of land<br />
inventoried in the Pilot<br />
Land Registration<br />
Areas<br />
Number<br />
Increm<br />
ental<br />
0 1024 521 -49% 1387 924<br />
31-Dec-<br />
2009<br />
1800 2,891 160.61% 1976 4800<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Outcome<br />
Percent of backlog of<br />
land cases cleared by<br />
the Judicial Service<br />
Percent Level 0 0 95% 95%<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Backlog of land cases<br />
identified<br />
Date Date None<br />
15-Jun-<br />
2009<br />
39,993<br />
2 weeks<br />
past due<br />
date<br />
15-Jun-<br />
2009<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Procurement of<br />
Needs Assessment<br />
Consultant completed<br />
Date Date None 27-Oct-2008 3-Dec-2008<br />
37 days<br />
past due<br />
date<br />
27-Oct-<br />
2008<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Road Map and TORs<br />
for Public Education<br />
and Small Grants<br />
finalized and<br />
approved<br />
Date Date None 26-Nov-2008 18-Nov-2008<br />
6 days<br />
ahead of<br />
due date<br />
26-Nov-<br />
2008<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Number of<br />
preparatory studies<br />
completed<br />
Number<br />
Cumula<br />
tive<br />
0 3 4 33.3% 3<br />
- 53 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Legal and Regulatory<br />
reforms adopted<br />
Number<br />
Increm<br />
ental<br />
0 1 2 100% 1 0<br />
31-Dec-<br />
2009<br />
3 1 33.33% 3 2 9<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Output<br />
Number of<br />
landholders reached<br />
by public outreach<br />
efforts<br />
Number<br />
Increm<br />
ental<br />
0 4,000 4794 19.9% 0 0<br />
31-Dec-<br />
2009 6,000<br />
0 0.00% 10000<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Output<br />
Number of Personnel<br />
Trained<br />
Number<br />
Increm<br />
ental<br />
0 6 6 0.0% 22 0<br />
25-Aug-<br />
2009<br />
194 51 26.29% 200<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity Output<br />
Number of buildings<br />
rehabilitated/<br />
constructed<br />
Number<br />
Cumula<br />
tive<br />
0 0 0 0.0% 0 1<br />
31-Dec-<br />
2009<br />
1 1 100.00% 3 3<br />
Agriculture<br />
Project<br />
Activity<br />
1.3. Land Activity<br />
Process<br />
milestone<br />
Value of equipment<br />
purchased<br />
US$<br />
Increm<br />
ental<br />
0 66,000 66,000 0.0% 0 0<br />
31-Dec-<br />
2009 200,000<br />
0 0.00% 266000<br />
Agriculture<br />
Project<br />
Activity<br />
1.4. Post-Harvest<br />
Activity<br />
Outcome<br />
Volume of products<br />
passing through postharvest<br />
treatment<br />
(metric tons)<br />
Metric tons<br />
Increm<br />
ental<br />
0 3324.8 2804.2<br />
31-Dec-<br />
2009<br />
111,820 6,129 5.48% 129,900 143,400 385,120<br />
Agriculture<br />
Project<br />
Activity<br />
1.4. Post-Harvest<br />
Activity<br />
Output<br />
Number of Cooling<br />
facilities installed<br />
Number<br />
Cumula<br />
tive<br />
0 7 2 -71.4% 3 4<br />
31-Dec-<br />
2009<br />
7 4 57.14% 12 12<br />
Agriculture<br />
Project<br />
Activity<br />
1.4. Post-Harvest<br />
Activity<br />
Output<br />
Area of cold storage<br />
facilities constructed<br />
Square<br />
Meters<br />
Increm<br />
ental<br />
0 156 114.2<br />
31-Dec-<br />
2009<br />
1021 270 26.46% 717 1738<br />
Agriculture<br />
Project<br />
Activity<br />
1.4. Post-Harvest<br />
Activity<br />
Output<br />
Area of Pack-Houses<br />
and other Post-<br />
Harvest Infrastructure<br />
constructed<br />
Square<br />
Meters<br />
Increm<br />
ental<br />
0 17076 17076<br />
Agriculture<br />
Project<br />
Activity<br />
1.4. Post-Harvest<br />
Activity<br />
Process<br />
milestone<br />
Number of<br />
Feasibilities Studies<br />
approved<br />
Number Level 0 0<br />
31-Dec-<br />
2009<br />
5 3 60.00% 5<br />
- 54 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Agriculture<br />
Project<br />
Activity<br />
Activity<br />
1.4. Post-Harvest<br />
Activity<br />
Indicator<br />
Level<br />
Process<br />
milestone<br />
Indicator<br />
Pack house/Other<br />
Post-Harvest<br />
Infrastructure sites<br />
identified<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Date Date None<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
30-Oct-<br />
2009<br />
Actuals<br />
as of<br />
(Date)<br />
31-Dec-<br />
2009<br />
Annual<br />
Target<br />
31-Dec-<br />
2009<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Completed<br />
2 months<br />
ahead of<br />
due date<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
31-Dec-<br />
2009<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit Activity Outcome<br />
Portfolio-at-risk of<br />
Agricultural Loan<br />
Fund<br />
Percent Level 0% 20 0 N/A 13.90 18.00%<br />
31-Dec-<br />
2009<br />
20% 0 N/A 20% 20% 20%<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit Activity Outcome<br />
Value of loans<br />
disbursed to clients<br />
from agricultural loan<br />
fund<br />
US$<br />
Cumula<br />
tive<br />
0 7,000,000 7,161,000 2.3% 10,327,084.5<br />
3<br />
12,707,915<br />
.90<br />
31-Dec-<br />
2009<br />
15,000,0<br />
00<br />
12,707,916 84.72%<br />
25,000,0<br />
00<br />
35,000,0<br />
00<br />
35,000,0<br />
00<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit Activity Output<br />
Number of loans<br />
disbursed to clients<br />
from agricultural loan<br />
fund<br />
Number<br />
Cumula<br />
tive<br />
0 90 42 -53.3% 214 269<br />
31-Dec-<br />
2009<br />
270 269 99.63% 360<br />
540<br />
540<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit Activity Output<br />
Number of clients<br />
receiving loans<br />
disbursed from<br />
agricultural loan fund<br />
Number<br />
Cumula<br />
tive<br />
0 5,000 7573 9744<br />
31-Dec-<br />
2009<br />
13,000 9,744 74.95% 15,500<br />
18,000<br />
18,000<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit Activity Output<br />
Number of<br />
Participating Financial<br />
Institutions accredited<br />
Number<br />
Cumula<br />
tive<br />
0 40 45 12.5% 53 56<br />
31-Dec-<br />
2009<br />
55 56 101.82% 60 60 60<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit Activity Output<br />
Number of<br />
Participating Financial<br />
Institutions' staff<br />
trained<br />
Number<br />
Increm<br />
ental<br />
0 120 119 -0.8% 25 0<br />
31-Dec-<br />
2009<br />
200 173 86.50% 100 60 480<br />
Agriculture<br />
Project<br />
Activity<br />
1.5. Credit<br />
Activity<br />
Output<br />
Total outstanding<br />
principal balance for<br />
group/ individual<br />
loans<br />
US$<br />
Cumula<br />
tive<br />
0 7,000,000 7,161,000 2.3%<br />
8,009,721.35<br />
9,344,875.<br />
34<br />
31-Dec-<br />
2009<br />
15,000,0<br />
00<br />
9,344,875 62.30% 25,000,0<br />
00<br />
35,000,0<br />
00<br />
35,000,0<br />
00<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Outcome<br />
International<br />
Roughness Index<br />
Meters/km Level 12.69 5.47 5.47<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Outcome<br />
Annualized Average<br />
Daily Traffic<br />
Number Level 298.02 TBD TBD<br />
- 55 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Output<br />
Kilometers of feeder<br />
roads completed<br />
Km<br />
Cumula<br />
tive<br />
0 96.7 406 406<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
feeder road works<br />
disbursed<br />
Percent<br />
Cumula<br />
tive<br />
0 15.00<br />
31-Dec-<br />
2009<br />
39.14 15 38.32% 72.86 100 100<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for feeder<br />
road works<br />
US$<br />
Cumula<br />
tive<br />
0<br />
18,443,422<br />
.17<br />
31-Dec-<br />
2009<br />
24,436,0<br />
11<br />
18,443,422 75.48%<br />
45,491,1<br />
94<br />
62,436,5<br />
71<br />
62,436,5<br />
71<br />
Agriculture<br />
Project<br />
Activity<br />
1.6 Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Kilometers of feeder<br />
roads under works<br />
contracts<br />
Km<br />
Cumula<br />
tive<br />
0 146.24<br />
31-Dec-<br />
2009<br />
358 146 40.85% 406 406 406<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Kilometers of feeder<br />
roads designed<br />
Km<br />
Cumula<br />
tive<br />
0 950 0 0.0% 539.63 570.81<br />
31-Dec-<br />
2009<br />
950 570.81 60.09% 950<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
design/feasibility<br />
studies completed<br />
Percent<br />
Cumula<br />
tive<br />
0 72.33 55.7 16.6% 57.10 89.84<br />
31-Dec-<br />
2009<br />
100% 89.84 89.84 100%<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for<br />
feasibility and/or<br />
design studies<br />
US$ Level 0 2,452,376 2,352,375 -4.1%<br />
2,452,37<br />
