Download full report - MiDA Ghana
Download full report - MiDA Ghana
Download full report - MiDA Ghana
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INDICATOR: Number of Landholders reached by Public Outreach Efforts (10,000)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
6,000 0 4,794<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Re-scope Consultancy for • Draft ToRs for the re-scoped<br />
• Finalize ToRs<br />
Public Education/<br />
Information<br />
Dissemination<br />
program completed.<br />
• Issue RFP<br />
INDICATOR: Number of Personnel Trained (200)<br />
TARGET (ANNUAL) APR<br />
2009-MAR 2010)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
194 0 73<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Train Stakeholders on<br />
Alternative Dispute<br />
• No Stakeholders were trained in<br />
the Quarter.<br />
Resolution (ADR) • Cumulatively, 73 Stakeholders<br />
trained in ADR.<br />
INDICATOR: Number of Buildings Rehabilitated/Constructed (3)<br />
TARGET (ANNUAL) APR<br />
2008-MAR 2009)<br />
ACTUALS FOR THE QUARTER<br />
(OCT-DEC 2009)<br />
CUMULATIVE<br />
ACTUALS TO DATE<br />
3 1 1<br />
ACTIVITY STATUS NEXT STEPS<br />
i. Complete Construction of<br />
Land Title Site Office.<br />
• Construction has been completed.<br />
- 18 -