O utput/Process<br />
IRRIGATION ACTIVITY<br />
2 0 10<br />
JAN FEB MAR APR<br />
MAY<br />
JUN<br />
Phase A: Feasibility Study &<br />
Environmental Impact<br />
Assessment<br />
Environmental Scoping Report<br />
Draft Feasibility Study Report<br />
(including Preliminary<br />
Design Report, Draft EIA and EMP)<br />
Final Feasibility Study Report<br />
Phase B: Design & Bidding<br />
Pre-Qualification of Contractors<br />
Commencement of Design<br />
Draft Design Report + Bid<br />
Documents + Draft Organizational<br />
& Mgt System Report<br />
Final EIA + EMP + RAP<br />
Final Design Report, Bid<br />
Documents and Organizational &<br />
Mgt System Report<br />
DEC. 2009 – MARCH 2010<br />
DEC. 2009 - FEBRUARY 2010<br />
JANUARY – 3 RD MARCH 2010<br />
19 TH MARCH – 1 ST APRIL 2010<br />
MARCH 2010 – MAY 2010<br />
MARCH 2010<br />
1 ST MAY<br />
31 ST MAY<br />
7 TH JUNE 2010<br />
- 81 -