B. PROGRESS IN OVERALL PROGRAM IMPLEMENTATION<br />

(1) AGRICULTURE PROJECT<br />

Commercial Training Activity<br />

• Twenty-eight (28) Task Orders were issued and signed in October for the training of 424<br />

FBOs for Phase II Early. Cumulatively 142 Task Orders have been issued.<br />

• About 21 000 farmers took part in the FBO Capacity Building Training organized for the<br />

Phase II Early group and 14,000 took part for Phase I Late Training.<br />

• All business plans for 424 FBOs in Phase II Early Stage I Training, have been finalized.<br />

• Two hundred and eighty six (286) Business Plans for Phase I Late Trainees have been<br />

prepared.<br />

• Out of the 59 MoFA Staff trained under the Training of Trainers for Global GAP, 26 were<br />

certified.<br />

Irrigation Activity<br />

• Inception Reports have been received from Messrs. SNC Lavalin, the Consultants for Lot 1<br />

(Northern Agric Zone) and Lot 3 (Southern Horticultural Belt)<br />

• Messrs Royal Haskoning, the Consultant for Lot 2 (Afram Basin) signed their Contract on<br />

21st October. The Inception Report has been submitted and reviewed.<br />

• About 1,000 ha of the remaining potential land are being designed by RICs under the Small<br />

Scale Irrigation projects during Quarter 11.<br />

• 4,234 ha out of the identified total land potential of 5,060 ha for Irrigation has been awarded<br />

on Contract for the Technical Feasibility Studies, Design and Supervision of Rehabilitation/<br />

Extension of Works.<br />

Land Activity<br />

The following are the achievements:<br />

Pilot Land Title Registration:<br />

• Fieldwork for all the six (6) Sections (total of 3,457 parcels) of the Pilot Registration<br />

District (PRD) comprising inventory, pillaring and surveying have been completed as<br />

follows:<br />

i. Section 1: 760 Parcels (100% complete);<br />

ii. Section 2: 718 Parcels (100% complete);<br />

iii. Section 3: 915 Parcels (100% complete);<br />

iv. Section 4: 267 Parcels (100% complete);<br />

v. Section 5: 198 Parcels (100% complete); and<br />

vi. Section 6: 599 Parcels (100% complete).<br />

• Section 2 (711 parcels) and Section 5 (198 parcels) had Parcel Plans <strong>full</strong>y developed and<br />

approved by the Survey and Mapping Division (SMD) of the Lands Commission and<br />

ready for Title Certificates to be issued.<br />

• 40% of Section 1; 20% of Section 3; 85% of Section 4; and 30% of Section 6 had their<br />

Parcels Plans completed but yet to be approved by the SMD.<br />

• 168 Title Certificates were ready to be handed over to Proprietors.<br />