10.07.2015 Views

View full report - NEEC

View full report - NEEC

View full report - NEEC

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

建 建 建 建 建 建 建 建 建 建 建 ).- Application form for fund of concrete ( 建 建 建 建 建 建 建 建 建 建 建 建 建 ).- Relevant documents of paid fees of quality supervising ( 建 建 建 建 建 建 建 建 建 建 ).- IC card of construction project.- Completion inspection <strong>report</strong>, IC card of construction project, use permit (issuedrespectively by Urban Planning Authority, Public Security Authority, Fire PreventionAuthority, Environmental Protection Bureau, Antithunder Center), concrete fundsettlement application, and documents on quality auditing fare settlement.Procedure30This procedure must be completed on the day of application, provided that thedocuments required for submission are complete. There is no charge for thisprocedure. The statutory time limit for this procedure is 15 working days.Request electricity connectionTime to complete:Cost to complete:Comment:1 dayno chargeShanghai Power Corp. will levy BuildCo’s power supply construction charges,which include a financial charge, temporary facility charge, construction supervisioncharge, and basic preparation charge. The power supply construction charge willbe determined mainly by the conditions of the premises and the surrounding areasof the warehouse. Thus the information assumed for this case study is insufficientto determine the specific charge. The power company indicates that the connectionfacilities must be finished within 3 months; an itemized bill will be providedafterward.Procedure31Receive electricity inspectionTime to complete:Cost to complete:Comment:1 dayno chargeThe on-site pre-inspection is needed to determine power connection feasibility inthis specific site. If feasible, they BuildCo must develop a cost budget for powerconnection, depending on the construction material price and quantity.Procedure32Connect to electricityTime to complete:Cost to complete:60 daysno chargeComment:Procedure33Request water and sewage connectionTime to complete:Cost to complete:Comment:1 dayno chargeThe water and sewage connection fee depends on the actual project size (includingthe price of labor and materials). A budget is a must.Procedure34The application procedure lasts at least 1–2 months and usually takes 3–4months.Receive water and sewage inspection68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!