Download full report - MiDA Ghana
Download full report - MiDA Ghana
Download full report - MiDA Ghana
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Feeder Roads – LOT 3<br />
Project Name Consultancy Services for Trunk and Feeder Roads Rehabilitation Project –<br />
LOT 3<br />
Client<br />
Consultant<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
SAI Consulting Engineers Pvt Limited in Joint Venture with Associated<br />
Consultant<br />
Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Type of Service Trunk and Feeder Roads Rehabilitation Project – LOT 3<br />
Cost of Consultancy<br />
Assignment US$ 2,895,885.00<br />
Disbursement to Date US$ 838,265.00<br />
Total Project Lengths<br />
(Km) 221.30<br />
Project Location<br />
Funding<br />
Contract Packages<br />
Southern Zone 2 - In five(5) Districts in the Volta Region of <strong>Ghana</strong><br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental and<br />
Social Evaluation; Final Design and Bid Document - MCC<br />
Three<br />
Contract Signed Date 12 th March, 2008<br />
Commencement Date 26 th March, 2008<br />
Date of Completion 26 th November, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
8 months from the commencement date<br />
21 months 2 weeks<br />
- 73 -