10.07.2015 Views

View full report - NEEC

View full report - NEEC

View full report - NEEC

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Time to complete:Cost to complete:Comment:1 dayno chargeUpon receiving the water supply application, the water service crew conductson-site surveys within 7 days. The completion of water supply is determined byconstruction conditions. As for sewage licensing, the Municipal Water Bureauneeds 20 days after BuildCo submits the project approval and other documents onthe sewage facility design to conduct a preliminary inspection. After completing theinspection and trial operation, the bureau requires 20 days to examine the resultsof the facility and grant approval.Procedure35Receive connection to water and sewage servicesTime to complete:Cost to complete:50 daysno chargeComment:Procedure36Request and receive connection to telephoneTime to complete:14 daysCost to complete: CNY 200Comment:The charge may vary between CNY 140 and CNY 310.Procedure37Register building with Real Estate RegistryTime to complete:30 daysCost to complete: CNY 384Comment:The warehouse considered here should fall into the category of nonresidential realproperty, in which case the registry procedure will take 20 days from receipt of theapplication. The cost is calculated according to the actual property value. In thiscase, considering the assumption that the value exceeds 1 million, the registry feerate should be 0.03%, or about CNY 384. Before selling the building, the propertymust be registered and the certificate obtained.69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!