14.06.2015 Views

CDOP2 Project Plan - Main Document - H-SAF

CDOP2 Project Plan - Main Document - H-SAF

CDOP2 Project Plan - Main Document - H-SAF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />

(<strong>Main</strong>)<br />

Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />

Issue: Version 1.0<br />

Date: 11/12/2012<br />

Page: 10/99<br />

270<br />

280<br />

290<br />

300<br />

on architecture:<br />

o<br />

upgrading of the system architecture: distributed architecture among productgenerating<br />

participants will be consolidated; ITAF CNMCA infrastructures will be<br />

upgraded, both for products generation and central services, in order to be able to<br />

sustain disaster recovery procedure of distributed generation chains. During CDOP-2<br />

timeframe, assessment of distributed versus centralized architecture for the<br />

generation chains will also be performed (see section 2.3.2).<br />

on cooperation:<br />

o<br />

o<br />

o<br />

o<br />

o<br />

progressive extension of the user community<br />

provision of support to other <strong>SAF</strong>s, (Land-<strong>SAF</strong>, CLIMATE <strong>SAF</strong>).<br />

achievement of concrete synergy with other <strong>SAF</strong>s and CAF implementing the<br />

combined production strategy between SW development/maintenance/validation<br />

and operations.<br />

intensification, in accordance to EUMETSAT policy, of the relationships with other<br />

<strong>SAF</strong>s, either through the mutual use of products, or through the definition of<br />

Federate activities.<br />

settlement ad running of operational cooperation with other agencies on space<br />

programmes, i.e. GPM.<br />

1.5 Reference documents<br />

[RD 1] Definition of Product Status Categories for the <strong>SAF</strong> Network. EUM/PPS/TEN/07/0036 -<br />

Issue v1A dated 14 May 2007<br />

[RD 2]<br />

[RD 3]<br />

[RD 4]<br />

Process Model for <strong>SAF</strong> CDOP-2 EUM/PPS/DOC/10/0105 2 Issue 1D<br />

EUMETSAT - H-<strong>SAF</strong> Joint Operation Procedure (JOP) / Operational Interface Control<br />

<strong>Document</strong> (OICD) - EUM/OPS/ICD/11/2281<br />

Product Requirement <strong>Document</strong> Rel. 1.3 <strong>SAF</strong>/H<strong>SAF</strong>/PRD/1.3<br />

[RD 5] Proposal for the Second Continuous Development and Operations Phase (CDOP-2), Rel. 2.0<br />

[RD 6]<br />

[RD 7]<br />

[RD 8]<br />

H-<strong>SAF</strong> SM & Snow SAG Terms of References<br />

H-<strong>SAF</strong> <strong>CDOP2</strong> Configuration Management <strong>Plan</strong> Rel. 0.1 <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/CMP/0.1<br />

EUM/PPS/WP/11/0144, <strong>SAF</strong> Implementation Procedures - Visiting Scientist Programme<br />

[RD 9] EUM/LAD/DOC/11/0374, <strong>SAF</strong> CDOP-2 Implementation Procedures - Legal and<br />

Administrative Aspects<br />

[RD 10] EUM/PPS/PRC/11/0182, <strong>SAF</strong> Implementation Procedures - Federated Activity Programme<br />

[RD 11] EUM/PPS/PRC/11/0186, Progress Monitoring and Control Implementation Procedures for<br />

<strong>SAF</strong> CDOP<br />

[RD 12] EUM/PPS/PRC/12/0030, <strong>SAF</strong> CDOP-2 Implementation Procedure on <strong>SAF</strong> Life-Cycle Process<br />

Model and Engineering Guidelines<br />

[RD 13] EUM/C/74/11/DOC/12 <strong>SAF</strong> Financial Status Reporting Procedure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!