24.11.2012 Views

Head - Department of National Parks, Recreation, Sport and Racing

Head - Department of National Parks, Recreation, Sport and Racing

Head - Department of National Parks, Recreation, Sport and Racing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Historically, the regions benefited from a state government<br />

decision to create Burnett Water Pty Ltd (now part <strong>of</strong> Sun<br />

Water) in 2001. This meant that early in this decade the Wide<br />

Bay Burnett area benefited from two construction projects,<br />

namely Paradise Dam <strong>and</strong> Kirar Weir. Paradise Dam supplies<br />

water to the Bundaberg Region. As a result <strong>of</strong> this dam being<br />

completed in late 2005, there are opportunities for recreational<br />

activities to be associated with the dam <strong>and</strong> these are outlined<br />

in Appendix 1.<br />

The challenges for the region in regard to the potable water<br />

supply are that a number <strong>of</strong> existing industries, namely<br />

horticulture including citrus, macadamia, peanuts, mangoes<br />

<strong>and</strong> sugar cane, use large quantities <strong>of</strong> water. Additionally, with<br />

new mining ventures being considered in the hinterl<strong>and</strong> (around<br />

Monto for instance), pressure for commercial water<br />

requirements will be competing with population growth on the<br />

coast <strong>and</strong> associated growth in tourism ventures.<br />

It has been indicated during the preparation <strong>of</strong> this plan that in<br />

view <strong>of</strong> the above growth plans for both domestic <strong>and</strong> industrial<br />

water usage, the region may need to identify potential solutions<br />

to potable water constraints.<br />

Two potential projects to manage on-going potable water<br />

supply could be:<br />

� It is proposed in the longer term, to increase the capacity <strong>of</strong><br />

the Borumba Dam to 350,000 mega litres by 2025; 39<br />

� Should the proposed Traveston Crossing Dam be approved,<br />

the region should work with the <strong>Department</strong> <strong>of</strong> Infrastructure<br />

<strong>and</strong> Planning to identify options for water transfer to areas<br />

outside <strong>of</strong> SEQ that have limited access to potable water. 40<br />

Capacity <strong>and</strong> other issues relevant to the supply <strong>of</strong> potable<br />

water to the Bundaberg <strong>and</strong> Fraser Coast regions are<br />

canvassed in Appendix 1 <strong>and</strong> 2.<br />

5 .3 .2 Improving Electricity Supply to the<br />

Regions<br />

Stakeholders noted that with Hervey Bay City’s population<br />

growing at 5% on average per annum, there is pressure on<br />

provision <strong>of</strong> power. Should some <strong>of</strong> the mining rights be<br />

developed within the area over the next few years, more<br />

pressure on electricity supply will become apparent. The State<br />

government has identified <strong>and</strong> commenced work on a number<br />

<strong>of</strong> new initiatives for the area, namely:<br />

� The Isis Central Mill Co-generation Plant was completed in<br />

2006 <strong>and</strong> is currently producing enough “green” energy to<br />

power 7,000 households annually;<br />

� The Maryborough-Hervey Bay electricity supply has been<br />

boosted by the reinforcement <strong>of</strong> a new switching station at<br />

Aramara;<br />

� There has also been the building <strong>of</strong> a 275 kV substation in<br />

the Woocoo Shire to assist in managing electricity for the<br />

rapidly growing Hervey Bay/Wide Bay region; <strong>and</strong><br />

� It will be important that the project committed to rebuild the<br />

66 kV power line network between Childers <strong>and</strong> Gayndah is<br />

undertaken <strong>and</strong> completed on time in mid-2010.<br />

The report notes that these initiatives are supported by the<br />

WBBRP 2007-202641 <strong>and</strong> that the <strong>Department</strong> <strong>of</strong> Infrastructure<br />

<strong>and</strong> Planning (DIP) recognises the critical nature <strong>of</strong> this utility to<br />

the region. Energy will also be considered as part <strong>of</strong> the<br />

Infrastructure Audit by DIP for the region.<br />

5 .3 .3 Improving the Supply <strong>of</strong><br />

Telecommunications Services<br />

It is understood that both regions have unreliable supplies <strong>of</strong><br />

telecommunications services, including: the supply <strong>of</strong> mobile<br />

phone coverage; the supply <strong>of</strong> broadb<strong>and</strong> internet connections;<br />

<strong>and</strong> the supply <strong>of</strong> l<strong>and</strong>line services. The WBBRP 2007-2026 is<br />

supportive <strong>of</strong> the communities having access to modern<br />

information <strong>and</strong> communications technology. 42<br />

It is noted that issues relevant to the supply <strong>of</strong><br />

telecommunications services to the Bundaberg <strong>and</strong> Fraser<br />

Coast regions are federal issues <strong>and</strong> as such projects are not<br />

canvassed in this TOP. It is, however, recommended that steps<br />

be taken to improve the reliability <strong>of</strong> the supply <strong>of</strong><br />

telecommunications services to the regions, not least to ensure<br />

safety <strong>and</strong> convenience.<br />

In regional <strong>and</strong> rural locations where there are national parks,<br />

consideration could be given to safety priority vs. maintaining a<br />

wilderness experience in “isolation” from everyday living.<br />

However, commercial operators do need to be able to be in<br />

contact with their head <strong>of</strong>fices in regard to passenger wellbeing<br />

<strong>and</strong> managing successful operational activities to the<br />

satisfaction <strong>of</strong> customers.<br />

5 .3 .4 Introducing Effective Waste<br />

Management Systems<br />

Wide Bay Water Authority is due to construct both a<br />

wastewater transport system <strong>and</strong> a modern bioreactor<br />

treatment plant to meet the needs <strong>of</strong> Hervey Bay’s growing<br />

population. 43<br />

Generally, however, the regions have good processes for<br />

managing waste water <strong>and</strong> avoiding flows into the coastal<br />

bays. As planned marinas are developed however, there may<br />

be a need for more waste disposal stations which are<br />

connected to sewage treatment plants.<br />

For example, the recently approved (by the State Government)<br />

Urangan Boat Harbour Development will exp<strong>and</strong> the Hervey<br />

Bay harbour, provide an additional 500 berth marina <strong>and</strong> will<br />

enable significant upgrading <strong>of</strong> the road <strong>and</strong> car park<br />

infrastructure to provide a pleasant boulevard with public<br />

boardwalks. As part <strong>of</strong> the development, processes will need to<br />

be in place for the management <strong>of</strong> waste water from the marina<br />

(<strong>and</strong> also fuel/oil run<strong>of</strong>f from additional car parks) to avoid<br />

contamination into the Great S<strong>and</strong>y Strait.<br />

The report notes that waste management initiatives are<br />

supported through the WBBRP 2007-2026. 44<br />

39 SEQ Water Supply Projects, Queensl<strong>and</strong> Water Commission, Factsheet 10, 3 September 2007<br />

40 Identified as a current threat “SEQ’s development <strong>and</strong> express wish to capture <strong>and</strong> pipe water out <strong>of</strong> the WBB region”, Strategic Regional Plan 2007-2010, Wide Bay<br />

Burnett Area Consultative Committee, Page 9<br />

41 Specifically policy framework principle Section 7.5 <strong>of</strong> the regional plan supports these actions<br />

42 Policy framework actions 7.61 a, c, e <strong>and</strong> f.<br />

43 Projects Queensl<strong>and</strong> 2007 Issue 26, Queensl<strong>and</strong> Government 2007, project 277, page 55<br />

44 Policy framework action 7.4.1<br />

27<br />

5 Tourism <strong>and</strong> support<br />

infrastructure opportunities

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!