6<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Number of<br />
Environmental<br />
Assessments<br />
approved<br />
Number<br />
Cumula<br />
tive<br />
0 3 2 -33.3% 2 2<br />
31-Dec-<br />
2009<br />
3 2 66.67% 3<br />
Agriculture<br />
Project<br />
Activity<br />
1.6. Feeder Roads<br />
Activity<br />
Process<br />
milestone<br />
Number of RAPs for<br />
Feeder roads as<br />
appropriate<br />
Number<br />
Cumula<br />
tive<br />
0 3 0 -100.0% 0 3<br />
31-Dec-<br />
2009<br />
3 3 100.00% 3<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Outcome<br />
Volume-to-capacity<br />
ratio on N1<br />
Number Level 0.85-1 0.26 0.26<br />
- 56 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Outcome<br />
Vehicles per hour at<br />
peak hour<br />
Number Level >2000 3120 3120<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Outcome<br />
Travel time at peak<br />
hour<br />
Minutes Level 60 min 20 min 20 min<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Outcome<br />
International<br />
Roughness Index<br />
Meters/km Level 4 2.5 2.5<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Outcome<br />
Annualized Average<br />
Daily Traffic<br />
Number Level 27737 36530 36530<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Output<br />
Percent of contracted<br />
road works disbursed:<br />
N1, Lot 1<br />
Percent<br />
Increm<br />
ental<br />
0 10% 10.00% 0% 2.45 2.80<br />
31-Dec-<br />
2009<br />
41.6% 5.25 12.62 29.2% 19.2% 100%<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Output<br />
Percent of contracted<br />
road works disbursed:<br />
N1, Lot 2<br />
Percent<br />
Increm<br />
ental<br />
0 0 10.00<br />
31-Dec-<br />
2009<br />
41.6% 10 24.04% 29.2% 29.2% 100%<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for road<br />
works N1, Lot 1<br />
US$<br />
Cumula<br />
tive<br />
0<br />
43,412,150<br />
42,168,601 -2.9%<br />
43,412,1<br />
50<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for road<br />
works N1, Lot 2<br />
US$<br />
Cumula<br />
tive<br />
0 0<br />
83,666,04<br />
6.33<br />
31-Dec-<br />
2009<br />
58,000,0<br />
00<br />
83,666,04<br />
6<br />
144.25<br />
58,000,0<br />
00<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Kilometers of N1 Lot<br />
1 under works<br />
contracts<br />
Km<br />
Cumula<br />
tive<br />
0 6<br />
31-Dec-<br />
2009<br />
6 6 100.00% 6<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Kilometers of N1 Lot<br />
2 under works<br />
contracts<br />
Km<br />
Cumula<br />
tive<br />
0 8.125<br />
31-Dec-<br />
2009<br />
8.125 8.125 100.00% 8.125<br />
- 57 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Kilometers of N1<br />
designed<br />
Km Level 0 14.125 14.125 0 14.125<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity Output<br />
Kilometers of road<br />
upgraded<br />
Km<br />
Cumula<br />
tive<br />
0 14.125 14.125<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
(design/feasibility)<br />
study completed<br />
Percent<br />
Cumula<br />
tive<br />
0 100 57.5 -42.5% 106.03 106.03<br />
31-Dec-<br />
2009<br />
100 106.03 106.03% 100%<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for<br />
feasibility and/or<br />
design study<br />
US$ Level 0 935,298.00 1,027,026.00 9.81% 935,298<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Number of<br />
Environmental<br />
Assessments<br />
approved<br />
Number<br />
Increm<br />
ental<br />
0 1 1 0.0% 1<br />
Transportatio<br />
n Project<br />
Activity<br />
2.1. N1- Activity<br />
Process<br />
milestone<br />
Number of RAPs<br />
approved<br />
Number<br />
Increm<br />
ental<br />
0 1 1 0.0% 0 1<br />
31-Dec-<br />
2009<br />
1 1 100.00% 2<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Outcome<br />
Annualized Average<br />
Daily Traffic<br />
Number Level 221.5 235 258.5 258.5<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Outcome<br />
International<br />
Roughness Index<br />
Meters/km Level 9 - 12 3.5 3.5 3.5<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Output<br />
Kilometers of trunk<br />
roads completed<br />
Km<br />
Cumula<br />
tive<br />
0 75.21 75.21<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
roads works<br />
disbursed<br />
US$<br />
Increm<br />
ental<br />
0 0 10.00<br />
31-Dec-<br />
2009<br />
44.2% 10 22.62 47.5% 8.3% 100%<br />
- 58 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for road<br />
works<br />
US$<br />
Cumula<br />
tive<br />
0 0 25,900,659<br />
31-Dec-<br />
2009<br />
11,622,7<br />
50<br />
25,900,659 222.84% 24,098,2<br />
30<br />
26,288,3<br />
12<br />
26,288,3<br />
12<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Kilometers of trunk<br />
roads under works<br />
contracts<br />
US$<br />
Cumula<br />
tive<br />
0 75.21<br />
31-Dec-<br />
2009<br />
75.21 75.21 100.00% 75.21<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Kilometers of trunk<br />
roads designed<br />
Km<br />
Cumula<br />
tive<br />
0 230 75.21 -67.3% 75.21 75.21<br />
31-Dec-<br />
2009<br />
230 75.21 32.70% 230<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Output<br />
Percent of contracted<br />
design/feasibility<br />
studies completed<br />
Percent<br />
Cumula<br />
tive<br />
0 67.0 57.5 -14.2% 67.50 70.32<br />
31-Dec-<br />
2009<br />
100 67.50 67.50% 100<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for<br />
feasibility and/or<br />
design studies<br />
US$ Level 0<br />
933,699.00 933,699.00<br />
0.0% 933,699<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Number of<br />
Environmental<br />
Assessments<br />
approved<br />
Number<br />
Cumula<br />
tive<br />
0 1 0 -100.0% 1 1<br />
31-Dec-<br />
2009<br />
1 1 100.00% 1<br />
Transportatio<br />
n Project<br />
Activity<br />
2.2. Trunk Roads<br />
Activity<br />
Process<br />
milestone<br />
Number of RAPs<br />
approved<br />
Number<br />
Cumula<br />
tive<br />
0 0 1<br />
31-Dec-<br />
2009<br />
1 0 0.00% 1<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Outcome<br />
Travel time for walkon<br />
passengers.<br />
Minutes Level 128.4 94.2 94.2<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Outcome<br />
Travel time for small<br />
vehicles<br />
Minutes Level 135.5 132 132<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Outcome Travel time for trucks. Minutes Level 1,200 390 390<br />
- 59 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Outcome<br />
Annualized Average<br />
Daily Traffic<br />
(vehicles).<br />
Number Level 58 63.8 63.8<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Outcome<br />
Annualized Average<br />
Daily Traffic<br />
(passengers)<br />
Number Level 620 651 651<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Rehabilitation of<br />
Akosombo Floating<br />
Dock Completed<br />
Date Date None<br />
30-Jun-<br />
2010<br />
30-Jun-<br />
2010<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Percent Physical<br />
Completion of Civil<br />
Works at Landing<br />
Stages<br />
Percent<br />
Increm<br />
ental<br />
0 44.6% 55.4% 100%<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Output<br />
Landing stages<br />
rehabilitated<br />
Number<br />
Increm<br />
ental<br />
0 2 2<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Rehabilitation of<br />
Landing Stages<br />
Completed<br />
Date Date None<br />
31-Dec-<br />
2010<br />
31-Dec-<br />
2010<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Percent Physical<br />
Completion of Ferry<br />
Terminals<br />
Percent<br />
Increm<br />
ental<br />
0 33.3% 66.7% 100%<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity Output<br />
Ferry Terminals<br />
upgraded<br />
Number<br />
Increm<br />
ental<br />
0 2 2<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
work disbursed: ferry<br />
and floating dock<br />
percent<br />
Increm<br />
ental<br />
0 50% 50% 100<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Percent of contracted<br />
work disbursed:<br />
landings and<br />
terminals<br />
percent<br />
Increm<br />
ental<br />
0 50% 50% 100<br />
- 60 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Transportatio<br />
n Project<br />
Activity<br />
2.3. Ferry Activity<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for works:<br />
ferry and floating dock<br />
US$<br />
Increm<br />
ental<br />
0 0 0<br />
31-Dec-<br />
2009<br />
5,905,00<br />
0<br />
0 0.00%<br />
5,905,00<br />
0<br />
Transportatio<br />
n Project<br />
Activity<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
2.3. Ferry Activity<br />
3.1. Procurement<br />
Capacity Activity<br />
3.1. Procurement<br />
Capacity Activity<br />
3.1. Procurement<br />
