11.07.2015 Views

Sopwith Camel Manual - Hangar 9

Sopwith Camel Manual - Hangar 9

Sopwith Camel Manual - Hangar 9

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Required Tools and AdhesivesTools• Drill. . • T-pins• Adjustable wrench • Hex wrench: 7/64", 3/32"• Hobby knife• Hobby scissors• Phillips screwdriver• Pliers• Side cutters• Nut driver: 5.5mm• 4-40 tap. .• Tap handle• Crimping tool• Drill bits: 1/16" (1.5mm), 5/64" (2mm), 3/32" (2.5mm).1/8" (3mm), $43, 5/32" (4mm)Adhesives• 6-minute epoxy (HAN8000)• Thin CA. .• Zap-A-Dap-A-Goo• Medium CA• 30-minute epoxy (HAN8002)• Canopy glue• ThreadlockOther Required Items• Epoxy brushes• Felt-tipped pen or pencil• Measuring device (e.g. ruler, tape measure)• Mixing sticks for epoxy• Paper towels• Rubbing alcohol• Masking tape• Sanding bar• Sandpaper• Rotary tool w/sanding drum• Sealing Iron (HAN101)• Covering Glove (HAN150)• Sealing Iron Sock (HAN141)• Soldering iron• Solder. . • Deans connector (male) (3)• Deans connector (female)• Cardstock

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!