14.06.2015 Views

Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF

Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF

Annex I to the CDOP2 Project Plan - Work Package ... - H-SAF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />

(<strong>Annex</strong> I)<br />

Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />

Issue: Version 1.0<br />

Date: 11/12/2012<br />

Page: 6/48<br />

Objectives and tasks:<br />

Development of H03B precipitation product, performing <strong>the</strong> enlargement of H03A product from H-<strong>SAF</strong> area <strong>to</strong><br />

full disc.<br />

WP output<br />

Miles<strong>to</strong>nes<br />

Scenario 5<br />

Operational chains (products), Operational report, Internal report, Pro<strong>to</strong>type algorithm<br />

code for operational implementation, Documents.<br />

(1) PCR [2014<br />

(1) ATBD-03B, Contribute <strong>to</strong> Engineering<br />

Q4],<br />

Documents for product H03B, (2) PVR-03B, PUM-<br />

Deliverables<br />

(2) ORR Part2<br />

03B, DOF-03B, Contribute <strong>to</strong> SVERF (execution of<br />

[2016 Q3]<br />

non regression tests)<br />

WP Number D-2215 Title New Precipitation Product H04B<br />

Responsible<br />

Country<br />

Italy<br />

Responsible<br />

Institute<br />

ITAF CNMCA<br />

Participants<br />

Start time T0 End time T0+60<br />

Objectives and tasks:<br />

Development of H04B precipitation product, performing <strong>the</strong> enlargement of H04A product from H-<strong>SAF</strong> area <strong>to</strong><br />

full disc.<br />

WP output<br />

Miles<strong>to</strong>nes<br />

Scenario 5<br />

Operational chains (products), Operational report, Internal report, Pro<strong>to</strong>type algorithm<br />

code for operational implementation, Documents.<br />

(1) PCR [2014<br />

(1) ATBD-04B, Contribute <strong>to</strong> Engineering<br />

Q4],<br />

Documents for product H04B (2) PVR-04B, PUM-<br />

Deliverables<br />

(2) ORR Part2<br />

04B, DOF-04B, Contribute <strong>to</strong> SVERF (execution of<br />

[2016 Q3]<br />

non regression tests)<br />

WP Number D-2220 Title New Precipitation Product H05B<br />

Responsible<br />

Country<br />

Italy<br />

Responsible<br />

Institute<br />

ITAF CNMCA<br />

Participants<br />

Start time T0 End time T0+60<br />

Objectives and tasks:<br />

Development of H05B precipitation product, performing <strong>the</strong> enlargement of H05A product from H-<strong>SAF</strong> area <strong>to</strong><br />

full disc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!