Capacity Activity<br />
3.1. Procurement<br />
Capacity Activity<br />
Process<br />
milestone<br />
Output<br />
Output<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Value of signed<br />
contracts for works:<br />
landings and<br />
terminals<br />
Number of Practicing<br />
procurement<br />
personnel who<br />
complete training<br />
modules<br />
Number of individuals<br />
completing<br />
Internships at<br />
Ministries,<br />
Departments and<br />
Agencies (MDAs) and<br />
Metropolitan,<br />
Municipal and District<br />
Assemblies (MMDAs)<br />
Number of<br />
Procurement students<br />
at various tertiary<br />
institutions who have<br />
success<strong>full</strong>y<br />
completed one year<br />
of coursework<br />
Number of<br />
Procurement students<br />
at various tertiary<br />
institutions who have<br />
success<strong>full</strong>y<br />
completed two years<br />
of coursework<br />
US$<br />
Number<br />
Number<br />
Number<br />
Number<br />
Increm<br />
ental<br />
Cumula<br />
tive<br />
Increm<br />
ental<br />
Increm<br />
ental<br />
Increm<br />
ental<br />
0 585,200 585,200<br />
0 400 900 900<br />
0 265 0<br />
31-Dec-<br />
2009<br />
1,170,40<br />
0<br />
300 265 88.33% 600 700 1600<br />
0 280 800 1080<br />
0 250 250<br />
Rural<br />
Development<br />
3.1. Procurement<br />
Capacity Activity<br />
Outcome<br />
Number of Interns<br />
who gain employment<br />
in public procurement.<br />
Number<br />
Increm<br />
ental<br />
0 100 100 200<br />
Rural<br />
Development<br />
3.1. Procurement<br />
Capacity Activity<br />
Outcome<br />
Number of Tertiary<br />
Institutions using the<br />
Modules developed<br />
by Public<br />
Procurement<br />
Authority/<strong>MiDA</strong><br />
Number<br />
Increm<br />
ental<br />
0 0<br />
31-Dec-<br />
2009<br />
1 0 0.00% 5 2 8<br />
- 61 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Rural<br />
Development<br />
3.1. Procurement<br />
Capacity Activity<br />
Process<br />
milestone<br />
Number of Institutions<br />
that agree to accept<br />
Interns<br />
Number<br />
Increm<br />
ental<br />
0 1 0<br />
31-Dec-<br />
2009<br />
150 180 120.00% 250 100 500<br />
Rural<br />
Development<br />
3.2a Local<br />
Government<br />
Service Delivery<br />
Outcome<br />
Level of citizen<br />
satisfaction with<br />
services<br />
Levels of<br />
satisfaction<br />
Level TBD TBD<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Outcome<br />
Number of students<br />
enrolled in schools<br />
affected by education<br />
facilities sub-activity<br />
Number<br />
Cumula<br />
tive<br />
58,606 61,538 64,468 67,399 67,399<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Outcome<br />
Additional female<br />
students enrolled in<br />
schools affected by<br />
Education Facilities<br />
Sub-Activity<br />
Number<br />
Increm<br />
ental<br />
0 1,202 1,202 1,202 3,606<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Output<br />
Number of school<br />
blocks rehabilitated<br />
Number<br />
Cumula<br />
tive<br />
0 35 30 -14% 35 35<br />
31-Dec-<br />
2009<br />
35 35 100.00% 35<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Output<br />
Number of school<br />
blocks constructed<br />
Number<br />
Cumula<br />
tive<br />
0 20 25<br />
31-Dec-<br />
2009<br />
30 22 73.33% 78 361 361<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Number of school<br />
blocks designed and<br />
diligenced<br />
Number<br />
Cumula<br />
tive<br />
0 125 30 -76% 65 182<br />
31-Dec-<br />
2009<br />
396 65 16.41% 396<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Percent of works<br />
contract sums<br />
(construction/rehabilit<br />
ation) disbursed<br />
Value of signed works<br />
contracts for MCCsupported<br />
educational<br />
facility<br />
(construction/rehabilit<br />
ation)<br />
Percent<br />
US$<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
0 63.87<br />
0 3,485,778.<br />
00<br />
31-Dec-<br />
2009<br />
31-Dec-<br />
2009<br />
20% 63.87 NA 95% 100% 100%<br />
NA 3,485,778 NA NA NA NA<br />
Rural<br />
Development<br />
3.2b Education<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Shortlist of IDIQ<br />
consultants/contractor<br />
s developed<br />
Date Date None 15-Oct-2008 23-Dec-2008<br />
10 weeks<br />
past due<br />
15-Oct-<br />
2008<br />
- 62 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Indicator<br />
Level<br />
Outcome<br />
Indicator<br />
Distance to collect<br />
water<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Meters Level 336 250 250<br />
Outcome Time to collect water Minutes Level 30.24 25 25<br />
Outcome<br />
Outcome<br />
Output<br />
Output<br />
Outcome<br />
Output<br />
Incidence of Guinea<br />
worm<br />
Volume of domestic<br />
water consumption<br />
Number of people<br />
affected by Water and<br />
Sanitation Facilities<br />
Sub-Activity<br />
Number of people<br />
trained in hygiene and<br />
sanitary best<br />
practices<br />
Number of<br />
Households with<br />
access to improved<br />
water supply<br />
Number of water<br />
points constructed<br />
Number Level 1.64 0.75 0.75<br />
Liters per<br />
capita per<br />
day<br />
Number<br />
Number<br />
Number<br />
Number<br />
Level TBD TBD TBD TBD<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
0 52,000 129,840 129,840<br />
0<br />
0.00 31-Dec-<br />
2009<br />
249<br />
0.00<br />
0.00% 1,329 1,661 1,661<br />
TBD TBD TBD TBD<br />
0 164 371 385<br />
Rural<br />
Development<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Percent of works<br />
contract sums for<br />
Boreholes disbursed<br />
Percent<br />
Cumula<br />
tive<br />
0<br />
0.00 31-Dec-<br />
2009<br />
20%<br />
0.00<br />
0.00% 95% 100% 100%<br />
Rural<br />
Development<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Percent of works<br />
contract sums for<br />
Small Town Water<br />
System disbursed<br />
Percent<br />
Cumula<br />
tive<br />
0<br />
0.00 31-Dec-<br />
2009<br />
20%<br />
0.00<br />
0.00% 95% 100% 100%<br />
- 63 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Indicator<br />
Level<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Indicator<br />
Percent of works<br />
contract sums for<br />
Pipe Extension<br />
Projects disbursed<br />
Percent of works<br />
contract sum for<br />
Tamale Water<br />
Extension Project<br />
disbursed<br />
Value of Boreholes<br />
construction contracts<br />
signed<br />
Unit<br />
Percent<br />
Percent<br />
US$<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Baseline<br />
0<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
0.00 31-Dec-<br />
2009<br />
Annual<br />
Target<br />
20%<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
0.00<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
0.00% 95% 100% 100%<br />
0 90% 100% 100%<br />
0<br />
0.00 31-Dec-<br />
2009<br />
Not<br />
required<br />
0.00 Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Rural<br />
Development<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Value of Small Town<br />
Water Systems<br />
construction contracts<br />
signed<br />
US$<br />
Cumula<br />
tive<br />
0<br />
0.00 31-Dec-<br />
2009<br />
Not<br />
required<br />
0.00 Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Rural<br />
Development<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Value of Pipe<br />
Extension Projects<br />
construction contracts<br />
signed<br />
US$<br />
Cumula<br />
tive<br />
0<br />
0.00 31-Dec-<br />
2009<br />
Not<br />
required<br />
0.00 Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Value of Tamale<br />
Water Extension<br />
Project construction<br />
contract signed<br />
Number of Standalone<br />
Boreholes/wells/nonconventional<br />
water<br />
systems identified<br />
and diligenced for<br />
rehabilitation/construc<br />
tion<br />
Number of Small<br />
Town Water System<br />
(STWS) designed and<br />
diligenced for<br />
construction<br />
Number of Pipe<br />
Extension Projects<br />
designed and<br />
Diligenced for<br />
construction<br />
US$<br />
Number<br />
Number<br />
Number<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
0<br />
0<br />
0<br />
0<br />
0.00 31-Dec-<br />
2009<br />
0.00 0.00 31-Dec-<br />
2009<br />
0.00 0.00 31-Dec-<br />
2009<br />
0.00 0.00 31-Dec-<br />
2009<br />
Not<br />
required<br />
150<br />
25<br />
10<br />
0.00 Not<br />
required<br />
0.00<br />
0.00<br />
0.00<br />
Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
0.00% 350 350<br />
0.00% 25<br />
0.00% 10<br />
- 64 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Rural<br />
