CA4 Approval of Change Order No. 2 to the Standard Construction Agreementwith Shenandoah<br />

General Construction Company, lnc. for PS OO7 l&l Removal and Manhole Rehabilitation in<br />

the Pasco UtilitY SYstem<br />

provided for the Board's consideration was Change Order No. 2 to the Standard Construction A$reement<br />

with Shenandoah General Construction Company, lnc. for PS OO7 l&l Removal and Manhole Rehabilitation in<br />

the pasco Utility System in the additive amount of $65,692.50 and a time extension of 586 days for this<br />

additional work. This additive change order and time extension is for additional repairs beyond the original<br />

estimated quantities of the contract. These repairs were identified during Televising and cleaning efiorts in<br />

the Aloha Gardens service area. Repairs include MH-MH lining, Testing and Sealing Joints and correction of<br />

break in connections. performing Ülese trenchless repairs in the Pasco Utility System if done early can help<br />

prevent sink holes from forming and more costly point repairs. Staff approval CA 4.<br />

CA 4a Approval of Work Authorization GSG 12-07 with nt Services Group, lnc. for general<br />

inspection services for <strong>FGUA</strong> Project No. PS<br />

Order No. 2, l&l Removal and<br />

Manhole Rehabilitation, in the Pasco Utility<br />

Provided for the Board's consideration was Work Authori<br />

Government Services GrouP, lnc.<br />

(GSG) will perform 24 hours of general constructionj n will include observation and<br />

l. and Manhole Rehabilitation<br />

documentation of the construction of PS 007 Changǡ No.2, l&l<br />

in the Pasco Utility System for the not to exceed<br />

Change Order No. 2 includes: manhole to manhole li'n<br />

connections. GSG will collect and record information<br />

completion in accordance with applica<br />

nt of $2,952.00.<br />

the ins<br />

identified in the PS 007<br />

and repair of break in<br />

to ensure project<br />

4a.<br />

CA 5 Approval of a<br />

the Southwest <strong>Florida</strong><br />

Management District<br />

mental Utility AuthoritY for<br />

Weathãr Reclaimed Water tnté'i.-c.gndöü;i-Sf9,,f,,?,Ë" andQr{l.tnping Project<br />

l:;il :..<br />

?-i1r<br />

provided for the Board's,,"ôßitjÈiat¡on was uiìi.ö.".ppu¡.q}iVéiiriüifqine nþîéement between the southwest<br />

Ftorida water Managemehî,ioìãtr¡ct tSWF,Wlvlol arìUj¡¡.0"¡¡$ä'"c_oveÈri'iÍí-ëntal Water<br />

a Wet<br />

utility Authoritv fglu.*-"'t_*:111:t<br />

rectaimed project inine ii'ffi;l,pur.o 1ffin spr¡nåé.üì,tj.. ity system."'This project will consist of thl,desiel<br />

permitting and consttu.a¡o6'lldj;:,,3<br />

water'lië.fp.¡age tank and pumping system as well as an<br />

interconnect to.Pasco.,county's:'recfaimecl:',water system. un ucrooer aY' zuru' SL.rlr irpprudr'rrË(<br />

ôffiwMD p¡neitáSrÄncióte.niyór Water svsté,ù. On October !9, 2OLO, staff approached the<br />

'<br />

easiri.:Bóard with,,a,:r9,guéç1,to consider out-of-cycle fundingfor allocation for<br />

Withiaireq uê5,1,to co ns i d e r o ut-of-cvcle f u nd i n g for I q:?! "¡1l?l<br />

Àn enøineerinäi,ieas¡oitiiv"stüuv to èvâluate atterriät¡ve,'aþproaches to utilizing excess wet weather <strong>FGUA</strong><br />

ié.1á¡,i"0 Wätãr. Tne Boãrd üôte.O to eiãñt+e <strong>FGUA</strong> rêöuest on December 1, 2O7O. ln January 2011' <strong>FGUA</strong><br />

nìiáá waoe-rrìäii¡g perform a We.ti,y.9ãttrei,ieas¡o¡lity study, which was finalized and preseT:l1:<br />

lT,f9yl<br />

board in July Zöl'l¡.,. The seleci<br />

pumping station al'ohgiwith an in<br />

permitted ano constiù-ðitZd.as part ot.1$is project. This project is a multi-year project and $1,200,000 of the<br />

project cost to be funded',,iiy,gWFWMO., fne est¡mated total project cost is-$2,400,000 and will be<br />

cost to be funded',,6y,SWFW,$O'i, fne est¡mated total project cost is $2,400,000 and will be funded<br />

bV óWfWVlD and F6UA ovêr,iprg,yeaiiiþöriod. Staff recommended approval of CA 5.<br />

'.;.:,;':':,ì j".f .;.'<br />

CA 6 Approvat of WorX'ffihorization WT 12-05 with Wade Trim for Final Engineering Due Diligence<br />

for the <strong>FGUA</strong>'s Purchase of the Assets of the Mad Hatter Utility, lnc.<br />

provided for the Board's consideration was Work Authorization WT 12-05 with Wade Trim to perform all final<br />

engineering due diligence related to the Mad Hatter Utility, lnc. system. The scope of work outlined in the<br />

woit< autnorization ié consistent with the engineering due diligence efforts completed for previous <strong>FGUA</strong><br />

utility acquisitions. The final engineering due diligence for Mad Hatter was originally included in a previous<br />

work authorization with pBS&J in 2009. However, due to the recent turnover of key staff, since the<br />

acquisition of pBS&J by Atkins, the parties have agreed to cancel the outstanding work authorization,<br />

allowing the <strong>FGUA</strong> to engage Wade Trim to undertake the engineering due dili$ence. The lump sum fee to be<br />

paid tJwade Trim for ihese services is $79,000. The previously approved fee for PBS&J was $90,000.<br />

These fees are contingent upon a successful acquisition by the <strong>FGUA</strong>. ln the event that a successful<br />

December L5,2}t1- <strong>FGUA</strong> Public Hearing and Regular Meeting Minutes<br />