Output/Process<br />
General Works<br />
Estab lishment of Contractor’s<br />
& Engineers Offices<br />
Contractor’s Lab oratory<br />
Plant & Equip ment<br />
Site Clearance & Demolition<br />
Earth Works<br />
Excavation<br />
Filling<br />
Road Works<br />
Cement treated Sub-Base Course<br />
Grad ed crushed Stone Base<br />
Drainage Structures<br />
Concrete Pip e Culverts<br />
Concrete Box Culverts<br />
Storm Drains<br />
Bridges<br />
Interchange at Dimp les<br />
Retaining Walls<br />
N.1 LOT 1 (TQM) Activity Timelines<br />
JUL 2 0 0 9 - FEB 2 0 1 0<br />
APR 2 0 0 9 – DECEMBER 2 0 1 0<br />
JUN 2 0 0 9 – DEC 2 0 1 0<br />
JUN 2 0 0 9 – FEBRUARY 2 0 1 1<br />
JANUARY 2 0 1 0 – MAY 2 0 1 1<br />
OCTOBER 2 0 0 9 – DECEMBER 2 0 1 0<br />
JULY 2 0 0 9 – MARCH 2 0 1 1<br />
2010<br />
JAN FEB MAR APR MAY JUN<br />
JAN 2 0 1 0<br />
APR 2 0 0 9 - MAR 2 0 1 0<br />
FEBRUARY 2 0 1 0 – MAY 2 0 1 1<br />
OCTOBER 2 0 0 9 – MAY 2 0 1 1<br />
OCTOBER 2 0 0 9 – MARCH 2 0 1 1<br />
JULY 2 0 0 9 – SEPTEMBER 2 0 1 0<br />
- 91 -