Development<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2c Water and<br />
Sanitation<br />
Facilities Sub-<br />
Activity<br />
3.2d Rural<br />
Electrification<br />
Sub-Activity<br />
Indicator<br />
Level<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Process<br />
milestone<br />
Output<br />
Indicator<br />
Percent of<br />
consultancy fees<br />
disbursed for<br />
Boreholes, Small<br />
Town Water Systems<br />
and Pipe Extension<br />
Projects feasibility<br />
studies<br />
Percent of<br />
consultancy fees<br />
disbursed for Tamale<br />
Water Extension<br />
Project feasibility<br />
studies<br />
Value of Feasibility<br />
and/or Detailed<br />
Design Contracts for<br />
Boreholes, Small<br />
Town Water Systems<br />
and Pipe Extension<br />
Projects signed<br />
Value of Feasibility<br />
and/or Detailed<br />
Design Contract for<br />
Tamale Water<br />
Extension Project<br />
signed<br />
Number of agricultural<br />
facilities in target<br />
districts with<br />
electricity due to<br />
Rural Electrification<br />
Sub-Activity<br />
Unit<br />
Percent<br />
Percent<br />
US$<br />
US$<br />
Number<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Cumula<br />
tive<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
0 4.46<br />
0<br />
0<br />
0<br />
0<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
31-Dec-<br />
2009<br />
0.00 31-Dec-<br />
2009<br />
989,650.00<br />
519,825.00<br />
31-Dec-<br />
2009<br />
31-Dec-<br />
2009<br />
0.00 0.00 31-Dec-<br />
2009<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
NA 4 NA TBD TBD TBD<br />
NA<br />
0.00<br />
NA TBD TBD TBD<br />
NA 989,650 NA NA NA NA<br />
NA 519,825 NA NA NA NA<br />
4<br />
0.00<br />
0.00% 8 12 12<br />
Rural<br />
Development<br />
3.2d Rural<br />
Electrification<br />
Sub-Activity<br />
Process<br />
milestone<br />
Number of electricity<br />
projects identified and<br />
diligence<br />
Number<br />
Cumula<br />
tive<br />
0<br />
0.00 10.00 31-Dec-<br />
2009<br />
10<br />
10.00<br />
100.00% 12 12<br />
Rural<br />
Development<br />
3.2d Rural<br />
Electrification<br />
Sub-Activity<br />
Process<br />
milestone<br />
Kilometers of<br />
Electricity lines<br />
identified and<br />
diligence<br />
Km<br />
Cumula<br />
tive<br />
0<br />
0.00 93 31-Dec-<br />
2009<br />
93 93 100.00% 200 200<br />
Rural<br />
Development<br />
3.3. Financial<br />
Services Activity<br />
Outcome<br />
Number of inter-bank<br />
transactions<br />
Number<br />
Cumula<br />
tive<br />
210,000<br />
400,000<br />
450,000 600,000<br />
600,000<br />
- 65 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Activity<br />
Indicator<br />
Level<br />
Indicator<br />
Unit<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
Rural<br />
Development<br />
3.3. Financial<br />
Services Activity<br />
Outcome<br />
Value of deposit<br />
accounts in rural<br />
banks<br />
US$<br />
Cumula<br />
tive<br />
184,593,<br />
274<br />
0.00<br />
31-Dec-<br />
2009<br />
400,000,<br />
000<br />
500,000,<br />
000<br />
600,000,<br />
000<br />
600,000,<br />
000<br />
Rural<br />
Development<br />
3.3. Financial<br />
Services Activity<br />
Output<br />
Number of PFIs<br />
Automated under the<br />
Automation/Computer<br />
ization and<br />
interconnectivity of<br />
Rural Bank Activity<br />
Number<br />
Increm<br />
ental<br />
0 0.00 0.00<br />
31-Dec-<br />
2009<br />
21<br />
70 30<br />
121<br />
Rural<br />
Development<br />
3.3. Financial<br />
Services Activity<br />
Output<br />
Number of PFIs<br />
Connected to the<br />
WAN<br />
Number<br />
Increm<br />
ental<br />
0 0.00 0.00<br />
31-Dec-<br />
2009<br />
21<br />
70 30<br />
121<br />
Rural<br />
Development<br />
3.3. Financial<br />
Services Activity<br />
Process<br />
milestone<br />
Project Management<br />
Support Consultant<br />
(PMSC) contract<br />
signed<br />
Date Date None 30-Mar-2009 39,980<br />
77 Days<br />
past due<br />
30-Mar-<br />
2009<br />
Environment<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Process<br />
milestone<br />
Scoping Reports for<br />
the 3 Zones Delivered<br />
Date Date None 20-May-2008 23-May-2008<br />
3 days past<br />
due<br />
20-May-<br />
2008<br />
Environment<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Process<br />
milestone<br />
Public Consultation<br />
Strategy approved<br />
Date Date None 10-Jun-2008 30-Jun-2008<br />
16 days<br />
past due<br />
10-Jun-<br />
2008<br />
Environment<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Process<br />
milestone<br />
Draft Preliminary SEA<br />
approved<br />
Date Date None 13-Aug-2008 24-Sep-2008<br />
30 days<br />
past due<br />
13-Aug-<br />
2008<br />
Environment<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Process<br />
milestone<br />
Compact Level<br />
Environmental<br />
Indicators submitted<br />
Date Date None 23-Jul-2008<br />
9 months<br />
past due<br />
39,917<br />
9 months<br />
past due<br />
23-Jul-<br />
2008<br />
Environment<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Process<br />
milestone<br />
Environmental<br />
Protection Agency<br />
(EPA) IEA signed<br />
Date Date None 30-Jun-2008 24-Jul-2008<br />
18 days<br />
past due<br />
30-Jun-<br />
2008<br />
Environment<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Process<br />
milestone<br />
Total Number of<br />
Resettlement Action<br />
Plans (RAP)<br />
approved<br />
Number<br />
Increm<br />
ental<br />
0 4 1 -75.0% 0.00 3<br />
31-Dec-<br />
2009<br />
2 4 200.00 6<br />
- 66 -
Cumulative Past Performance through last<br />
completed Compact Year<br />
Last Quarter<br />
Current Quarter<br />
Performance for Current Compact<br />
Year<br />
Remaining Annual<br />
Targets<br />
End of<br />
Compact<br />
Target<br />
Project<br />
Environment<br />
Activity<br />
4.0 Environmental<br />
and Social<br />
Assessment<br />
Indicator<br />
Level<br />
Process<br />
milestone<br />
Indicator<br />
Total Number of<br />
Environmental<br />
Assessments<br />
approved<br />
Unit<br />
Number<br />
Indicat<br />
or<br />
Classifi<br />
cation<br />
Type<br />
Increm<br />
ental<br />
Baseline<br />
Q [1] to Q [8] (Apr 2008-Mar 2009)<br />
Cumulative<br />
Targets<br />
Cumulative<br />
Actuals<br />
Q [10] (Jul-<br />
Sep 2009)<br />
Deviation Actuals Actuals<br />
0 5 3 -40.0% 0 1<br />
Q [11] Oct-Dec 2009 Q[9] to Q[12] (Apr 2009-Mar 2010)<br />
Actuals<br />
as of<br />
(Date)<br />
31-Dec-<br />
2009<br />
Annual<br />
Target<br />
Cumulativ<br />
e Actual<br />
for<br />
Compact<br />
Year 3<br />
%<br />
Complete<br />
Towards<br />
Annual<br />
Target<br />
Y[4] (Apr<br />
2010-Mar<br />
2011)<br />
Y[5] (Apr<br />
2011-Feb<br />
2012)<br />
Q1 to<br />
Q20<br />
Target Target Target<br />
0 2 NA 5<br />
Monitoring &<br />
Evaluation<br />
5.0 Monitoring and<br />
Evaluation<br />
Process<br />
milestone<br />
Clean GLSS5+<br />
baseline data<br />
received by <strong>MiDA</strong><br />
Date Date None 28-May-2009<br />
31-May-<br />
2009<br />
39,961<br />
3 days<br />
before due<br />
31-May-<br />
2009<br />
Monitoring &<br />
Evaluation<br />
5.0 Monitoring and<br />
Evaluation<br />
Process<br />
milestone<br />
FBO survey launched Date Date None 1-Nov-2008 4-Nov-2008<br />
3 days past<br />
due<br />
1-Nov-<br />
2008<br />
Monitoring &<br />
Evaluation<br />
5.0 Monitoring and<br />
Evaluation<br />
Process<br />
milestone<br />
FBO baseline data<br />
received by <strong>MiDA</strong><br />
Date Date None 21-Aug-2009<br />
31-May-<br />
2009<br />
40,046<br />
13 weeks<br />
past due<br />
31-May-<br />
2009<br />
Monitoring &<br />
Evaluation<br />
5.0 Monitoring and<br />
Evaluation<br />
Process<br />
milestone<br />
Feeder Roads<br />
Investment Evaluation<br />
contract signed<br />
Date Date None 18-Nov-2008 30-Mar-2009<br />
14 weeks<br />
past due<br />
18-Nov-<br />
2008<br />
- 67 -
ANNEX B:<br />
Transportation Project Technical Report<br />
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: N1 Highway Project<br />
Project Name<br />
Client<br />
Consultant<br />
Upgrading of N1 Highway between Tetteh Quarshie Interchange and<br />
Mallam Road Junction, Accra, <strong>Ghana</strong> to 3 lane Dual Carriageways with<br />
Adequate Public Transport Facilities and Grade Separated Structures.<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Intercontinental Consultants & Technocrats Pvt. Ltd (ICT), New Delhi,<br />
India in Joint Venture with Bans Consult Ltd, Accra, <strong>Ghana</strong><br />
Type of Service<br />
Cost of Consultancy<br />
Assignment<br />
Disbursement to Date<br />
