10.07.2015 Views

View full report - NEEC

View full report - NEEC

View full report - NEEC

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Procedure3As a result of this procedure, the relevant municipal construction commission willgive the applicant an identification number that allows the applicant to track theprogress made on the application (an IC card) when the applicant submit <strong>report</strong>s onthe approved construction project; this occurs after Procedure 2. If the applicantsubmits the required documents, the IC card will be issued immediately, free ofcharge. The commission requires the IC card.Request and obtain the approval on planning and design project forconstruction ( 开 开 开 开 开 开 开 开 开 开 开 开 ) and the notification on the review of thedesign plan ( 开 开 开 开 开 开 开 开 开 ) from the Municipal Commission of Urban Planning( 开 开 开 开 开 开 )Time to complete:Cost to complete:Comment:28 daysno chargeAfter obtaining the approval of planning request, BuildCo should apply with thePlanning Bureau for the approval of the construction planning and design project ( 建建 建 建 建 建 建 建 建 建 建 建 ). The following documents are required for apply this approval:- Application form, Planning and design project for construction.- Topographical map 建 建 建 建 建 .- Ichnographic map 建 建 建 建 建 .- Scheme drawing ( 建 建 建 建 and instruction of design.- Form, Area of layers ( 建 建 建 建 建 ).- Approval of the feasibility study <strong>report</strong> or other relevant approval.- Approval of request of construction project planning and design ( 建 建 建 建 建 建 建 建 建 建建 建 建 ).- Other relevant documents and drawings required in the notice of request forconstruction project planning and design.Procedure4The time line is 28 days. There is no charge for this approval.Request and obtain the planning permit of using land for construction purposesTime to complete:Cost to complete:60 daysno chargeComment:To request a land-use planning permit, the documents to be filed include- Application for project planning permit (form sealed by BuildCo).- Planning opinion and attached map.- Project proposal, including feasibility <strong>report</strong> and other documents approved by themunicipal planning authority.- Notice of opinion on construction location and affixed maps or, otherwise, theagreement of the transfer of right for state-owned land and affixed maps.- Cadastral map.- Approval of construction design and maps, if the plan has been approved.Procedure5The authority should notify the applicant whether revisions are needed within 5days. The time for this procedure is 40 working days. This procedure occurs afterthe “notification of the review of design plans” is issued by the municipality.Request and obtain the land use permit for construction from the State Land,Resources, and Housing AgencyTime to complete:Cost to complete:10 daysno charge61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!