CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />
(<strong>Main</strong>)<br />
Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />
Issue: Version 1.0<br />
Date: 11/12/2012<br />
Page: 34/99<br />
700<br />
710<br />
<strong>Project</strong> Team meetings are scheduled twice a year; if possible they are placed two or three months<br />
before each relevant project milestone (review), in order to accomplish the necessary monitoring of<br />
the project and make it possible all relevant corrective actions.<br />
Inter-cluster meetings are also foreseen for each to emphasize the coordination of technical aspects;<br />
their frequency shall be approximately once a year.<br />
A joint Validation (Quality Monitoring)-Hydrovalidation workshop is organized once a year with the<br />
purpose to monitor and assess the status of the Quality Monitoring and Hydrovalidation services.<br />
2.3.8.3 <strong>Project</strong> Management Team<br />
A <strong>Project</strong> Management Team is settled, composed by the <strong>Project</strong> Manager and staff persons<br />
nominated by PM. It will regularly control the ongoing activities comparing the statement of work<br />
with the Master Schedule, to be reported to the Steering Group.<br />
As stated in 2.3.9 and 2.3.10 and in the JOP-OICD (see [RD 3]) <strong>Project</strong> Management Team is in charge<br />
of the interactions with EUMETSAT Secretariat and with CAF, other <strong>SAF</strong>s and other external entities<br />
or initiatives.<br />
Country Name Institute Role<br />
Italy Luigi De Leonibus ITAF USAM <strong>Project</strong> Manager<br />
Italy Paolo Rosci ITAF USAM Science Manager<br />
Italy Flavio Gattari Telespazio<br />
<strong>Project</strong> Management Officer<br />
<strong>Project</strong> Controller<br />
Italy Emiliano Agosta Telespazio Head Engineer<br />
Table 9 Composition of the H-<strong>SAF</strong> <strong>Project</strong> Management Team<br />
720<br />
Furthermore, as staff person nominated by PM, the Financial Officer will perform the activities<br />
related to financial accounting and control, in the framework of the Support Function WP-S 1210<br />
and in coordination with the <strong>Project</strong> Management Team, the EUMETSAT <strong>SAF</strong> <strong>Project</strong> Controller and<br />
the EUMETSAT Accounting Officer. He will accomplish the annual Cost and Asset Reporting,<br />
according to the <strong>SAF</strong> Financial Status Reporting Procedure [RD 13].<br />
Country Name Institute Role<br />
Italy Enrico Conte ITAF CNMCA Financial Officer<br />
Table 10 Financial Officer<br />
2.3.8.4 Actions Management<br />
Actions agreed during <strong>Project</strong> Team Meetings, Steering Group Meetings, Reviews Meetings and<br />
bilateral Meetings with EUMETSAT will be tracked by mean of the Action List document, in which<br />
each action will be numbered, assigned to a responsible person or institute, and associated to a date<br />
of completion.<br />
The document will be regularly updated and its presentation and discussion will be in each agenda of<br />
<strong>Project</strong> Team Meeting , as well as the check on the action closure.