Total Project Lengths<br />
Other Project<br />
Requirements<br />
Project Location<br />
Funding<br />
Contract Packages<br />
Feasibility Studies, Detailed Engineering Design including Preparation<br />
of EIA, RAP, Tender Documents and Construction Supervision.<br />
The Cost of Consultancy assignment is US$ 1,767, 425 (Foreign<br />
component) and GH¢ 1,303,409 (Local component)<br />
US$810,805.95 and GHC880,308.75<br />
14.10 Kms<br />
Grade Separated Structures and other Public Transport Facilities<br />
Within the Capital City in the Greater Accra Region and forms an<br />
Integral Part of the ECOWAS Trans West African Coastal Highway<br />
Network<br />
Phase I – Improvement Works and Design Part of Phase II - MCC<br />
Two<br />
Contract Signed Date 28 th December, 2007<br />
Commencement Date 7 th January, 2008<br />
Date of Completion Phase II: Construction Supervision commenced January 2009.<br />
Duration of Project 2 years from the effective date of Contract<br />
Variation of Contract ICT-BANS JV re-negotiated a Variation in Contract<br />
Time Elapsed till date 24 Months<br />
- 68 -
N1 Highway Works: LOT 1<br />
Project Name<br />
Upgrading of N1 Highway between Tetteh Quarshie Interchange and<br />
Apenkwa Interchange, Accra, <strong>Ghana</strong> to 3 lane Dual Carriageways with<br />
Adequate Public Transport Facilities and Grade Separated Structures.<br />
Client<br />
Contractor<br />
Type of Works<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Messrs. China Railway (WUJU) Group Corporation.<br />
Upgrading of the N1 Highway Project road section from Tetteh<br />
Quarshie Interchange to Apenkwa Interchange.<br />
Contract Sum<br />
US$ 42.2 Million<br />
Disbursement to Date US$ 7,505,630.59<br />
Total Project Lengths<br />
Other Project<br />
Requirements<br />
Project Location<br />
Funding<br />
6.05 Kms<br />
Grade Separated Structures and other Public Transport Facilities<br />
Within the Capital City in the Greater Accra Region and forms an<br />
Integral Part of the ECOWAS Trans West African Coastal Highway<br />
Network<br />
United States of America under the Millennium Challenge Account and<br />
the Government of <strong>Ghana</strong><br />
Contract Signed on Date 31 st December, 2008<br />
Commencement Date 27 th March, 2009<br />
Completion Date<br />
Duration of Project<br />
Time elapsed till date<br />
30 th June 2011 for Construction Phase<br />
30 months from date of commencement of Contract.<br />
12 months from the effective date of Signing of Contract<br />
N1 Highway Works: LOT 2<br />
Project Name<br />
Upgrading of N1 Highway between Apenkwa Interchange and Mallam<br />
Road Junction, Accra, <strong>Ghana</strong> to 3 lane Dual Carriageways with<br />
Adequate Public Transport Facilities and Grade Separated Structures.<br />
Client<br />
Contractor<br />
Type of Works<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Messrs. Moniz da Maia Serra & Fortunato-Empereiteros (MSF).<br />
Upgrading of the N1 Highway Project road section from Apenkwa<br />
Interchange to Mallam Junction.<br />
Contract Sum<br />
US$ 83.666 Million<br />
Disbursement to Date US$ 8,366,046.33<br />
Total Project Lengths<br />
Other Project<br />
Requirements<br />
Project Location<br />
8.119 Kms<br />
Grade Separated Structures and other Public Transport Facilities<br />
Within the Capital City in the Greater Accra Region and forms an<br />
Integral Part of the ECOWAS Trans West African Coastal Highway<br />
- 69 -
Network<br />
Funding<br />
United States of America under the Millennium Challenge Account and<br />
the Government of <strong>Ghana</strong><br />
Contract Signed on Date 1 st October, 2009<br />
Commencement Date 15 th October, 2009<br />
Completion Date 14 th October, 2011<br />
Duration of Project<br />
Time elapsed till date<br />
24 months from date of commencement of Contract.<br />
3months from the effective date of Signing of Contract<br />
- 70 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Feeder Roads – LOT 1<br />
Consultancy Services for Trunk and Feeder Roads Rehabilitation Project<br />
Project Name<br />
– LOT 1<br />
Client<br />
Consultant<br />
Type of Service<br />
Cost of Consultancy<br />
Assignment<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Kocks Consult GmbH Consulting Engineers in Association with RRI<br />
Rhein International GmbH and Conterra Ltd<br />
Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Trunk and Feeder Roads Rehabilitation Project – LOT 1<br />
US$2,223,270.00<br />
Disbursement to Date US$ 630,292.75<br />
Total Project Lengths 337.1 Kms<br />
Length Designed<br />
Project Location<br />
Funding<br />
Contract Packages<br />
333.4 km<br />
In five (5) Districts in the Northern Region<br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental<br />
and Social Evaluation; Final Design and Bid Document - MCC<br />
Two<br />
Contract Signed on Date 3 rd March, 2008<br />
Commencement Date 17 th March, 2008<br />
Date of Completion 17 th December, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
9 months from the commencement date<br />
21months, 3 weeks<br />
- 71 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Feeder Roads – LOT 2<br />
Project Name<br />
Client<br />
Consultant<br />
Consultancy Services for Trunk and Feeder Roads Rehabilitation Project<br />
– LOT 2<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Rom Consult Limited<br />
Type of Service Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Trunk and Feeder Roads Rehabilitation Project – LOT 2<br />
Cost of Consultancy<br />
Assignment US$ 1,356,550.00<br />
Disbursement to Date US$ 644,739.63<br />
Total Lengths (Km)<br />
Length Designed<br />
Project Location<br />
Funding<br />
Contract Packages<br />
386.5 km<br />
283.1 km<br />
Southern Zone 1 - In six (6) Districts in the Central Region and Eastern<br />
Regions of <strong>Ghana</strong><br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental<br />
and Social Evaluation; Final Design and Bid Document - MCC<br />
Three<br />
Contract Signed Date 21 st February, 2008<br />
Commencement Date 6 th March, 2008<br />
Date of Completion 6 th November, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
8 months from the commencement date<br />
22 months 3weeks<br />
- 72 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Feeder Roads – LOT 3<br />
Project Name Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />
LOT 3<br />
Client<br />
Consultant<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
SAI Consulting Engineers Pvt Limited in Joint Venture with Associated<br />
Consultant<br />
Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Type of Service Trunk and Feeder Roads Rehabilitation Project – LOT 3<br />
Cost of Consultancy<br />
Assignment US$ 2,895,885.00<br />
Disbursement to Date US$ 838,265.00<br />
Total Project Lengths<br />
(Km) 221.30<br />
Project Location<br />
Funding<br />
Contract Packages<br />
Southern Zone 2 - In five(5) Districts in the Volta Region of <strong>Ghana</strong><br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />
Social Evaluation; Final Design and Bid Document - MCC<br />
Three<br />
Contract Signed Date 12 th March, 2008<br />
Commencement Date 26 th March, 2008<br />
Date of Completion 26 th November, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
8 months from the commencement date<br />
21 months 2 weeks<br />
- 73 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Trunk Roads – LOT 4<br />
Project Name<br />
Client<br />
Consultant<br />
Type of Service<br />
Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />
LOT 4<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
H. P. Gauff Ingenieures GmbH & Co<br />
Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Trunk and Feeder Roads Rehabilitation Project – LOT 4<br />
Cost of Consultancy<br />
Assignment The cost of consultancy assignment is US$ 2,079,638.00<br />
Disbursement to Date US$ 840,329.05 for Phase A1, A2, A3<br />
Total Project Length<br />
(Km) 227<br />
Project Location<br />
Funding<br />
Afram Basin - In six(6) Districts in the Eastern and Ashanti Regions of<br />
<strong>Ghana</strong><br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />
Social Evaluation; Final Design and Bid Document - MCC<br />
Contract Packages Two<br />
Contract Signed on<br />
Date 3 rd March, 2008<br />
Commencement Date 17 h March, 2008<br />
Date of Completion 17 th November, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
8 months from the commencement date<br />
21months 3 weeks<br />
- 74 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Ferry Project<br />
