Exhibit B<br />
FLORIDA GOVERNM ENTAL UTI LITY AUTHORIry<br />
DEVELOPER CONVEYANCE CH ECKLIST<br />
Project Name: Dr. Pikos Admin. Offices System: Pasco Water & Wastewater<br />
Ptoject #: 11-005 SSD County: Pasco<br />
Conveyance Agreement Approved by <strong>FGUA</strong> Board:<br />
A. Documents Required for a Conditional Boald Approval of the Closeout Package<br />
Item Required for<br />
This Project Item Description<br />
NO<br />
YES<br />
YES<br />
NO<br />
NO<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
NO<br />
NO<br />
NO<br />
YES<br />
NO<br />
YES<br />
YES<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
NO<br />
YES<br />
YES<br />
Warranty Deed<br />
Utility Easement (s) dedicated to <strong>FGUA</strong><br />
Bill of Sale - Water<br />
Bill of Sale - Wastewater<br />
Bill of Sale - Reclaimed Water<br />
Attorney's Affidavit<br />
Owner's Affidavit<br />
Owner's Waiver and Release<br />
Releases of Lien (from all subcontractors and material providers)<br />
Contractor's Letter of Warranty<br />
Engineers Certification of Construction Completion<br />
1- copy of final plat CAD and PDF disk and one hard copy (11X17)<br />
2 sets of "As-Built" plans full size & one 11x17<br />
1 CAD and PDF disk of "As-Built" plans<br />
Assign ment and Assumption Agreement<br />
B. Documents Required for <strong>FGUA</strong> Staff Review and Acceptance<br />
Mandrel, Low Pressure Air, TVing, Lamping Results (gravity)<br />
Pressure test results (force mains)<br />
Pressure tests (water mains)<br />
Pressure tests (reclaimed mains)<br />
Bacteriologica I tests (water main)<br />
Backflow Preventer Certification<br />
Lift station start up repoft and O&M manual(s)<br />
Lift station calculation w¡th shop drawings<br />
Manufacturer's Wa rranties<br />
FDEP/DOH request for ceftification for water system application*<br />
FDEP certification of completion for wastewater system application*<br />
C. Documents Required for Final <strong>FGUA</strong> Release<br />
FDEP/DOH water clearance**<br />
FDEP wastewater clearance**<br />
Final walk through by <strong>FGUA</strong> ¡nspector<br />
<strong>FGUA</strong> final acceptance and meter release letter<br />
* Please note that all documents marked as required in sections A. and B. must be submitted and approved pr¡or to the <strong>FGUA</strong> sign¡ng the FDEP<br />
appl¡cations' **TheFDEPClearance(s)arerequired¡nordertocompletedthefinalwalkthoughandprojectacceptanceletterandthesestepswill<br />
not be completed if any items are outstanding.<br />
REVS-2011 _ _ 10<br />
Date<br />
Received Reviewed by