30.06.2015 Views

Block Party Permits Application Form - Upper Arlington

Block Party Permits Application Form - Upper Arlington

Block Party Permits Application Form - Upper Arlington

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Block</strong> <strong>Party</strong> <strong>Permits</strong> <br />

<strong>Application</strong> <strong>Form</strong> <br />

Updated May 2013<br />

Policies & Procedures (Effective June 1, 2013)<br />

The following policies & procedures pertain to requests by <strong>Upper</strong> <strong>Arlington</strong> property owners who desire to host a block<br />

party that requires the barricading of a public road to vehicular movement. These procedures supersede all previous policy<br />

statements pertaining to this subject, for those residents participating in the block party, as well as for persons using our<br />

public streets for transportation purposes.<br />

1. Only an <strong>Upper</strong> <strong>Arlington</strong> resident can file a request for a block party.<br />

2. A <strong>Block</strong> <strong>Party</strong> <strong>Application</strong> & Petition <strong>Form</strong> may be filed for any day of the year. It should be filed with the City at least<br />

ONE WEEK prior to the date of the block party.<br />

3. A <strong>Block</strong> <strong>Party</strong> Permit will be issued by the City Manager or his designated representative. The City Manager reserves the<br />

right to approve and limit the time, as well as the right to revoke the permit.<br />

4. Roads recommended for <strong>Block</strong> Parties: Permissible locations are preferably roads not more than one or two blocks long,<br />

and not considered a main thoroughfare or heavily traveled street (see Section 12). Roads upon which block parties are<br />

permitted must be properly barricaded (see Barricading Requirements).<br />

5. A Petition: Residential concurrence is required from all residents whose driveways will be impacted within the appropriated<br />

block(s), indicating their knowledge and consent of the block party. Proof of this concurrence must be provided by<br />

completing and submitting the attached <strong>Block</strong> <strong>Party</strong> Petition <strong>Form</strong>.<br />

6. A $50.00 non-refundable fee is required for the issuance of a <strong>Block</strong> <strong>Party</strong> Permit, to cover the costs of application processing<br />

and advance drop-off and pick-up of the necessary barricades.<br />

7. Barricading Requirements: Following the block party, barricades should be returned to the address at which they were<br />

delivered for collection on the next business day. If there is damage to the City’s property, or loaned items are lost or stolen,<br />

the responsible party will be billed for the cost of the replacement or repair.<br />

8. Off duty uniformed police officer(s) may be required by the City to patrol the block party, depending on the location and<br />

nature of the event. You are responsible for paying for the officers.<br />

9. Intoxicating beverages are not permitted on public property.<br />

10. Permitted Hours: Permitted hours for block parties are Noon–Midnight, on authorized streets only.<br />

11. Fourth of July Hours: Permitted hours for the Fourth of July are 7 a.m.–8 p.m., with the following exceptions:<br />

• 11 a.m.–8 p.m. for streets within a two-block radius of the Parade Route (Northwest Boulevard);<br />

• No streets south of Northam Park and north of Wilshire Road will be barricaded after 1 p.m.<br />

12. <strong>Block</strong> parties are not permitted on any of the following streets:<br />

East–West: Abington Cambridge Camelot Canterbury<br />

Chatwell Fifth Ave. Fishinger Guilford<br />

Haverford Henderson Highland Dr. King Ave.<br />

Lane Ave. Lane Rd. London Longeaton<br />

Lytham McCoy MacKenzie Northam<br />

Nottingham (Riverside–Kioka) Sandover Waltham Windermere<br />

Windham<br />

Zollinger<br />

North-South: Andover <strong>Arlington</strong> <strong>Arlington</strong> Ctr. Asbury<br />

Burbank Cambridge (Lane-Canterbury) Carriage Hill Coach (McCoy-Lane Rd.)<br />

Concord Village Coventry Dierker Gateway<br />

Greensview Kenny Kioka Langport<br />

Leeds Lyon Mountview North Star<br />

NW. Prof. Plaza Nottinghill Gate Nugent Redding<br />

Reed Sawmill Stonehaven Tremont<br />

Woodbridge<br />

Yorkshire


<strong>Application</strong> <strong>Form</strong> <br />

Please Submit The Following:<br />

□ Completed and Signed <strong>Application</strong> <strong>Form</strong><br />

□ Completed and Signed <strong>Block</strong> <strong>Party</strong> Petition <strong>Form</strong> (must be printed and completed by hand)<br />

□ $50.00 non-refundable Permit Fee<br />

Please note: you will be notified if additional fees are required to cover the costs of police officers<br />

<strong>Block</strong> <strong>Party</strong> <strong>Application</strong> Details (please print if completing by hand)<br />

Name of Resident(s):<br />

Address of Resident(s):<br />

Phone:<br />

Name of Street to Barricade:<br />

From (name of street):<br />

To (name of street):<br />

Date of <strong>Block</strong> <strong>Party</strong>:<br />

Time: From __________ a.m. / p.m. To _________ a.m. / p.m.<br />

Resident Concurrency<br />

Before such a permit will be issued by the City Manager, concurrency by all residents whose property faces the proposed barricaded<br />

area must first be obtained. Your signature to this <strong>Block</strong> <strong>Party</strong> <strong>Application</strong> <strong>Form</strong> is therefore, solely for the purpose of agreeing to<br />

such a barricading on the time(s) and date(s) as indicated above.<br />

I hereby certify that the signature(s) and address(es) that appear on the <strong>Block</strong> <strong>Party</strong> Petition <strong>Form</strong> were obtained under the<br />

conditions described in this petition. I hereby declare I have read the above application and all of the statements made therein are true<br />

to the best of my knowledge and belief; I understand the issuance of a registration certificate or license pursuant to this application is<br />

not an endorsement by the City of <strong>Upper</strong> <strong>Arlington</strong> or by any of its departments, officers, or agents of the activity authorized to be<br />

conducted thereby, and I expressly agree said permit application shall not be used or represented in any way as such an endorsement.<br />

By typing my name in full below, I acknowledge that I have read and accept and certify the above certification statement.<br />

__________________________________________<br />

Applicant’s signature<br />

_______________________<br />

Date<br />

Submittal <br />

• Email the completed and signed <strong>Application</strong> <strong>Form</strong> and Petition <strong>Form</strong> to permits@uaoh.net. Payment can be made online at<br />

www.uaoh.net, under “Online Payments” (Visa, MasterCard and Discover cards are accepted).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!