14.06.2015 Views

CDOP2 Project Plan - Main Document - H-SAF

CDOP2 Project Plan - Main Document - H-SAF

CDOP2 Project Plan - Main Document - H-SAF

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />

(<strong>Main</strong>)<br />

Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />

Issue: Version 1.0<br />

Date: 11/12/2012<br />

Page: 36/99<br />

770<br />

780<br />

790<br />

Objective Description CAF / other <strong>SAF</strong><br />

Evapotranspiration<br />

LSA will be user of H-<strong>SAF</strong> products.<br />

Use of LSA <strong>SAF</strong> snow<br />

detection product<br />

Large scale surface soil<br />

moisture by radar<br />

scatterometer<br />

No cooperation model necessary<br />

2.3.10.1 Interactions: Precipitation Products<br />

Cooperation with GPM<br />

The product is generated by LSA <strong>SAF</strong>, its maintenance and<br />

Validation will be carried on by H-<strong>SAF</strong>.<br />

The sharing of tasks between H-<strong>SAF</strong> and LSA-<strong>SAF</strong> will be<br />

ruled by a specific “service level agreement”.<br />

The product is generated at the CAF on behalf of H <strong>SAF</strong>.<br />

H-<strong>SAF</strong> (TU Wien) will support the operations activities<br />

Table 11 Interactions with CAF and other <strong>SAF</strong>s<br />

LSA <strong>SAF</strong><br />

During the previous phases the consortium contacted the GPM management to discuss a possible<br />

cooperation. There were several contacts between the <strong>SAF</strong> and the GPM management in order to<br />

explore a suitable collaboration framework. The most effective avenue currently being examined is<br />

an agreement as part of the general EUMETSAT-NASA agreement so that the overall institutional<br />

and technical aspects are taken into proper consideration. In this context H-<strong>SAF</strong> aims at becoming a<br />

user of NASA GPM data on one side and also a direct collaborator of GPM as to the European and<br />

African scenario on the other.<br />

The cooperation with GPM will involve the following issues:<br />

- Validation of GPM products using the <strong>SAF</strong>’s Precipitation Product Validation network, whcih is<br />

to be considered an asset for GPM;<br />

- Development of two H-<strong>SAF</strong> precipitation products (H19 and H20) making use of the GPM<br />

Microwave Imager (GMI) data and the Dual-frequency Precipitation Radar (DPR) products and<br />

data (please refer to WP number D-2240 and D-2245 at pag 8 and 9 in Annex I) with special<br />

emphasis on the H-<strong>SAF</strong> area of interest;<br />

- Expected improvement of the IR (GEO) + MW (LEO) different H-<strong>SAF</strong> products (H03, H04, H40<br />

and H41), based on blending and morphing techniques deriving from the availability of GPM<br />

and related products.<br />

Moreover, the possibility of including GPM products into the <strong>SAF</strong> framework and an exchange of<br />

software are being examined and will be considered for inclusion into the agreement.<br />

The agreement will be possibly signed during the first semester of 2013 thus setting the necessary<br />

institutional framework for the cooperation before launch. However, note that the GPM launch date<br />

is yet to be finalized and thus a thorough planning of algorithm development is currently beyond<br />

reach.<br />

CAF<br />

2.3.10.2 Interactions: Soil moisture products<br />

Surface Soil Moisture products interaction with CAF<br />

The main responsibilities of the CAF regarding the large-scale soil moisture product (H16/SM-OBS-3)<br />

will be:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!