Transportation and Agriculture Infrastructure Projects<br />
Key Project Data<br />
Consultancy: Feeder Roads – LOT 2<br />
Project Name<br />
Client<br />
Consultant<br />
Consultancy Services for Trunk and Feeder Roads Rehabilitation Project<br />
– LOT 2<br />
Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />
Rom Consult Limited<br />
Type of Service Consultancy Services for Feasibility Study, Environmental and Social<br />
Evaluation, Final Construction Design and Construction Supervision of<br />
Trunk and Feeder Roads Rehabilitation Project – LOT 2<br />
Cost of Consultancy<br />
Assignment US$ 1,356,550.00<br />
Disbursement to Date US$ 644,739.63<br />
Total Lengths (Km)<br />
Length Designed<br />
Project Location<br />
Funding<br />
Contract Packages<br />
386.5 km<br />
283.1 km<br />
Southern Zone 1 - In six (6) Districts in the Central Region and Eastern<br />
Regions of <strong>Ghana</strong><br />
Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental<br />
and Social Evaluation; Final Design and Bid Document - MCC<br />
Three<br />
Contract Signed Date 21 st February, 2008<br />
Commencement Date 6 th March, 2008<br />
Date of Completion 6 th November, 2008<br />
Duration of Project<br />
Time Elapsed till date<br />
8 months from the commencement date<br />
22 months 3weeks<br />