PROJECT 2: TRANSPORTATION PROJECT<br />

Objective:<br />

To reduce Transportation cost affecting Agricultural Commerce at the Sub-Regional and Regional levels,<br />

in order to improve the Competitiveness of Agricultural Producers using Roads in the Intervention Zones.<br />

QTR. 11 PROGRESS<br />

2.1 N1 ACTIVITY<br />

INDICATOR: Percent of Contracted Road Works disbursed: N1 Lot 1 (100%)<br />

TARGET(ANNUAL) ACTUALS FOR THE QUARTER CUMMULATIVE TO DATE<br />

APR 2009- MAR 2010<br />

(OCT-DEC 2009)<br />

41.6% 5.35% 17.80%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Carry out General<br />

Excavation and Filling<br />

Works on Ch. 2+000<br />

to Ch. 4+900<br />

• Actual Physical Completion achieved<br />

was 19.64% as against Planned Physical<br />

Completion of 22.7 %.<br />

• Supervision Reports on Monthly<br />

Progress of N1 Lot 1 Main Works<br />

obtained.<br />

• Monthly Technical Meetings for N1 Lot<br />

1 Construction Works organized.<br />

- 27 -<br />

• Clear Site of structures.<br />

• Carry out Earthworks<br />

• Execute Drainage Works<br />

• Continue Foundation for<br />

Bridge and Retaining Walls<br />

at Dimples Interchange<br />

INDICATOR: Percent of Contracted Road Works disbursed: N1 Lot 2 (100%)<br />

TARGET(ANNUAL)<br />

APR 2009- MAR 2010<br />

ACTUALS FOR THE QUARTER (OCT-<br />

DEC 2009)<br />

CUMMULATIVE TO<br />

DATE<br />

41.6% 10% 10%<br />

ACTIVITY STATUS NEXT STEPS<br />

i. Sign Contract with<br />

Messrs.MSF.<br />

• <strong>MiDA</strong> signed Contract with Messrs.<br />

Moniz da Maia Serra & Fortunato-<br />

Empereiteros (MSF), the Contractor for<br />

ii.<br />

iii.<br />

Issue Notice to<br />

Commence N1 Lot<br />

2 Works.<br />

Carry out pre-<br />

Construction<br />

Activities<br />

N1 Lot 2 on 1 st October, 2009.<br />

• ICT-BANS JV issued Notice of Works<br />

commencement on 14 th October, 2009<br />

• 23 rd December, 2009.<br />

• <strong>MiDA</strong> handed over Section 1(Km<br />

12+500 to Km 14+119) to Contractor<br />

on 15 th October, 2009.<br />

• Contractor submitted of evidence of<br />

insurance on 13 th November, 2009.<br />

• <strong>MiDA</strong> received Contractor’s revised<br />

Work Program and Method Statement<br />

on 15 th December, 2009.<br />

• Environmental Baseline Survey <strong>report</strong>,<br />

revised EMP, revised Health and<br />

Safety Management Plans were<br />

received on 15 th December, 2009.<br />

• ICT BANs and Messrs. MSF jointly<br />

inspected Utility Relocation Works at<br />

• Hand over all Sections of<br />

N1 Lot 2.<br />

• Complete topographic<br />

surveys for entire<br />

corridor.<br />

• Complete Pile foundation<br />

tests on Site.<br />

• Commence STI and AID<br />

awareness on site<br />

• Complete investigations<br />

on Quarries and Borrow<br />

pits.