Trunk Roads Activity<br />

• <strong>MiDA</strong> and Messrs. China Jiangsu Jianda Incorporated signed Contract for the construction of<br />

Agogo- Dome trunk road (75.21km). There was a Sod-cutting Ceremony at the Site on 22nd<br />

October, 2009. Contractor has commenced pre-constructional activities on Site.<br />

Ferry Activity<br />

• Solicitation of Bids for the Rehabilitation of Floating Dock & Construction of two (2) Ferries<br />

(Lot FS1) and the Extension of Landing Stages and Rehabilitation of Terminals (Lot FS2)<br />

ended on 2nd December, 2009. Bid Evaluation exercise completed and Reports forwarded to<br />

MCC for approval.<br />

(3) RURAL DEVELOPMENT PROJECT<br />

Procurement Capacity Activity<br />

i. A Stakeholders Workshop was held to review and discuss the Draft Curricula and Modules<br />

presented by Crown Agents.<br />

ii. The revised version of the Draft Curricula and Modules have been reviewed by the PC/PPA<br />

and comments forwarded to Crown Agents. The Consultant has submitted a final version of<br />

the Curricula and Modules.<br />

iii. A Draft Report of the 2009 Internship Program has been presented to MCC. Comments have<br />

been received.<br />

iv. Agreements arising out of discussions to determine how soon Institutions would begin using<br />

the Curricula and Modules and, therefore, need to be supported with textbooks have been<br />

reached with <strong>Ghana</strong> Institute of Management & Public Administration (GIMPA), Catholic<br />

Institute of Business and Technology (CIBT), Takoradi and Koforidua Polytechnics.<br />

Community Services<br />

i. Rehabilitation of Schools<br />

Phase IA: The outstanding furniture for Savelugu Nanton District have been <strong>full</strong>y supplied<br />

and accepted by Inspection Teams.<br />

Phase IB: Twenty (25) flood affected school blocks were completed under Phase IB of the<br />

School Reconstruction Activity and are ready to be handed over to the beneficiary<br />

Communities. Work on the remaining five (5) Project Sites is about 82% complete.<br />

Community Teacher Training Program (<strong>MiDA</strong>/MoE/USAID MOU): Training is ongoing<br />

for two hundred and sixty (260) Community Teachers in all the three Intervention Zones in<br />

<strong>MiDA</strong>-rehabilitated Schools and others in the Districts.<br />

ii.<br />

Feasibility Studies<br />

Schools and Water & Sanitation Facilities: Final Engineering Reports of new Schools, new<br />

Water and Sanitation facilities to farming Communities in the Southern and Northern Zones<br />

have been completed by Consultants and reviewed. Feasibility Studies of new Schools, new<br />

Water and Sanitation Facilities to farming Communities for the Afram Basin Zone have been<br />

completed and reviewed. Draft detailed Designs of the Facilities are ongoing.<br />