Improvement of Volta Lake Transport Company (VLTC) Ferry Service at<br />
Project Name the Adawso-Ekye Amanfrom Ferry Crossing<br />
Client<br />
Consultant<br />
Type of Service<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Grontmij/Carl Bro in Association with Erria A/S and MAP Consult Limited<br />
Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, and Construction Supervision of Ferry Activity<br />
Cost of Consultancy<br />
Disbursement to Date<br />
Project Description<br />
Project Location<br />
Funding<br />
The cost of consultancy assignment is US$2,660,128.00<br />
US$622,399.00 for 100% payment on Phase I<br />
US$485,287.50 for 75% payment on Phase II<br />
• Rehabilitation of the Floating Dock at Akosombo<br />
• Construction of two new RoRo Ferries<br />
• Expansion of the Landing Stages at Ekye Amanfrom and Adawso<br />
• Construction of Terminal Facilities at Ekye Amanfrom and Adawso<br />
• Removal of Tree Stumps in the Navigational Path at Ekye<br />
Amanfrom to Adawso<br />
Eastern Region of <strong>Ghana</strong><br />
Phase I – Inception Report, Environmental Scoping Report, Final Feasibility<br />
Report including Preliminary ESIA Design Report – MCC<br />
Phase II – Final Design, and Preparation of Bidding and Contract<br />
Documents - MCC<br />
Contract Packages Three (Lot FS1, Lot FS2 and Lot FS3)<br />
Contract Signed on<br />
Date 14 th February, 2008<br />
Commencement Date 28 th February, 2008<br />
Date of Completion 28 th August 2008<br />
Phase I – Feasibility Studies, EIA and SIA -5 months<br />
Phase II – Final Design, and Preparation of Contract Documents and<br />
Tendering – 10 months<br />
Duration of Project Phase 3 – Supervision – 24 months<br />
Phase I of Project completed.<br />
Time Elapsed Phase II Works 15 months 2 weeks lapsed since 15 th September, 2008.<br />
- 75 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: KIA_PCC Project<br />
Consultant Services for a Perishable Cargo Centre at Kotoka International<br />
Project Name Airport (KIA-PCC)<br />
Client<br />
Consultant<br />
Type of Service<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Vek Adviesgroep B.V. in Association with Adviesburo Verhoef B.V. and<br />
Architectural & Engineering Services Limited (AESL)<br />
Consultancy Services for a Perishable Cargo Centre and Design of new<br />
Palletization facility at KIA.<br />
Cost of Consultancy<br />
Assignment The cost of consultancy assignment is US$1,450,000.00 and GHC 36,000.00<br />
Disbursement to Date<br />
Project Description<br />
Project Location<br />
Funding<br />
Contract Package One<br />
Contract Signed on<br />
Date 2 nd June, 2009<br />
Commencement Date 16 th June, 2009<br />
Nil<br />
Phase A<br />
• Review of Designs, Bidding Documents, Bill of Quantities, Cost and<br />
Returns, Design Preparation of Bidding Document of a New<br />
Palletization facility at KIA<br />
• Prepare Environmental Review and Environmental Assessment<br />
Report<br />
Phase B<br />
• Bidding and Evaluation of Bids for the Construction Works<br />
• Supervision Services for the Construction and Installation of<br />
Equipment in the PCC<br />
Phase C<br />
• Post Construction and Installation Services during Defects Liability<br />
Period.<br />
Greater Accra Region of <strong>Ghana</strong><br />
Phase A – Inception Report, Economic Viability Statement, Environmental<br />
Review Report and Assessment Register, Final Design Report and Bidding<br />
Documents– MCC<br />
Date of Completion 28 th August 2008<br />
Duration of Project Phase A – 7.5 months; Phase B – 14 months; Phase C – 12 months<br />
Time Elapsed till Phase A 6.5 months<br />
Date<br />
- 76 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Irrigation Development (LOT 1)<br />
Rehabilitation/Extension Works on 4 Selected Irrigation Schemes in the<br />
Project Name Northern Agriculture Zone<br />
Client<br />
Consultant<br />
Type of Service<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
SNC Lavalin International Incorporated<br />
Consultancy Services for the Provision of Feasibility Study, Final Design<br />
and Construction Supervision of Rehabilitation/Extension Works on<br />
irrigation Schemes in the Northern Agriculture Zone<br />
Cost of Consultancy<br />
Assignment The Cost of Consultancy assignment is US$ 2,751,669.00<br />
Disbursement to Date<br />
Project Description<br />
Project Location<br />
Funding<br />
Contract Package N/A<br />
Contract Signed on<br />
Date 10 th September, 2009<br />
Commencement Date 1 st October, 2009<br />
Nil<br />
Phase A<br />
• Conduct Feasibility Study, Preliminary Designs<br />
• Assessment of Environmental and Social Impacts<br />
• Preparation of EMPs, Resettlement Plans,<br />
• Organizational and Management Capacity Assessment in the<br />
Operation of the Rehabilitated Schemes.<br />
Phase B<br />
• Preparation of Final Engineering Designs<br />
• Bidding and Evaluation of Bids for the Construction Works<br />
Phase C<br />
• Supervision of Construction Works involved in the Rehabilitation,<br />
Extension and /or Construction of the Schemes.<br />
• Establishment of the Appropriate Operational and Management<br />
Systems on Rehabilitated Schemes.<br />
• Post Construction Supervision during Defects Liability Period.<br />
Northern Region<br />
Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />
Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />
Organizational and management Needs Assessment Report and Final<br />
Feasibility Report– MCC<br />
Date of Completion 31 st December, 2011<br />
Duration of Project Phase A – 4 months; Phase B – 5 months; Phase C – 30 months<br />
Time Elapsed till Phase A 3months<br />
Date<br />
- 77 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Irrigation Development (LOT 2)<br />
Rehabilitation/Extension Works on 4 Selected Irrigation Schemes in the<br />
Project Name Afram Basin Zone<br />
Client<br />
Consultant<br />
Type of Service<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Haskoning Nederland BV, ABP Consult Ltd. and SAL Consult Limited<br />
Consultancy Services for the Provision of Feasibility Study, Final Design<br />
and Construction Supervision of Rehabilitation/Extension Works on<br />
irrigation Schemes in the Afram Basin Zone<br />
Cost of Consultancy<br />
Assignment The Cost of Consultancy assignment is US$ 1,998,113.00<br />
Disbursement to Date<br />
Project Description<br />
Project Location<br />
Funding<br />
Contract Package N/A<br />
Contract Signed on<br />
Date 21 st October, 2009<br />
Commencement Date 11 th November, 2009<br />
Nil<br />
Phase A<br />
• Conduct Feasibility Study, Preliminary Designs<br />
• Assessment of Environmental and Social Impacts<br />
• Preparation of EMPs, Resettlement Plans,<br />
• Organizational and Management Capacity Assessment in the<br />
Operation of the Rehabilitated Schemes.<br />
Phase B<br />
• Preparation of Final Engineering Designs<br />
• Bidding and Evaluation of Bids for the Construction Works<br />
Phase C<br />
• Supervision of Construction Works involved in the Rehabilitation,<br />
Extension and /or Construction of the Schemes.<br />
• Establishment of the Appropriate Operational and Management<br />
Systems on Rehabilitated Schemes.<br />
• Post Construction Supervision during Defects Liability Period.<br />
Northern Region<br />
Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />
Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />
Organizational and Management Needs Assessment Report and Final<br />
Feasibility Report– MCC<br />
Date of Completion 31 st December, 2011<br />
Duration of Project Phase A – 4 months; Phase B – 5 months; Phase C – 30 months<br />
Time Elapsed till<br />
Date<br />
1.5 months<br />
- 78 -
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Irrigation Development (LOT 3)<br />
Rehabilitation/Extension Works on 2 Selected Irrigation Schemes in the<br />
Project Name Southern Horticulture Zone<br />
Client<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Consultant<br />
Type of Service<br />
SNC Lavalin International Incorporated<br />
Consultancy Services for the Provision of Feasibility Study, Final Design<br />
and Construction Supervision of Rehabilitation/Extension Works on<br />
irrigation Schemes in the Southern Horticulture Zone<br />
Cost of Consultancy<br />
Assignment The Cost of Consultancy assignment is US$ 3,248,331.00<br />
Nil<br />
Disbursement to Date<br />
Phase A<br />
• Conduct Feasibility Study, Preliminary Designs<br />
• Assessment of Environmental and Social Impacts<br />
