Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Irrigation Development (LOT 2)<br />

Rehabilitation/Extension Works on 4 Selected Irrigation Schemes in the<br />

Project Name Afram Basin Zone<br />

Client<br />

Consultant<br />

Type of Service<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Haskoning Nederland BV, ABP Consult Ltd. and SAL Consult Limited<br />

Consultancy Services for the Provision of Feasibility Study, Final Design<br />

and Construction Supervision of Rehabilitation/Extension Works on<br />

irrigation Schemes in the Afram Basin Zone<br />

Cost of Consultancy<br />

Assignment The Cost of Consultancy assignment is US$ 1,998,113.00<br />

Disbursement to Date<br />

Project Description<br />

Project Location<br />

Funding<br />

Contract Package N/A<br />

Contract Signed on<br />

Date 21 st October, 2009<br />

Commencement Date 11 th November, 2009<br />

Nil<br />

Phase A<br />

• Conduct Feasibility Study, Preliminary Designs<br />

• Assessment of Environmental and Social Impacts<br />

• Preparation of EMPs, Resettlement Plans,<br />

• Organizational and Management Capacity Assessment in the<br />

Operation of the Rehabilitated Schemes.<br />

Phase B<br />

• Preparation of Final Engineering Designs<br />

• Bidding and Evaluation of Bids for the Construction Works<br />

Phase C<br />

• Supervision of Construction Works involved in the Rehabilitation,<br />

Extension and /or Construction of the Schemes.<br />

• Establishment of the Appropriate Operational and Management<br />

Systems on Rehabilitated Schemes.<br />

• Post Construction Supervision during Defects Liability Period.<br />

Northern Region<br />

Phase A – Inception Report, Environmental Scoping Report, draft Feasibility<br />

Study (Incl. Preliminary Design Report, Draft EIA and EMP),<br />

Organizational and Management Needs Assessment Report and Final<br />

Feasibility Report– MCC<br />

Date of Completion 31 st December, 2011<br />

Duration of Project Phase A – 4 months; Phase B – 5 months; Phase C – 30 months<br />

Time Elapsed till<br />

Date<br />

1.5 months<br />