09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Schedule,• Study area boundary,• Study purpose and objectives,• Study process and approach used to meet objectives,• Data collection plan,• Design standards and guidelines, (per; MCDOT standards regarding accessprinciples, Arizona Parkway Guidelines, geometry, etc.)• Stakeholder database,• Key issues and challenges,• Detailed study tasks,• Criteria for the evaluation <strong>of</strong> alternatives,• Scoping report summary, (as an attachment from RHA)• Written quality assurance/quality control plan – including:o Checklists <strong>of</strong> items to be reviewed prior to each <strong>County</strong> submittal(including sub-consultant prepared materials),o Monthly quality progress reports,o Procedures for conducting QA/QC activities,o Person(s) responsible for QA/QC activities,o Sub consultant coordination and communication plan.1.2. Existing and Future Corridor Features AnalysisProduct: Technical Memorandum #1 – Existing and Future Corridor Features (includingaerial maps illustrating the base conditions/constraints)The Consultant will collect, analyze, map, and document (including dates) existing datarelevant to the corridor feasibility study area. Both corridor characteristics and roadwayconditions will need to be assessed. The Consultant shall also obtain, and utilize asappropriate, existing information/documentation from recent/relevant studies such as: I-10/Hassayampa Valley Roadway Framework Study, Town <strong>of</strong> Buckeye General <strong>Plan</strong>s,Area Drainage Master <strong>Plan</strong>s (ADMPs), Developer Master <strong>Plan</strong> Circulation Elements,available master plan circulation documents, and other recent reports/analysis tosupplement this collection effort. All information and analysis will be documented in theExisting and Future Corridor Features Technical Memorandum #1.At a minimum, the following features will be included in this section:1.2.1. Physical Features (natural and human made) <strong>of</strong> Study Area such as:• Drainage features (floodplains, washes, rivers and alluvial fans) and structures(channels, dikes, bridges, dams),• Irrigation canals,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!