Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Trunk Roads – LOT 4<br />
Project Name<br />
Client<br />
Consultant<br />
Type of Service<br />
Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />
LOT 4<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
H. P. Gauff Ingenieures GmbH & Co<br />
Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Trunk and Feeder Roads Rehabilitation Project – LOT 4<br />
Cost of Consultancy<br />
Assignment The cost of consultancy assignment is US$ 2,079,638.00<br />
Disbursement to Date US$ 840,329.05 for Phase A1, A2, A3<br />
Total Project Length<br />
(Km) 227<br />
Project Location<br />
Funding<br />
Afram Basin - In six(6) Districts in the Eastern and Ashanti Regions of<br />
<strong>Ghana</strong><br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />
Social Evaluation; Final Design and Bid Document - MCC<br />
Contract Packages Two<br />
Contract Signed on<br />
Date 3 rd March, 2008<br />
Commencement Date 17 h March, 2008<br />
Date of Completion 17 th November, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
8 months from the commencement date<br />
21months 3 weeks<br />