• Preparation of EMPs, Resettlement Plans,<br />
• Organizational and Management Capacity Assessment in the<br />
Operation of the Rehabilitated Schemes.<br />
Phase B<br />
• Preparation of Final Engineering Designs<br />
• Bidding and Evaluation of Bids for the Construction Works<br />
Phase C<br />
• Supervision of Construction Works involved in the Rehabilitation,<br />
Extension and /or Construction of the Schemes.<br />
• Establishment of the Appropriate Operational and Management<br />
Systems on Rehabilitated Schemes.<br />
Project Description • Post Construction Supervision during Defects Liability Period.<br />
Project Location Northern Region<br />
Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />
Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />
Organizational and management Needs Assessment Report and Final<br />
Funding<br />
Feasibility Report– MCC<br />
Contract Package N/A<br />
Contract Signed on<br />
Date 10 th September, 2009<br />
Commencement Date 1 st October, 2009<br />
Date of Completion 31 st December, 2011<br />
Duration of Project Phase A – 6 months; Phase B – 5 months; Phase C – 30 months<br />
Time Elapsed till<br />
Date<br />
3 months<br />
- 79 -
Annex C: Work Plans<br />
Output/Process<br />
Jan<br />
Commercial Agriculture -2010<br />
Feb Mar Apr May<br />
Jun<br />
Issue 28 TOs for Phase I I Late 400<br />
FBOs stage 1<br />
Demo Centres established in the Afram<br />
and Northern Zones<br />
120 SMEs out of 394 SMEs selected<br />
Train 120 SMEs<br />
Review and approve the Monitoring and<br />
Evaluation System for Impact Evaluation<br />
33,000 starter packs for Phase II early<br />
and Phase I late distributed<br />
Monitoring of Starter pack usage<br />
3500 farmers that require global gap<br />
training Identified<br />
Identify FBOs around irrigation sites<br />
Farm Measurement and data collection<br />
- 80 -
O utput/Process<br />
IRRIGATION ACTIVITY<br />
2 0 10<br />
JAN FEB MAR APR<br />
MAY<br />
JUN<br />
Phase A: Feasibility Study &<br />
Environmental Impact<br />
Assessment<br />
Environmental Scoping Report<br />
Draft Feasibility Study Report<br />
(including Preliminary<br />
Design Report, Draft EIA and EMP)<br />
Final Feasibility Study Report<br />
Phase B: Design & Bidding<br />
Pre-Qualification of Contractors<br />
Commencement of Design<br />
Draft Design Report + Bid<br />
Documents + Draft Organizational<br />
& Mgt System Report<br />
Final EIA + EMP + RAP<br />
Final Design Report, Bid<br />
Documents and Organizational &<br />
Mgt System Report<br />
DEC. 2009 – MARCH 2010<br />
DEC. 2009 - FEBRUARY 2010<br />
JANUARY – 3 RD MARCH 2010<br />
19 TH MARCH – 1 ST APRIL 2010<br />
MARCH 2010 – MAY 2010<br />
MARCH 2010<br />
1 ST MAY<br />
31 ST MAY<br />
7 TH JUNE 2010<br />
- 81 -
Land Tenure Facilitation Activity<br />
Timelines<br />
Step<br />
JAN<br />
FEB<br />
2 0 1 0<br />
MAR APR MAY JUNE<br />
JUL<br />
SEPT<br />
NOV<br />
(Awutu Senya 1)<br />
• Title Certificate to Farmers Issued<br />
• IEA - Winneba Land Title Site Office: Land<br />
Registration Management Software<br />
developed<br />
Awutu Senya 2 (Extension)<br />
• Consultants procured.<br />
• Identification of PRD carried out<br />
• PRD declared<br />
• Initial sensitization/gender/ADR/inventory<br />
work started<br />
Savelugu Nanton (North Pilot)<br />
• Feasibility done<br />
Refurbishment of 3 Circuit Courts Completed<br />
Public Education Campaign and Information Dissemination<br />
Consultant procured<br />
Training for Public Land Sector Agency Staff under<br />
Small Grants Program initiated<br />
- 82 -
PO ST H ARVEST INFRASTRUCTURE<br />
O utput/Process<br />
JAN FEB M AR<br />
2010<br />
APR M AY<br />
JUN<br />
K I A - P C C<br />
E c o n o m i c V ia b ili ty S ta te me n t<br />
D r a f t D e si g n R e po r t<br />
D r a f t B id d in g D o c u me n ts<br />
J A N – FE BR U AR Y 20 10<br />
J A N U A R Y – MA RC H 20 10<br />
J A N U A R Y – MA RC H 20 10<br />
P r o c u r e m<br />
e n t S tr a te g y R e p o rt<br />
F i n a l B i d d in g D o c um e nt s ( IC B )<br />
A P R I L – JU N 20 10<br />
A P R I L –MA Y 20 10<br />
P U B L I C P A C K H O U S E S<br />
B i d E v a l u a t io n E x er c is e<br />
M i D A<br />
R e qu e s t fo r in f o rma t io n t o C la r if y<br />
r e c e i v e d B id s<br />
S u b mi s s i o n o f B id E v a lu a ti o n R e po r t<br />
A<br />
M<br />
p p r o v a l s<br />
C C A p p r o v a l o f BE P Re p o rt<br />
B o a r d A p p r o v a l fo r A w a rd<br />
I s s u a n c e o f L e t e r of A c c ep t a nc e<br />
N e g o t i a t io n s w it h w i n i ng C o nt ra c to r<br />
S i g n i n g o f C o n tr a ct<br />
P r e - c o m m e n c e m en t A ct iv i ti e s<br />
2 0 t h JA N –2 3R DF EB R UA R Y<br />
1 0 T H FE B .<br />
2 6 T H FE B RU A RY<br />
MA R C H 20 10<br />
MA R C H 20 10<br />
A P R I L 20 10<br />
M A R C H –A P RIL 2 01 0<br />
A P R I L 20 10<br />
A P R I L – JU NE 2 01 0<br />
- 83 -
Activity Timelines – Credit Activity<br />
Output/Process<br />
2009 - 2010<br />
Oct Nov Dec Jan Feb Mar Apr<br />
May<br />
Portfolio at Risk (20%)<br />
Value of Agric Loans<br />
(Disbursement of ACP<br />
Loans)<br />
$20m<br />
# of PFIs Staff Trained<br />
# of PFIs Accredited<br />
200<br />
55<br />
Grants for Setting of PFI<br />
Loan Offices<br />
$250,000<br />
- 84 -
NR series Feeder Roads Timelines<br />
Output/Process<br />
2009<br />
JUL AUG SEP OCT NOV DEC<br />
Draft Final Designs & Bidding<br />
Documents<br />
MCC Approval of Bidding<br />
Documents<br />
Start of Procurement<br />
process<br />
Advert on Lots NR1 & NR2<br />
Evaluation of Bids for<br />
Lots NR1 and NR2<br />
Approvals<br />
MCC Approval<br />
Board Approval<br />
Negotiations<br />
Issuance of Letter of<br />
Acceptance<br />
15 th July<br />
28 th Aug<br />
31 st August 2009 - Mid- January 2010<br />
31 st August<br />
9 th -18 th Nov<br />
2 nd Dec<br />
October<br />
17 th Dec<br />
22 nd Dec<br />
23 rd Dec<br />
- 85 -
NR series Feeder Roads Timelines<br />
Output/Process<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
Negotiations with winning<br />
Contractors<br />
Signing of Contracts Lots NR<br />
1&2<br />
Mobilization of Contractors<br />
Pre-commencement meeting<br />
Issuance of Letters to<br />
Commence the Works<br />
Handing Over of Lots NR 1 &<br />
2 Sites<br />
Kick Off Meeting<br />
START OF CONSTRUCTION<br />
WORKS<br />
6 th JAN<br />
12 th JANUARY<br />
13 th JANUARY – 13 th APRIL 2010<br />
18 th JANUARY<br />
17 th FEBRUARY<br />
24 th FEBRUARY<br />
23 RD MARCH 2010<br />
APRIL 2010<br />
- 86 -
Output/Process<br />
Lot EC 1 Feeder Roads Timelines<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
Nsawam-Odeikrom-Pakro Raods<br />
(Zone 1)<br />
Demolition & Site Clearance<br />
Drainage Structures<br />
Construction of Culverts<br />
Construction of U-Drains<br />
Earthworks<br />
Excavate to Formation of Works<br />
Fill with Exc. Material from borrow pits<br />
ROADS & PAVINGS<br />
Scarify existing gravel & bitumen<br />
surface<br />
Reshaping and compaction works<br />
Provide, lay, compact natural Gravel<br />
Sub-base<br />
Provide, lay, compact natural Gravel<br />
Base<br />
Pre coat & spread 10mm chippings<br />
Pre coat & spread 14mm chippings<br />
Provide & place kerbs<br />
DECEMBER 2009 – SEPTEMBER 2010<br />
JANUARY 2010<br />
3 RD DECEMBER 2009 – 10 TH APRIL 2010<br />
JANUARY – JULY 2010<br />
JANUARY – FEBRUARY 2010<br />
DECEMBER 2009 – APRIL 2010<br />
JANUARY 2010 – JULY 2010<br />
MARCH – JULY 2010<br />
8 TH APRIL - AUGUST 2010<br />
19 TH APRIL – AUGUST 2010<br />
3 RD MAY – SEPTEMBER<br />
12 TH MAY - SEPTEMBER<br />
JUNE 2010<br />
- 87 -
Output/Process<br />
Lot EC 2 Feeder Roads Timelines<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
Akoti-Kwanyarko Bridge Works<br />
Excavation Works<br />
Blinding Works<br />
Casting of Abutment Foundation<br />
Concrete wall (1 st Lift)<br />
Casting of Abutment Foundation<br />
Concrete (2 nd Lift)<br />
Construction of Bearing seating and<br />
installation of Bearings<br />
Decks and Girders<br />
Earthworks<br />
Bridge Approach & Ancillary Works<br />
Upgrading of Ofaakor-Apra Road<br />
Earthworks<br />
Excavation & Filling works<br />
Reshaping and compaction works<br />
Drainage Structures<br />
Construction of Culverts, U-Drains<br />
Provision & Placement of in situ<br />
Concrete<br />
Precast Concrete & Pipeworks<br />
Roads & Paving Works<br />
DECEMBER 2009 – JULY 2010<br />
DECEMBER 2009 – MARCH 2010<br />
FEBRUARY – MARCH 2010<br />
FEBRUARY – MARCH 2010<br />
MARCH 2010<br />
