10.07.2015 Views

Response to Comments - Presidio Trust

Response to Comments - Presidio Trust

Response to Comments - Presidio Trust

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

actions at these sites, <strong>to</strong> the extent they are known and reasonably related <strong>to</strong> the project, are described indetail in the SEIS (see, e.g., Sections 3.2.2.8, 3.2.2.9, 3.3.2.2 through 3.3.2.5, 3.3.2.7, and 3.5.2.7; seealso <strong>Response</strong> <strong>to</strong> Comment ER-2). Additionally, the mitigation measures described in the SEIS fullyaddress and reduce any potential impacts of the project as they relate in any way <strong>to</strong> the remediationactivities at these sites (refer <strong>to</strong> Section 3.11.3, Mitigation Measures). Comprehensive informationregarding the planned remediation activities at these sites has been made available <strong>to</strong> CCSF and othermembers of the public through the <strong>Presidio</strong>’s independent decision-making process that includes formalpublic notice, review, and comment. As stated in the SEIS, final remedies for these sites will be subject<strong>to</strong> additional public participation and comment prior <strong>to</strong> remedy implementation (see Section 2.2.1).Further follow-up by the public regarding these sites, including the nature of hazardous materials present,timing for remediation, involvement of resource agencies with jurisdiction, and moni<strong>to</strong>ring and reportingrequirements, may be addressed at that time. For more information regarding these sites, see also RevisedFeasibility Study for the Main Installation Sites (<strong>Presidio</strong> <strong>Trust</strong> 2003d) and Landfills 8 and 10 FeasibilityStudy Report (Erler & Kalinowski, Inc. 2005).ER-2. Impact on Lobos Creek from Landfill 10The CCSF asserted that the presence of hazardous materials on the PHSH site at Landfill 10 is onlymentioned tangentially in the discussion of hydrology, wetlands, and water quality. The CCSF contendedthat because of the adjacency of Lobos Creek, a source of water supply for the [<strong>Trust</strong>] and NPS, this is acritical element for any environmental impact discussion and this discussion is missing from the SEIS. “Asection should be added <strong>to</strong> the SEIS <strong>to</strong> characterize the hazardous materials and evaluate the potentialimpacts from all the alternatives…” They continued: “[t]he SEIS acknowledges the potential forcontamination of the Lobos Creek watershed, but provides no specific information about how <strong>to</strong> protectagainst the contamination…” And concluded: “[t]he mitigation measures themselves could yieldenvironmental impacts, particularly with respect <strong>to</strong> installation of s<strong>to</strong>rm water drainage system upgradesand slope stabilization. Because the SEIS does not provide any detailed description of the measures <strong>to</strong> beundertaken, it is impossible <strong>to</strong> evaluate either the effectiveness of the mitigation measures or possible sideeffects of the measures.”<strong>Response</strong> ER-2 – To the extent necessary, information regarding the environmental conditions at Landfill10 and mitigation measures <strong>to</strong> address potential effects on water quality associated with Landfill 10 arediscussed in Section 3.11, Hydrology, Wetlands, and Water Quality and other sections in the SEIS. TheSEIS includes mitigation measures <strong>to</strong> adequately eliminate any potential effects on water quality,including potential degradation of surface and groundwater quality due <strong>to</strong> runoff. The mitigationmeasures identified include maintenance of existing and new drains and culverts <strong>to</strong> ensure that runoff isnot altered or diverted <strong>to</strong>ward Landfill 10 or the Lobos Creek watershed and groundwater basin (seegenerally Section 3.11.3, Mitigation Measures, and specifically Mitigation Measure NR-15 WaterResources Best Management Practices: “[d]ue <strong>to</strong> the presence of hazardous waste underlying the largeparking area west of the PHSH, the diversion of subsurface drainage around the underground parkingfacility will not divert <strong>to</strong>ward Landfill 10”). In addition <strong>to</strong> the implementation of water resources bestmanagement practices, the implementation of a S<strong>to</strong>rm Water Pollution Prevention Plan will further reduce72 <strong>Response</strong>s <strong>to</strong> <strong>Comments</strong> Public Health Service Hospital

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!