09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.0 Relevant Studies and GuidelinesSeveral relevant transportation studies and design guideline documents will bereferenced throughout the course <strong>of</strong> the corridor feasibility study. Some <strong>of</strong> the studiesinclude the following:Interstate 10-Hassayampa Valley Roadway Framework Study, MAG, September2007o This study was completed to develop a recommended roadway networkthat will provide access throughout northwest <strong>Maricopa</strong> <strong>County</strong> andpreserve the interstate functionality <strong>of</strong> I-10.o This study identified the need for the Hidden Waters Parkway between I-10 and SR 74. Town <strong>of</strong> Buckeye General <strong>Plan</strong>, Town <strong>of</strong> Buckeye, January 2008.o The Town’s General <strong>Plan</strong> document is intended to serve as a blueprint fordevelopment within their community.o The Town’s General <strong>Plan</strong> makes recommendations for appropriate landuses within Town limits.Town <strong>of</strong> Buckeye Preliminary <strong>Transportation</strong> Master <strong>Plan</strong>, Town <strong>of</strong> Buckeye,December 2009.o (Progress on this document is ongoing.) This document supports theTown’s General <strong>Plan</strong> by defining the needed roadway network within theTown <strong>of</strong> Buckeye.Hassayampa Framework Study for the Wickenburg Area, MAG, ongoing.o This is an ongoing transportation framework study for the region north <strong>of</strong>the Interstate 10-Hassayampa Valley Roadway Framework Study.Interstate 8 and 10: Hidden Valley <strong>Transportation</strong> Framework Study, MAG, October2009o This study was completed to develop a recommended roadway networkthat will provide access throughout southwest <strong>Maricopa</strong> <strong>County</strong> andpreserve the interstate functionality <strong>of</strong> I-10. The study area extends fromthe Gila Mountains to Casa Grande, generally between I10 and I8.There are also several design guidelines that will be referenced throughout the course<strong>of</strong> the study.Design Guideline Recommendations for the Arizona Parkway, MCDOT, August2008o This document identifies various elements necessary to design an ArizonaParkway such as; cross-section features, design speed, vehicles, accessmanagement and other geometric design standards.Hidden Waters<strong>Final</strong> <strong>Work</strong> <strong>Plan</strong>Corridor Feasibility Study April, 2011<strong>Maricopa</strong> <strong>County</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> 11 EPS Job No. 10-092

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!