Transportation and Agriculture Infrastructure Projects<br />

Key Project Data<br />

Consultancy: Feeder Roads – LOT 2<br />

Project Name<br />

Client<br />

Consultant<br />

Consultancy Services for Trunk and Feeder Roads Rehabilitation Project<br />

– LOT 2<br />

Millennium Development Authority (<strong>MiDA</strong>), Accra, <strong>Ghana</strong><br />

Rom Consult Limited<br />

Type of Service Consultancy Services for Feasibility Study, Environmental and Social<br />

Evaluation, Final Construction Design and Construction Supervision of<br />

Trunk and Feeder Roads Rehabilitation Project – LOT 2<br />

Cost of Consultancy<br />

Assignment US$ 1,356,550.00<br />

Disbursement to Date US$ 644,739.63<br />

Total Lengths (Km)<br />

Length Designed<br />

Project Location<br />

Funding<br />

Contract Packages<br />

386.5 km<br />

283.1 km<br />

Southern Zone 1 - In six (6) Districts in the Central Region and Eastern<br />

Regions of <strong>Ghana</strong><br />

Phase A (1, 2 and 3) – Preparation of Feasibility Study; Environmental<br />

and Social Evaluation; Final Design and Bid Document - MCC<br />

Three<br />

Contract Signed Date 21 st February, 2008<br />

Commencement Date 6 th March, 2008<br />

Date of Completion 6 th November, 2008<br />

Duration of Project<br />

Time Elapsed till date<br />

8 months from the commencement date<br />

22 months 3weeks<br />

- 72 -