Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF
Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF
Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />
(<strong>Annex</strong> I)<br />
Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />
Issue: Version 1.0<br />
Date: 11/12/2012<br />
Page: 10/48<br />
Objectives and tasks:<br />
The WP has in charge <strong>the</strong> development of <strong>the</strong> new product H21 “High frequency MW delineation of cloud<br />
areas with new development of hydrometeors”.<br />
The releases are expected for T0+24, and a second release for <strong>the</strong> end of project. Since T0+24 <strong>to</strong> end of<br />
DCOP-2 <strong>the</strong> WP is committed <strong>to</strong> resolve <strong>the</strong> problem highlighted from <strong>the</strong> validation results.<br />
The WP will also have responsibility for <strong>the</strong> installation of news codes, jointly with <strong>the</strong> team of <strong>the</strong> related<br />
chains development.<br />
The WP has in charge <strong>the</strong> Internal Reports provision <strong>to</strong> support <strong>the</strong> <strong>to</strong> implementation and maintenance of<br />
news codes. The WP will participate <strong>to</strong> write <strong>the</strong> requested documents.<br />
WP output<br />
Miles<strong>to</strong>nes<br />
Scenario 5<br />
Pro<strong>to</strong>type algorithm code for operational implementation. Internal reports. Documents.<br />
(1) PCR [2015<br />
(1) ATBD-21, Contribute <strong>to</strong> Engineering Documents<br />
Q3],<br />
for product H21, (2) PVR-21, PUM-21, DOF-21,<br />
Deliverables<br />
(2) ORR Part2<br />
Contribute <strong>to</strong> SVERF (execution of non regression<br />
[2016 Q3]<br />
tests)<br />
WP Number D-2255 Title New Precipitation Product H22<br />
Responsible<br />
Country<br />
Italy<br />
Responsible<br />
Institute<br />
CNR-ISAC<br />
Participants<br />
Start time T0+24 End time T0+60<br />
Objectives and tasks:<br />
The WP has in charge <strong>the</strong> development of <strong>the</strong> new product H22 “Snowfall intensity”.<br />
The releases are expected for T0+24, and a second release for <strong>the</strong> end of project. Since T0+24 <strong>to</strong> end of<br />
DCOP-2 <strong>the</strong> WP is committed <strong>to</strong> resolve <strong>the</strong> problem highlighted from <strong>the</strong> validation results.<br />
The WP will also have responsibility for <strong>the</strong> installation of news codes, jointly with <strong>the</strong> team of <strong>the</strong> related<br />
chains development.<br />
The WP has in charge <strong>the</strong> Internal Reports provision <strong>to</strong> support <strong>the</strong> <strong>to</strong> implementation and maintenance of<br />
news codes. The WP will participate <strong>to</strong> write <strong>the</strong> requested documents.<br />
WP output<br />
Miles<strong>to</strong>nes<br />
Scenario 5<br />
Pro<strong>to</strong>type algorithm code for operational implementation. Internal reports. Documents.<br />
(1) PCR [2015<br />
(1) ATBD-22, Contribute <strong>to</strong> Engineering Documents<br />
Q3],<br />
for product H22, (2) PVR-22, PUM-22, DOF-22,<br />
Deliverables<br />
(2) ORR Part2<br />
Contribute <strong>to</strong> SVERF (execution of non regression<br />
[2016 Q3]<br />
tests)<br />
WP Number D-2260 Title New Precipitation Product H40<br />
Responsible<br />
Country<br />
Italy<br />
Responsible<br />
Institute<br />
CNR-ISAC<br />
Participants<br />
Start time T0+24 End time T0+60