Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF
Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF
Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />
(<strong>Annex</strong> I)<br />
Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />
Issue: Version 1.0<br />
Date: 11/12/2012<br />
Page: 32/48<br />
MA Intermediate Products Development<br />
Development and tuning of <strong>the</strong> algorithms for <strong>the</strong> product H32 already being developed.<br />
FF Intermediate Products Development<br />
To study possible improvements using new approaches, <strong>to</strong> calibrate, characterise snow products (and <strong>the</strong>ir<br />
errors) existing at <strong>the</strong> end of CDOP for non-mountainous areas.<br />
Merged Products Development<br />
To study possible improvements of merging mountainous and non-mountainous snow products, and <strong>to</strong><br />
characterise <strong>the</strong> error structures resulting from <strong>the</strong> merging.<br />
WP output Operational chains (products), Operational report, Internal report, Documents.<br />
Miles<strong>to</strong>nes<br />
Scenario 5<br />
(1) PCR [2014 Q4],<br />
(2) ORR Part1 [2015 Q2]<br />
OR-4 [2016 Q1], OR-5<br />
[2017 Q1]<br />
2.4 Validation Services<br />
2.4.1 Hydrovalidation Service<br />
Deliverables<br />
(1) Contribute <strong>to</strong> PVR (for ORRs);<br />
(2) Contribute <strong>to</strong> Operations Report (for<br />
ORs, updated twice a year)<br />
WP Number O-5100 Title Product interfacing and utilization improvement<br />
Responsible<br />
Country<br />
Poland<br />
Responsible<br />
Institute<br />
IMWM<br />
Participants<br />
Belgium (IRM), Bulgaria<br />
(NIMH), Finland (FMI),<br />
Germany (BfG), Italy<br />
(DPC), Turkey (AU,ITU,<br />
METU)<br />
Start time<br />
T0<br />
End<br />
time<br />
T0+60<br />
Objectives and tasks:<br />
Activities in Poland (IMWM) – Responsible Institute<br />
1. Moni<strong>to</strong>r and coordinate <strong>the</strong> work performances in <strong>the</strong> frame of OE 5100.<br />
2. Collecting <strong>the</strong> participant results and provide reports.<br />
3. Perform <strong>the</strong> analysis of possible product utility for hydrological tasks.<br />
4. Efforts on blending and merging techniques <strong>to</strong> improve level of different H-<strong>SAF</strong> products assimilation.<br />
5. Development of <strong>the</strong> <strong>to</strong>ols for data format conversion acceptable by hydrological models.<br />
6. <strong>Work</strong>s on snow and soil moisture products assimilation.<br />
Activities in Belgium (IRM)<br />
Preliminary evaluation of <strong>the</strong> products by comparison with standard input data (precipitation) or with<br />
hydrological model variable (soil moisture, snow) will be pursued. Development of assimilation <strong>to</strong>ol is in<br />
progress. The test sites will be enlarged <strong>to</strong> most parts of <strong>the</strong> Scheldt and Meuse basins for precipitation, <strong>to</strong> <strong>the</strong><br />
main sub-catchments in <strong>the</strong> Ardennes for <strong>the</strong> snow and <strong>to</strong> a set of catchments in <strong>the</strong> loamy region in central<br />
Belgium for <strong>the</strong> soil moisture. Hydrological validation procedure and <strong>to</strong>ols will be adapted. New experiments<br />
will be prepared <strong>to</strong> assimilate soil moisture and snow products in <strong>the</strong> hydrological model.<br />
Activities in Bulgaria (NIMH)<br />
Activities: Set of input fields for <strong>the</strong> hydrological models facilitating <strong>the</strong> comparison of <strong>the</strong> hydrological<br />
products resulting from different inputs, such as: ground data, H-<strong>SAF</strong> data, combination of <strong>the</strong>m will be<br />
prepared. The idea is <strong>to</strong> use <strong>the</strong> ground observations as “true values”, but of point type. The H-<strong>SAF</strong> data will