CDOP-2 <strong>Project</strong> <strong>Plan</strong><br />
(<strong>Annex</strong> I)<br />
Doc. No: <strong>SAF</strong>/H<strong>SAF</strong>/<strong>CDOP2</strong>/PP/1.0<br />
Issue: Version 1.0<br />
Date: 11/12/2012<br />
Page: 40/48<br />
ECMWF, Turkey (TSMS)<br />
Start time<br />
T0<br />
End<br />
time<br />
T0+60<br />
Objectives and tasks:<br />
Activities In Italy (DPC) – Responsible Institute<br />
The activity of this WP consists of:<br />
receiving <strong>the</strong> H-<strong>SAF</strong> products in NRT, generally via EUMETCast;<br />
recording operational features such as actual arrival, timeliness, intelligibility;<br />
provide a bulletin <strong>to</strong> ITAF CNMCA on operational moni<strong>to</strong>ring results. The bulletin will act as a continuous<br />
moni<strong>to</strong>ring of <strong>the</strong> operational effectiveness of <strong>the</strong> different operational chains and will inform almost in<br />
real time of <strong>the</strong> possible failures in <strong>the</strong> transmission of data.<br />
Identification and moni<strong>to</strong>ring of <strong>the</strong> NRT operational features of Products is performed <strong>to</strong> support <strong>the</strong><br />
operational chain for possible improvement.<br />
Activities in Austria (ZAMG)<br />
Provision of feedback on <strong>the</strong> technical and scientific aspects of <strong>the</strong> operationally produced soil moisture products,<br />
including timeliness, visualisation and quality assessment.<br />
Activities in Belgium (IRM)<br />
A number of products will be received in NRT for operational use, <strong>the</strong>ir operational features will be recorded, a<br />
first quality assessment will be performed and a feedback provided <strong>to</strong> ITAF CNMCA. This workpackage will require<br />
<strong>to</strong> set-up au<strong>to</strong>matic procedures <strong>to</strong> help <strong>the</strong> moni<strong>to</strong>ring of <strong>the</strong> products. For this activity, potential partners will be<br />
contacted like <strong>the</strong> Wea<strong>the</strong>r Bureau of IRM in charge of severe wea<strong>the</strong>r warnings and Regional Authorities in<br />
charge of floods and droughts and with whom IRM has a long standing collaboration.<br />
Activities in ECMWF<br />
ECMWF operational Near Real Time moni<strong>to</strong>ring of <strong>the</strong> ASCAT global surface soil moisture (SM) product will be<br />
continued in <strong>the</strong> H-<strong>SAF</strong> CDOP-2. ASCAT soil moisture moni<strong>to</strong>ring relies on <strong>the</strong> ECMWF Integrated Forecasting<br />
System (IFS).<br />
Moni<strong>to</strong>ring satellite products performances by watching observation values as well as first guess<br />
and analysis departures is highly relevant both <strong>to</strong> prepare <strong>the</strong> satellite product data assimilation and <strong>to</strong> give a<br />
real-time feedback on <strong>the</strong> product quality. These activities require permanent resources <strong>to</strong> maintain data use in<br />
<strong>the</strong> IFS, <strong>to</strong> update <strong>the</strong> operational moni<strong>to</strong>ring web page, <strong>to</strong> update <strong>the</strong> visualization <strong>to</strong>ols, etc. Moni<strong>to</strong>ring of<br />
ASCAT soil moisture provides NRT assessment of <strong>the</strong> products quality at global scale and at regional scale.<br />
Activities in Finland (FMI)<br />
Moni<strong>to</strong>ring of production chains <strong>to</strong> assess operational features.<br />
FMI moni<strong>to</strong>rs <strong>the</strong> production chain for non-mountainous areas <strong>to</strong> recognise problems in production,<br />
dissemination or availability of input data. Also, <strong>the</strong> moni<strong>to</strong>ring of merging of non-mountainous and mountainous<br />
products <strong>to</strong> final output products is on <strong>the</strong> responsibility of FMI.<br />
Activities in France (MeteoFrance)<br />
Activities in France: NRT acquisition of <strong>the</strong> SMOSMANIA data and regular comparison with <strong>the</strong> ASCAT soil<br />
moisture products. Contribution <strong>to</strong> OR and VR reports.<br />
Activities in Germany(BfG)<br />
Moni<strong>to</strong>ring of <strong>the</strong> performance of <strong>the</strong> H-<strong>SAF</strong> data distribution system<br />
Activities can be summarised as:<br />
- operation of a satellite reception station and processing software.<br />
- adaptation of <strong>the</strong> developed processing and reporting workflow <strong>to</strong> new requirements<br />
- performing <strong>the</strong> processing and reporting workflow<br />
- receiving <strong>the</strong> H-<strong>SAF</strong> products in NRT for operational use (acquisition of products from o<strong>the</strong>r <strong>SAF</strong>’s, of<br />
interest for Hydrology and Civil protection, will be preformed<br />
- recording operational features such as actual arrival, timeliness, intelligibility;<br />
- providing end-users’ quality assessment.<br />
A standard bulletin for <strong>the</strong> documentation of developed local procedures for acquisition, visualisation and