11.07.2015 Views

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

BANGLADESH TELECOMMUNICATIONS COMPANY LIMITED - BTCl

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

at both ends of inter-connecting cable and related service) between its own systemODF/DDF and BTCL’s existing Switching/Transmission ODF/DDF in the samebuilding (if applicable).ii) Probable requirements of the connectors, optical fiber cables, coaxial cables, cabletray etc. should be checked during the survey by the bidder.2.15 Inter-works with the Existing SystemsThe Bidder shall be responsible to ensure that all the system covered by this purchaseshall be able to inter-work with all the existing systems of BTCL. The bidder shall makenecessary survey and shall also be entirely responsible to solve any mismatch, ifencountered.2.16 Installation MaterialThe Bidder shall provide all installation material for all of the equipment covered by thispurchase. The material shall include all type local material like fuel, power etc necessaryto be used during installation and testing functions.2.17 Installation and Commissioning ServicesThe Bidder shall be responsible to provide all services related to installation, testing,commissioning and cut-over services for all equipment covered by this purchase.2.18 Survey, Network Planning & Design Servicesi) As part of its turn-key responsibility, the successful bidder shall be responsible toprovide all services related to installation survey, planning & design for allequipment/ system covered by this purchase.ii) A report shall be submitted to BTCL’s relevant office after completion of that work.2.19 DocumentationThe successful bidder shall supply at least (but not limited to) the following documentsbefore PAT of each site.Technical on line documentation for all equipment of each site in the operating consoleand 1(one) set in CD ROM. Such on line document in control console shall include (butnot limited to) the following:i) System descriptionii) Input/ command manual & output manual (including on line help menu) with detailexplanation of each parameteriii) Alarm dictionary with detail explanationiv) Fault / Malfunction dictionary with detail explanation.v) Maintenance manual.vi) As-built installation drawings for all equipment: 2 (two) set in hard copy; per site.vii) Station AC power wiring diagrams: 2 (two) set in hard copy per site.viii) Detail technical document for NMS: 1 (one)set in CD and 1 set in hard copy.ix) PAT documents for each sitex) Earthing diagram, 2 (one) set per siteBook 2 :: Tender on Replacement of Old Telephones in Dhaka City Page: 21 of 153

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!