30.04.2015 Views

Download full report - MiDA Ghana

Download full report - MiDA Ghana

Download full report - MiDA Ghana

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Feeder Roads – LOT 3<br />

Project Name Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />

LOT 3<br />

Client<br />

Consultant<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

SAI Consulting Engineers Pvt Limited in Joint Venture with Associated<br />

Consultant<br />

Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, Final Construction Design and Construction Supervision of<br />

Type of Service Trunk and Feeder Roads Rehabilitation Project – LOT 3<br />

Cost of Consultancy<br />

Assignment US$ 2,895,885.00<br />

Disbursement to Date US$ 838,265.00<br />

Total Project Lengths<br />

(Km) 221.30<br />

Project Location<br />

Funding<br />

Contract Packages<br />

Southern Zone 2 - In five(5) Districts in the Volta Region of <strong>Ghana</strong><br />

Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />

Social Evaluation; Final Design and Bid Document - MCC<br />

Three<br />

Contract Signed Date 12 th March, 2008<br />

Commencement Date 26 th March, 2008<br />

Date of Completion 26 th November, 2008<br />

Duration of Project<br />

Time Elapsed till date<br />

8 months from the commencement date<br />

21 months 2 weeks<br />

- 73 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!