JANUARY 2010 – APRIL 2010<br />
MARCH 2010 - APRIL 2010<br />
APRIL 2010 – MAY 2010<br />
JANUARY 2010 - MARCH 2010<br />
JANUARY 2010 - MARCH 2010<br />
JANUARY 2010 – MAY 2010<br />
JANUARY 2010 – JUNE 2010<br />
JANUARY 2010 – APRIL 2010<br />
APRIL 2010 – JUNE 2010<br />
- 88 -
Outp ut/ Pro ce ss<br />
Lot EC 3 Feeder Roads Timelines<br />
2 010<br />
JAN FE B M AR AP R M AY JUN<br />
D uayed en - Maame Ded e J n. –<br />
O tu krom Roa ds ( 7.31 km)<br />
Sett ing out of w orks<br />
Demolit ion & Site Clearanc e<br />
Ear th wor ks<br />
Exc avate in c ut and F ill<br />
Exc avate uns uitable mater ial & dis pose<br />
Exc avate in r ock & w ith blast ing and<br />
drilling<br />
Exc avate in B orrow pit and f ill t o<br />
embankment<br />
Sc arify exist ing Gr avel s urfac e<br />
Res hape and comp ac t f ormation<br />
D rai nage S tr uctu res<br />
Exc avation w orks<br />
Provis ion & Placement of in-s itu<br />
Conc rete<br />
Anc illaries<br />
Pr ecast C oncr ete<br />
Pipe wor ks & Conc rete Sur rounds<br />
Ro ads & Pavi ng W orks<br />
Ro ad Saf et y and Fu rn itu re<br />
JANUARY – APRIL 2 01 0<br />
JANAURY 20 10<br />
2 1 s t F EBRUARY – MARCH<br />
2 01 0<br />
JANUARY - 2 0 T H FEBRU ARY 20 1 0<br />
2 1 ST -2 8 TH F EB.2 01 0<br />
JANUARY 2 01 0 - F EBRUARY 20 10<br />
M ARCH 2 01 0<br />
FEBRUARY - M AY 20 1 0<br />
JANUARY 2 01 0 – AP RIL 2 01 0<br />
12 TH -2 1 ST M ARCH 20 10<br />
M ARCH – AP RIL 20 10<br />
22 ND MAR - APRIL<br />
2 7 T H MARCH – M AY 20 10<br />
13 TH AP RIL - 1 5 TH JUNE 20 10<br />
- 89 -
VR series Feeder Roads Timelines<br />
Output/Process<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
Procurement of Contractors<br />
Issuance of Letter of Acceptance<br />
(Lot VR1)<br />
Signing of Contract -Lot VR1<br />
Pre-Construction Activities<br />
Procurement for Lot VR2<br />
Court Injunction on Lot VR2<br />
Negotiation with winning<br />
Contractor (Lot VR3)<br />
Signing of Contract Lot VR3<br />
Mobilization of Resources<br />
Technical meeting with<br />
Contractor<br />
Issuance of Letter to commence<br />
Works<br />
Handing Over of Lot VR3 Sites<br />
Start of Works<br />
FEB. 2010<br />
FEB. – MARCH 2010<br />
JANUARY – MAR CH 2010<br />
JAN 2010<br />
6 th JAN<br />
12 th JAN 2010<br />
12 th JANUARY – 12 th APRIL 2010<br />
18 th JANUARY<br />
3 RD FEBRUARY<br />
10 TH FEBRUARY<br />
MARCH – JUNE 2010<br />
APRIL 2010<br />
- 90 -
Output/Process<br />
General Works<br />
Estab lishment of Contractor’s<br />
& Engineers Offices<br />
Contractor’s Lab oratory<br />
Plant & Equip ment<br />
Site Clearance & Demolition<br />
Earth Works<br />
Excavation<br />
Filling<br />
Road Works<br />
Cement treated Sub-Base Course<br />
Grad ed crushed Stone Base<br />
Drainage Structures<br />
Concrete Pip e Culverts<br />
Concrete Box Culverts<br />
Storm Drains<br />
Bridges<br />
Interchange at Dimp les<br />
Retaining Walls<br />
N.1 LOT 1 (TQM) Activity Timelines<br />
JUL 2 0 0 9 - FEB 2 0 1 0<br />
APR 2 0 0 9 – DECEMBER 2 0 1 0<br />
JUN 2 0 0 9 – DEC 2 0 1 0<br />
JUN 2 0 0 9 – FEBRUARY 2 0 1 1<br />
JANUARY 2 0 1 0 – MAY 2 0 1 1<br />
OCTOBER 2 0 0 9 – DECEMBER 2 0 1 0<br />
JULY 2 0 0 9 – MARCH 2 0 1 1<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
JAN 2 0 1 0<br />
APR 2 0 0 9 - MAR 2 0 1 0<br />
FEBRUARY 2 0 1 0 – MAY 2 0 1 1<br />
OCTOBER 2 0 0 9 – MAY 2 0 1 1<br />
OCTOBER 2 0 0 9 – MARCH 2 0 1 1<br />
JULY 2 0 0 9 – SEPTEMBER 2 0 1 0<br />
- 91 -
N.1 LOT 2 (TQM) Activity Timelines<br />
Output/Process<br />
Handing Over of Site<br />
Section 2, CH. 8+600 - 12+500<br />
Section 3, CH. 6+000 - 7+500<br />
Section 4, CH. 7+500 - 8+600<br />
Section 5, Interchange Loop<br />
Pre-Commencement A ctivities<br />
Establishment of Contractor’s<br />
& Engineers Offices<br />
Set up Contractor’s Laboratory,<br />
Plant & Equipment<br />
Kick Off meeting<br />
Earthworks<br />
General Works<br />
Filling<br />
Pavement works<br />
Sub-Base and Base material<br />
Drainage Works<br />
Insitu Concrete works<br />
Pipeworks<br />
18 th – 28 th FEBRAURY, 2010<br />
DECEMBER 2009 – MARCH 2010<br />
DECEMBER, 2009 – MARCH , 2010<br />
JANUARY 2010 – OCTOBER 2011<br />
DECEMBER 2009 – MARCH 2010<br />
FEBRUARY 2010 – MARCH 2010<br />
DECMBER 2009 – FEBRUARY 2010<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
JANUARY 2010 – MARCH 2010<br />
30 th MARCH, 2010<br />
30 th MARCH, 2010<br />
31 st MARCH , 2010<br />
DECMBER 2009 – FEBRUARY 2010<br />
30 th APRIL, 2010<br />
- 92 -
Output/Process<br />
Trunk Roads Timelines<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
Preparatory Works & Mobilisation.<br />
Setting Out of Works<br />
Mobilization of Equipment<br />
Temporary Crossing over Afram Basin<br />
Production of Crushed Aggregates<br />
Demolition & General Clearance<br />
Demolition<br />
General Clearance<br />
Earthworks<br />
Cut to Spoil & Borrow Excavation<br />
Compaction works<br />
Rock Excavation<br />
Drainage & Concrete Works<br />
Excavation, Blinding for Concrete Struc<br />
Construction of Culverts & U -drains<br />
Mass Concrete & Stone Pitching Works<br />
Road s & Pavings<br />
Scarifying, Reshaping & Compaction<br />
DEC, 2009 -<br />
JAN 2010 - FEBRUARY<br />
MARCH<br />
FEB - MARCH 2010<br />
JANUARY<br />
DEC. 2009 – MARCH 2010<br />
MARCH 2010 - NOVEMBER, 2010<br />
JULY 2010<br />
JUNeE 2010<br />
JUNE 2010<br />
JUNE 2010<br />
MAY 2010<br />
MAY 2010<br />
- 93 -
Output/Process<br />
Ferry Activity Timelines<br />
2010<br />
JAN FEB MAR APR MAY<br />
JUN<br />
Procurement process for Ferry<br />
Works<br />
Final Bid Clarification with Contractor<br />
MCC Approval of Bid Evaluation Report<br />
Board approval for Award of Contract<br />
Advert for Lot FS 2 Ferry Works<br />
Closing/Opening of Bids<br />
Evaluation of Bids for Lot FS1<br />
Preparation of IEA for Lot FS3 Ferry<br />
Works<br />
Approvals<br />
MCC Approvals on Lots FS2 & FS3<br />
Board Approvals for Lots FS2 & FS3<br />
JANUARY – APRIL 2010<br />
JAN - 23 RD FEB. 2010<br />
MARCH 2010<br />
MARCH – APRIL 2010<br />
MARCH 2010<br />
FEBRUARY – MARCH 2010<br />
APRIL - MAY 2010<br />
APRIL 2010<br />
APRIL – MAY 2010<br />
MAY –JUNE 2010<br />
- 94 -
Output/Process<br />
Community Services: Education<br />
OCT’09 NOV’09 DEC’09 JAN’10 FEB’10 MAR’10<br />
Rehabilitated 35 schools<br />
(Maintenance Period)<br />
Supply of Furniture for rehabilitated<br />
schools<br />
Construction of 30 Flood Affected<br />
Supply of Furniture for Flood<br />
Affected Project (Documentation by<br />
Procurement Department & CKP)<br />
Procurement of IDIQ contractors<br />
(Approval of Evaluation Reports in<br />
progress)<br />
Feasibility Studies – South<br />
Feasibility Studies – North<br />
Feasibility Studies - Afram<br />
- 95 -
Output/Process<br />
Community Services: Water & Sanitation<br />
OCT’09 NOV’09 DEC’09 JAN’10 FEB’10 MAR’10<br />
South Zone – 86 Boreholes and 9 Pipe<br />
Extensions identified and diligenced (10-<br />
09-09) Detailed designs for next quarter.<br />
Northern Zone – Contract signed (19-06-<br />
09); 58 Boreholes and 1 Small Town Water<br />
Supply System. Inception and Draft<br />
Feasibility Reports submitted. Detailed<br />
designs submitted and finalised.<br />
Feasibility of Tamale Water Extension<br />
Project (Contract Signed: 11-09-09)<br />
Inception <strong>report</strong> submitted. Feasibility<br />
studies submitted. Detailed design<br />
submitted.<br />
Afram Basin – Contract signed (13-08-<br />
09); Feasibility of 93 Boreholes and 13<br />
Small Town Water Systems in progress.<br />
Inception submitted. Feasibility submitted.<br />
Procurement of IDIQ contractors (July-<br />
Nov, 09). Evaluation <strong>report</strong> under review.<br />
- 96 -
Output/Process<br />
Community Services: Electrification -– 2009-2010<br />
OCT’09 NOV’09 DEC’09 JAN’10 FEB’10 MAR’10<br />
South Zone –Contract signed (15-06-<br />
09); Inception, Feasibility studies and<br />
Draft and Final detailed Reports for<br />
26km, 33kV O/H lines and 10<br />
transformer stations. Final detailed <strong>report</strong><br />
submitted and finalised.<br />
Northern Zone – Contract signed (15-<br />
06-09); Inception, Feasibility studies and<br />
Draft and Final detailed Reports for<br />
67km, 33kV O/H lines and 2 transformer<br />
stations. Final Detail Report submitted<br />
and finalised.<br />
Initial RAP and environmental Impact<br />
Assessments on the proposed Line Route<br />
mapped for the 67km, 33kV Savelugu-<br />
Nasia Irrigation Sub-Transmission Line<br />
in the Northern Zone. Draft Report<br />
submitted.<br />
- 97 -