11.07.2015 Views

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a. For Softswitch and Media gatewaya) Number of BTCL Engineers 3 (three)b) Number of working days 7 (Seven)c) Per diem charge to BTCLEngineersUS$ 80 (Eighty) per day (includingholidays in between and travel days) perpersond) Other facilities Local TransportationStandard AccommodationMedical Services (if required)Economy Class Return Air Ticketb. For NMS, LAN Switch, Firewall and Session Border Controllera) Number of BTCLEngineers2 (two)b) Number of working days 7 (Seven)c) Per diem charge to BTCLEngineersUS$ 80 (Eighty) per day (including holidays inbetween and travel days) per persond) Other facilities Local TransportationStandard AccommodationMedical Services (if required)Economy Class Return Air Ticketc. For Optical Fiber, GPON, Power System and Access Gatewaya) Number of BTCLEngineers3 (three)b) Number of working days 7 (Seven)c) Per diem charge to BTCLEngineersUS$ 80 (Eighty) per day (including holidays inbetween and travel days) per persond) Other facilities Local TransportationStandard AccommodationMedical Services (if required)Economy Class Return Air Ticketiii) The bidder may propose more number of such CPOC or may propose extendedperiods for such CPOC, if necessary.2.12.2 Provisional Acceptance Test (PAT)Before acceptance of the installed system/ equipment, BTCL representatives shallcarryout, on site, detailed tests of all equipment to ascertain their inter-working abilitywith relevant equipment of the other manufacturers, working reliability, concurrence toagreed technical and other specifications, inventory checking of installed equipment etc.Such tests shall be termed as “Provisional Acceptance Test (PAT)”. Prior tocommencement of such tests, the contractor shall submit a proposed procedure for thePAT to be subsequently passed by BTCL. The PAT, including System Overload Testswill be done by a joint team of BTCL Engineers and bidder’s Engineers.Book 2 :: Tender on Replacement of Old Telephones in Dhaka City Page: 15 of 153

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!